L15PS00204_Cottonwood_Solicitation.pdf
PDF 288 KB Posted
- Attached to
- y--COTTONWOOD FIELD OFFICE REPLACEMENT Federal contract opportunity
- Solicitation number
- L15PS00204
About this file
L15PS00204 Cottonwood Solicitation
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO: L15PS00204
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 4
Type of Contract: Construction, Firm Fixed Priced (FFP), Single Award Contract County: Idaho County, Idaho Type of Construction: Building
Magnitude: $1,000,000 – $5,000,000 NAICS: 236220 SIZE STD: $36.5 M SET-ASIDE: Small
Business
Bureau of Land Management Technical Representative Contracting Officer (CO)
Name: Jeane Steed
Email: jsteed@blm.gov
John Kelley (Contract Specialist /
PRIMARY CONTACT
jakelley@blm.gov / 303-236-2626
Site Visit: Yes See Section L, Clause 52.236-27, Site Visit (Also Section I, Clauses 52.236-02, Differing Site Conditions and 52.236-03, Site Investigation and Conditions Affecting the Work, will be included in the resultant award)
Questions Due: 19 May 2015 2:00 pm Local Pacific Time All questions must be submitted in writing. No questions will be accepted via phone calls.
In accordance with this Solicitation Part IV – Representation and Instructions See Section L, Clause 52.236-27, paragraph(c)
Proposal Submittal Information: 28 May 2015; 2:00 pm Local Pacific Time In accordance with this Solicitation Part IV – Representation and Instructions See Section L, Instructions, Conditions and Notices to Offerors, and Section M, Evaluation Factors for Award.
Due Date and Time is noted in Block 13 of the Standard Form 1442
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 5
Award Selection Process:
Lowest Price, Technically Acceptable
Table of Contents
SIGNATURE EXTENSION PAGE
SECTION B – PRICE SCHEDULE – SUPPLEMENT TO SF 1442
SECTION C: SPECIFICATIONS/DRAWINGS
SECTION D: PACKAGING AND MARKING
SECTION E: INSPECTION AND ACCEPTANCE
SECTION F: DELIVERIES OR PERFORMANCE
SECTION G: CONTRACT ADMINISTRATION DATA
SECTION H: SPECIAL CONTRACT REQUIRMENTS
SECTION I: CONTRACT CLAUSES
SECTION J: LIST OF ATTACHMENTS
SECTION K: REPRESENTATIONS, CERTIFCATIONS, AND OTHER STATEMENTS OF OFFERORS
SECTION L: INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
SECTION M: EVALUATION FACTORS FOR AWARD
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 6
SIGNATURE EXTENSION PAGE
All persons participating in a "joint venture" shall sign as contractors, when submitting a bid. Spaces are provided below for additional signatures. If a written acceptance is required, then all signatures on the bid will be required on the written acceptance.
By: _______________________________________ By: ______________________________________
Name & Title: ______________________________ Name & Title: ______________________________
Address: __________________________________ Address: _________________________________
By: _______________________________________ By: ______________________________________
Address: __________________________________ Address: _________________________________
By: _______________________________________ By: ______________________________________
Address: __________________________________ Address: __________________________________
For persons involved in a "partnership" this proposal must be signed in the partnership name. The contractor shall be prepared to furnish the Government, upon demand, a list of all partners, and proof that they have authority to sign for the partnership.
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 7
SECTION B – PRICE SCHEDULE – SUPPLEMENT TO SF 1442
PRICE SCHEDULE
Estimated Item No. Description Quantity Unit Unit Cost Total Cost
1 Mobilization & Construction Management 1 Lump Sum $ _________
2 Demolition 1
3 Site Excavation & Structural Fill 1
4 Site Work 1
5 Office Building 1
6 Storage Building 1
7 Landscaping & Irrigation 1
8 Site Utilities 1
9 12 Inch Wide Water Main 1250 Linear Feet ------------ $ _________
10 Asphalt Paving 580 Ton ------------ $ _________
TOTAL PROJECT COST $ _________
Period of Performance: 405 Calendar days
Also Reference Section J (Soft Copy attached)
(END OF SECTION)
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 8
SECTION C: SPECIFICATIONS/DRAWINGS.
See Section J for additional attachments to include project specifications and drawings.
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 9
SECTION D: PACKAGING AND MARKING.
SECTION NOT USED-NOT APPLICABLE
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 10
SECTION E: INSPECTION AND ACCEPTANCE.
E.1 Clauses Incorporated by Reference
Clause Title Date
52.246-12 Inspection of Construction August 1996
52.246-13 Inspection -- Dismantling, Demolition, or Removal of Improvements August 1996
52.246-21 Warranty of Construction March 1994
DIAR 1452.201-70 Authorities and Delegations September 2011
E.2 FINAL INSPECTION AND ACCEPTANCE
Final completion of the punch list items, submission of all required submittals, and final cleanup of the project site shall be completed before the contract’s required completion date. The Contracting Officer or his/her designated representative will perform final inspection.
Acceptance of the work will occur only upon written notice of acceptance by the Contracting Officer or any other warranted Contracting Officer at the National Operations Center (NOC), Bureau of Land Management (BLM) performing authorized duties in conjunction with this contract. The contracts required completion date is 405 calendar days after receipt of the notice to proceed.
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 11
SECTION F: DELIVERIES OR PERFORMANCE.
F.1 Clauses Incorporated by Reference
52.211-13 Time Extensions September 2000
52.242-14 Suspension of Work April 1984
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK April 1984 ALTERNATE 1 April 1984
The Contractor shall be required to
(a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 405 calendar days after receipt of the notice to proceed. The time stated for completion shall include final cleanup of the premises.
Alternate 1 April 1984 The completion date is based on the assumption that the successful Offeror will receive the notice to proceed by June 3, 2015 and that the Offeror will provide the necessary bonds and/or insurance within 5 days of the notice to proceed.. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION September 2000
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $847.06 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 12
SECTION G: CONTRACT ADMINISTRATION DATA
G.1 GOVERNMENT POINTS OF CONTACT
Contracting Office Bureau of Land Management, BC-664 Building 50, Denver Federal Center P.O. Box 25047 Denver, CO 80225-0047
G.2 LOCAL INTERNET PAYMENT PLATFORM (IPP) HOTLINE
To check payment status, contact the Payment Hotline at 877-480-9724 or 303-236-2850. You will need to leave a message with the following information:
1. Company Name
2. Contract Number
3. Invoice Number
4. Invoice Amount
5. A brief description of why you are calling
6. Your contact information
If you do not receive a callback from the Payment Hotline within 72 hours, please contact the Contract Officer with the day and time you contacted the Payment Hotline.
DIAPR 2010-14 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM July 2010
(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.
(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award.
Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.
(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive a n automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at http://www.cpars.gov. The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.
(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation and the report will be accessible at http://www.cpars.gov. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 13 response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.
(f) The following guidelines apply concerning your use of the past performance evaluation:
(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.
(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.
(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.
(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
DIAPR 2011-04 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS- INVOICE PROCESSING PLATFORM (IPP) April 2013
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Internet Payment Platform System
(IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a pro per invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
Format and Content: Use the Project Manual table of contents as a guide to establish line items for the schedule of values. Provide at least one line item for each
Specification Section.
Each invoice shall be submitted on the Contractor’s letterhead or invoice form with the following:
1. Invoice date and Government Contract Number
2. Billing period specified with beginning and ending dates. The beginning date must not be later than the completion date or within any previous billing dates.
3. The accounting must follow the approved schedule of values as described in the specification attachment.
4. Total amount due for the billing period
5. Certification of Progress Payment
6. Payrolls (Mail weekly)
7. Substantiation of Subcontractor Payment
8. 52.223-9 Certification with final payment request.
9. A Release of Claims (See 1452.204-70) with a request for final payment.
A Progress Report (may be included in Progress Meeting Notes) shall be submitted to support each invoice and shall include a summary of work performed during the period of performance identified on the invoice, which at a minimum must include:
1. ACTIVITY: Description of the previous month’s project activities and the planned activities for the next month. Also, Describe activities performed on contingency task(s), percent complete, task or deliverable schedule and identify any issues or concerns that may affect the performance and/or completion of the task(s);
2. PERCENTAGE COMPLETE: In accordance with the accepted Schedule of Values, for each task/deliverable: identify the percentage completed during the month and the cumulative percentage completed;
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 14
3. SCHEDULE: Reconcile progress of each task/deliverable with the schedule identified for each; submit a revised schedule as required.
4. ISSUES OR CONCERNS: Identify issues and/or concerns that may affect the project Statement of Work (SOW) or schedule.
5. OTHER INFORMATION: Any other information required in the Contract to be included in the Progress Report.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 15
SECTION H: SPECIAL CONTRACT REQUIRMENTS
H.1 WORK HOURS
The performance period established for this contract is based upon all work being conducted during regular working hours between 7:30am and 5:30pm, Monday through Friday, excluding Government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and Government holidays, a request must be submitted to the Contracting Officer in sufficient time to allow satisfactory arrangements to be made by the Government for access to the work site and inspection.
H.2 COMMUNICATIONS
“Time” for communications received after 3:00pm, after 12:00 pm locally on Fridays, or after 12:00 pm locally prior to a holiday will not start until the next business day. All times are local Pacific time.
H.3 FIRE DANGER SEASON
If the Contracting Officer Representative (COR) allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.
H.4 DRAWINGS
(a) Typical Drawings. Any drawings titled typical are general only and dimensions of each structure will be fixed by the Contracting Officer to adapt the design to existing conditions at the structure location.
(b) Reduced Size Drawings. Any drawings identified as "REDUCED SIZE DRAWINGS" appearing in the solicitation are photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. Prospective bidders desiring to review a copy of the full size drawings may contact the Contracting Officer identified in the solicitation.
H.5 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
(a) The Historic and Archeological Data Preservation Act of 1974, provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or program. (b) If, in connection with operations under this contract, the Contractor, subcontractors, or the employees of any of them, discovers, encounters or becomes aware of any possible historical or archeological data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the Contracting Officer in writing, giving the location and nature of the findings. No objects of cultural resource value may be removed.
(c) Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the Changes clause.
(d) The Contractor will be responsible for protecting the cultural resources within the effected area from damage. In addition, the contractor will be liable for all damage to the identified cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or his representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed.
H.6 WORK BY THE GOVERNMENT
The Government reserves the right to undertake performance by Government forces or other Contractors, the same type of similar work as contracted for herein, as the Government deems necessary or desirable, and to do so will not breach or otherwise violate this contract.
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 16
H.7 EXTENT OF OBLIGATION
The Government obligation for performance of this contract beyond the award price is contingent upon the availability of funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond the amount that has been authorized through the issuance of contract modification, or change order by the Contracting Officer. The funded amount is stated as the “Total.”
H.8 SAFETY AND QUALITY CONTROL PLAN
Once Contract Award has been made, the contractor must provide effective quality assurance and safety plans.
H.8 FEDERAL HOLIDAYS
The following Federal Legal Holidays are observed:
New Year’s Day Martin Luther King, Jr. Day President’s Day Memorial Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 17
PART II – CONTRACT CLAUSES
SECTION I: CONTRACT CLAUSES
CLAUSES Incorporated by Reference
52.202-1 Definitions November 2013
52.203-3 Gratuities April 1984
52.203-5 Covenant Against Contingent Fees May 2014
52.203-7 Anti-Kickback Procedures May 2014
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity May 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity May 2014
52.203-12 Limitation On Payments To Influence Certain Federal Transactions October 2010
52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights
April 2014
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper May 2011
52.204-9 Personal Verification Contractor Personnel January 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards July 2013
52.204-12 Data Universal Numbering System Number December 2012
52.204-13 System for Award Management Maintenance July 2013
52.204-19 Incorporation by Reference of Representations and Certifications December 2014
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
August 2013
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters July 2013
52.215-2 Audit and Records – Negotiation October 2010
52.215-8 Order of Precedence- Uniform Contract Format October 1997
52.215-21 Requirements for Certified Cost or Pricing Data and Data Other than Certified Cost or Pricing Data – Modifications Alternate III
October 2010
52.219-6 Notice of Total Small Business Set Aside November 2011 52.219-8 Utilization of Small Business Concerns October 2014 52.219-14 Limitations on Subcontracting November 2011 52.219-28 Post-Award Small Business Program Representation July 2013 52.222-1 Notice To The Government Of Labor Disputes February 1997
52.222-3 Convict Labor June 2003
52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation May 2014
52.222-6 Construction Wage Requirements May 2014 52.222-7 Withholding of Funds May 2014 52.222-8 Payrolls and Basic Records May 2014 52.222-9 Apprentices and Trainees July 2005
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 18
52.222-10 Compliance with Copeland Act Requirements February 1988 52.222-11 Subcontracts (Labor Standards) May 2014 52.222-12 Contract Termination-Debarment May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Act Regulations May 2014
52.222-14 Disputes Concerning Labor Standards February 1988 52.222-15 Certification of Eligibility May 2014 52.222-21 Prohibition of Segregated Facilities February 1999 52.222-26 Equal Opportunity March 2007
52.222-27 Affirmative Action Compliance Requirements for Construction February 1999 52.222-34 Project Labor Agreement May 2010 52.222-35 Equal Opportunity for Veterans July 2014
52.222-36 Equal Opportunity for Workers with Disabilities July 2014 52.222-37 Employment Reports Veterans July 2014
52.222-40 Notification of Employee Rights Under the National Labor Relations Act December 2010
52.222-50 Combating Trafficking in Persons February 2009
52.222-54 Employment Eligibility Verification August 2013 52.222-55 Establishing a Minimum Wage for Contractors 13658 December 2014 52.223-3 Hazardous Material Identification and Material Safety Data January 1997 52.223-5 Pollution Prevention and Right-to-Know Information May 2011 52.223-6 Drug Free Workplace May 2001
52.223-15 Energy Efficiency in Energy-Consuming Products December 2007
52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts
May 2008
52.223-18 Encouraging Contractor Policy to Ban Text Messaging While Driving August 2011
52.223-19 Compliance with Environmental Management Systems May 2011
52.225-13 Restrictions on Certain Foreign Purchases June 2008
52.225-14 Inconsistency Between English Version and Translation of Contract February 2000
52.227-1 Authorization and Consent December 2007
52.228-2 Additional Bond Security October 1997
52.228-5 Insurance – Work on a Government Installation January 1997
52.228-11 Pledges of Assets January 2012
52.228-12 Prospective Subcontractor Requests for Bonds May 2014
52.228-14 Irrevocable Letter of Credit November 2014 52.228-15 Performance and Payment Bond – Construction October 2010 52.229-3 Federal, State And Local Taxes February 2013 52.229-4 Federal, State, and Local Taxes (State and Local Adjustments) February 2013
52.232-5 Payments under Fixed-Price Construction Contracts May 2014
52.232-16, Alt 1 Progress Payments April 2012 52.232-17 Interest May 2014
52.232-23 Assignment Of Claims May 2014
52.232-27 Prompt Payment for Construction Contracts May 2014
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 19
52.232-33 Payment by Electronic Funds Transfer-- System for Award Management July 2013
52.232-39 Unenforceability of Unauthorized Obligations June 2013
52.232-40 Providing Accelerated Payments to Small Business Subcontractors December 2013
52.233-1, Alt 1 Disputes, Alternate 1 Disputes, Alternate 1 May 2014 December 1991
52.233-3 Protest After Award August 1996 52.233-4 Applicable Law for Breach of Contract Claim October 2004 52.236-1 Performance of Work by the Contractor April 1984 52.236-2 Differing Site Conditions April 1984 52.236-3 Site Investigation and Conditions Affecting the Work April 1984
52.236-5 Material and Workmanship April 1984 52.236-6 Superintendence by the Contractor April 1984
52.236-7 Permits and Responsibilities November 1991
52.236-8 Other Contracts April 1994 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. April 1984
52.236-10 Operations and Storage Areas April 1984 52.236-11 Use and Possession Prior to Completion April 1984
52.236-12 Cleaning up April 1984
52.236-13 Alt 1 Accident Prevention November 1991
52.236-14 Availability and use of Utility Services April 1984
52.236-15 Schedules for Construction Contracts April 1984
52.236-17 Layout of Work April 1984 52.236-21 Alt 1 Specifications and Drawings for Construction February 1997, April 1984 52.236-26 Preconstruction Conference February 1995 52.242-13 Bankruptcy July 1995 52.242-14 Suspension of Work April 1984
52.243-4 Changes June 2007
52.244-2 Subcontracts. October 2010
52.244-6 Subcontracts for Commercial Items October 2014
52.245-1 Government Property April 2012
52.245-9 Use and Charges April 2012
52.246-12 Inspection of Construction August 1996
52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements August 1996
52.246-21 Warranty of Construction March 1994
52.249-2, Alt 1 Termination for Convenience of the Government (Fixed-Price), Alternate 1 April 2012 September 1996
52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements
April 2012
52.249-10, Alt I Default (Fixed-Price Construction) April 1984 52.249-14 Excusable Delays April 1984
52.253-1 Computer Generated Forms January 1991
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 20
DIAR 1452.203-70 Restrictions on Endorsements – Department of the Interior July 1996
DIAR 1452.204-70 Release of Claims – Department of the Interior July 1996
DIAR 1452.215-70 Examination of Records – Department of the Interior April 1984
DIAR 1452.236-70 Prohibition Against Use of Lead-Based Paint – Department of the Interior July 1996
52.203-99, PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS (DEVIATION 2015-02)
(a) The contractor shall not require employees or subcontractors seeking to report fraud, waste, or abuse to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such fraud, waste, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.
(b) The contractor shall notify employees that the prohibition and restrictions of any internal confidentiality agreements covered by this clause are no longer in effect.
(c) The prohibition in paragraph (a) of this clause does not contravene requirements applicable to Standard Form 312, Form 4414, or any other form issued by a Federal department or agency governing the nondisclosure of classified information.
(d)(1) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Resolution Appropriations Act, 2015 (Pub. L. 113-235), use of funds appropriated (or otherwise made available) under that or any other Act may be prohibited, if the Government determines that the contractor is not in compliance with the provisions of this clause.
(2) The Government may seek any available remedies in the event the contractor fails to comply with the provisions of this clause.
52.225-09 BUY AMERICAN ACT - CONSTRUCTION MATERIALS September 2010
(a) Definitions. As used in this clause-- “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101); (ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit .
Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 21
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: None.
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) *
Item 1
Foreign construction material
Domestic construction material
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 22
Item 2
Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
52.228-1 BID GUARANTEE September 1996
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds --
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 25 percent of the bid price or $640,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.228-2 ADDITIONAL BOND SECURITY October 1997
The Contractor shall promptly furnish additional security required to protect the Government and persons supplying labor or materials under this contract if --
(a) Any surety upon any bond, or issuing financial institution for other security, furnished with this contract becomes unacceptable to the Government;
(b) Any surety fails to furnish reports on its financial condition as required by the Government;
(c) The contract price is increased so that the penal sum of any bond becomes inadequate in the opinion of the Contracting Officer; or
(d) An irrevocable letter of credit (ILC) used as security will expire before the end of the period of required security. If the Contractor does not furnish an acceptable extension or replacement ILC, or other acceptable substitute, at least 30 days before an ILC’s scheduled expiration, the Contracting officer has the right to immediately draw on the ILC.
52.228-5 INSURANCE – WORK ON A GOVERNMENT INSTALLATION January 1997
(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.
(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective --
(1) For such period as the laws of the State in which this contract is to be performed prescribe; or
(2) Until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
52.228-11 PLEDGE OF ASSETS January 2012
(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee, a performance bond, or a payment bond --
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 23
(1) Pledge of assets; and
(2) Standard Form 28, Affidavit of Individual Surety.
(b) Pledges of assets from each person acting as an individual surety shall be in the form of—
(1) Evidence of an escrow account containing cash, certificates of deposit, commercial or Government securities, or other assets described in FAR 28.203-2 (except see 28.203-2(b)(2) with respect to Government securities held in book entry form); and/or
(2) A recorded lien on real estate. The offeror will be required to provide—
(i) A mortgagee title insurance policy, in an insurance amount equal to the amount of the lien, or other evidence of title that is consistent with the requirements of Section 2 of the United States Department of Justice Title Standards athttp://www.justice.gov/enrd/ENRD_Assets/Title_Standards_2001.pdf . This title evidence must show fee simple title vested in the surety along with any concurrent owners; whether any real estate taxes are due and payable; and any recorded encumbrances against the property, including the lien filed in favor of the Government as required by FAR 28.203-3(d);
(ii) Evidence of the amount due under any encumbrance shown in the evidence of title;
(iii) A copy of the current real estate tax assessment of the property or a current appraisal dated no earlier than 6 months prior to the date of the bond, prepared by a professional appraiser who certifies that the appraisal has been conducted in accordance with the generally accepted appraisal standards as reflected in the Uniform Standards of Professional Appraisal Practice, as promulgated by the Appraisal Foundation.
52.228-12 PROSPSECTIVE SUBCONTRACTOR REQUESTS FOR BONDS May 2014
In accordance with Section 806(a)(3) of Pub. L. 102-190, as amended by sections 2091 and 8105 of Pub. L. 103-355 (10 U.S.C. 2302 note), upon the request of a prospective subcontractor or supplier offering to furnish labor or material for the performance of this contract for which a payment bond has been furnished to the Government pursuant to 40 U.S.C. chapter 31, subchapter III Bonds, the Contractor shall promptly provide a copy of such payment bond to the requester.
52.228-14 IRREVOCABLE LETTER OF CREDIT November 2014
(a) “Irrevocable letter of credit” (ILC), as used in this clause, means a written commitment by a federally insured financial institution to pay all or part of a stated amount of money, until the expiration date of the letter, upon presentation by the Government (the beneficiary) of a written demand therefor. Neither the financial institution nor the offeror/Contractor can revoke or condition the letter of credit.
(b) If the offeror intends to use an ILC in lieu of a bid bond, or to secure other types of bonds such as performance and payment bonds, the letter of credit and letter of confirmation formats in paragraphs (e) and (f) of this clause shall be used.
(c) The letter of credit shall be irrevocable, shall require presentation of no document other than a written demand and the ILC (including confirming letter, if any), shall be issued/confirmed by an acceptable federally insured financial institution as provided in paragraph (d) of this clause, and --
(1) If used as a bid guarantee, the ILC shall expire no earlier than 60 days after the close of the bid acceptance period;
(2) If used as an alternative to corporate or individual sureties as security for a performance or payment bond, the offeror/Contractor may submit an ILC with an initial expiration date estimated to cover the entire period for which financial security is required or may submit an ILC with an initial expiration date that is a minimum period of one year from the date of issuance. The ILC shall provide that, unless the issuer provides the beneficiary written notice of non-renewal at least 60 days in advance of the current expiration date, the ILC is automatically extended without amendment for one year from the expiration date, or any future expiration date, until the period of required coverage is completed and the Contracting Officer provides the financial institution with a written statement waiving the right to payment. The period of required coverage shall be:
(i) For contracts subject to 40 U.S.C. chapter 31, subchapter III, Bonds, the later of --
(A) One year following the expected date of final payment;
(B) For performance bonds only, until completion of any warranty period; or
(C) For payment bonds only, until resolution of all claims filed against the payment bond during the one-year period following final payment.
(ii) For contracts not subject to 40 U.S.C. chapter 31, subchapter III, Bonds, the later of --
(A) 90 days following final payment; or
(B) For performance bonds only, until completion of any warranty period.
PROJECT DESCRIPTION: Cottonwood Field Office Replacement / 0040197686 PAGE 24
(d)
(1) Only federally insured financial institutions rated investment grade by a commercial rating service shall issue or confirm the ILC.
(2) Unless the financial institution issuing the ILC had letter of credit business of at least $25 million in the past year, ILCs over $5 million must be confirmed by another acceptable financial institution that had letter of credit business of at least $25 million in the past year.
(3) The Offeror/Contractor shall provide the Contracting Officer a credit rating that indicates the financial institutions have the required rating as of the date of issuance of the ILC.
(4) The current rating for a financial institution is available through any of the following rating services registered with the U.S.
Securities and Exchange Commission (SEC) as a Nationally Recognized Statistical Rating Organization (NRSRO). NRSRO’s can be located at the Web stie http://www.sec.gov/answers/nrsro.htm maintained by the SEC.
(e) The following format shall be used by the issuing financial institution to create an ILC:
[Issuing Financial Institution’s Letterhead or Name and Address] Issue Date ______ Irrevocable Letter of Credit No. ________________ Account party’s name ________________________ Account party’s address ______________________ For Solicitation No. __________ (for reference only) To: [U.S. Government agency] [U.S. Government Agency’s Address]
1. We hereby establish this irrevocable and transferable Letter of Credit in your favor for one or more drawings up to United States $ ______. This Letter of Credit is payable at [issuing financial institution’s and, if any, confirming financial institution’s]office at [issuing financial institution’s address and, if any, confirming financial institution’s address] and expires with our close of business on ______, or any automatically extended expiration date.
2. We hereby undertake to honor your or the transferee’s sight draft(s) drawn on the issuing or, if any, the confirming financial institution, for all or any part of this credit if presented with this Letter of Credit and confirmation, if any, at the office specified in paragraph 1 of this Letter of Credit on or before the expiration date or any automatically extended expiration date.
3. [This paragraph is omitted if used as a bid guarantee, and subsequent paragraphs are renumbered.] It is a condition of this Letter of Credit that it is deemed to be automatically extended without amendment for one year from the expiration date hereof, or any future expiration date, unless at least 60 days prior to any expiration date, we notify you or the transferee by registered mail, or other receipted means of delivery, that we elect not to consider this Letter of Credit renewed for any such additional period. At the time we notify you, we also agree to notify the account party (and confirming financial institution, if any) by the same means of delivery.
4. This Letter of Credit is transferable. Transfers and assignments of proceeds are to be effected without charge to either the beneficiary or the transferee/assignee of proceeds. Such transfer or assignment shall be only at the written direction of the Government (the beneficiary) in a form satisfactory to the issuing financial institution and the confirming financial institution, if any.
5. This Letter of Credit is subject to the Uniform Customs and Practice (UCP) for Documentary Credits, International Chamber of Commerce Publication No. _________ (Insert version in effect at the time of ILC issuance, e.g.,” Publication 600, 2006 edition”) and to the extent not inconsistent therewith, to the laws of _____________________ [State of confirming financial institution, if any, otherwise State of issuing financial institution].
6. If this credit expires during an interruption of business of this financial institution as described in Article 17 of the UCP, the financial institution specifically agrees to effect payment if…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .