This document provides details for a federal contract opportunity for roof replacement services. The Federal Aviation Administration is soliciting proposals for the A80 TRACON Roof Replacement project located in Peachtree City, Georgia. Offerors must be registered in the System for Award Management and submit a proposal in accordance with Sections L and M of the solicitation by January 26, 2023. A non-mandatory site visit is scheduled for January 5, 2023. All questions are due by January 12, 2023 and must be submitted in writing to the point of contact. Proposals will be evaluated for award based on the criteria specified in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to BIL FUNDED - A80 TRACON ROOF REPLACEMENT, newest first.
File Type Posted
697DCK-23-R-00072 P00002.pdf PDF
J1 - FAA-A80-22003855 Roof replacement - Specifications Rev1 01232023.pdf PDF
J7. A80 RFI Set 2.pdf PDF
J6. A80 Roof - RFI Set 1.pdf PDF
J5. TRACON BUILDING SECTIONS.pdf PDF
697DCK-23-R-00072 Amend 01.pdf PDF
J4. TRACON ROOF PLAN.pdf PDF
Attachment A - A80 Roof Special Conditions.pdf PDF
L1. BidBond.pdf PDF
FAA-A80-22003855 Roof replacement - Specifications Final.pdf PDF
L2. Past Performance Questionnaire.pdf PDF
L3 - Standardized Proposal Breakdown.xls XLS spreadsheet
697DCK-23-R-00072.pdf PDF
J2. Wage Rate GA20220313_10.14.22.pdf PDF
J3. Uniform BIL Data Report.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

220038557/17/2022

Revision A July 17, 2022

A

AA

7/17/2022 22003855

Michael Lelak Line

Michael Lelak Line

Michael Lelak Text Box Operations Wing: 10:00 PM to 5:00 AM All other wings: Daytime

Michael Lelak Polygon

Michael Lelak Text Box NOTE: Generator Exhaust Flues shown incorrectly. Existing flues penetrate the roof. Please see attached support documentation for pictures.

Michael Lelak Line

Michael Lelak Text Box Every effort shall be taken to cleanly remove and safely store the precast copings. Should this prove impossible and/or cause precast copings to break during removal, they shall be replaced in whole with new metal copings. Provide a price for this possibility as an option during initial bid such that it can be utilized if necessary.

Michael Lelak Line

Michael Lelak Line

Michael Lelak Callout

6. Existing formed metal copings are to be replaced in whole.

Michael Lelak Line

Michael Lelak Polygon

Michael Lelak Line

Michael Lelak Text Box Actual Generator Exaust flue locations.

Michael Lelak Polygon

Michael Lelak Polygon

Michael Lelak Polygon

Michael Lelak Polygon

Michael Lelak Callout Special Condition 5

Michael Lelak Callout Special Condition 3

Michael Lelak Callout Special Condition 4

Michael Lelak Callout Special Condition 1

Michael Lelak Polygon

Michael Lelak Callout Special Condition 2

Michael Lelak Polygon

Michael Lelak Callout Special Condition 6 (typ of 13)

Brad Fowler Polygon

Brad Fowler Callout Special Condition 7

Brad Fowler Polygon

Brad Fowler Polygon

Brad Fowler Callout Actual location (approx.) of E/G exhaust penetrations thru roof

Brad Fowler Polygon

Brad Fowler Callout Special Condition 8 - similar to Special Condition 3

Brad Fowler Polygon

Brad Fowler Callout Special Condition 9 - similar to special conditions 3 & 8

Brad Fowler Polygon

Brad Fowler Polygon

Brad Fowler Callout Special Condition 10

Brad Fowler Callout Sloping Parapet

Brad Fowler Callout Sloping Parapet

Michael Lelak Text Box

6. See Attachment A: A80 Roof Special Conditions, this document contains pictures of site conditions.

7. All "special conditions" identified on this drawing must receive a manufacturer produced detail on how they shall be completed prior to construction. A shop drawing detail from the roofing installer shall be acceptable, but only if each detail is signed off and approved by the roofing manufacturer.

Michael Lelak Line

Michael Lelak Line

Michael Lelak Text Box 1.Facility Lightning Protection to remain active on all wings except the wing being re-roofed. Only 1 wing shall be inactive at a time. All impacted lightning protection system components to be demolished and replaced with new components.

a80-1508361-g001
a80-1508361-g002
a80-1508361-g003
a80-1508361-d101
a80-1508361-a101
a80-1508361-e101
a80-1508361-e102
A80 A101 Rev 07182022.pdf
Untitled
2022-08-11T14:19:28-0400
MICHAEL C LELAK
2022-08-11T14:19:56-0400
MICHAEL C LELAK
2022-08-11T14:20:20-0400
MICHAEL C LELAK
2022-08-11T14:20:53-0400
MICHAEL C LELAK
2022-08-11T14:21:30-0400
MICHAEL C LELAK
2022-08-11T14:22:15-0400
MICHAEL C LELAK
2022-08-11T14:22:44-0400
MICHAEL C LELAK
2022-08-11T15:35:34-0400
THOMAS J OLIVER
2022-08-11T15:36:35-0400
THOMAS J OLIVER
2022-08-11T15:38:29-0400
THOMAS J OLIVER
2022-08-11T15:40:01-0400
THOMAS J OLIVER
2022-08-11T15:41:25-0400
THOMAS J OLIVER
2022-08-11T15:42:34-0400
THOMAS J OLIVER
2022-08-11T15:43:47-0400
THOMAS J OLIVER

File details come from the government source that posted it. Updated .