L3 - Form 7460-1.pdf
PDF 277 KB Posted
- Attached to
- MFE Fire and Safety Upgrade Federal contract opportunity
- Solicitation number
- 697DCK-22-R-00483
About this file
This solicitation is for upgrading the fire and safety system at McAllen International Airport in McAllen, Texas. The Federal Aviation Administration requires upgrading the fire and safety system for the air traffic control tower. Interested offerors must attend an optional site visit on August 23, 2022 and submit any questions to the contacts listed by August 30, 2022. To be eligible, offerors must have a valid SAM registration and submit a proposal in accordance with the solicitation instructions by the specified due date. The solicitation number is 697DCK-22-R-00483 and was issued by the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK22R00483_Amendment 0003.pdf | ||
| Amendment 3_Past Peformance revised L and M.pdf | ||
| MFE Fire and Safety Upgrade QAs 6 Sep 22.pdf | ||
| 697DCK22R00483_Amendment 0002.pdf | ||
| Site Visit Signin Sheet.pdf | ||
| 697DCK22R00483_Amendment 0001 Signin Sheet.pdf | ||
| L2 - Price Proposal.xlsx | XLSX spreadsheet | |
| J-6 COVID-19 Contractual Requirement Rev 1 8-26-20.pdf | ||
| J-2 Wage Determinations.pdf | ||
| J-7 FAA Certification Vaccination PRAv7_Blank.pdf | ||
| J-4 eInvoicing Vendor Notification Letter.pdf | ||
| J-3 Construction Waste Management Form.xls | XLS spreadsheet | |
| L1 - Past Performance Questionnaire.pdf | ||
| 697DCK-22-R-00483 15 Aug 22.pdf | ||
| J-5 COVID 19 Memo Contractor_8-17-21.pdf | ||
| J-1a Drawings MFE ATCT FLS Upgrade.pdf | ||
| J-1 Specifications MFE ATCT FLS Upgrade.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Genique Clinton Typewritten Text A Notice of Proposed Construction or Alteration (FAA Form 7460-1) must be submitted a minimum of 45 days prior to the planned start of construction for the use of a crane or lift.
File details come from the government source that posted it. Updated .