Attachment B - A80-22003855-Final Drawing 081122.pdf
PDF 9 MB Posted
- Attached to
- BIL FUNDED - A80 TRACON ROOF REPLACEMENT Federal contract opportunity
- Solicitation number
- 697DCK-23-R-00072
About this file
This document provides details for a federal contract opportunity for roof replacement services. The Federal Aviation Administration is soliciting proposals for the A80 TRACON Roof Replacement project located in Peachtree City, Georgia. Offerors must be registered in the System for Award Management and submit a proposal in accordance with Sections L and M of the solicitation by January 26, 2023. A non-mandatory site visit is scheduled for January 5, 2023. All questions are due by January 12, 2023 and must be submitted in writing to the point of contact. Proposals will be evaluated for award based on the criteria specified in the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-23-R-00072 P00002.pdf | ||
| J1 - FAA-A80-22003855 Roof replacement - Specifications Rev1 01232023.pdf | ||
| J7. A80 RFI Set 2.pdf | ||
| J6. A80 Roof - RFI Set 1.pdf | ||
| J5. TRACON BUILDING SECTIONS.pdf | ||
| 697DCK-23-R-00072 Amend 01.pdf | ||
| J4. TRACON ROOF PLAN.pdf | ||
| Attachment A - A80 Roof Special Conditions.pdf | ||
| L1. BidBond.pdf | ||
| FAA-A80-22003855 Roof replacement - Specifications Final.pdf | ||
| L2. Past Performance Questionnaire.pdf | ||
| L3 - Standardized Proposal Breakdown.xls | XLS spreadsheet | |
| 697DCK-23-R-00072.pdf | ||
| J2. Wage Rate GA20220313_10.14.22.pdf | ||
| J3. Uniform BIL Data Report.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
220038557/17/2022
Revision A July 17, 2022
A
AA
7/17/2022 22003855
Michael Lelak Line
Michael Lelak Line
Michael Lelak Text Box Operations Wing: 10:00 PM to 5:00 AM All other wings: Daytime
Michael Lelak Polygon
Michael Lelak Text Box NOTE: Generator Exhaust Flues shown incorrectly. Existing flues penetrate the roof. Please see attached support documentation for pictures.
Michael Lelak Line
Michael Lelak Text Box Every effort shall be taken to cleanly remove and safely store the precast copings. Should this prove impossible and/or cause precast copings to break during removal, they shall be replaced in whole with new metal copings. Provide a price for this possibility as an option during initial bid such that it can be utilized if necessary.
Michael Lelak Line
Michael Lelak Line
Michael Lelak Callout
6. Existing formed metal copings are to be replaced in whole.
Michael Lelak Line
Michael Lelak Polygon
Michael Lelak Line
Michael Lelak Text Box Actual Generator Exaust flue locations.
Michael Lelak Polygon
Michael Lelak Polygon
Michael Lelak Polygon
Michael Lelak Polygon
Michael Lelak Callout Special Condition 5
Michael Lelak Callout Special Condition 3
Michael Lelak Callout Special Condition 4
Michael Lelak Callout Special Condition 1
Michael Lelak Polygon
Michael Lelak Callout Special Condition 2
Michael Lelak Polygon
Michael Lelak Callout Special Condition 6 (typ of 13)
Brad Fowler Polygon
Brad Fowler Callout Special Condition 7
Brad Fowler Polygon
Brad Fowler Polygon
Brad Fowler Callout Actual location (approx.) of E/G exhaust penetrations thru roof
Brad Fowler Polygon
Brad Fowler Callout Special Condition 8 - similar to Special Condition 3
Brad Fowler Polygon
Brad Fowler Callout Special Condition 9 - similar to special conditions 3 & 8
Brad Fowler Polygon
Brad Fowler Polygon
Brad Fowler Callout Special Condition 10
Brad Fowler Callout Sloping Parapet
Brad Fowler Callout Sloping Parapet
Michael Lelak Text Box
6. See Attachment A: A80 Roof Special Conditions, this document contains pictures of site conditions.
7. All "special conditions" identified on this drawing must receive a manufacturer produced detail on how they shall be completed prior to construction. A shop drawing detail from the roofing installer shall be acceptable, but only if each detail is signed off and approved by the roofing manufacturer.
Michael Lelak Line
Michael Lelak Line
Michael Lelak Text Box 1.Facility Lightning Protection to remain active on all wings except the wing being re-roofed. Only 1 wing shall be inactive at a time. All impacted lightning protection system components to be demolished and replaced with new components.
| a80-1508361-g001 |
| a80-1508361-g002 |
| a80-1508361-g003 |
| a80-1508361-d101 |
| a80-1508361-a101 |
| a80-1508361-e101 |
| a80-1508361-e102 |
| A80 A101 Rev 07182022.pdf |
| Untitled |
| 2022-08-11T14:19:28-0400 | |
| MICHAEL C LELAK |
| 2022-08-11T14:19:56-0400 | |
| MICHAEL C LELAK |
| 2022-08-11T14:20:20-0400 | |
| MICHAEL C LELAK |
| 2022-08-11T14:20:53-0400 | |
| MICHAEL C LELAK |
| 2022-08-11T14:21:30-0400 | |
| MICHAEL C LELAK |
| 2022-08-11T14:22:15-0400 | |
| MICHAEL C LELAK |
| 2022-08-11T14:22:44-0400 | |
| MICHAEL C LELAK |
| 2022-08-11T15:35:34-0400 | |
| THOMAS J OLIVER |
| 2022-08-11T15:36:35-0400 | |
| THOMAS J OLIVER |
| 2022-08-11T15:38:29-0400 | |
| THOMAS J OLIVER |
| 2022-08-11T15:40:01-0400 | |
| THOMAS J OLIVER |
| 2022-08-11T15:41:25-0400 | |
| THOMAS J OLIVER |
| 2022-08-11T15:42:34-0400 | |
| THOMAS J OLIVER |
| 2022-08-11T15:43:47-0400 | |
| THOMAS J OLIVER |
File details come from the government source that posted it. Updated .