KYJM189030 SOW Attch 5.2 AF 66 Working Copy.pdf
PDF 235 KB Posted
- Attached to
- Completion Project Repair DMS Facility for Radar Pods B182 Federal contract opportunity
- Solicitation number
- FA6648
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. ITEM SD-01 SD-02 SD-03 SD-04 SD-05 SD-06 SD-07 SD-08 SD-09 SD-10 SD-11 SD-12 SD-13 SD-14 SD-15 APPROVED DIS‐APPROVED CR FA REMARKS
1 01 35 26 / GOVERNMENTAL
SAFETY REQUIREMENTS X X
1.01 Accident Prevention Plan (APP); G X
1.02 Accident Reports; G X
2 01 45 00.00 20 / QUALITY
CONTROL X
2.01 Construction Quality Control (QC)
Plan; G X
01 57 19.01 20 / SUPPLEMENTAL
TEMPORARY ENVIRONMENTAL
CONTROLS
01 74 19 / CONSTRUCTION AND
DEMOLITION WASTE
MANAGEMENT
5 01 78 00 / CLOSEOUT
SUBMITTALS X X
5.01 Operation and Maintenance Manuals;
G X
5.02 As-Built Drawings; G X
6 01 78 23 / OPERATION AND
MAINTENANCE DATA X X
6.01 O&M Database ; G X
6.02 Training Plan ; G X
6.03 Training Outline ; G X
6.04 Training Content ; G X
6.05 Training Video Recording ; G X
6.06 Validation of Training Completion ; G X
7 02 41 00 / DEMOLITION AND
DECONSTRUCTION X
7.01 Demolition Plan; G X
8 03 30 00 / CAST-IN-PLACE
CONCRETE X X X X X
8.01 Quality Control Plan; G X
8.02 Reinforcement; G X
8.03 Reinforcement Steel; G X
8.04 Concrete Mix Design; G X
9 04 20 00 / UNIT MASONRY X X 14-Oct-20 KTR has backerod listed as item "9"on AF Form 66
9.01 Reinforcement Detail Drawings; G X 19-Nov20 Disapproved
9.02 Cement; G X
9.03 Cementitious Materials; G X 28-Sep-20
10 05 12 00 STRUCTURAL STEEL X
10.01 Fabrication Drawings Including
Details of Connections; G X
11 05 50 13 / MISCELLANEOUS
METAL FABRICATIONS X X
11.01 Cover Plates and Frames; G X
11.02 Welding Electrodes and Rods; G X
11.03 Certificates of Welders; G X
11.04 Certified Mill Test Reports for Chemistry and Mechanical Properties; G
X
11.05 Burn Permit to weld on site; G X
12 08 33 23 / OVERHEAD COILING
DOORS X X X X X
12.01 Overhead Coiling Doors; G X 14-Oct-20
12.02 Counterbalancing Mechanism; G X
12.03 Manual Door Operators; G X
12.04 Electric Door Operators; G X
12.05 Bottom Bars; G X
12.06 Guides; G X
12.07 Mounting Brackets; G X
12.08 Overhead Drum; G X
12.09 Hood; G X
12.10 Installation Drawings; G X
12.11 Overhead Coiling Doors; G X
12.12 Hardware; G X
12.13 Counterbalancing Mechanism; G X
12.14 Manual Door Operators; G X
12.15 Electric Door Operators; G X 14-Oct-20
12.16 Fire-Rated Door Assembly; G X
12.17 Overhead Coiling Doors; G X 26-Oct-20
12.18 Hardware; G X
12.19 Mechanism; G X
12.20 Manual Door Operators; G X
12.21 Electric Door Operators;G X
12.22 Fire-Rated Door; G X
12.23 All items listed in Section 3.3.2; G X
12.24 Warranty; G X
13 09 23 00/ GYPSUM PLASTERING 27-Oct-20
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT # PROJECT TITLE CONTRACT NUMBER
KYJM 18‐9030
REPAIR DMS FACILITY FOR AN/ASQ‐236 RADAR PODS, BLDG.
FA66819CA012
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE #
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
SD
‐01
PRECO
N
STRU
CTIO
N
SU
BM
ITTALS
SD
‐02 SH
O P
DRAW
IN
G S
SD
‐03 PRO
DU
CT
D
ATA
SD
‐04 SAM
PLES
AN
D CO
LO
R
SELECTIO
N
SD
‐05 DESIG
N
D
ATA
SD
‐06 TEST
REPO
RTS
SUBMITTAL NUMBERS
SD
‐07
CERTIFICATES
SD
‐08
M
AN
U
FACTU
RER’S
IN
STRU
CTIO
N S
SD
‐09 W
ARRAN
TY
O R O
TH
ER
SD
‐10
O
PERATIO
N
S AN
D M
AIN
TEN
AN
CE
D
ATA
SD
‐11 CLO
SEO
U T
SU
BM
ITTALS
REQ
U
IRED
SU
BM
ISSIO
N D
ATE
REMARKS
D
ATE RECEIVED
IN
CO
TRACTIN
G
D
ATE TO
CIVIL
EN
G
IN
EERIN
G
RETU
RN
SPEN
SE D
ATE
CO
N
TRACT
RESU
BM
ITTAL
FIN
AL APPRO
VAL
AF Form 66, SEP 1986 PAGE 1 OF 3 DATE: 6/30/2022
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT # PROJECT TITLE CONTRACT NUMBER
KYJM 18‐9030
REPAIR DMS FACILITY FOR AN/ASQ‐236 RADAR PODS, BLDG.
FA66819CA012
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE #
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
SD
‐01
PRECO
N
STRU
CTIO
N
SU
BM
ITTALS
SD
‐02 SH
O P
DRAW
IN
G S
SD
‐03 PRO
DU
CT
D
ATA
SD
‐04 SAM
PLES
AN
D CO
LO
R
SELECTIO
N
SD
SD
‐06 TEST
REPO
RTS
SUBMITTAL NUMBERS
SD
‐07
CERTIFICATES
SD
‐08
M
AN
U
FACTU
RER’S
IN
STRU
CTIO
N S
SD
‐09 W
ARRAN
TY
O R O
TH
ER
SD
‐10
O
PERATIO
N
S AN
D M
AIN
TEN
AN
CE
D
ATA
SD
‐11 CLO
SEO
U T
SU
BM
ITTALS
REQ
ISSIO
N D
ATE
REMARKS
D
TRACTIN
G
D
ATE TO
CIVIL
EN
G
IN
EERIN
G
SE D
ATE
CO
N
TRACT
RESU
BM
ITTAL
FIN
AL APPRO
VAL
14 09 51 00 / ACOUSTICAL
CEILINGS X X X X
14.01 Approved Detail Drawings; G X 15-Oct-20
14.02 Acoustical Ceiling Systems; G X 29-Sep-20
14.03 Acoustical Ceiling Tiles; G X
14.04 Fire Resistive Ceilings; G X
15 09 65 00 / RESILIENT FLOORING X X X
15.01 Resilient Flooring and Accessories; G X
15.02 Resilient Flooring and Accessories; G X
15.03 Surface Preparation; G X
09 67 23.14 / CHEMICAL
RESISTANT RESINOUS
FLOORING
16.01 Sealer and Resin; G X 20-Oct-20
Color approved on 19Oct2020, but material for sealer/resin was disapproved 20Oct2020
16.02 Floor Surfacing; G X
16.03 Flooring Systems; G X
16.04 Qualifications of Installer; G X
16.05 Application; G X
16.06 Flooring Systems; G X
17 09 90 00 / PAINTS AND
COATINGS X X X
17.01 Coating; G X
17.02 Manufacturer’s paint Color; G X 13-Nov-20 KTR has submitted sample to Mr.
Mare/contracting office
17.03 Coatings; G X 21-Oct-20
23 00 00 / AIR SUPPLY,
DISTRIBUTION, VENTILATION,
AND EXHAUST SYSTEMS
X X X
18.01 Detail Drawings; G X
18.02 Manual Balancing Dampers; G X
18.03 Centrifugal In Line Exhaust Fan; G X 20-Oct-20
18.04 Operation and Maintenance Manuals;
G X
18.05 Manual Balancing Dampers; G X
18.06 Ceiling Exhaust Fans; G X
19 23 05 93 / TESTING, ADJUSTING,
AND BALANCING FOR HVAC X X
19.01 Records of Existing Conditions; G X
19.02 Certified Final TAB Report for
Proportional Balancing; G X
20 23 07 00 / THERMAL INSULATION
FOR MECHANICAL SYSTEMS
20.01 Duct Insulation Systems; G X
21 23 31 13.00 40 / METAL DUCTS X X
21.01 HVAC Ductwork Plan; G X
21.02 Record Drawings; G X
26 00 00.00 20 / BASIC
ELECTRICAL MATERIALS AND
METHODS
23 26 05 00.00 40 / COMMON WORK
RESULTS FOR ELECTRICAL X X
23.01 Power and Lightning Distribution; G X
23.02 Raceways; G X 26-Oct-20
23.03 Switches; G X 19-Oct-20
23.04 Receptacles; G X 27-Oct-20
23.05 Circuit Breakers; G X
23.06 Panelboards; G X
24 26 09 23.00 40 / LIGHTING
CONTROL DEVICES X X X
24.01 Installation Drawings; G X
24.02 Dimming Ballast Controls; G X
24.03 Dimmer Switch; G X 13-Nov-20 Disapproved due to not properly identifying "Buy America Act"
24.04 Lighting Contactor; G X
24.05 Occupancy Sensors; G X 15-Oct-20
26 35 43 / 400-HERTZ (HZ) SOLID
STATE FREQUENCY
CONVERTER
X X X X X X
25.01 Frequency Converter Drawings; G X
25.02 Frequency Converter; G X
25.03 Work Plan; G X
25.04 Routine Factory Test Plan; G X
AF Form 66, SEP 1986 PAGE 2 OF 3 DATE: 6/30/2022
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT # PROJECT TITLE CONTRACT NUMBER
KYJM 18‐9030
REPAIR DMS FACILITY FOR AN/ASQ‐236 RADAR PODS, BLDG.
FA66819CA012
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE #
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
SD
‐01
PRECO
N
STRU
CTIO
N
SU
BM
ITTALS
SD
‐02 SH
O P
DRAW
IN
G S
SD
‐03 PRO
DU
CT
D
ATA
SD
‐04 SAM
PLES
AN
D CO
LO
R
SELECTIO
N
SD
SD
‐06 TEST
REPO
RTS
SUBMITTAL NUMBERS
SD
‐07
CERTIFICATES
SD
‐08
M
AN
U
FACTU
RER’S
IN
STRU
CTIO
N S
SD
‐09 W
ARRAN
TY
O R O
TH
ER
SD
‐10
O
PERATIO
N
S AN
D M
AIN
TEN
AN
CE
D
ATA
SD
‐11 CLO
SEO
U T
SU
BM
ITTALS
REQ
ISSIO
N D
ATE
REMARKS
D
TRACTIN
G
D
ATE TO
CIVIL
EN
G
IN
EERIN
G
SE D
ATE
CO
N
TRACT
RESU
BM
ITTAL
FIN
AL APPRO
VAL
25.05 Special Factory Test Plan; G X
25.06 Performance Test Plan; G X
25.07 Test Schedule; G X
25.08 Routine Factory Tests; G X
25.09 Special Factory Tests; G X
25.1 Qualifications of Manufacturer; G X
25.11 UL Listing; G X
25.12 Initial Inspection and Tests; G X
25.13 Performance Tests; G X
25.14 Training Syllabus; G X
25.15 Frequency Converter; G X
25.16 Preliminary Operation and
Maintenance Manuals; G X
26 26 51 00 / INTERIOR LIGHTING X X X
26.01 Luminaire Drawings; G X
26.02 Occupancy Sensor Coverage Layout;
G X
26.03 Photometric Plan; G X
26.04 Luminaires; G X 18-Nov-20 *Disapproved 18Nov2020 Under
submittal no 26.04
26.05 LED Luminaire Warranty; G X
26.06 Luminaire Design Data; G X
26.07 Occupancy Sensors; G X 21-Oct-20
*Has another submittal Disapproved on 16Oct2020
*High/low bay sensor is also used under the same line no. That was approved 16Oct2020
26.08 Exit Signs; G X 16-Oct-20
26.09 Luminaire Useful Life Certificate; G X
27 26 52 00.00 40 / EMERGENCY
LIGHTING X X X X
27.01 Central Emergency Lighting Systems
G X
27.02 Material, Equipment, and Fixture
Lists; G X
27.03 Sample Warranty; G X
27.04 Central Emergency Lighting Systems
G X
27.05 Accessories; G X
27.06 System Operational Tests; G X
27.07 Warranty X
28 26 53 00.00 40 / EXIT SIGNS X X X
28.01 Material, Equipment, and Fixture
Lists; G X
28.02 Exit Lighting Units; G X
28.03 Exit Lighting Units; G X
41 22 13.14 / BRIDGE CRANES,
OVERHEAD ELECTRIC, TOP
RUNNING
X X X X X
29.01 Overhead electric crane; G X 21-Oct-20
29.02 Gear Reducers; G X
29.03 Hook; G X
29.04 Trolley; G X
29.05 Hoist; G X
29.06 Controls; G X
29.07 Couplings; G X
29.08 Pendant pushbutton station; G X
29.09 Electrification; G X
29.10 Motors; G X
29.11 Brakes; G X
29.12 Capacity Overload Protective Device;
G X
29.13 Limit Switches; G X
29.14 Load and sizing calculations; G X
29.15 Chain breaking strength; G X
29.16 Post-erection inspection; G X
29.17 Operational Tests; G X
29.18 Hook Proof Test; G X
29.19 No-load Test; G X
29.20 Load Tests; G X
29.21 Overload Test Certificate; G X
29.22 Loss of Power (Panic Test)
Certificate; G X
29.23 Hazardous Material Certificate; G X
29.24 Certificate of the Coupling Alignment
Verification Record; G X
29.25 Brake Setting Record; G X
29.26 Certificate of Compliance with Listed
Standards; G X
29.27 Overhead electric crane; G X
29.28 Data Package 3; G X
AF Form 66, SEP 1986 PAGE 3 OF 3 DATE: 6/30/2022