Lake Wee-Ma-Tuk Dams - Stevens Lake Plan Sheets.pdf
PDF 10 MB Posted
- Attached to
- AML 2304 Wee Ma Tuk Dams
- Solicitation number
- 26-422DNR-MINES-B-50946
- Issued by
- Illinois
About this file
Lake Wee-Ma-Tuk Dams - Stevens Lake Plan Sheets
This document is a comprehensive set of plan sheets for the Lake Wee-Ma-Tuk Dams project, prepared by the Illinois Department of Natural Resources, Office of Mines and Minerals. The project encompasses modifications to four dams in Fulton County, Illinois: Long Lake, Stevens Lake, Hanks Lake, and McCamey Lake. The Stevens Lake Dam plan sheets detail extensive earthwork, drainage infrastructure, paving, and erosion control work across multiple roadways including Wee-Ma-Tuk Road, Chippewa Drive, Blackfoot Drive, and an access road. Key project quantities include 2,855 cubic yards of earth excavation, 2,163 cubic yards of borrow excavation for embankment fill, 1,774 square yards of aggregate base course, 964 square yards of stone riprap, 7,737 square yards of topsoil restoration, and 1.63 acres of seeding. The project involves installation of multiple pipe culverts ranging from 8 inches to 48 inches in diameter, reinforced concrete structures including a 10-foot diameter manhole with walkway, filter fabric applications, and various storm sewer systems with flared end sections and controlled low-strength material (flowable fill) backfill specifications.
The plan sheets specify detailed technical requirements including riprap basin sizing with reinforced concrete weir structures, guardrail installations, and comprehensive erosion control measures utilizing erosion control blankets, sediment control checks, temporary ditches, and inlet protection basins. Soil boring logs document subsurface conditions across six boring locations with ground surface elevations ranging from approximately 616.87 to 630.07 feet, revealing silty clay, gravel, sand, coal seams, and shale deposits at varying depths. The sheets include multiple schedule tables detailing drainage specifications, paving requirements, seeding and erosion control locations by station, and earthwork calculations with provisions for unsuitable material removal and borrow excavation approval by the project engineer. Design work was completed on August 30, 2024, with plot dates of October 29 and 31, 2024, indicating recent finalization of construction documents for this state-sponsored infrastructure improvement project in Fulton County.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scale Station From Station To Contract
ILLINOIS
TOTAL
SHEETS
SHEET
NO.
DATE
DESIGNED
CHECKED
DRAWN
REVISED -
REVISED
REVISED
REVISED
SECTIONF.A.P. RTE.
SCALE: SHEETS
Route FULTON
$MODELNAME$
USER NAME RMM=
PLOT DATE = 8/30/2024
LAKE WEE-MA-TUK 2024
SHEET NO. OF
BTM
RMM
COUNTYSTATE OF ILLINOIS
DEPARTMENT OF NATURAL RESOURCES
OFFICE OF MINES & MINERALS
EXTRACTION_TYPE
SUMMARY OF QUANTITIES
LAKE WEE-MA-TUK DAMS PROJECT 4
TON 100.00 25.00 25.00 25.00 25.00
ILLINOIS
TOTAL
SHEETS
SHEET
NO.
DATE
DESIGNED
CHECKED
DRAWN
REVISED -
REVISED
REVISED
REVISED
SECTIONF.A.P. RTE.
SCALE: SHEETS
Route FULTON
$MODELNAME$
USER NAME RMM=
PLOT DATE = 8/30/2024
LAKE WEE-MA-TUK 2024
SHEET NO. OF
BTM
RMM
COUNTYSTATE OF ILLINOIS
DEPARTMENT OF NATURAL RESOURCES
OFFICE OF MINES & MINERALS
EXTRACTION_TYPE
SUMMARY OF QUANTITIES
LAKE WEE-MA-TUK DAMS PROJECT 5
ILLINOIS
TOTAL
SHEETS
SHEET
NO.
DATE
DESIGNED
CHECKED
DRAWN
REVISED -
REVISED
REVISED
REVISED
SECTIONF.A.P. RTE.
SCALE: SHEETS
Route FULTON
$MODELNAME$
USER NAME RMM=
PLOT DATE = 8/30/2024
LAKE WEE-MA-TUK 2024
SHEET NO. OF
BTM
RMM
COUNTYSTATE OF ILLINOIS
DEPARTMENT OF NATURAL RESOURCES
OFFICE OF MINES & MINERALS
EXTRACTION_TYPE
SUMMARY OF QUANTITIES
LAKE WEE-MA-TUK DAMS PROJECT 6
63000003
63100167
STEEL PLATE BEAM GUARDRAIL, TYPE A, 9 FOOT POSTS
TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT
550A2630
ILLINOIS
TOTAL
SHEETS
SHEET
NO.
DATE
DESIGNED
CHECKED
DRAWN
REVISED -
REVISED
REVISED
REVISED
SECTIONF.A.P. RTE.
SCALE: SHEETS
Route FULTON
$MODELNAME$
USER NAME RMM=
PLOT DATE = 8/30/2024
LAKE WEE-MA-TUK 2024
SHEET NO. OF
BTM
RMM
COUNTYSTATE OF ILLINOIS
DEPARTMENT OF NATURAL RESOURCES
OFFICE OF MINES & MINERALS
EXTRACTION_TYPE
LAKE WEE-MA-TUK DAMS PROJECT 7
ILLINOIS
TOTAL
SHEETS
SHEET
NO.
DATE
DESIGNED
CHECKED
DRAWN
REVISED -
REVISED
REVISED
REVISED
SECTIONF.A.P. RTE.
SCALE: SHEETS
Route FULTON
$MODELNAME$
USER NAME RMM=
PLOT DATE = 8/30/2024
LAKE WEE-MA-TUK 2024
SHEET NO. OF
BTM
RMM
COUNTYSTATE OF ILLINOIS
DEPARTMENT OF NATURAL RESOURCES
OFFICE OF MINES & MINERALS
EXTRACTION_TYPE
LAKE WEE-MA-TUK DAMS PROJECT 8
STONE RIPRAP STONE RIPEAP FILTER
CLASS A3 CLASS A4 FABRIC
(SQ YD) (SQ YD) (SQ YD)
28100105 28100107 28200200
WEE‐MA‐TUK RD
24+92.77 LT 25+26.56 LT 108 108
CHIPPEWA DRIVE
9+50.00 RT 13+60.00 RT 964 964
BLACKFOOT DRIVE
82 82
TOTAL = 964 190 1,154
RIP RAP SCHEDULE
STATION LT/RT STATION LT/RT
TRENCH PIPE CULV, CL D, METAL FLARED END METAL FLARED END PRC FLARED END PRC FLARED END RC PIPE TEE PIPE CULVERTS STORM SEWERS, RUBBER STORM SEWERS, RUBBER STORM SEWERS STORM SEWERS CONTROLLED LOW‐ PIPE UNDERDRAINS MH, TA, 5' DIA MH, TA, 6' DIA MH, TA, 10' DIA BACKFILL TY 1 12" (TEMP) SECTIONS 12" SECTIONS 24" SECTIONS 24" SECTIONS 48" 48" w/ 24" RISER CL A, TY 2 30" GASKET, CL A, TY 1 48" GASKET, CL A, TY 2 48" CL B, TY 1 12" CL B, TY 1 24" STRENGTH MAT'L 8" (SPECIAL) T1F, CLID T1F, CLID T1F, CLID (CU YD) (FOOT) (EACH) (EACH) (EACH) (EACH) (EACH) (FOOT) (FOOT) (FOOT) (FOOT) (FOOT) (CU YD) (FOOT) (EACH) (EACH) (EACH) 20800150 5421D012 54262712 54262724 54213669 54213693 54217722 542A1075 550A2420 550A2620 550B0050 550B0120 59300100 60108300 60221100 60223800 X6022110
WEE‐MA‐TUK RD
25+04.15 132.41' LT 25+01.44 124.70' LT 1
25+01.44 124.70' LT 24+84.89 79.41' LT 48
24+84.89 77.53' LT 24+82.90 71.86' LT 1
24+75.56 77.36' LT 24+80.58 75.33' LT 1
24+82.90 71.86' LT 24+42.60 43.00' RT 119
24+58.70 14.00' LT 24+56.50 14.50' RT 86
24+42.60 43.00' RT 1
24+25.00 21.61' RT 24+42.60 43.00' RT 1 22
24+54.66 16.83' RT 24+69.17 21.50' RT
24+69.17 21.50' RT 24+75.00 23.35' RT 1 27
24+42.60 43.00' RT 24+20.92 104.74' RT 60
24+90.35 22.08' LT 24+96.30 15.80' RT 18
26+34.00 13.70' RT 26+66.00 13.90' RT 32
26+25.00 28.72' RT 27+50.00 28.00' RT 1 120 1
27+50.00 28.00' RT 28+50.00 31.51' RT 1 93
CHIPPEWA DRIVE
9+66.88 0.94' LT 09+84.31 14.45' LT 9
10+21.00 26.50' LT 13+25.00 31.89' LT 283
12+48.00 17.00' LT 12+63.00 14.00' RT 53
12+52.30 20.00' LT 1
12+50.00 46.00' LT 12+50.00 39.00' LT 7
BLACKFOOT DRIVE
62 84 46
TOTAL = 175 32 1 3 1 1 1 84 48 179 22 240 99 290 1 1 1
STATION OFFSET STATION OFFSET
DRAINAGE SCHEDULE
AGG BASE AGG SURFACE BIT SURFACE BIT MATERIALS WEATHERING WEATHERING STEEL
COURSE, TA 8" COURSE, TA 6" TREATMENT, A3 (FOG SEAL) STEEL PLATE BEAM TRAFFIC BAR TERM
(SQ YD) (SQ YD) (SQ YD) (POUND) GUARD RAIL T1, SPL (TANG), MOD
35100700 40200500 X1500006 X4060107 (FOOT) (EACH)
WEE‐MA‐TUK RD
22+34.00 TO 26+00.00 866 866 217
22+75.00 LT 23+75.00 151
CHIPPEWA DRIVE
9+42.56 TO 13+50.00 757 757 190
9+96.00 TO 10+21.00 1
10+21.00 TO 13+51.00 330
13+51.00 TO 13+76.00 1
ACCESS ROAD
0+10.00 TO 2+26.38 318
BLACKFOOT DRIVE 151 151 38
TOTAL 1,774 469 1,774 445 330 2
STATIONSTATION TO
PAVING & GUARD RAIL SCHEDULE
TREE REMOVAL PIPE CULVERTS TO REMOVE
ACRES 8" PVC 12" CMP 12" PVC 15" PVC 24" CMP BE CLEANED 18" EX RIPRAP
(ACRES) (FOOT) (FOOT) (FOOT) (FOOT) (FOOT) (FOOT) (SQ YD)
20100500 60920018 X0323265
CHIPPEWA DRIVE 0.3
09+66.88 0.94' LT 09+84.31 14.45' LT 22
12+48.59 17.04' RT 12+54.44 21.83' LT 40
12+53.20 18.59' RT 12+56.96 21.04' LT 40
WEE‐MA‐TUK ROAD 0.1
23+97.60 117.01' LT 24+08.48 101.00' LT 20
24+90.35 22.08' LT 24+93.96 16.02' RT 39
24+92.20 22.27' LT 24+96.31 15.80' RT 39
24+84.70 76.42' LT 25+16.48 163.77' LT 93 100
29+68.36 36.79' LT 30+03.46 70.50' RT 113
BLACKFOOT DRIVE
SUB‐TOTAL = 0.4 113 149 40 39 93 20 100
TOTAL = 0.4 20 100434
STATION LT/RT STATION LT/RT
PIPE CULVERT REMOVAL
50105220
REMOVAL SCHEDULE
T1, SPL (TANG),
TOPSOIL GRD & SHAP SEEDING NITROGEN PHOSPHORUS POTASSIUM MULCH H D EROSION TEMP EROSION TEMP DITCH PER EROSION INLET AND WASHOUT F & P, 4" DITCHES CLASS 1 FERT NUTRIENT FERT NUTRIENT FERT NUTRIENT METHOD 1 CNTRL BLNKT CONT SEEDING CHECKS BARRIER PIPE PROT BASIN (SQ YD) (FOOT) (ACRE) (POUND) (POUND) (POUND) (ACRE) (SQ YD) (POUND) (FOOT) (FOOT) (EACH) (L SUM) 21101615 21400100 25000100 25000400 25000500 25000600 25100105 25100635 28000250 28000305 28000400 28000500 X0326806
WEE‐MA‐TUK RD
22+34.00 LT 25+25.00 LT 2,902 0.60 54 54 54 0.60 30
21+50.00 RT 30+00.00 RT 2,249 0.47 43 43 43 0.47 24
21+50.00 RT 30+00.00 RT 84
22+65.00 14' LT 23+93.00 121' LT 176
23+04.00 13' LT 24+10.00 97' LT 146
23+97.60 117' LT 1
24+08.48 101' LT 24+74.80 77' LT 71
24+25.00 21' RT 1
24+56.00 LT 25+61.00 LT 112
24+74.80 77' LT 1
24+75.00 31' RT 1
28+50.00 32' RT 1
CHIPPEWA DRIVE
9+00.00 RT 11+05.00 RT 556 0.12 11 11 11 0.12 6
9+72.00 RT 13+75.00 RT 393
9+80.00 LT 13+70.00 LT 1,134 0.24 22 22 22 0.24 12
12+60.30 29' RT 1
12+73.00 RT 13+75.00 RT 104 0.03 3 3 3 0.03 112 2
ACCESS ROAD
0+10.00 LT/RT 2+26.38 LT/RT 642 0.14 13 13 13 0.14 223 7
BLACKFOOT DRIVE
N/A 150 0.03 3 3 3 0.03
AS DIRECTED 1
TOTAL = 7,737 71 1.63 149 149 149 1.63 657 81 84 505 6 1
STATION LT/RT STATION LT/RT
SEEDING AND EROSION CONTROL SCHEDULE
Location
Earth
Excavation 20200100
Earth Excavation No Adjustment For Shrinkage
Unsuitable Material
Borrow
Excavation (Embankment)
Earthwork Balance
Waste (+) or Shortage (‐)
Cubic Yard Cubic Yard Cubic Yard Cubic Yard Cubic Yard Lake Stevens Dam
Benching Excavation 962 962 962 0 Chippewa Drive
Sta 9+50.00 to 13+50.00 304 304 304 1,315 ‐1,315 Wee‐Ma‐Tuk Road
Sta. 20+00.00 to 29+50.00 1,281 1,281 1,281 817 ‐817 Access Road
Sta. 0+10.00 to 2+26.38 207 207 207 30 ‐30 Blackfoot Drive
101 101 101 1 ‐1
TOTAL 2,855 2,855 2,855 2,163 ‐2,163
Columns 1 & 2 Location and Quantities from Cross Sections: Earth Excavation = Cut Column 3 Quantity of Earth Excavation (Cut) With No Adjustment for Shrinkage Column 4 Quantity of Earth Excavation (Cut) Not Suitable for Use in Dam, to be removed.
Column 5 Quantities from Cross Sections: Embankment = Fill Column 6 Earthwork Required ‐ Note: All Borrow Excavation to be Approved for Use in Dam
(‐) = Quantity of Fill or Embankment needed (Borrow Excavation‐20400100) (+) = Quantity to be Wasted
Note: Excavation from Column 4, containing no organic material or roots, may be usable in Wee‐Ma‐Tuk Road Embankment and for restoring The Access Road area, if approved by The Engineer.
Topsoil from Column 4, containing no roots, may also be used for The Project, as Approved and Directed By The Engineer.
EARTHWORK SCHEDULE
63000003
63100167
63100167
0 20 40 60
SCALE IN FEET
S U
R V
E Y
E D
P L
O T
T E
D
B Y
D A
T E
N O
T E
B
O O
K
N O
P L
A N
A L
IG
N M
E N
T
C
H E
C K
E D
R T
O F
W A
Y
C
H E
C K
E D
C A
D D
F
IL
E
N
A M
E
P R
O F
IL
E S
U R
V E
Y E
D
P L
O T
T E
D
G R
A D
E S
C
H E
C K
E D
B .M
N O
T E
D
S T
R U
C T
U R
E
N
O T
A T 'N
S
C
H 'K
D
B Y
D A
T E
N O
T E
B
O O
K
N
SECTION COUNTY
ILLINOIS FED. AID PROJECT
FULTON 45 19
TOTAL
SHEETS
SHEET
NO.RTE.
LAKE WEE-MA-TUK 2024
CONTRACT NO.
SCALE: 1" = 20'
OFFICE OF MINES AND MINERALS
DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOIS
jbegue=USER NAME
50.0000 ' / in.=PLOT SCALE
10/31/2024=PLOT DATE
DESIGNED REVISED
REVISED
REVISED
REVISEDDATE
DRAWN
CHECKED
F.A.
WOODS LAKE DAM
PLAN AND CULVERT PROFILE - BLACKFOOT DRIVE
SHEET 6 OF 6 SHEETS STA. N/A TO STA. N/A
JEB
JEB
RHD
8/30/2024
D e fa u lt
Z
V a n d
K
Jo b s \6
K n ig h t
E A
W S P \6
-0
L a k e -M a -T u k
H il ls a n d
B u w ic k
D a m s \C
A D
D
S h e e ts \1
-P
P B la c k fo o t.
d g n
F
IL
E
N
A M
E
M O
D E
L
01020304050 10 20 30 40 50
N
EE-M
A -T
U K
R O A D
B L
A C
K F
O
T
R
IV
E
EX 12" CMP
MATERIALS & QUANTITIES.
SEE "PAVING SCHEDULE" FOR ADDITIONAL
151 SQ YD
AGGREGATE BASE COURSE, TYPE A, 8"
35100700
PR A-3 SURFACE TREATMENT ON
62 CU YD
TRENCH BACKFILL
20800150
PLUNGE POOL
BOTTOM ELEV 628.70
6"
O D S L
AKE
6"
2 - 30" @ 2.05% 7
TOP OF CAST-N-PLACE
0.15 CU YD
ELEV 631.37
CONCRETE WEIR
14'-0" LONG
1 - #4 BAR
WEIR WALL PLACEMENT DETAIL
INV 630.80
END OF APRON
USFL 630.73
6"x7"x14'-4" WEIR WALL
SECTION, DUAL 30" w/
REINFORCED CONCRETE END
FILTER FABRIC
16" THICK RR4 ON 6" BEDDING
STONE RIP RAP, CLASS A4
DSFL ELEV 629.87
USFL ELEV 630.73
30" x 42' @ 2.05% = 84 FOOT
2 - PIPE CULVERTS, CLASS A, TYPE 2
542A0235
82 SQ YD
FILTER FABRIC
28200200
82 SQ YD
16" THICK RR4 ON 6" BEDDING
STONE RIPRAP, CLASS A4
28100107
PROT COAT = 7.4 SQ YD
REINF BARS = 95 POUNDS
CONC STRUC = 1.90 CU YD
INV ELEV 629.80
E = 2,303,696.663
N = 1,406,724.706
NW INV RCES APRON
END SECTION, DUAL 30"
REINFORCED CONCRETE
PROT COAT = 7.4 SQ YD
REINF BARS = 95 POUNDS
CONC STRUC = 2.05 CU YD
INV ELEV 630.80
E = 2,303,731.607
N = 1,406,690.834
SE INV RCES APRON
CONCRETE WEIR (SEE DETAIL)
DUAL 30" w/ 6"x7" CAST-IN-PLACE
REINF CONCRETE END SECTION
(SEE SPECIAL PROVISIONS) CLSM = 46 CU YD
PIPE AND THE TRENCH THRU THE EMBANKMENT OF BLACKFOOT DRIVE.
BOTTOM OF THE TRENCH, TO REMOVE ALL AIR POCKETS, AND TO ELIMINATE SEEPAGE PATHS ALONG THE
PIPES BETWEEN THE HEADWALLS TO ASSURE CONSISTENT CONTACT WITH THE PIPE, THE SIDEWALLS, AND
TO MIDPOINT OF 30" PIPES. THE CLSM MUST BE VIBRATED INTO PLACE FOR THE ENTIRE LENGTH OF THE
59300100 - USE CONTROLLED LOW-STRENGTH MATERIAL (FLOWABLE FILL) FOR PIPE BEDDING AND BACKFILL
WVWV
WV
WV
WV
WV
E =
N =
EXISTING 12" CMP - 48' @ 2.0%| (TBR)
G
T
2.5% 2.5%
:1
6% 6%
6%
30" x 42' @ 2.05%
PR 2 - CULVERTS, CLASS A TYPE 2
W
~ "R-O-W" BLACKFOOT DRIVE
R T
A P
P R
O X
P
R O P
E R
T Y
L I N
E
INV 630.80
END OF APRON
INV 629.80
END OF APRON
EACH END
IDOT STANDARD 542116
MULTIPLE PIPE CULVERTS
REINF CONC END SECTIONS FOR
.5 :1
ELEV 629.80
APRON
TOP OF RIPRAP
L T
A P
P R
O X
P
R O P
E R
T Y
L I N
E
AGGREGATE BASE COURSE, TYPE A, 8"
PROPOSED A-3 SURFACE TREATMENT ON
FIELD VERIFY ACTUAL LOCATIONS.
UTILITIES SHOWN ARE APPROXIMATE.
NOTE:
L T
A P
P R
O X
E
A S
E M
E N
T
L I N
E
10'| 11.00'
PIPE REQUIRES ADJUSTMENT
REMAIN CONSTANT EVEN IF
WIER, TOP ELEV 631.37 TO
CAST-IN-PLACE CONCRETE
AGGREGATE BASE COURSE.
BACKFILL TO BOTTOM OF PR 8"
MIDPOINT OF PIPES, THEN TRENCH
PIPE "HAUNCH" TO BE CLSM UP TO
DSFL 629.87
USFL 630.73
PGL
HEIGHT
LOCATION PIPE RIPRAP POOL APRON DEPTH ABOVE RIPRAP THICKNESS THICKNESS
STATION SIZE AREA LENGTH LENGTH OF POOL] INVERT GRADE 1 N
(SQ YD) (FEET) (FEET) (FEET) (FEET) (FEET) (FEET)
STEVENS LAKE DAM
WEE‐MA‐TUK ROAD
LT 25+04.15 48" 98 22 19 2.2 2.5 RR4 2.5 1.9
WOODS LAKE
BLACKFOOT DRIVE 2@30" 82 11 16 1.1 2.6 RR4 2.5 1.9
RIPRAP BASIN SIZING
0 2
SCALE IN FEET
4 6
SECTION COUNTY
ILLINOIS FED. AID PROJECT
FULTON 45 22
TOTAL
SHEETS
SHEET
NO.RTE.
LAKE WEE-MA-TUK 2024
CONTRACT NO.
SCALE: NONE
OFFICE OF MINES AND MINERALS
DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOIS
jbegueUSER NAME =
PLOT SCALE = 10.0000 ' / in.
PLOT DATE = 10/29/2024 DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
F.A.
STEVENS LAKE DAM PROJECT
DETAILS - MANHOLE, TYPE A 10' DIAMETER
SHEET 1 OF 1 SHEET STA. TO STA.
JEB
JEB
RHD
8/30/2024 fa u lt
Z
V a n d
K
Jo b s \6
K n ig h t
E A
W S P \6
-0
L a k e -M a -T u k
H il ls a n d
B u w ic k
D a m s \C
A D
D
S h e e ts \1
-T e n
F o o t
M a n h o le
D e ta il s .d g n
F
IL
E
N
A M
E
M O
D E
L
~ WALKWAY
90°
AS MEASURED ALONG INSIDE FACE OF WALL
13.34' OF WALL
18.08' OF OPENINGS
ELEVATION - WALKWAY AND MANHOLE, TYPE A 10' DIAMETER
NOT TO SCALE
LOOKING NORTHERLY
RT STA 12+60.30 (CHIPPEWA DRIVE)
PLAN - TOP SECTION OF MANHOLE
2'-7†"
2'-7†"
1'-3Ž"
1'-3Ž"
4'-3‚"
4'-3‚"
4'-9‚"
4'-9‚"
2'-8"
2'-8"
4'-6"
3'-6"
~ WALKWAY
P
N
C H I P
P E
I V
E
PLAN - WALKWAY
STA 12+60.30
LOCAL TANGENT
90° 00' 00" @ 2' } OPENING
A
A
FLAT SLAB TOP
2" C
L (T
YP)
#4 BAR, 5'-8" RADIUS
1'-2"
11'-8"
PLAN - FLAT SLAB TOP PLAN - FLAT SLAB TOP
SHOWING TOP REINFORCEMENT SHOWING BOTTOM REINFORCEMENT
2'- 0" Ø O
PENI
NG
1'-2" RADIUS
#4 RING STEEL
2 SPACES AT 3" OC = 6"
2 SPACES AT 3" OC = 6"
3 SPACES AT 12" OC = 3'-0"
2 SPACES AT 12" OC = 2'-0"
12"OC = 7'-0"
7 SPACES @
2 SPACES AT 3" OC = 6"
6"
1'-0"
6"8"
#7 BAR, 5'-8" RADIUS
11'-8"
2" C
L (T
YP)
2'- 0" Ø O
PENI
NG
1'-2" RADIUS
#7 RING STEEL
4 SPACES AT 10" OC = 3'-4"
2 SPACES AT 3" OC = 6"
2 SPACES AT 10" OC = 1'-8"
2 SPACES AT 3" OC = 6"
4 SPACES AT 10" OC = 3'-4"
2 SPACES AT 3" OC = 6"
10"OC = 6'-8"
8 SPACES @8"
1'-0"
10"
6"
7"
7"
RAILING
90°
SCALE: 1" = 5'
1'-8" 2'-4"
2'-0"
LAKE
STEVENS
2'-0"
4'-0"
3 SPACES AT 12" OC = 3'-0"
F F
I L
R
15.52' RT
*12+56.79
15.52' RT
*12+63.63
FACE OF GUARDRAIL
@ ~ WALKWAY
EDGE OF SHOULDER
= 7'-4"
SPACES @ 3'-8"
2 RAIL POST2'-0"
2.0%
FLAT SLAB TOP
O P E N
O P E N
PR ~ N CHIPPEWA DRIVE
DAM
LAKESTEVENS
LAKESTEVENS
9'-6ƒ" MIN
10' DIA MANHOLE
2% MIN SLOPE
INV ELEV 617.00
6%
48" x 60' @ 5.83%
STORM SEWERS, CL A, TY 2
OUTLET PIPE
.5
15'-5"
ELEV 632.00
ELEV 630.00
3 RAIL POSTS
IN PLAN VIEW)
(SPACE AS SHOWN
EACH SIDE
APPROVED ALTERNATE.
4" (EMBEDDED) OR
TYPE 1 FRAME, CLOSED LID
LAKE FULL POOL
ELEV 627.43
VARIES
3'-1"
A
A
CLEAR WALKWAY.
POSITIONED TO
GUARDRAIL POSTS,
RAILING (42" HEIGHT)
@ ~ WALKWAY
EDGE OF SHOULDER
WALKWAY
EOS 630.70
EOP 631.06
14'-0"
8'-0" 6'-0"
(SPACED AS SHOWN)
FIELD CUT AS NEEDED
#4 BARS EACH WAY
(SPACED AS SHOWN)
FIELD CUT AS NEEDED
#7 BARS EACH WAY
WEST ABUTMENT
WEST ABUTMENT
EAST ABUTMENT
EAST ABUTMENT
1'-3†"
= 7'-4"
SPACES @ 3'-8"
2 RAIL POST
1'-3†"
(TYP)
1'-0"
PGL 631.22
13.6%
FOR OTHER SPACING.
WITH 6'-3" SPACING. ADJUST ACCORDINGLY
POSTS, POSITIONED TO CLEAR WALKWAY
*STA/OFFSET FOR CENTER OF GUARDRAIL
2.1 B
0.8 B
1.5 B
1.1 B
1.1 B
4.0 P
2.2 B
1.3 B
0.8 S
2.8 S
1.9 S
1.2 S
OIL + CHIP
SILTY CLAY - Brown + Gray, Medium-Stiff becomes Stiff
LL = 39 %, PL = 17 %, PI = 22%
becomes Brown, Wet
CLAYEY SHALE - Olive-brown Shelby Tube Dry Unit Weight=96.2pcf, Max Shear Strength w/5 psi confining pressure=0.26tsf SILTY CLAY - Brown + Gray, Stiff
COAL - Loose
COAL - Loose (continued)
SILTY CLAY - Brown + Gray, Very Stiff
SHALE - Weathered, Hard
End of Boring
100/3"
628.9
616.1
614.1
612.1
608.1
605.6
589.1
M O I S T
(/6")
B L O W S
(tsf)
U C S
Qu
(%)(ft)
D E P T H
-5
-10
-15
-20
Groundwater Elev.:
HAMMER TYPEHSA AUTO
618.1 624.1
DRILLING METHOD
The Unconfined Compressive Strength (UCS) Failure Mode is indicated by (B-Bulge, S-Shear, P-Penetrometer) The SPT (N value) is the sum of the last two blow values in each sampling zone (AASHTO T206)
BBS, form 137 (Rev. 8-99)
Surface Water Elev.
After ft ft
First Encounter
SOIL BORING LOG
ft ft ft
Upon Completion Hrs.
Stream Bed Elev.
SECTION
Fulton
SL-01
629.11
Station
COUNTY
Station
Ground Surface Elev.
BORING NO.
LOGGED BYROUTE
Offset ft
1/30/23
KEGWee Ma Tuk Dams - Stevens Lake Dam
STRUCT. NO.
DESCRIPTION
Page
Date of
LOCATION 40.5315739°,-090.1435040°
Division of Highways
Illinois Department of Transportation
M O I S T
(/6")
B L O W S
(tsf)
U C S
Qu
(%)(ft)
D E P T H
-25
-30
-35
-40
2.0 B
1.1 B
3.5 B
1.0 P
0.6 B
0.6 B
1.6 B
0.9 B
2.1 B
5.7 B
SILTY CLAY - Brown + Gray, Stiff becomes medium stiff w/ trace Sand, Gravel, and Coal Shelby Tube Dry Unit Weight=100.4pcf becomes soft
COAL - Dry
COAL - Dry (continued)
SILTY CLAY - Brown + Gray, Stiff
SHALE - Hard
End of Boring
611.9
606.9
598.4
590.9
M O I S T
(/6")
B L O W S
(tsf)
U C S
Qu
(%)(ft)
D E P T H
-5
-10
-15
-20
Groundwater Elev.:
HAMMER TYPEHSA AUTO
609.9 622.9
DRILLING METHOD
The Unconfined Compressive Strength (UCS) Failure Mode is indicated by (B-Bulge, S-Shear, P-Penetrometer) The SPT (N value) is the sum of the last two blow values in each sampling zone (AASHTO T206)
BBS, form 137 (Rev. 8-99)
Surface Water Elev.
After ft ft
First Encounter
SOIL BORING LOG
ft ft ft
Upon Completion Hrs.
Stream Bed Elev.
SECTION
Fulton
SL-02
627.94
Station
COUNTY
Station
Ground Surface Elev.
BORING NO.
LOGGED BYROUTE
Offset ft
1/30/23
KEGWee Ma Tuk Dams - Stevens Lake Dam
STRUCT. NO.
DESCRIPTION
Page
Date of
LOCATION 40.5318810°,-090.1435184°
Division of Highways
Illinois Department of Transportation
M O I S T
(/6")
B L O W S
(tsf)
U C S
Qu
(%)(ft)
D E P T H
-25
-30
-35
-40
JDS
11/21/2025
3.3
2.8 B
0.3 P
0.4 B
0.3 P
0.5 B
0.5 P
1.2 S
3.3 S
3.1 S
3.7 S
GRAVEL
SILTY CLAY - Brown + Gray, Stiff becomes Brown, Soft becomes Brown + Gray
LL = 42 %, PL = 17 %, PI = 25%
SAND - Fine to Coarse, w/ Trace Gravel, Wet
SAND - Fine to Coarse, w/ Trace Gravel, Wet (continued)
SILTY CLAY - Brown, Soft becomes Brown + Gray, Very Stiff
SHALE - Hard
End of Boring
WH
WH
WH
100/5"
629.9
614.1
608.6
596.6
590.1
M O I S T
(/6")
B L O W S
(tsf)
U C S
Qu
(%)(ft)
D E P T H
-5
-10
-15
-20
Groundwater Elev.:
HAMMER TYPEHSA AUTO
612.6 620.1
DRILLING METHOD
The Unconfined Compressive Strength (UCS) Failure Mode is indicated by (B-Bulge, S-Shear, P-Penetrometer) The SPT (N value) is the sum of the last two blow values in each sampling zone (AASHTO T206)
BBS, form 137 (Rev. 8-99)
Surface Water Elev.
After ft ft
First Encounter
SOIL BORING LOG
ft ft ft
Upon Completion Hrs.
Stream Bed Elev.
SECTION
Fulton
SL-03
630.07
Station
COUNTY
Station
Ground Surface Elev.
BORING NO.
LOGGED BYROUTE
Offset ft
1/30/23
KEGWee Ma Tuk Dams - Stevens Lake Dam
STRUCT. NO.
DESCRIPTION
Page
Date of
LOCATION 40.5322534°,-090.1433287°
Division of Highways
Illinois Department of Transportation
M O I S T
(/6")
B L O W S
(tsf)
U C S
Qu
(%)(ft)
D E P T H
-25
-30
-35
-40
1.4 B
1.5 P
1.3 B
3.0 P
1.1 B
1.2 B
1.1 B
1.8 B
2.4 B
2.4 S
ASPHALT
SILTY CLAY - Gray, Medium Stiff, w/ Gravel + Some Coal
GRAVEL - Loose, Dry
SILTY CLAY - Brown, Medium Stiff
CLAY - Brown + Gray, Medium Stiff
LL=53%, PL=20%, PI=33%
GRAVEL - Wet,w/ Red Brick Fragments
SILTY CLAY - Gray + Brown, Medium Stiff Poor Recovery
Becomes Stiff
CLAY TILL - Gray, Very Stiff, 3" Coal Seam
SHALE - Hard
End of Boring
100/18"
619.5
616.2
615.7
613.7
611.2
608.2
598.7
593.7
592.2
M O I S T
(/6")
B L O W S
(tsf)
U C S
Qu
(%)(ft)
D E P T H
-5
-10
-15
-20
Groundwater Elev.:
HAMMER TYPEHSA AUTO
609.7 616.7
DRILLING METHOD
The Unconfined Compressive Strength (UCS) Failure Mode is indicated by (B-Bulge, S-Shear, P-Penetrometer) The SPT (N value) is the sum of the last two blow values in each sampling zone (AASHTO T206)
BBS, form 137 (Rev. 8-99)
Surface Water Elev.
After ft ft
First Encounter
SOIL BORING LOG
ft ft ft
Upon Completion Hrs.
Stream Bed Elev.
SECTION
Fulton
SL-04
619.71
Station
COUNTY
Station
Ground Surface Elev.
BORING NO.
LOGGED BYROUTE
Offset ft
1/27/23
KEGWee Ma Tuk Dams - Stevens Lake Dam
STRUCT. NO.
DESCRIPTION
Page
Date of
LOCATION 40.5317382°,-090.1436682°
Division of Highways
Illinois Department of Transportation
M O I S T
(/6")
B L O W S
(tsf)
U C S
Qu
(%)(ft)
D E P T H
-25
-30
-35
-40
1.6
0.2 B
0.0 P
0.0 P
1.9 B
1.1 B
3.0 P
2.8 S
2.8 S
ASPHALT
SILTY CLAY FILL - Brown + Gray, Medium Stiff, w/ Some Coal w/ Trace Gravel, Brick Fragments, Sand, Shale Seams, and Organics Shelby Tube Dry Unit Weight=86.3pcf, Max Shear Strength w/6 psi confining pressure=0.31tsf Poor Recovery becomes Brown, Stiff
LL=48%, PL=19%, PI=29%
SILTY CLAY - Gray, Stiff
SHALE - Hard Poor Recovery
SHALE - Hard Poor Recovery (continued)
End of Boring
100/18"
617.6
603.3
599.3
592.8
M O I S T
(/6")
B L O W S
(tsf)
U C S
Qu
(%)(ft)
D E P T H
-5
-10
-15
-20
Groundwater Elev.:
HAMMER TYPEHSA AUTO
608.8 614.8
DRILLING METHOD
The Unconfined Compressive Strength (UCS) Failure Mode is indicated by (B-Bulge, S-Shear, P-Penetrometer) The SPT (N value) is the sum of the last two blow values in each sampling zone (AASHTO T206)
BBS, form 137 (Rev. 8-99)
Surface Water Elev.
After ft ft
First Encounter
SOIL BORING LOG
ft ft ft
Upon Completion Hrs.
Stream Bed Elev.
SECTION
Fulton
SL-05
617.76
Station
COUNTY
Station
Ground Surface Elev.
BORING NO.
LOGGED BYROUTE
Offset ft
1/27/23
KEGWee Ma Tuk Dams - Stevens Lake Dam
STRUCT. NO.
DESCRIPTION
Page
Date of
LOCATION 40.5318815°,-090.1436777°
Division of Highways
Illinois Department of Transportation
M O I S T
(/6")
B L O W S
(tsf)
U C S
Qu
(%)(ft)
D E P T H
-25
-30
-35
-40
0.9 B
1.2 B
1.0 B
2.0 B
2.0 P
0.8 B
0.7 B
0.2 B
0.2 B
ASHPALT
SILTY CLAY - Brown + Gray, Medium Stiff, w/ Trace Coal
GRAVEL
SILTY CLAY - Brown, Moist, Medium-Stiff, w/ Trace Coal becomes Brown, Medium-Stiff, Moist, w/ Coal
Shelby Tube Dry Unit Weight=103.5pcf, Max Shear Strength w/5 psi confining pressure=0.3tsf
SAND - Loose
SAND - Loose (continued)
SILTY CLAY - Brown
CLAY - Brown, Soft, w/ Medium Stiff Coal
SHALE - Hard
End of Boring
100/9"
616.7
613.4
612.9
600.4
595.9
593.4
590.9
589.4
M O I S T
(/6")
B L O W S
(tsf)
U C S
Qu
(%)(ft)
D E P T H
-5
-10
-15
-20
Groundwater Elev.:
HAMMER TYPEHSA AUTO
599.9 606.9
DRILLING METHOD
The Unconfined Compressive Strength (UCS) Failure Mode is indicated by (B-Bulge, S-Shear, P-Penetrometer) The SPT (N value) is the sum of the last two blow values in each sampling zone (AASHTO T206)
BBS, form 137 (Rev. 8-99)
Surface Water Elev.
After ft ft
First Encounter
SOIL BORING LOG
ft ft ft
Upon Completion Hrs.
Stream Bed Elev.
SECTION
Fulton
SL-06
616.87
Station
COUNTY
Station
Ground Surface Elev.
BORING NO.
LOGGED BYROUTE
Offset ft
1/27/23
KEGWee Ma Tuk Dams - Stevens Lake Dam
STRUCT. NO.
DESCRIPTION
Page
Date of
LOCATION 40.5321043°,-090.1437278°
Division of Highways
Illinois Department of Transportation
M O I S T
(/6")
B L O W S
(tsf)
U C S
Qu
(%)(ft)
D E P T H
-25
-30
-35
-40
File details come from the government source that posted it. Updated .