IRRIGATION NOTES

1. The Contractor shall be familiar with the irrigation technical specifications for this project. Failure to do so shall not relieve him of meeting all of the requirements contained therein.

2. The irrigation plan is diagrammatic in nature, and some drafting liberties have been taken to maintain the graphic clarity of the drawings. All irrigation equipment shall be located in planting areas only, unless noted otherwise. The Contractor shall install piping to minimize changes in direction, avoid placement under large trees or large shrubs, and avoid placement under hardscape features. Refer to the irrigation equipment schedule, installation details, and specifications for equipment and its proper installation.

3. The Contractor shall use only the equipment and products specified in the construction drawings. No substitution of materials will be allowed on the irrigation system without prior authorization from the Contracting Officer and the Government.

4. The Contractor shall visit and inspect the project site. He shall take into consideration known and reasonably inferable conditions affecting the proposed work. Failure to visit the site shall not relieve the Contractor of furnishing materials and performing the work required. Any discrepancies between existing site conditions and those indicated on the plans shall be called to the attention of the Contracting Officer prior to continuance of the project.

5. If the water point of connection is located other than as shown on the drawings, or if the water pressure is different than indicated on the plans, or appears to be unusually high or low, the Contractor shall immediately notify the Contracting Officer prior to proceeding with any irrigation work.

6. The Contractor shall keep the premises clean and free of excess equipment, materials, and rubbish incidental to work of this project. Work areas shall be swept clean and trash and debris picked up daily. Open trenches or hazards shall be protected with yellow caution tape. The Contractor is responsible for removal and legal disposal (offsite) of trash and debris generated by his work on this project.

7. Pipe fittings shall conform to the following standards unless otherwise noted:

A. All main line fittings four (4) inches or larger shall be either M.J. or deep bell push-on, gasketed, and constructed of ductile iron material.

B. All main line fittings three (3) inches and smaller shall be solvent weld Schedule 80 PVC.

C. M.J. tees, Schedule 80 tees with SxT Schedule 80 bushings, or Harco ductile iron service tees are approved on

PVC main lines for automatic control valve installation. M.J. fittings shall be greased and wrapped.

D. All lateral line fittings shall be solvent weld Schedule 40 PVC.

E. All risers and exposed fittings shall be solvent weld Schedule 80 PVC, including conversions to metal pipe and fixtures, unless otherwise noted on the plans.

F. All main line fittings four (4) inches and larger, whether ductile iron or solvent weld, shall be thrust blocked.

8. Backflow prevention devices shall be a reduced pressure principle backflow preventer. Installation shall comply with local, state, and national codes and regulations, and per manufacturer's recommendations (whichever is most restrictive). Included in the installation shall be the specified enclosure.

9. Irrigation wire shall conform to the following:

A. All irrigation control wire shall bear approval as U.L. listed type of underground feeder (direct burial) and each conductor shall be of electrical conductivity grade solid copper in accordance with ASTM 30.

B. No aluminum wire shall be used on this project.

C. Wire size shall be #14 gauge minimum.

D. Two spare wires shall be run from each controller to the farthest valve under its control in all directions and any valve which is on a dead-end line.

E. All wire crossing water, attached to bridges, going under paving, or where conditions require protection, shall be housed in conduit or sleeves. All out-of-ground conduits shall be rigid metal. All buried conduit may be PVC.

F. All splices shall be water-tight. All connections made inside the box to connect wires to the valve shall be made using a 3M DBR/Y dry-splice connector or pre-approved equal. Each connector shall be completely sealed and water-proofed.

G. All other splices in control wire shall be housed in a separate valve box.

H. The pigment or color of the wires shall be integrated into the covering, rather than painted on. All common or ground wires shall be white in color. Where more than one controller is required, a different colored hot wire shall be used for each controller. A separate color shall be used for all spare wires.

10.Run a single fourteen (14) gauge wire along the top of the main line to be used for tracking the location of the main line. The color of the tracing wire shall be different than any other wire color used.

11. All pressure main lines shall have between eighteen (18) and thirty (30) inches of cover, while all lateral lines shall have between twelve (12) and fourteen (14) inches of cover. Trench bedding and backfill material shall consist of existing site soil free of rocks larger than one (1) inch in diameter and any other debris. Wasted pipe and other excess project materials or rubbish (tape, wire, trash, wrappers, boxes, plastic or glass bottles, etc.) shall not be backfilled into the trenches. All trenches shall be backfilled, and then watered sufficiently to insure no settling of the surface. In the event of any backfill settlement prior to the end of the guarantee period, the Contractor shall perform all required repairs at his own expense.

12.Manual drain valves shall be required at all low points in the main lines. All trenches shall be sloped so the pipes will gravity-drain back to the main connection point or to the nearest manual drain.

13.Check valves shall be used where indicated and where necessary to prevent water flow from lower elevation heads when the irrigation system is turned off.

14. All control valves shall be located within shrub areas where possible and installed per the details shown on the plans.

Each control valve shall have its own separate shut-off valve, and only one (1) control valve and gate valve per valve box. No valve manifolds shall be allowed. The bottom of the remote control valve shall be a minimum of four (4) inches above the gravel. Isolation gate valves on the main line shall be located in separate valve boxes.

15. All main lines and lateral lines shall be sleeved where they pass under any paved areas. The size of the sleeve shall be twice the size of the pipe being sleeved, unless otherwise specified on the drawings.

16. The automatic controller shall be of the type and manufacturer specified, and located as shown on the plans. The Contractor shall be responsible for providing 120 volt electrical service to the controller. Coordinate this work with other trades on this project.

17.Prior to backfilling any trenches or irrigation lines:

A. All main lines shall be capped and pressure tested at 120 psi for a period of 4 hours. Any leaks found shall be corrected by removing the leaking pipe or fittings and installing new material in its place. Repeat the pressure test to insure the absence of leaks.

B. The Contractor shall not allow nor cause any of his work to be covered until it has been inspected, tested, and approved by the Contracting Officer.

C. Where a main line has been allowed to sit in the trench uncovered for any length of time prior to testing, the line may be shaded with a thin layer of soil to minimize weather related expansion or contraction of the pipe.

18. The Contractor shall adjust all irrigation heads to provide a uniform coverage and to keep spray off of buildings, walkways, and paved surfaces.

19. When the sprinkler system has been completed, the Contractor shall, in the presence of the Contracting Officer, conduct a coverage test of the water afforded to the planting areas to insure that it is consistent and uniform. The Contractor shall provide, at his own expense, all materials and labor necessary to correct any deficiencies or inadequacies discovered during the coverage test.

20.The Contractor shall keep on site a current and accurate as-built record of his work. It shall include exact dimensioned locations, grades, elevations, and the size of all exterior and interior underground piping, valves, and drains. Dimensions shall indicate distances from columns, buildings, curbs, and similar permanent features on the site. This information shall be recorded on a print as the work progresses, but shall be permanently recorded on a reproducible, two (2) mil Mylar or Tyvek original which shall be given to the Government before the project is accepted.

21.The irrigation contractor shall maintain the system for the duration of the contract period, including the maintenance period.

22.Upon final acceptance of the sprinkler irrigation system as being operational and properly installed, the Contractor shall guarantee the workmanship, materials, fixtures, and equipment to be free from defects for a period of one (1) year after that date.

23.Inline Drippers A. Inline drip tubing shall be spaced approximately equal to the inline emitter spacing. Inline drip tubing spacing may be adjusted to be slightly less than the emitter spacing in order to achieve uniform spacing. For slope applications, place drip tubing laterals parallel to the slope contour. When slopes exceed thirty (30) percent, increase the recommended lateral spacing by twenty five (25) percent on the lower one third (1/3) of the slope.

B. Weed barrier fabric shall be installed directly on top of finished grade soil, with Inline dripper tubing on top of fabric.

Inline dripper tubing shall be secured with soil staples and covered with three (3) inches of specified mulch. Supply and exhaust headers shall be installed at normal lateral line depths.

C. All drip tubing shall be held in place by soil staples and shall conform to the following:

I. Sandy Soil - One staple per every three (3) feet and two (2) staples on each change of direction (tee, elbow, or cross) II. Loam Soil - One staple every four (4) feet and two (2) staples on each change of direction (tee, elbow, or cross) III. Clay Soil - One staple every five (5) feet and two (2) staples on each change of direction (tee, elbow, or cross) D. Installation of inline drip circuits shall generally conform to the following steps:

I. Assemble and install ball valve, filter, remote control valve, and inline pressure regulator assembly in accordance with installation details.

II. Assemble and install supply header(s) in accordance with installation details. Tape or plug all open connections to prevent debris contamination.

III. Install lateral drip lines in accordance with details and relevant specifications and manufacturer's recommendations. Tape or plug all open ends while installing to prevent debris contamination.

IV. Assemble and install exhaust header(s) in accordance with installation details. Tape or plug all open connections to prevent debris contamination.

V. Install air/vacuum relief valve(s) at the zone's highest point(s) in accordance with installation details.

VI. Thoroughly flush supply header(s) and connect drip lateral lines while flushing.

VII. Thoroughly flush drip lateral lines and connect to exhaust header(s) and any interconnecting lateral lines while flushing.

VIII. Thoroughly flush exhaust header(s) and install line flushing valves in accordance with details.

1-23-15

LA-16639

PLANTING NOTES

1. The Contractor shall be familiar with the planting and irrigation technical specifications -- failure to do so will not relieve the contractor of his responsibility to fulfill all requirements in said specifications.

2. Prior to any planting operations, the irrigation system shall be fully operational and all planting areas shall be thoroughly moistened.

3. The planting plan is diagrammatic, and all plant locations are approximate. Plant symbols take precedence over plant quantities shown on the plans and in the Plant Material Schedule. The Contractor shall verify all plant quantities and notify the Contracting Officer of any discrepancies between the quantities and the symbols shown. The Plant Materials Schedule is for the Contractor's convenience only.

4. No substitution of size, grade, variety or any species shall be permitted except by written permission of the Contracting Officer.

5. Final Grade Preparation A. The subgrade Material Shall be rough graded to plus or minus one tenth (+0.1) foot of the final rough grade, which will allow the Contractor to achieve final finished grade through the placement of the topsoil.

B. Protect existing trees, shrubs, lawns, existing structures, fences, roads, sidewalks, paving, curb and gutter and other features during Construction.

C. Protect above or below grade utilities. Contact utility companies to repair damage to utilities. Contractor shall pay all cost of repairs which he causes.

D. Maintain all benchmarks, control monuments and stakes, whether newly established by surveyor or previously existing. Protect from damage and dislocation.

E. Grading Intent: Spot elevations and contours indicated are based on the best available data. The intent is to maintain constant slopes between spot elevations.

F. Conduct work in an orderly manner. Do not create a nuisance. Do not permit soil accumulation on streets or sidewalks. Do not allow soil to be washed into sewers and storm drains.

G. Grade slopes to provide adequate drainage after compaction. Do not create water pockets or ridges. Use all means necessary to prevent erosion of freshly graded areas during construction until surfaces have been constructed and landscaping areas have taken hold.

H. Grades shall be smooth, even, and maintain a consistent uniform slope. Grades with undulating surfaces will be rejected and require re-grading.

I. The Contractor shall maintain a minimum of two (2) percent drainage away from all buildings, structures, and walls.

Finished grades shall be smoothed to eliminate puddling or standing water.

J. All finished grades shall be approved by the Contracting Officer prior to installation of any plant materials.

6. All planting areas shall receive a minimum of four (4) inches of imported topsoil in turf areas and twelve (12) inches in planting beds. All topsoil used on this project shall meet the following criteria:

A. pH:....................................................................................................5.5 - 8.0 B. EC (electrical conductivity):..............................................................<2.0 mmhos per centimeter C. SAR (sodium absorption ratio):........................................................<3.0 D. % OM (percent organic matter):.......................................................2% E. Texture (particle size per USDA classification):

I. Sand:.............................................................................. <70% II. Silt:................................................................................. <70% III. Clay:............................................................................... <30% IV. Stone Fragments (gravels or any soil particle

Greater than two (2) mm in size):................................... <5% (by volume) V. Rocks > 1.5”................................................................... None

In addition, the topsoil shall be fertile, friable, natural loam and shall be capable of sustaining vigorous plant growth.

It shall be free of stones, lumps, clods of hard earth, plants or their roots, sticks, and other extraneous matter. The topsoil shall contain neither noxious weeds nor their seeds. It shall not be used for planting operations while in a frozen or muddy condition. An appropriate fertilizer may be used to provide needed nutrients for healthy and vigorous plant growth. Follow recommendation of topsoil report.

7. The following procedure shall be followed in placing all topsoil:

A. All areas to receive topsoil which have a slope of less than ten (10) percent shall be cross-ripped to a depth of four

(4) to six (6) inches.

B. The surface of the subgrade shall be scarified to a depth of two (2) inches to provide a transition zone between the subgrade and the topsoil. Place the topsoil on the subgrade and fine grade to the final finished grade and topsoil depths as indicated on the drawings and in these notes.

C. Any required soil amendments (i.e. organic matter, fertilizer, gypsum, etc.) shall be placed directly on the topsoil at the required rates and spread evenly over the planting area. The amendments shall then be thoroughly blended into the topsoil to a depth of four (4) inches. Where only a dry, granular fertilizer is to be added, it may be applied to the surface and raked in during the fine grading process.

8. The Contractor shall obtain a soil analysis from any authorized soil testing agency of any existing stockpiled or imported topsoil to be used on the project to verify that it conforms to the topsoil specifications. Test results shall include horticultural nutrient recommendations. The soil samples shall be obtained per the testing agency directions.

Allow ten (10) working days to obtain test results. The costs for such testing shall be the responsibility of the Contractor. Prior to delivery of the imported topsoil to the site, the Contractor shall provide to the Contracting Officer the name and location of the topsoil source, along with the certified soil analysis of the topsoil to be used. The analysis shall verify that the proposed topsoil meets the topsoil specifications, and is capable of supporting healthy plant growth.

9. After imported top soil has been delivered to the site, a second soils test may be required to verify that it is indeed the same soil as previously tested and designated for use in this project. No substitution of top soil shall be allowed without prior written authorization from the Contracting Officer.

10. All plants used for this project shall conform to the following:

A. Any inspection certificates required by law shall accompany each delivery of plants and such certificate shall be filed with the Contracting Officer. All plants shall be subject to inspection and approval at the place of growth or upon delivery to the site for their quality, size, species, and variety. Such approval shall not impair the right of inspection and rejection at the site or during progress of work for size and condition of the plants, latent defects, or injuries. Any and all rejected plants shall be removed immediately from the premises by the Contractor. The Contractor shall make all replacements at his expense should he fail to comply in full with any of the specifications.

Necessary replacements will be made as soon as weather conditions permit and all such plants replaced shall conform to all specifications herein.

B. Plants shall be fresh and vigorous, of normal habit and growth, and free of disease, insects and insect eggs and insect larvae, weeds and weed seed. No heeled-in plants from cold storage shall be accepted except on approval by the Contracting Officer prior to installation.

11. All plants shall be installed using the following procedures:

A. Plants shall be generally located as indicated by the drawing. The Contractor shall stake out the location of all plants and planting areas, and no excavation or installation shall commence until such locations have been approved by the Contracting Officer.

B. All trees and shrubs shall be planted in pits as detailed in the planting details contained herein or as noted on the drawings. Tree and shrub pits shall be circular in outline, with a diameter at least two (2) times the diameter of the rootball of each plant to be installed. They shall be one to two and one half (1 - 2 ½) inches shallower than the rootball depth. When the plant is properly placed in the plant pit, the root collar shall be at or approximately one (1) inch above finished grade. The sides of the plant pit shall be roughened, and not smooth or sculpted.

C. Plant backfill mix shall be one hundred (100) percent native site soil.

D. For container grown plants, remove the container and place the plant vertically in the plant pit, directly on undisturbed soil. The root crown or collar shall be at or approximately one (1) inch above the finished grade.

Perennial plants and ornamental grasses shall be planted with root collar at finished grade.

E. For balled and burlapped plants, place the plant vertically in the center of the pit, with the rootball resting on undisturbed soil. Cut and remove the wire basket and burlap or other wrapping material from the rootball. This may be done with the rootball in the pit. Any burlap or wire pieces underneath the rootball may be left in place if they cannot be removed. Do not fold the burlap over, but cut away as much as possible without disturbing the rootball. No burlap shall be pulled from under the rootball. Backfill the bottom one third (1/3) of the pit as the wire and burlap are removed. In all cases, maintain the integrity of the rootball.

F. Specified backfill material shall be carefully and firmly worked and tamped under and around the rootball to fill all voids. When backfilled and compacted to two thirds (2/3) the depth of the pit, thoroughly water with a hose to completely soak the roots and remove any air pockets.

G. The plant pit shall then be completely backfilled with the specified backfill mix and tamped well. A shallow watering basin or rain cup shall be formed around each plant. This basin will be equal in diameter to that of the original planting pit.

H. After planting, the following operations shall be performed:

I. Stake and mulch all trees per installation details.

II. Remove all nursery stakes ties, and tags from all plants. Prune and remove any dead, damaged, or broken branches. Maintain side growth on all trees.

12.Staking shall be performed as follows:

A. Two (2) 2"x 2" square or 2” diameter round wood stakes, minimum ten (10) feet in length, shall be used to support each tree planted under this contract unless otherwise indicated. Metal t-posts shall not be used.

B. Tree ties shall conform to the staking detail shown on the planting detail sheet. Wire and vinyl hose shall not be used.

C. Each stake shall be located adjacent to the rootball, on opposing sides, to provide maximum support to the trunk.

Do not penetrate the rootball with the stake.

D. The stakes shall be driven into the pit bottom after the tree has been placed in the pit, but before backfilling begins so as to avoid damage to the roots.

E. Stakes and ties shall be removed after one (1) full growing season from the time the tree was installed.

13. All plants shall be thoroughly watered immediately after planting. This shall mean full and thorough saturation of all backfill in the pits and beds during the same day of planting. Water shall be applied only by open end hose at very low pressure to avoid air pockets, injury to the plant, or washing away of backfill. When installed, watered, and fully settled, the plants shall be vertical. Subsequent watering shall be provided by the site's irrigation system. The Contractor shall insure that all plants, especially trees, receive sufficient water to maintain healthy growth and vigor.

Over-watering shall be avoided, and prolonged saturation of the soil around the trees shall be eliminated by appropriately controlling the irrigation circuit which provides water to that area.

14.Rock mulch (see plans for size requirements) shall be placed to a depth of three (3) inches on top of the topsoil in all planting beds and over tree planting pits. The finished grade of the rock mulch shall be as follows:

A. Two (2) inches below the surface or finished grade of any paving, mowstrips, or walks adjacent to the planting area.

B. At adjacent finished grade of the turf surrounding tree planting pits.

C. In tree pits, the mulch shall be kept six (6) inches away from the base of the tree.

D. Just prior to placement of the mulch, the Contractor shall treat the mulched areas with a pre-emergent herbicide according to the manufacturer's recommendations.

15.For projects with turf grass sod, all sod used for this project shall be free of grassy and broad-leaf weeds, contain no bare or burned spots, and be clean and strongly rooted. It shall be of the varieties noted in the plans and Plant Material Schedule. The sod shall be cut using approved methods and equipment. It shall be cut in pieces not exceeding one (1) square yard, with a uniform thickness on all pieces. Sod thickness may vary between a minimum of one (1) inch and maximum one and one half (1 ½) inches, but must be consistent throughout this project. The Contractor shall notify the Contracting Officer of the source of the sod prior to placement. The sod shall be stripped and delivered to the site not more than twenty four (24) hours prior to laying. It shall be maintained in a moist and healthy condition to encourage immediate growth.

16.The following procedure shall be followed when installing the sod:

A. Lay the sod on smooth, moist topsoil, working off planks if required.

B. Rake the topsoil to loosen and level prior to placing each course of sod.

C. Lay strips perpendicular to the direction of the slope. Strips shall be parallel to each other, with their end seams staggered. The sod shall be neither stretched nor overlapped, and all joints shall be butted tightly together.

D. Roll the sod immediately after placing and thoroughly water with a fine spray to a depth sufficient that the underside of the new sod and the soil immediately below the sod are thoroughly wet.

E. On slopes two (2) horizontal to one (1) vertical or steeper, lay the sod perpendicular to the slope and secure every row with wooden pegs at two (2) feet maximum on center. Drive the pegs flush with the soil portion of the sod.

F. Sod pieces shall be laid tightly together. Sod areas with gaps caused by pieces not being laid tightly enough together or areas with ridges from overlapping pieces shall not be accepted and the Contractor will be required to re-lay the sod.

17.For projects with turf grass seed, hydroseeding shall conform to the following general standards:

A. Wood fiber mulch shall be Echofiber or Conwed or equal, that is virgin wood fiber, free of growth--or germination--inhibiting substances. The mulch shall be air dried with not more than fifteen (15) percent moisture by weight. The total organic weight shall be a minimum of ninety eight (98) percent. Inorganic ash content shall be 0.7±0.2 percent. Water holding capacity shall be 1000G/100G (oven dried weight). The pH range shall be 4.0 -

6.0. The fiber length shall meet the following:

I. Fifty (50) percent shall be at least 0.15 inches in length or longer.

II. Fifty (50) percent shall be retained on the twenty eight (28) mesh screen.

B. The seed mix shall be as specified on the plans. Provide written certification that the seed conforms to Utah seed law and is in compliance with Utah State Department of Agriculture regulations.

C. The tackifier shall be M-Binder or Plantego or equal.

D. Application rates shall be as follows:

I. Wood fiber mulch................................................. 50 pounds (min.)/1,000 SF II. Seed mix (see plans)............................................(7 pounds/1,000 SF typ.)

III. Tackifier............................................................... 100 pounds/Acre IV. Fertilizer............................................................... 7 - 8 pounds/1,000 SF V. Water................................................................... 92 gallons/1,000 SF

18.Throughout the course of planting, excess and waste materials as well as excavated subsoil shall be continuously and promptly removed. All areas shall be kept clear and all reasonable precautions taken to avoid damage to existing structures, plants, and grass. When planting has been completed in an area, it shall be thoroughly cleaned of all debris, rubbish, subsoil, and waste materials. These shall be removed from the property and disposed of legally. All planting tools shall also be put away.

19.Substantial Completion shall be defined as the complete installation of all plant materials, staking, mulching, and other work on the project in its entirety. Substantial completion shall not be given on designated portions of a project.

A. At substantial completion of all planting work outlined in these plans, the Contractor shall contact the Contracting

Officer to arrange for a walk through to verify that all aspects of the work have been completed. Work must be fully completed (except for final clean-up) according to all plans, notes, and specifications and exhibit professional workmanship.

B. Notice by the Contractor shall be given, in writing, at least three (3) days in advance to the Government's Representative and Contracting Officer so that proper scheduling can be made for those who are to attend.

C. At the appointed time, an inspection of all plant materials, including staking and mulching, shall be made.

D. A list of uncompleted items (punch list) shall be generated by the Contracting Officer and distributed to the

Contractor and other involved parties within three (3) days of the substantial completion inspection. Each item on the punch list shall be corrected before the project will be approved and accepted by the Government's representative. The Contractor will be back charged for time spent by the Government and any consultants who have been brought to the site for a final inspection when the project is not ready for said inspection.

21.The maintenance/establishment period shall begin one (1) day after the substantial completion inspection. The Contractor shall complete all punch list items during this period, as well as maintain and operate the entire irrigation system. The Contractor shall maintain all plantings until the turf is fully established. The turf shall be considered fully established when turf grass stands come in uniform and thick, with no bare or thin spots, and roots have begun to spread and knit together. No weeds shall be allowed in the grass areas. This shall be a minimum period of sixty (60) days. If winter weather interrupts the maintenance period, the maintenance period shall be suspended and the balance of the time shall be carried over to the next growing season and completed then. The Government and Contractor shall mutually determine when the maintenance period is suspended and when it starts up again. The maintenance work required shall include but not be limited to the following:

A. Appropriate watering of all plant materials.

B. Weeding and removal of all weeds from groundcover and planting areas.

C. Replacement of any dead, dying, or damaged trees, shrubs, perennials, or groundcover.

D. Filling and replanting of any low areas which may cause standing water.

E. Adjusting of sprinkler head heights and watering patterns.

F. Filling and re-compaction of eroded areas, along with any required re-seeding and/or replanting.

G. The turf grass shall be mowed when the blades reach three (3) inches tall and maintained to a minimum height of two (2) inches. No more than one third (1/3) of the blade shall be removed per cutting. The cutting frequency shall be once every five (5) to seven (7) days depending upon turf grass height and growth rate.

H. Weekly removal of all trash, litter, clippings, and all foreign debris.

I. At thirty (30) days after planting, a balanced fertilizer (16-16-16) shall be applied to the turf grass areas at a rate of one half (½) pound of nitrogen per one thousand (1,000) square feet.

J. At intervals of thirty (30) days after the first application of fertilizer to the turf grass, apply a balanced fertilizer

(16-16-16) at a rate of one half (½) pound of nitrogen per one thousand (1,000) square feet until the turf grass is established.

22.A final inspection shall be held prior to the end of the maintenance period to insure that all punch list items have been completed and the entire project is ready for acceptance by the Government. Upon satisfaction that the Contractor has completed all punch list items, the irrigation system is fully and completely functional, and the required As-Built drawings, mylars and maintenance manuals have been submitted, the Government shall accept the project. An official letter of final acceptance shall be prepared and issued to the Contractor, Contracting Officer, and the Government's representative. Upon final acceptance of the project by the Government's representative, the Government shall assume full responsibility for the project, and the guarantee period shall begin.

23.Upon final acceptance of the project as being properly installed, the Contractor shall guarantee the plant materials as follows:

A. All shrubs and groundcovers shall be guaranteed by the Contractor as to growth and health for a period of sixty

(60) days after completion of the maintenance period and final acceptance.

B. All trees shall be guaranteed by the Contractor to live and grow in an acceptable upright position for a period of one

(1) year after completion of the maintenance period and final acceptance.

24.The Contractor shall, within fifteen (15) days after receiving written notification by Government's representative, remove and replace all guaranteed plant materials which die or become unhealthy or appear to be in a badly impaired condition at any time during the guarantee period. Any plants that settle below or rise above the desired finished grade shall also be reset to the proper grade.

A. All replacements shall be plants of the same kind, size, and quality as originally specified in the “plant list” and they shall be furnished, planted, staked, and maintained as specified herein at no additional cost.

B. The Contractor will not be responsible for plants destroyed or lost due to occupancy of the project, vandalism on the part of others, or improper maintenance or lack thereof.

BU

TT

E D

R

EA

ST

S T

COTTONWOOD BUTTE RD

C

"1

"1

"1

43 " 43 "

43 "

43 "

43 "

1" 19.34

1" 24.75

1" 3 9.15

1" 4 5.49

1" 52.28

1" 6 6.25

"1 "1

43 "

SYMBOL MANUFACTURER/MODEL/DESCRIPTION

Drip Control Zone Kit Assembly - .25 - 4.4 Netafim LVCZS8010075-LF Pre-Assembled Control Zone Kit, with 1" Series 80 Control Valve, 3/4" Disc Filter, and Low Flow Pressure Regulator 0.25GPM to 4.4GPM. Install Netafim Operation Flag 10-F-01 on each drip zone.

Drip Control Zone Kit Assembly - 4.5 - 17.6 Netafim LVCZS8010075-HF Pre-Assembled Control Zone Kit, with 1" Series 80 Control Valve, 3/4" Disc Filter, and High Flow Pressure Regulator 4.5GPM to 17.6GPM. Install Netafim Operation Flag 10-F-01 on each drip zone.

Area to Receive Dripline Dripline Assembly Netafim TLDL-4-12 (12) Netafim TLDL-4-12 (12) Techline Pressure Compensating Landscape Dripline. 0.4GPH emitters at 12.0" O.C. Dripline laterals spaced at 12.0" apart, with emitters offset for triangular pattern. Sub Surface Installation (install per drip installation details except provide 4-6" of topsoil cover over dripline laterals and supply and exhaust headers) . UV Resistant.

Area to Receive Dripline Dripline Assembly Netafim TLDL-4-12 (18) Techline Pressure Compensating Landscape Dripline. 0.4GPH emitters at 12.0" O.C. Dripline laterals spaced at 18.0" apart, with emitters offset for triangular pattern. Surface and Sub Surface Installations (see drip installation details). UV Resistant.

SYMBOL MANUFACTURER/MODEL/DESCRIPTION

Quick Coupler Valve Assembly Hunter HQ-44LRC, yellow locking rubber cover, red brass and stainless steel, with 1" NPT inlet, 2-piece body.

Isolation Valve Assembly (line size) Nibco, Matco, or Mueller resilient seat gate valve with non-rising stem, and cross handle.

Master Valve/Flow Sensor Assembly 1-1/2" Netafim Hydrometer w/Reed Switch Register 1-1/2" Master Valve/Flow Sensor with Water Meter and Hydraulic Valve in a Single Unit. Cast Iron with Baked Powder-Coated Finish, Minimum Working Pressure 14 psi. Male Pipe Thread Connection, Reed Switch Register.

Manual Drain Valve Assembly Apollo Bronze ball valve with weld top (78-621-01) 3/4"

Backflow Device Assembly 1-1/2" Wilkins 375 Reduced Pressure Backflow device with Strong Box aluminum enclosure (SBBC-30AL)

Irrigation Controller Assembly Rain Bird ESP8LXME - 8 Station Capable Commercial Controller with Rain Bird ETC-LX (upgrades any ESP-LX Series Controller to an ET/Weather-Based Irrigation Controller).

Mounted on a Plastic Wall Mount.

Point of Connection 1-1/2"

Irrigation Lateral Line: PVC Schedule 40 PVC Schedule 40 irrigation pipe.

Irrigation Mainline: PVC Schedule 40

Pipe Sleeve: PVC Class 200 SDR 21 Typical pipe sleeve for irrigation pipe. Pipe sleeve size shall be twice the size of the pipe being sleeved. Extend sleeves 18 inches beyond edges of paving or construction.

C

Valve Number

Valve Size Valve Flow

Valve Callout

IRRIGATION SCHEDULE

14 Gauge Irrigation Control Wire

N

200 40

SCALE IN FEET

KEYED NOTES

1. THE CONTRACTOR SHALL BE FAMILIAR WITH THE IRRIGATION

TECHNICAL SPECIFICATIONS FOR THIS PROJECT. FAILURE TO DO SO

SHALL NOT RELIEVE HIM OF MEETING ALL OF THE REQUIREMENTS

CONTAINED THEREIN.

2. THE IRRIGATION PLAN IS DIAGRAMMATIC IN NATURE, AND SOME

DRAFTING LIBERTIES HAVE BEEN TAKEN TO MAINTAIN THE GRAPHIC

CLARITY OF THE DRAWINGS. ALL IRRIGATION EQUIPMENT SHALL BE

LOCATED IN PLANTING AREAS ONLY , UNLESS NOTED OTHERWISE.

GENERAL IRRIGATION NOTES

1 1

2" SCH. 40 PVC SUPPLY HEADER

1 1

2" SCH. 40 PVC EXHAUST HEADER

PIPE SLEEVE - SEE IRRIGATION EQUIPMENT SCHEDULE

COORDINATE WITH CONTRACTING OFFICER AND OTHER

TRADES FOR EXACT CONTROLLER LOCATION.

TRENCH DETAIL

SLEEVE DETAIL

REDUCED PRESSURE BACKFLOW ASSEMBLY

1 2

1 WALL-MOUNT CONTROLLER

1 2

5 54 4

MASTER VALVE ASSEMBLY

1 2 3

ISOLATION GATE VALVE (THREADED; LESS THAN 2")

QUICK COUPLING VALVE ASSEMBLY (2 1/2" AND SMALLER)

1 2

DRIPLINE CONNECTIONS

3 4

6 7 8

DRIPLINE CIRCUIT LAYOUT

4 INLINE DRIP LAYOUTS

3 3

1 2 3

8 9

MANUAL DRAIN VALVE ASSEMBLY

DRIP ZONE REMOTE CONTROL VALVE ASSEMBLY

1 2 3

121314

(8)ARA

(2)RAG

(2)GAG

(14) CAK

(2)RAG

(2)RAG

(2)GAG

(14)CAK

(2)RAG

(2) GAG

(3) RAG

(11)CAK

(2)RAG

(2) RAG

(2)GAG

(14)CAK

(2)RAG

(38) CS

(22) CAK

(5)PAR

(3)HSB

(3)PAR

(7)RAG

(1)FNG

(3)HSB

(3)LAL

(1)CDK

(3)HSB

(1)PLL

(3)HSB

(3)FNG

(5)HSB (6)RAG (3)PAR

(3)LAL

(1)CDK

(3)LAL

(3)PAR

(6)HSB

(4)HSB

(1)CDK

(3)FNG

(3)HSB

(6)RAG

(5)LAL

(1)PLL

(6)HSB

(1) CDK

(1)PAR

(1)FNG

(2)LAL

(5) LAL

(1)PAR

(3) ARA

(1)CDK

(3)HSB

(2)PLL

(1)PLL (3) HSB

(3) CDK

(3)HSB

(3)PAR

(3)HSB (3) RAG

(3)FNG

(5)RAG

(3) RAG

(3)FNG

(5)RAG

(5)CAK

(3)CDK

(5)CAK(3) LAL

(3)CAK(7)LAL(5)CAK

(3) PAR

(5) CAK

(3) LAL

(3) CAK

(5) LAL

(3) CAK(3)PAR

(33) CAK

(1)ARA

(12)CAK

(6) CAK

(12) CAK

(7)LAL

(3) AGA

BU

TT

E D

R

EA

ST

S T

COTTONWOOD BUTTE RD

3/16" x 8" Permaloc XL Landscape Edging or Approved Equal. (Mill Finish)

TREES CODE BOTANICAL NAME COMMON NAME CONT CAL QTY

ARA Acer x freemanii `Jeffersred` `Autumn Blaze` Autumn Blaze Maple B & B 2"Cal 12

AGA Amelanchier x grandiflora `Autumn Brilliance` `Autumn Brilliance` Serviceberry B & B Clump 3

GAG Ginkgo biloba `Autumn Gold` TM Maidenhair Tree B & B 2"Cal 8

SHRUBS CODE BOTANICAL NAME COMMON NAME CONT QTY

CS Caragana arborescens Siberian Peashrub 5 gal 38

CDK Caryopteris x clandonensis `Dark Knight` Blue Mist Shrub 5 gal 11

FNG Forsythia x `Northern Gold` Northern Gold Forsythia 5 gal 14

PLL Philadelphus lewisii `Blizzard` Blizzard Mockorange 5 gal 6

RAG Rhus aromatica `Gro-Low` Gro-Low Fragrant Sumac 5 gal 53

ANNUALS/PERENNIALS CODE BOTANICAL NAME COMMON NAME CONT QTY

LAL Lupinus argenteus Lupine 1 gal 46

PAR Perovskia atriplicifolia Russian Sage 1 gal 25

ORNAMENTAL GRASSES CODE BOTANICAL NAME COMMON NAME CONT QTY

CAK Calamagrostis x acutiflora `Karl Foerster` Feather Reed Grass 1 gal 168

HSB Helictotrichon sempervirens `Blue Oats` Blue Oat Grass 1 gal 48

GROUND COVERS CODE BOTANICAL NAME COMMON NAME CONT SPACING QTY

DTF Drought Tolerant Fescue Blend Turf Grass sod 331 sf

RM2 Rock Mulch 1" Minus Rounded River Rock mulch 12,519 sf

RM1 Rock Mulch 3/4" Minus Crushed Gravel mulch 8,124 sf

PLANT SCHEDULE

N

200 40

SCALE IN FEET

DECIDUOUS TREE STAKING

1 EVERGREEN TREE STAKING

2 LANDSCAPE METAL EDGING

4 5

TREE/SHRUB PLANTING4 PERENNIAL PLANTING

COTTONWOOD

FIELD OFFICE

2 - SIDED MONUMENT SIGN1

SIGN BRACKET DETAIL AND ELEVATION4

SIGN BRACKET DETAIL AND ELEVATION3

SIGN BRACKET DETAIL AND ELEVATION2

ROCK BASE AND CONRETE FOOTING DETAILS2

FLAG POLE FOOTING SECTION1

2-2-15

L001
L002
L101
L102
L103
L104
L105
L106
L107
L108