About this file

This document includes an organizational conflicts of interest (OCI) mitigation plan checklist and related request for proposal for a launch operations support contract. The request for proposal is seeking proposals for launch operations support services to be provided at Vandenberg Air Force Base in California. Proposals are due by January 27, 2022. The North American Industry Classification System code for this effort is 561210 for facilities support services, and the small business size standard is $41.5 million. The OCI mitigation plan checklist outlines requirements for identifying and addressing any actual or potential conflicts of interest among offerors or their proposed subcontractors or teammates. It includes guidelines for defining terms, managing and training personnel on the OCI plan, conducting reviews, describing any OCI situations, and proposing avoidance or mitigation techniques.

View the file

Other files for this federal contract opportunity

Other files attached to Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL, newest first.
File Type Posted
Solicitation Amendment FA461022R00010005 SF 30.pdf PDF
RFP Amendment 0003 Conf SF33 - FA461022R00010003.pdf PDF
L-4_Section L dtd 19Nov21_Revised_18Jan2022.pdf PDF
Atch 2_Appendix A_Property and Equipment Responibility List_Final_6Jan2022.xlsx XLSX spreadsheet
Atch 7 DB WD CA20210018_Mod 28_20211203_12Jan2022.pdf PDF
Atch 10 SCA WD 1986-0431 Rev 54_20210219_12Jan2022.pdf PDF
Atch 11 CBA-2019-12949_12Jan2022.pdf PDF
L-4_Section L dtd 19Nov21_Revised_10Jan2022.pdf PDF
Solicitation Amendment FA461022R00010001_20220112(S).pdf PDF
Atch 2_Appendix J_Contract Data Requiremetns List (CDRL) Deliverables dtd 07Jan22_Final.pdf PDF
Atch 12 DB WD CA20210014_Mod 14_20211029_12Jan2022.pdf PDF
TECH LIBRARY 0 List of documents_Tech Ref Library_07Jan2022.pdf PDF
TECH LIBRARY 14-CES operations support_Template.pdf PDF
L-1_Contractor Staffing Plan and Matrix_Final_9Dec2021.xlsx XLSX spreadsheet
L-4_Section L dtd 19Nov21_Final_9Dec2021.pdf PDF
Atch 2_Appendix C_D_E_F_Final_9Dec2021.pdf PDF
Atch 2_Appendix H_Acronyms and Abbreviations_Final_9Dec2021.pdf PDF
Atch 3_LOSC_GFP Attachment (cover page)_9Dec2021.docx DOCX document
Atch 8 SCA WD 2015-5637_Rev 19_20211020.pdf PDF
Exhibit A_CDRL_A004_Power Plant Operation and Maintenance Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A008_P-E Responsibility List_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A018_Contract Work Breakdown Structure_Final_9Dec2021.pdf PDF
TECH LIBRARY 0 List of documents Tech Ref Library_09DEC21.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1756-um540_-en-p 1756-IRT8I.pdf PDF
TECH LIBRARY 1 Func Desc Instrux - HMI - ACGAL020S000003_B.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1756-IB32 Contact Input Module.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals EthosEnergy Customer Support Services.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Axiomatic corrected current-converter.pdf PDF
TECH LIBRARY 3-8310-PV-182-VTE-20210225.pdf PDF
TECH LIBRARY 12-Pillar Point Outfall Storm Drain Inspection Checklist example.pdf PDF
TECH LIBRARY 13-CDRL_A004_Power_example.pdf PDF
TECH LIBRARY 13-CDRL_A015_Solid Waste Report_example.pdf PDF
L-5_Section M dtd 19Nov21_Final_9Dec2021.pdf PDF
Atch 6_LOSC_DD254_9Dec2021.pdf PDF
Atch 11 Appendix B - Wage Rate Tables (2019-2024)_Redacted.pdf PDF
Exhibit A_CDRL_A002_GFP Inventory Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A010_Daily Maintenance and Repair Schedule_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A014_Cathodic Protection Booklet_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A020_Contract Funds Status Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A027_Facility Assessment Report_Final_9Dec2021.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1444-um001_-en-p.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1407-CGCM-DLR.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1444-td001_-en-p.pdf PDF
TECH LIBRARY 1 Drawings - As Builts - ACGAL020S000002_E1.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Everight Alliance S1AmanualRev022610V13.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Phoenix Contact 2814100.pdf PDF
TECH LIBRARY 10-Fences_Gates_WLF.pdf PDF
TECH LIBRARY 13-CDRL_A006_Waste Water_example.pdf PDF
TECH LIBRARY 13-CDRL_A008_P-E Responsibility List_example.pdf PDF
TECH LIBRARY 13-CDRL_A013_Backflows_example.pdf PDF
Show all 50

Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source Selection Information – See FAR 2.101 and 3.104 – Controlled Unclassified Information (CUI)

Source Selection Information – See FAR 2.101 and 3.104 – Controlled Unclassified Information (CUI)

Attachment L-3

RFP: FA4610-22-R-0001

ORGANIZATIONAL CONFLICTS OF INTEREST (OCI)

DISCLOSURE AND ANALYSIS FORM

Instructions:

Offerors will assess if they or any of their potential subcontractors have any OCI issues in accordance with FAR 9.5, DFARS 209.5 and AFFARS 5309.5. This form requires Offerors to identify whether actual, potential or no conflicts of interest exist. If an actual or potential conflict of interest exists, the offeror is required to provide an OCI mitigation plan to demonstrate how the offeror will avoid or mitigate the OCI. The guideline to address any potential or actual OCI follows this Disclosure and Analysis form.

All Offerors must check one statement, have an authorized official sign on behalf of the offeror, and submit this form (and any supporting documentation) with Offeror’s proposal.

I certify that there is no actual or potential OCI situation associated with my or any of my teammate’s or subcontractor’s performances under any contract I or any of my teammates or subcontractors have been or may be awarded by any federal agency or other entity.

I certify that there is a potential OCI situation associated with my or at least one of my teammate’s or subcontractor’s performances under a contract I or at least one of my teammates or subcontractors have been or may be awarded by any federal agency or other entity. I have proposed an OCI mitigation plan, in accordance with the following guidelines, and it will be submitted with our proposal..

I certify that there is an actual OCI situation associated with my or at least one of my teammate’s or subcontractor’s performances under a contract I or at least one of my teammates or subcontractors have been or may be awarded by any federal agency or other entity. I have proposed an OCI mitigation plan, in accordance with the following guidelines, and it will be submitted with our proposal..

OFFERORS NAME:

APPROVAL NAME:

APPROVAL SIGNATURE AND DATE:

Source Selection Information – See FAR 2.101 and 3.104 – Controlled Unclassified Information (CUI)

ORGANIZATIONAL CONFLICTS OF INTEREST

(OCI) MITIGATION PLAN CHECKLIST

Contractor:

Contract/RFP Number:

Instructions:

1. If the contractor identifies an actual or potential OCI situation associated with its or any of its teammate’s or subcontractor’s performance under any contract it or any of its teammates or subcontractors has been or may be awarded by any federal agency or other entity, the contractor shall propose an OCI mitigation plan to be included as an attachment in any contract resulting from this solicitation. At a minimum, the plan shall address all of the items in the checklist below.

2. The OCI mitigation plan shall include this completed checklist as an appendix to the plan.

The contractor shall enter the page and paragraph numbers from its OCI mitigation plan that correspond to each requirement listed below. If subcontractors or other teammates submit individual OCI mitigation plans, each subcontractor or teammate OCI mitigation plan shall also include a completed checklist. Mark items that are not applicable “N/A.”

1 General Considerations Page/Para

1.1 A clear statement of corporate commitment to continuously identify and avoid or mitigate OCI situations for this acquisition signed by senior corporate official (Vice President or above).

1.2 Corporate commitment to certify annual compliance with OCI Plan.

1.3 Description of the position of the business unit performing this contract effort within the overall corporate structure.

1.4 Organizational charts for the parent organization and the performing business unit (e.g., division, sector, subsidiary, affiliate).

1.5 Letters of commitment to the prime contractor’s OCI Plan from all teammates and subcontractors or individual OCI Plans from all teammates and subcontractors attached to prime contractor’s OCI Plan.

2 Definitions

2.1 Definition of all terms used in the OCI Plan.

2.2 Definitions of all acronyms used in the OCI Plan.

3 Management of OCI Plan

3.1 Identification of individual responsible for oversight and administration of the OCI Plan by position and place in company/business unit organizational structure.

3.2 Identification of individual responsible for maintaining documentation related to OCI Plan by position and place in company/business unit organizational structure.

Source Selection Information – See FAR 2.101 and 3.104 – Controlled Unclassified Information (CUI)

3.3 Location where OCI Plan documentation will be maintained and commitment that the location will be easily accessible by Contracting Officer or Government auditor.

3.4 Identification of corporate OCI-related policies and procedures (policies and procedures shall be attached to the OCI Plan).

3.5 Description of processes and procedures implemented to execute the OCI Plan.

3.6 Commitment to flow OCI Plan requirements down to all teammates and subcontractors. Only those teammates and subcontractors who have committed to the Contractor’s OCI Plan in writing or provided an OCI Plan of their own shall be allowed to commence work on this contract.

3.7 Description of process for advance notification to Contracting Officer of addition, deletion, or changes to subcontractors and teammates. Notification shall include sufficient information for the Contracting Officer to determine whether or not the OCI situation has changed. Notification shall also include any proposed changes to the OCI Plan.

3.8 Description of process for timely notification to Contracting Officer of newly identified OCI situations, OCI Plan violations, or appearance of violation.

Notification shall include a description of the violation or appearance of violation and the actions taken or proposed to be taken to mitigate or avoid repetition of the violation. After conducting further inquiries and discussions as may be necessary, the Contracting Officer and the contractor shall agree on appropriate corrective action, if any.

4 OCI Training

4.1 Plan for OCI training of all personnel working on the program.

4.2 Identification of persons or classes of persons working on the program not subject to OCI training, including rationale and description of alternate OCI mitigation techniques.

4.3 Statement of frequency of training (not less than annually).

4.4 Description of how training completion is documented and where training documentation is maintained.

4.5 Description of process for determining personal (individual) conflicts of interest.

4.6 Description of personnel policies to limit employee transfers that might result in the inadvertent flow of sensitive information to other parts of the company where information could be used inappropriately.

4.7 Statement that requirement is in place for program personnel to execute non-disclosure agreements (NDA) to protect proprietary and other sensitive information.

4.8 Statement that requirement is in place for debriefing personnel who executed NDAs upon their transfer, reassignment, resignation, or retirement.

4.9 Statement of the length of time that NDAs require protection of information.

4.10 Description disciplinary actions for non-compliance with the OCI Plan.

4.11 Description of how and where disciplinary actions are documented.

Source Selection Information – See FAR 2.101 and 3.104 – Controlled Unclassified Information (CUI)

5 OCI Plan Reviews

5.1 Description of how OCI processes and procedures are overseen and audited by the corporate organization.

5.2 Statement of the frequency of corporate audits.

5.3 Commitment to annual certification by a senior corporate official (Vice

President or above) of compliance with the terms of the OCI Plan.

5.4 Description of location where certification documentation is maintained.

6 Description of OCI Situation

6.1 Description of actual and potential OCI situations for prime contractor, subcontractors, or teammates, including classification of OCI situations as biased ground rules, impaired objectivity or unequal access to non-public information. Description identifies applicable contract numbers and customers.

6.2 Explanation of factors that place the prime contractor, subcontractors, or teammates in an OCI situation.

7 OCI Mitigation

7.1 Description of avoidance or mitigation technique(s) proposed for each identified OCI situation in sufficient detail to evaluate efficacy of proposed technique.

7.2 Identification of individuals (by position and place in company/business unit organizational structure) responsible for executing proposed technique(s).

7.3 If OCI situation is one of biased ground rules or impaired objectivity, avoidance or mitigation techniques shall involve more than firewalls.