L3 - Standardized Proposal Breakdown.xls

XLS spreadsheet 57 KB Posted

Attached to
BIL FUNDED - A80 TRACON ROOF REPLACEMENT Federal contract opportunity
Solicitation number
697DCK-23-R-00072
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This document includes a standardized proposal breakdown template and a solicitation for the A80 TRACON Roof Replacement project.

The standardized proposal breakdown template provides a standardized cost structure for vendors to utilize when developing proposals for modernization projects. It includes line items for equipment, labor, and other costs associated with modernization requirements, construction/installation, after hours work, profit, overhead, and annual maintenance costs. The solicitation seeks proposals to replace the roof at the A80 TRACON facility located in Peachtree City, GA. Proposals are due by January 26, 2023 and the work is to be performed for the Department of Transportation Federal Aviation Administration Southwestern Region. A site visit is scheduled for January 5, 2023 and interested parties must RSVP by December 30, 2022. Proposers must also be registered in the System for Award Management to be eligible for award.

View the file

Other files for this federal contract opportunity

Other files attached to BIL FUNDED - A80 TRACON ROOF REPLACEMENT, newest first.
File Type Posted
697DCK-23-R-00072 P00002.pdf PDF
J1 - FAA-A80-22003855 Roof replacement - Specifications Rev1 01232023.pdf PDF
J7. A80 RFI Set 2.pdf PDF
J6. A80 Roof - RFI Set 1.pdf PDF
J5. TRACON BUILDING SECTIONS.pdf PDF
697DCK-23-R-00072 Amend 01.pdf PDF
J4. TRACON ROOF PLAN.pdf PDF
FAA-A80-22003855 Roof replacement - Specifications Final.pdf PDF
Attachment B - A80-22003855-Final Drawing 081122.pdf PDF
L2. Past Performance Questionnaire.pdf PDF
Attachment A - A80 Roof Special Conditions.pdf PDF
L1. BidBond.pdf PDF
697DCK-23-R-00072.pdf PDF
J2. Wage Rate GA20220313_10.14.22.pdf PDF
J3. Uniform BIL Data Report.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Modernization

Standardized Proposal BreakdownDATE PREPARED: MMM DD - YYYY
PROJECT:
VENDOR:
PREPARER:PREPARER'S CONTACT INFORMATION:
ITEMEQUIPMENT COSTS - $LABOR COSTS - $OTHER COSTS - $TOTAL ITEM COST - $
TOTALTOTALTOTAL
Modernization Requirements:
Electronics/Controls/Softwarethiat$ - 0$ - 0
Electrical$ - 0$ - 0$ - 0
Mechanical/Drives/Sheaves/Traveling Cable$ - 0$ - 0$ - 0
Safety Equipment$ - 0$ - 0$ - 0
Cab Interior/Finishes$ - 0$ - 0$ - 0
Additional Items (please specify):$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0
Construction/Install:
Mobilization/Demobilization$ - 0$ - 0$ - 0$ - 0
Removal/Demolition$ - 0$ - 0$ - 0$ - 0
Installation$ - 0$ - 0$ - 0$ - 0
Permits$ - 0$ - 0$ - 0$ - 0
Additional Items (please specify):$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0
After Hours Variance:
Modernization/Construction$ - 0$ - 0$ - 0$ - 0
Additional Items (please specify):$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0
Profit$ - 0$ - 0
Overhead$ - 0$ - 0
MODERNIZATION TOTAL$ - 0
Performance Maintenance:
Maintenance Fee (monthly)$ - 0$ - 0$ - 0$ - 0
Maintenance Monitoring (as required)$ - 0$ - 0$ - 0$ - 0
Additional Items (please specify):$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0
Profit$ - 0$ - 0
Overhead$ - 0$ - 0
MAINTENANCE TOTAL (Annual) Base Year$ - 0
Maintenance Option Year 1
Maintenance Option Year 2
Maintenance Option Year 3
Maintenance Option Year 4
Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown.