The Pre-Proposal Conference Instructions document relates to a Department of Energy Fermi National Accelerator Laboratory solicitation (LBNF-RFP-367397-JEE) for a Thin Sprayed on Liner (TSL) Application Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The opportunity is for applying TSL to shotcrete liner at the SURF facility in Lead, SD, with a focus on testing and potential future task orders. Up to three IDIQ subcontracts will be awarded under NAICS 23832, with the initial Task Order 1 covering lab testing, field trials, and test reporting.

Key operational details include work performed at the 4850 Level, accessed through the Ross Shaft with limited equipment dimensions (4'6" x 12' long), and work access available 5 days per week, 24 hours per day. Bull Gang support is required for surface and underground work from 7 AM - 5 PM and 7 PM - 5 AM Monday through Friday. The expected start date is July 2025, with an anticipated kick-off meeting to be scheduled after subcontract award. Contractors should anticipate approximately 7 additional work stoppages per year due to extreme weather conditions in South Dakota. The test application will be conducted in the 4850-40 Spray Chamber, with subsequent task orders dependent on the performance and results of the initial testing phase.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

May 5, 2025

Subject: Letter of Instruction – Pre-Proposal Conference for RFP No. LBNF-367397 (TSL Application at SURF)

Dear Offerors, Fermi Forward Discovery Group, LLC (FFDG) invites interested Offerors to participate in the Pre-Proposal Conference for Request for Proposal (RFP) No. LBNF-367397 concerning the Thin Sprayed-on Liner (TSL) application under the Long-Baseline Neutrino Facility (LBNF)/Deep Underground Neutrino Experiment (DUNE) Project. The conference will occur at the Sanford Underground Research Facility (SURF), Lead, South Dakota.

1. Conference Details Date: May 14, 2025

· Time: 8:00 AM – 12:00 PM MST (as specified in Section L18 of the RFP)

· Location: SURF Conference Facility, 100 Ross Street, Lead, SD 57754

· Onsite Meeting: Begins at 8:00 AM local time

· Underground Tour: Will immediately follow the formal meeting session

· Virtual Option: Teleconference details will be provided upon RSVP confirmation

2. Purpose The Pre-Proposal Conference will:

· Review the technical scope, schedule, and evaluation criteria of RFP No. LBNF-367397

· Provide Offerors with a clearer understanding of the Statement of Work (Attachment J-4), deliverable expectations, and safety/compliance standards

· Include a walkthrough of the 4850L “Spray Chamber” for onsite attendees

· Allow for open discussion and clarification of Offeror questions

3. RSVP Requirements All offerors must confirm attendance no later than May 9, 2025 at 5:00 PM MST by email to all three of the following contacts:

· Joe Eagleston – joeeagle@fnal.gov

· Russell Olliff – rolliff@fnal.gov

· Jodi Campbell – jodic@fnal.gov

Please include the following in your RSVP:

· Full legal name and email address for each attendee (including lower-tier subcontractors)

· Indicate whether the individual will participate onsite or virtually

4. Safety, PPE, and Training Requirements

· PPE Required: Hard hat, steel-toe boots, safety glasses, and reflective safety vest (per RFP Section L18)

· Self-Rescuers: W65 self-rescuers will be provided by FFDG for all participants entering the underground site

· Prequalification Safety Training: Will be conducted onsite by FFDG on the morning of the visit – no pre-training is required before arrival

5. Site Access Instructions For all onsite attendees, Fermilab site access approval is required in advance. Each attendee must:

· Complete the Fermilab Access Request Form (Access Request Form)

· Submit a scanned copy of a REAL ID-compliant driver’s license (REAL ID-compliant document) or passport and visa documentation if applicable (Visa documents)

· Select “LBNF – Long Base Neutrino Facility” as the affiliation and “Procurement Meeting” as the purpose of the visit

· Indicate visit date: May 14, 2025

· Point of Contact: Shane Good

Access Request Form Instructions

Reason for access request
Business Visitor
Have you visited the lab before?
If yes, find previous information
What Fermilab affiliation will you be visiting?
LBNF - Long Base Neutrino Facility
Point of Contact (click on magnifying glass)
Shane Good
Purpose of Visit
Procurement Meeting
Description of visit
Pre-proposal meeting for spray liner proposal
Is your request onsite or virtual
Onsite
From (Date)
3/14/2025
To (Date)
3/14/2025
What Fermilab site will you be visiting
Lead, SD
What Building will you be visiting
South Dakota
Enter your personal information
Enter your personal information

6. Additional Notes

· Questions asked during the conference will be documented and included in an RFP Addendum

· Proposals remain due May 30, 2025, at 5:00 PM MST, as stated initially

· Attendance, while optional, is highly encouraged

We thank you for your interest in supporting the LBNF/DUNE Project and look forward to your participation.

File details come from the government source that posted it. Updated .