Lake Wee-Ma-Tuk Dams - McCamey Lake Plan Sheets.pdf

PDF 18 MB Posted

Attached to
AML 2304 Wee Ma Tuk Dams
Solicitation number
26-422DNR-MINES-B-50946
Issued by
Illinois

About this file

This document consists of plan sheets for the McCamey Lake Dam, prepared by the State of Illinois Department of Natural Resources, Mines and Minerals Division, as part of the Lake Wee-Ma-Tuk Dams project. The plan sheets are cross-sectional drawings and technical specifications for modifications to McCamey Lake Dam located in Fulton County, Illinois. The document includes detailed engineering specifications for structural elements such as steel plate beam guardrails (Type A with 9-foot posts), traffic barrier terminals (Type 1 special, tangent), precast concrete box culverts (6' x 5'), drop structures, and storm sewers with rubber gasket connections in various classes and types. The cross-sections span multiple stations from 70+25 through 73+63, displaying elevations, slopes, and dimensional specifications for the embankment work, driveway construction, and utility locations including fiber optic lines, water lines, telephone lines, and gas lines.

The technical specifications indicate normal pool elevation (N.P. ELEV.) at 619.10 feet and provide precise elevation data and slope ratios (ranging from 2.3:1 to 6.6:1) at each cross-section station. The document explicitly notes that contractors must use extreme caution during excavation on the embankment, particularly on the downstream face benches, to prevent damage to utilities, with full contractor responsibility for preventing utility damage resulting from construction activities. The plan sheets are identified as Sheet Nos. 20, 21, 22, and 23 of 33 total sheets and are marked as revised with initials BTM and RMM, indicating multiple revisions have been made to the original design specifications.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TON 100.00 25.00 25.00 25.00 25.00

63000003

63100167

STEEL PLATE BEAM GUARDRAIL, TYPE A, 9 FOOT POSTS

TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT

550A2630

(TON)

M

AT

CH

E

XI

ST

IN

G

+2

-1

-2

-3

-4

-5

-6

-7

-8

-9

PR

O

P.

C

L M

CC

AM

EY

D

AM

+5

-1

-2

-3

-4

-5

-6

-7

-8

-9

DR

IV

EW

AY

PR

O

P.

C

L M

CC

AM

EY

D

AM

+7

-1

-2

-3

-4

-5

-6

-7

-8

-9

DR

IV

EW

AY

PR

O

P.

C

L M

CC

AM

EY

D

AM

+0

-1

-2

-3

-4

-5

-6

-7

-8

-9

DR

IV

EW

AY

PR

O

P.

C

L M

CC

AM

EY

D

AM

617.63 -17.01

.9

:1

621.30 -6.00

1.

6.

618.13 -51.96

621.30 -6.00

614.18 -46.05

1.

6.

1.

6.

621.30

-6.00

613.45 -45.15

FO

TE

L W

AT

N .P

.E

LE

V.

.1

N .P

.E

LE

V.

.1

N .P

.E

LE

V.

.1

621.50 -7.18

621.60 6.76

0.

0%

3.

0:

0.

0% 2.5

:1620.76

7.35 617.63

-17.01

0.

0%

0.

0%

2.5 :1

3.

0:

620.45 8.14

614.98 -24.97

0.

0%

0.

0%

2.5 :1

3.

0:

620.54 7.90

614.15

-27.45

0.

0%

0.

0%

2.5 :1

3.

0:

617.69 -35.42

617.63 -17.01

614.98 -24.97

614.15

-27.45

EXTRACTION_TYPE

REVISED

REVISED

REVISED

REVISED

BTM

RMM

Scale Station From Station To Contract

ILLINOIS

SHEETS NO.SECTIONF.A.P. RTE.

SCALE: SHEETS

LAKE WEE-MA-TUK 2024 FULTON

SHEET NO. OF

COUNTYSTATE OF ILLINOIS

DEPARTMENT OF NATURAL RESOURCES

MINES AND MINERALS DIVISION

FT

F

T

CROSS SECTIONS

MCCAMEY LAKE DAM 20

ED

G

E O

F

ED

G

E O

F

ED

G

E O

F

LE

G

EN

D

FO

FI

BE

R O

PT

IC

W

AT

W

AT

ER

L

IN

E

TE

L

- T

EL

EP

H O

N E

LI

N

E G

AS

G

AS

L

IN

E

N O

TE

: T

H E

CO

N

TR

AC

TO

R

IS

T

O U

SE

E

XT

RE

M E

CA

U

TI

O

N W

IT

H

R

ES

PE

CT

T O

A

LL

E

XC

AV

AT

IO

N

O N

TH

E

EM

BA

N

KM

EN

T

AN

D

ES

PE

CI

AL

LY

W

IT

H

RE

SP

EC

T

TO

T

H E

BE

N

CH

ES

O N

T H

E

DO

W N

ST

RE

AM

FA

CE

T

O P

RE

VE

N T

DA

M

AG

E

TO

U

TI

LI

TI

ES

IT

IS

TH

E

CO

N

TR

AC

TO

R' S

RE

SP

O N

SI

BI

LI

TY

T O

P

RE

VE

N

T

DA

M

AG

ES

T

O U

TI

LI

TI

ES

A S

A

RE

SU

LT

O F

CO

N

ST

RU

CT

IO

N A

CT

IV

IT

IE

S

RE

LA

TE

D

TO

T H

IS

PR

O

JE

CT

+2

-1

-2

-3

-4

-5

-6

-7

-8

-9

DR

IV

EW

AY

PR

O

P.

C

L M

CC

AM

EY

D

AM

+5

-1

-2

-3

-4

-5

-6

-7

-8

-9

DR

IV

EW

AY

PR

O

P.

C

L M

CC

AM

EY

D

AM

+7

-1

-2

-3

-4

-5

-6

-7

-8

-9

DR

IV

EW

AY

PR

O

P.

C

L M

CC

AM

EY

D

AM

+0

-1

-2

-3

-4

-5

-6

-7

-8

-9

DR

IV

EW

AY

PR

O

P.

C

L M

CC

AM

EY

D

AM

612.90 -43.16

621.30 -6.00

621.30 6.00

621.30 -6.00

621.30 6.00

621.30 -6.00

621.30 6.00

621.30 -6.00

621.30 6.00

N .P

.E

LE

V.

.1

N .P

.E

LE

V.

.1

N .P

.E

LE

V.

.1

N .P

.E

LE

V.

.1

618.93 11.92

613.27 -30.09

0.

0%

0.

0%

2.5 :1

3.

0:

609.92

-34.45

614.52 22.94

0.

0%

2.5 :1

2.5 :1

0.

0%

609.86 -34.61

612.22 28.71

0.

0%

2.5 :1

2.5 :1

0.

0%

609.00 -36.76

611.53 30.42

0.

0%

2.5 :1

2.5 :1

0.

0%

613.27 -30.09

EXTRACTION_TYPE

REVISED

REVISED

REVISED

REVISED

BTM

RMM

Scale Station From Station To Contract

ILLINOIS

SHEETS NO.SECTIONF.A.P. RTE.

SCALE: SHEETSSHEET NO. OF 33

COUNTYSTATE OF ILLINOIS

DEPARTMENT OF NATURAL RESOURCES

MINES AND MINERALS DIVISION

LAKE WEE-MA-TUK 2024 FULTON

CROSS SECTIONS

MCCAMEY LAKE DAM 21

ED

G

E O

F

ED

G

E O

F

ED

G

E O

F

ED

G

E O

F

LE

G

EN

D

FO

FI

BE

R O

PT

IC

W

AT

W

AT

ER

L

IN

E

TE

L

- T

EL

EP

H O

N E

LI

N

E G

AS

G

AS

L

IN

E

N O

TE

: T

H E

CO

N

TR

AC

TO

R

IS

T

O U

SE

E

XT

RE

M E

CA

U

TI

O

N W

IT

H

R

ES

PE

CT

T O

A

LL

E

XC

AV

AT

IO

N

O N

TH

E

EM

BA

N

KM

EN

T

AN

D

ES

PE

CI

AL

LY

W

IT

H

RE

SP

EC

T

TO

T

H E

BE

N

CH

ES

O N

T H

E

DO

W N

ST

RE

AM

FA

CE

T

O P

RE

VE

N T

DA

M

AG

E

TO

U

TI

LI

TI

ES

IT

IS

TH

E

CO

N

TR

AC

TO

R' S

RE

SP

O N

SI

BI

LI

TY

T O

P

RE

VE

N

T

DA

M

AG

ES

T

O U

TI

LI

TI

ES

A S

A

RE

SU

LT

O F

CO

N

ST

RU

CT

IO

N A

CT

IV

IT

IE

S

RE

LA

TE

D

TO

T H

IS

PR

O

JE

CT

T

+2

-1

-2

-3

-4

-5

-6

-7

-8

-9

DR

IV

EW

AY

PR

O

P.

C

L M

CC

AM

EY

D

AM

+5

-1

-2

-3

-4

-5

-6

-7

-8

-9

DR

IV

EW

AY

PR

O

P.

C

L M

CC

AM

EY

D

AM

+7

-1

-2

-3

-4

-5

-6

-7

-8

-9

DR

IV

EW

AY

PR

O

P.

C

L M

CC

AM

EY

D

AM

621.30 -6.00

621.30 6.00

621.30 -6.00

621.30 6.00

610.23 -45.82

621.30 -6.00

621.30 6.00

617.10 35.77

617.10

42.32

N .P

.E

LE

V.

.1

N .P

.E

LE

V.

.1

+9

-1

-2

-3

-4

-5

-6

-7

-8

-9

608.76

-37.35

610.62

32.70

0.

0%

2.5 :1

2.5 :1

0.

0%

608.53 -37.92

615.64

20.15

0.

0%

2.5 :1

2.5 :1

0.

0%

619.83 9.67

609.30

-38.46

0.

0%

0.

0%

2.5 :1

2.7 :1

620.23 8.67

607.85 -37.04

0.

0%

0.

0%

2.5 :1

2.3 :1

609.30

-38.46

618.29 28.98

619.17 25.84

607.85 -37.04

608.00 -37.91

620.53 26.35

618.23 34.10

619.06

47.19

620.73 58.38

3:

3:

3:

EXTRACTION_TYPE

REVISED

REVISED

REVISED

REVISED

BTM

RMM

Scale Station From Station To Contract

ILLINOIS

SHEETS NO.SECTIONF.A.P. RTE.

SCALE: SHEETSSHEET NO. OF

COUNTYSTATE OF ILLINOIS

DEPARTMENT OF NATURAL RESOURCES

MINES AND MINERALS DIVISION

LAKE WEE-MA-TUK 2024 FULTON

CROSS SECTIONS

MCCAMEY LAKE DAM 22

ED

G

E O

F ED

G

E O

F

ED

G

E O

F

LE

G

EN

D

FO

FI

BE

R O

PT

IC

W

AT

W

AT

ER

L

IN

E

TE

L

- T

EL

EP

H O

N E

LI

N

E G

AS

G

AS

L

IN

E

N O

TE

: T

H E

CO

N

TR

AC

TO

R

IS

T

O U

SE

E

XT

RE

M E

CA

U

TI

O

N W

IT

H

R

ES

PE

CT

T O

A

LL

E

XC

AV

AT

IO

N

O N

TH

E

EM

BA

N

KM

EN

T

AN

D

ES

PE

CI

AL

LY

W

IT

H

RE

SP

EC

T

TO

T

H E

BE

N

CH

ES

O N

T H

E

DO

W N

ST

RE

AM

FA

CE

T

O P

RE

VE

N T

DA

M

AG

E

TO

U

TI

LI

TI

ES

IT

IS

TH

E

CO

N

TR

AC

TO

R' S

RE

SP

O N

SI

BI

LI

TY

T O

P

RE

VE

N

T

DA

M

AG

ES

T

O U

TI

LI

TI

ES

A S

A

RE

SU

LT

O F

CO

N

ST

RU

CT

IO

N A

CT

IV

IT

IE

S

RE

LA

TE

D

TO

T H

IS

PR

O

JE

CT

M

AT

CH

E

XI

ST

IN

G

+0

-1

-2

-3

-4

-5

-6

-7

-8

-9

PR

O

P.

C

L M

CC

AM

EY

D

AM

+2

-1

-2

-3

-4

-5

-6

-7

-8

-9

PR

O

P.

C

L M

CC

AM

EY

D

AM

+5

-1

-2

-3

-4

-5

-6

-7

-8

-9

PR

O

P.

C

L M

CC

AM

EY

D

AM

+6

-1

-2

-3

-4

-5

-6

-7

-8

-9

+0

-1

-2

-3

-4

-5

-6

-7

-8

-9

1.

6.

621.30

-6.00

610.23

-53.09

618.52

39.04

620.88 55.13

617.10

37.38

617.10

53.71

621.30

-6.58

1.

6.

621.30 -6.00

1.

6.

1.

6.

621.30

-6.00

620.18 8.80

607.80 -37.13

0.

0%

0.

0%

2.5 :1

2.3 :1

620.24 9.58

0.

0%

0.

0%

0.

0%

2.8 :1

615.47 -23.50

620.57 7.83

0.

0%

3.

0:

0.

0%

2.5 :1

619.93 -10.11

620.73 7.42

0.

0%

3.

0:

0.

0% 2.5

:1

620.94

-7.09

621.53

6.57

0.

0%

3.

0:

0.

0% 2.5

:1

607.80 -37.13

620.47 27.27

3.

0:

610.48 -47.20

620.53

27.57

619.99 29.37

619.87 48.27

6.

6:

620.24 9.58

0.

0%

0.

0%

0.

0%

2.8 :1

3.

2:

6.

6:

PR

O

P.

C

/L M

CC

AM

EY

D

AM

EXTRACTION_TYPE

REVISED

REVISED

REVISED

REVISED

BTM

RMM

Scale Station From Station To Contract

ILLINOIS

SHEETS NO.SECTIONF.A.P. RTE.

SCALE: SHEETSSHEET NO. OF

COUNTYSTATE OF ILLINOIS

DEPARTMENT OF NATURAL RESOURCES

MINES AND MINERALS DIVISION

LAKE WEE-MA-TUK 2024 FULTON

CROSS SECTIONS

MCCAMEY LAKE DAM 23

PR

EC

AS

T

CO

N

CR

ET

E

BO

X

CU

LV

ER

T 6'

X5

6F T

X 5F

T

DR

O P

ST

RU

CT

U

RE

X6

M

AN

H

O

LE

S, T

YP

E

A, ' D

IA

M

ET

ER

, W

IT

H

SP

EC

IA

L

FR

AM

A N

D G

RA

TE

ST

O

RM

S

EW

ER

S, R

U

BB

ER

G

AS

KE

T, CL

AS

S A, T

YP

E

LE

G

EN

D

FO

FI

BE

R O

PT

IC

W

AT

W

AT

ER

L

IN

E

TE

L

- T

EL

EP

H O

N E

LI

N

E G

AS

G

AS

L

IN

E

N O

TE

: T

H E

CO

N

TR

AC

TO

R

IS

T

O U

SE

E

XT

RE

M E

CA

U

TI

O

N W

IT

H

R

ES

PE

CT

T O

A

LL

E

XC

AV

AT

IO

N

O N

TH

E

EM

BA

N

KM

EN

T

AN

D

ES

PE

CI

AL

LY

W

IT

H

RE

SP

EC

T

TO

T

H E

BE

N

CH

ES

O N

T H

E

DO

W N

ST

RE

AM

FA

CE

T

O P

RE

VE

N T

DA

M

AG

E

TO

U

TI

LI

TI

ES

IT

IS

TH

E

CO

N

TR

AC

TO

R' S

RE

SP

O N

SI

BI

LI

TY

T O

P

RE

VE

N

T

DA

M

AG

ES

T

O U

TI

LI

TI

ES

A S

A

RE

SU

LT

O F

CO

N

ST

RU

CT

IO

N A

CT

IV

IT

IE

S

RE

LA

TE

D

TO

T H

IS

PR

O

JE

CT

ST

O

RM

S

EW

ER

S, R

U

BB

ER

G

AS

KE

T, C

LA

SS

A, T

YP

E

File details come from the government source that posted it. Updated .