This document includes a standardized proposal breakdown template and a solicitation for the A80 TRACON Roof Replacement project.
The standardized proposal breakdown template provides a standardized cost structure for vendors to utilize when developing proposals for modernization projects. It includes line items for equipment, labor, and other costs associated with modernization requirements, construction/installation, after hours work, profit, overhead, and annual maintenance costs. The solicitation seeks proposals to replace the roof at the A80 TRACON facility located in Peachtree City, GA. Proposals are due by January 26, 2023 and the work is to be performed for the Department of Transportation Federal Aviation Administration Southwestern Region. A site visit is scheduled for January 5, 2023 and interested parties must RSVP by December 30, 2022. Proposers must also be registered in the System for Award Management to be eligible for award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-23-R-00072 P00002.pdf | ||
| J1 - FAA-A80-22003855 Roof replacement - Specifications Rev1 01232023.pdf | ||
| J7. A80 RFI Set 2.pdf | ||
| J6. A80 Roof - RFI Set 1.pdf | ||
| J5. TRACON BUILDING SECTIONS.pdf | ||
| 697DCK-23-R-00072 Amend 01.pdf | ||
| J4. TRACON ROOF PLAN.pdf | ||
| FAA-A80-22003855 Roof replacement - Specifications Final.pdf | ||
| Attachment B - A80-22003855-Final Drawing 081122.pdf | ||
| L2. Past Performance Questionnaire.pdf | ||
| Attachment A - A80 Roof Special Conditions.pdf | ||
| L1. BidBond.pdf | ||
| 697DCK-23-R-00072.pdf | ||
| J2. Wage Rate GA20220313_10.14.22.pdf | ||
| J3. Uniform BIL Data Report.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modernization
| Standardized Proposal Breakdown | DATE PREPARED: MMM DD - YYYY | |||
| PROJECT: | ||||
| VENDOR: | ||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | |||
| ITEM | EQUIPMENT COSTS - $ | LABOR COSTS - $ | OTHER COSTS - $ | TOTAL ITEM COST - $ |
| TOTAL | TOTAL | TOTAL | ||
| Modernization Requirements: | ||||
| Electronics/Controls/Software | thiat | $ - 0 | $ - 0 | |
| Electrical | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical/Drives/Sheaves/Traveling Cable | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Cab Interior/Finishes | $ - 0 | $ - 0 | $ - 0 | |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | |
| Construction/Install: | ||||
| Mobilization/Demobilization | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Removal/Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Installation | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Permits | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| After Hours Variance: | ||||
| Modernization/Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| MODERNIZATION TOTAL | $ - 0 | |||
| Performance Maintenance: | ||||
| Maintenance Fee (monthly) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Maintenance Monitoring (as required) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| MAINTENANCE TOTAL (Annual) Base Year | $ - 0 | |||
| Maintenance Option Year 1 | ||||
| Maintenance Option Year 2 | ||||
| Maintenance Option Year 3 | ||||
| Maintenance Option Year 4 | ||||
| Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown. |
File details come from the government source that posted it. Updated .