This is a standardized pricing template spreadsheet for the P50 Fire Suppression Upgrade and FLS project. The template includes detailed breakdown sections for equipment, material, labor, and other costs across multiple construction categories including general requirements, existing conditions, hazmat remediation, concrete, metals, thermal protection, openings, finishes, specialties, equipment, furnishings, special construction, plumbing, HVAC, electrical, security, earthwork, exterior improvements, and utilities. The spreadsheet also includes sections for markup calculations including mobilization/demobilization, general conditions, nighttime/off-hour work premiums, Buy America Act premiums, phasing premiums, bonding/insurance, profit, and overhead.
The template contains separate tabs for labor rates (both prime contractor and subcontractor) and materials, with fields for work item descriptions, quantities, man hours, unit costs, and equipment costs. Any materials costing $10,000 or more in the lump sum must be broken down in detail on the materials tab. This is a blank template with formulas embedded in pink-colored cells, while white cells are for manual data entry.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Breakdown
| Standardized Proposal Breakdown | DATE PREPARED: MMM DD - YYYY |
| PROJECT: P50 Fire Suppression Upgrade and FLS |
| VENDOR: | |||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | ||||
| ITEM | EQUIPMENT COSTS - $ | MATERIAL COSTS - $ | LABOR COSTS - $ | OTHER COSTS - $ | TOTAL ITEM COST - $ |
| TOTAL | TOTAL | TOTAL | TOTAL |
| 01-00-00.00 General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 02-00-00.00 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 02-80-00.00 HazMat Remediation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 03-00-00.00 Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 05-00-00.00 Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 07-00-00.00 Thermal and Moisture Protection | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 08-00-00.00 Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 09-00-00.00 Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10-00-00.00 Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11-00-00.00 Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 12-00-00.00 Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 13-00-00.00 Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 22-00-00.00 Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 23-00-00.00 HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 26-00-00.00 Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 28-00-00.00 Electronic Safety and Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 31-00-00.00 Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 32-00-00.00 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 33-00-00.00 Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Markups | |||||
| Mobilization/Demobilization | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Difficulty | |||||
| Nighttiime/Offhour Work Premium | |||||
| Buy America Act Premium | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Phasing Premium | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Bonding/Insurance | |||||
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| TOTAL | $ - 0 | |||
| Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown. |
Labor Rates PROJECT: P50 Fire Suppression Upgrade and FLS
| VENDOR: | |
| PREPARER: | PREPARER'S CONTACT INFORMATION: |
| Prime Contractor Work | |||||||||||||
| Item No. | Labor Category/Description | Qty | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Mat. Cost | Bare Mat. | Unit Labor Cost | Bare Labor | Unit Equip. Cost | Bare Equip. Cost | Total |
| hr | 1 | 2 | 40 | $ - 0 | $ - 0 | $ - 0 | |||||||
| hr | 1 | 1 | 80 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Totals | 120 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
General Notes:
Subcontractor(s) PROJECT: P50 Fire Suppression Upgrade and FLS
| VENDOR: | |
| PREPARER: | PREPARER'S CONTACT INFORMATION: |
| Subcontractor Work | |||||||||||||
| Item No. | Labor Category/Description | Qty | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Mat. Cost | Bare Mat. | Unit Labor Cost | Bare Labor | Unit Equip. Cost | Bare Equip. Cost | Total |
| hr | 1 | 2 | 40 | $ - 0 | $ - 0 | $ - 0 | |||||||
| hr | 1 | 1 | 80 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Totals | 120 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
General Notes:
Materials PROJECT: P50 Fire Suppression Upgrade and FLS
| VENDOR: | |
| PREPARER: | PREPARER'S CONTACT INFORMATION: |
| Prime Contractor Work | |||||||||||
| Item No. | Labor Category/Description | Qty | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Mat. Cost | Bare Mat. | Unit Equip. Cost | Bare Equip. Cost | Total |
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| Totals | 0 | $ - 0 | $ - 0 | $ - 0 |
General Notes:
- Any materials provided in the Cost Breakdown tab in the lumpsum amount of $10K or more must be brokendown on this tab.
File details come from the government source that posted it. Updated .