L15PS00204_003_Questions_and_Answers.pdf

PDF 175 KB Posted

Attached to
y--COTTONWOOD FIELD OFFICE REPLACEMENT Federal contract opportunity
Solicitation number
L15PS00204
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

L15PS00204 003 Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to y--COTTONWOOD FIELD OFFICE REPLACEMENT, newest first.
File Type Posted
L15PS00204_DRAWING_C101.pdf PDF
Sol_L15PS00204_Amd_000003.pdf PDF
L15PS00204_DRAWINGS_A201_A202.pdf PDF
L15PS00204_Site_Inspection_Tour_Pre-Bid_Conference_Record.pdf PDF
L15PS00204_002_Questions_and_Answers.pdf PDF
Sol_L15PS00204_Amd_000002.pdf PDF
L15PS00204_AMENDMENT_001_CONTENT_CHANGES.pdf PDF
WDOL_ID24_04102015.pdf PDF
Sol_L15PS00204_Amd_000001.pdf PDF
L15PS00204_DIVISION_27_SPECIFICATIONS_AMENDMENT_001.pdf PDF
L15PS00204_Cottonwood_Solicitation.pdf PDF
L15PS00204_Cottonwood_DRAWINGS_13-22_OF_89.pdf PDF
L15PS00204_Cottonwood_DRAWINGS_67-76_OF_89.pdf PDF
L15PS00204_Supplemental_All_Buildings_ACM_Report.pdf PDF
L15PS00204_Cottonwood_SPECIFICATIONS.pdf PDF
Sol_L15PS00204.pdf PDF
L15PS00204_Cottonwood_DRAWINGS_77-89_OF_89.pdf PDF
L15PS00204_Cottonwood_DRAWINGS_23-50_OF_89.pdf PDF
L15PS00204_Supplemental_GEOTECHNICAL_REPORT.pdf PDF
L15PS00204_Cottonwood_Field_Office_Replacement_Past_Performance_Questionnaire.pdf PDF
L15PS00204_Cottonwood_DRAWINGS_51-66_OF_89.pdf PDF
L15PS00204_Cottonwood_DRAWINGS_1-12_OF_89.pdf PDF
WDOL_ID51_01232015.pdf PDF
L15PS00204_Banking_Information_Questionnaire_(Editable).doc DOC document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF LAND MANAGEMENT

National Operations Center

Denver Federal Center, Building 50

P.O. Box 25047

Denver, Colorado 80225-0047 http://www.blm.gov

In Reply

Refer To:

1510 (OC-664) May 21, 2015

Subject: SOLICITATION L15PS002004 – COTTONWOOD FIELD OFFICE

REPLACEMENT AMENDMENT 003 QUESTIONS AND ANSWERS

John Kelley, Contract Specialist; Contracting Officer Representative, Tanya Pardy; and Steve

Janzen, Project Manager.

Primary Contact is John Kelley / jakelley@blm.gov / 303-236-2626.

Q1: How does a Contractor submit requests for alternate products/substitutions?

A1: Alternate products/substitution requests are not accepted prior to bidding. Contractors are required to submit a bid proposal based on the specifications. If a manufacturer is not listed under the available manufacturers, as long as the product meets the listed salient characteristics it will be approved as an acceptable product. After award, the Contractor may request product substitutions per Specification

016000 - PRODUCT REQUIREMENTS.

Q2: What is the R-Value of the rigid insulation at the roof area?

A2: R-25 (6.25 per inch - long term).

Q3: The rigid insulation will have spacers for ventilation and on top of those will be sheathing for the shingles to nail to. How thick of sheathing is required and can it be OSB or does it need to be plywood?

A3: Refer to Drawing S001, Note 10.L and Specification 061600-2.3 for sheathing specifications.

Q4: Is there a reason the roof insulation calls out a glass matt facer rather than felt? In this type of application with rigid foam we typically see a felt facer.

A4: This is the Vented Nailable Base Panel manufacture’s standard.

Q5: Is the exterior stone veneer real stone or a manufacturer stone? Part 2 of 044313.16 - ADHERED

STONE MASONRY VENEER of the Specifications appears to require real stone in that it refers to obtaining the stone “from [a] single quarry with resources to provide materials of consistent quality in appearance and physical properties.” However, the drawing on Plan Page A100 Sheet 23 of 89 refers to

“river rock, manufactured stone masonry.”

A5: The exterior stone veneer is manufactured stone. CHANGE 044313.16 - 2.1.A “single quarry” to

“single manufacturer”.

Q6: Plan Page A201 Sheet 31 of 89 has two different stucco types. However both are shaded white. Can the Architect clarify the intent of what type to us where?

mailto:jakelley@blm.gov

A6: The different stucco types are differentiated by hatching on A201 and A202. It may just have plotted out as white shades. See attached drawings A201 and A202 for clarification.

Q7: We have determined that the flashing for the tubular skylights for the office building as on Sheet

A113 Detail 13 is not available. It is recommended that you authorize the same flashings as used in Sheet

A113 Detail 14 for the storage building for use on the office building. Please clarify.

A7: Provide a curb cap style flashing for the office building, similar to Detail 14.

Q8: There is no classification for Davis Bacon wages for tile setters or carpet installers on the wage determination paper work. Request the wage requirements for tile setters and carpet installers.

A8: If there is not classification for a specific worker, then it will fall under LABORER (common or general) on Page 3 of the Building Wage Rate.

Q9: There is an interference problem with the overhead door opening and portal frame on Grid Line A between frame lines 2 and 3. The door as specified will not open in the space that is allowed. Please provide clarification.

A9: Contractor shall coordinate with the overhead door manufacturer and the metal building manufacturer to provide a design that works with the 12’H door by either raising the eave height as required to accommodate the door opening or specify a portal frame that will work with the required opening.

Q10: In looking at the contract documents online with the intention of bidding the signs, I do not see any drawings of sign types. In the specs under 2.2 signs section D. Panel Sign Types it states “(See drawings)”. Maybe I missed them, but any help in this regards is appreciated.

A10: All requirements for sign types are specified in Specification 101423-Part 2. There are no drawing details. The reference to “See drawings” is in reference to the room names and numbers.

ADDITIONAL CLARIFICATIONS

1. Clarification on air monitoring per Specification 028214 - ASBESTOS ABATEMENT: All work required for Class II asbestos work shall comply with applicable OSHA requirements, including exposure assessment and air monitoring.

2. See attached C101 - DEMOLITION PLAN drawing for location of additional sewer service.

3. The City of Cottonwood has scheduled to repave East St starting in mid-July. The city has requested the BLM Contractor complete the 12” water main extension prior to this date. At a minimum, the BLM Contractor shall complete the connection and East St crossing prior to mid-

July.