Solicitation - FA664822R0001.pdf
PDF 283 KB Posted
- Attached to
- Completion Project Repair DMS Facility for Radar Pods B182 Federal contract opportunity
- Solicitation number
- FA6648
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION
CALL:
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
12b. CALENDAR DAYS
YES NO
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
AMOUNTS
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
Section A - Solicitation/Contract Form
COMPLETION PROJECT - Repair DMS Facility for Radar Pods
Purchase Requisition Number: A018861 Date: 08 Oct 2021 Proposal Identifier: FA664822R0001 Date: 05 Aug 2022
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Qty Unit Unit Price
Amount
Completion Project - Performance and Payment Bonds are required within 10 days of award and the penal sum of the bonds shall be equal to 100% of the quoted price. This CLIN is just for the premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable).
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Completion - Construction This CLIN includes all work, labor, materials, and equipment required torepair and modify Building 182, all as required by the contract document drawings and specifications.
Pricing Arrangement: Firm Fixed Price
1 Lot
Section C - Description/Specifications/Statement of Work
Requirements Complete the repair of the DMS FACILITY FOR AN/ASQ-236 RADAR PODS - BLDG 182.
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.246-12 Inspection of Construction. Aug 1996
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: N/A
DoDAAC: FA6648 CountryCode: USA
FA6648 482 LSS LGC
ADMINISTRATIVE ONLY NO REQUISITIONS
29050 CORAL SEA BLVD
HOMESTEAD AFB, FL 33039-1299
UNITED STATES
Daniela Marton Email: daniela.marton@us.af.mil Telephone: 786-415-6815
Inspection and Acceptance Location
Both Destination Instructions: N/A
DoDAAC: FA6648 CountryCode: USA
FA6648 482 LSS LGC
ADMINISTRATIVE ONLY NO REQUISITIONS
29050 CORAL SEA BLVD
HOMESTEAD AFB, FL 33039-1299
UNITED STATES
Daniela Marton Email: daniela.marton@us.af.mil Telephone: 786-415-6815
Section F - Deliveries or Performance
Overall Contract Delivery Period
From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
From date of lead time event to completion of performance 120 Calendar Days Date of Notice to Proceed Receipt
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.201-7000 Contracting Officer's Representative. Dec 1991 252.204-7006 Billing Instructions. Oct 2005 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. Dec 2018
As prescribed in 232.7004(b), use the following clause:
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.
in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Construction Invoice
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Construction Invoice
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(f) [Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC F87700
Issue By DoDAAC FA6648
Admin DoDAAC FA6648
Inspect By DoDAAC F5E3CE
Ship To Code N/A
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) F5E3CE
Service Acceptor (DoDAAC) F5E3CE
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
N/A
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
This requirement is for the completion of a terminated for default construction project. The prevailing Offeror will complete the project IAW the SOW, design requirements and 100% Signed and Sealed Drawings.
SUBCONTRACTORS
The potential prevailing Offeror would be responsible for the coordination of all materials to include delivery, inspection, acceptance and payment of any remaining balances. The Offeror is highly encouraged to contact the subcontractors listed below before submitting their proposal.
The current scaffolding is owned by J and M Scaffolds of Florida and is on lease to the Government. The lease has been paid through January 2023. The prevailing Offeror will assume responsibility for the lease to include maintenance, removal and return of the scaffolding to J and M Scaffolds of Florida, Inc.
J and M Scaffolds of Florida, Inc.
POC: Yesi Scroggin Acct No: 58444-002
PH: (305) 953-5497
The beams were fabricated by Seminole Precast, LLC and are on site. Potential Offerors will have access to them at the site visit. Any technical questions regarding the materials should be directed to Seminole Precast, LLC.
Seminole Precast, LLC POC's: Ruth Guadagnino 386.668.7745 x 43 RGuadagnino@seminoleprecast.com Mike Balmer 386.668.7745 X34 MBalmer@seminoleprecast.com
The bridge crane and hoist system fabricator is Florida Handling Systems, Inc. The prevailing Offeror will be responsible for the coordination, delivery, inspection, acceptance and payment of any due balances regarding the bridge crane and hoist system.
Florida Handling Systems, Inc.
POC: Drew Lowery
PH: (954) 459-1740
dlowery@fhsinc.com
REQUIRED INSURANCE IAW FAR 28.306 (b) IAW clause FAR 52.228-5, "Insurance--Work on a Government Installation" the Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
a. Workmen's Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen's Compensation insurance shall extend to cover employer's liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
b. General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
c. Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and
$500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
Section I - Contract Clauses
FAR 52.242-13 Bankruptcy FAR 52.222-35 Equal Opportunity for Veterans FAR 52.222-36 Equal Opportunity for Workers with Disabilities FAR 52.216-18 Ordering FAR 52.216-19 Order Limitations FAR 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper FAR 52.242-17 Suspension of Work FAR 52.249-2 Termination for Convenience of the Government Alternate I FAR 52.249-10 Default (Fixed-Price Construction)--Alternate I FAR 52.246-26 Reporting Nonconforming Items FAR 52.246-13 Inspection--Dismantling, Demolition, or Removal of Improvements FAR 52.243-4 Changes FAR 52.236-17 Layout of Work FAR 52.236-14 Availability and Use of Utility Services FAR 52.229-3 Federal, State, and Local Taxes FAR 52.222-62 Paid Sick Leave Under Executive Order 13706 FAR 52.222-55 Minimum Wages Under Executive Order 13658 FAR 52.222-54 Employment Eligibility Verification FAR 52.222-27 Affirmative Action Compliance Requirements for Construction FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction FAR 52.219-28 Post-Award Small Business Program Rerepresentation FAR 52.215-8 Order of Precedence--Uniform Contract Format FAR 52.215-2 Audit and Records--Negotiation FAR 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment FAR 52.204-2 Security Requirements--Alternate II FAR 52.204-12 Unique Entity Identifier Maintenance FAR 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity FAR 52.203-7 Anti-Kickback Procedures FAR 52.203-6 Restrictions on Subcontractor Sales to the Government FAR 52.203-5 Covenant Against Contingent Fees FAR 52.203-3 Gratuities FAR 52.203-12 Limitation on Payments to Influence Certain Federal Transactions FAR 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity FAR 52.202-1 Definitions DFARS 252.204-7002 Payment for Contract Line or Subline Items Not Separately Priced DFARS 252.203-7001 Prohibition on Persons Convicted of Fraud or Other Defense-Contract-Related Felonies
FAR 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) FAR 52.228-11, Pledges of Assets (DEVIATION 2020-O0016) FAR 52.228-14 Irrevocable Letter of Credit (Nov 2014) FAR 52.228-17 Individual Surety--Pledge of Assets (Feb 2021) DFARS 252.232-7004 Deviation 2020-O0010DoD Progress Payment Rates (DEVIATION 2020-O0010) (Revision 1) Oct 2014 DFARS 252.232-7010 Levies on Contract Payments DFARS 252.204-7020 NIST SP 800-171 DoD Assessment Requirements DFARS 252.203-7002 Requirement to Inform Employees of Whistleblower Rights DFARS 252.203-7000 Requirements Relating to Compensation of Former DoD Officials
DFARS 252.223-7999 Deviation 2021-O0009 Rev 2 shall not be enforced.
FAR 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Method) does not apply to this contract.
FAR 52.232-11 Extras does not apply to this contract.
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.
Jul 2018
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
Aug 2020
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.219-6 Deviation 2020-O0008 Notice of Total Small Business Set-Aside (DEVIATION 2020-O0008) (Revision 2) Nov 2020 52.219-13 Notice of Set-Aside of Orders. Mar 2020 52.222-1 Notice to the Government of Labor Disputes. Feb 1997 52.222-3 Convict Labor. Jun 2003 52.222-4 Contract Work Hours and Safety Standards -Overtime Compensation. May 2018 52.222-6 Construction Wage Rate Requirements. Aug 2018 52.222-7 Withholding of Funds. May 2014 52.222-8 Payrolls and Basic Records. Jul 2021 52.222-9 Apprentices and Trainees. Jul 2005 52.222-10 Compliance with Copeland Act Requirements. Feb 1988 52.222-11 Subcontracts (Labor Standards). May 2014 52.222-12 Contract Termination-Debarment. May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards. Feb 1988 52.222-15 Certification of Eligibility. May 2014 52.222-21 Prohibition of Segregated Facilities. Apr 2015 52.222-26 Equal Opportunity. Sep 2016
52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Method).
Aug 2018
52.222-50 Combating Trafficking in Persons. Oct 2020 52.223-5 Pollution Prevention and Right-to-Know Information. May 2011 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. Jun 2020 52.223-19 Compliance with Environmental Management Systems. May 2011 52.223-21 Foams. Jun 2016 52.225-13 Restrictions on Certain Foreign Purchases. Feb 2021 52.228-2 Additional Bond Security. Oct 1997 52.228-5 Insurance-Work on a Government Installation. Jan 1997 52.228-12 Prospective Subcontractor Requests for Bonds. May 2014 52.232-18 Availability of Funds. Apr 1984 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Dec 2013 52.233-1 Disputes. May 2014 52.233-3 Protest after Award. Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim. Oct 2004 52.236-2 Differing Site Conditions. Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work. Apr 1984 52.236-5 Material and Workmanship. Apr 1984 52.236-6 Superintendence by the Contractor. Apr 1984 52.236-7 Permits and Responsibilities. Nov 1991 52.236-8 Other Contracts. Apr 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.
Apr 1984
52.236-10 Operations and Storage Areas. Apr 1984 52.236-11 Use and Possession Prior to Completion. Apr 1984 52.236-12 Cleaning Up. Apr 1984 52.236-13 Accident Prevention. Nov 1991 52.236-15 Schedules for Construction Contracts. Apr 1984 52.236-21 Alternate I Specifications and Drawings for Construction. - (Alternate I) Feb 1997 52.242-14 Suspension of Work. Apr 1984 52.243-1 Alternate I Changes-Fixed-Price. - (Alternate I) Aug 1987
52.243-5 Changes and Changed Conditions. Apr 1984 52.244-6 Subcontracts for Commercial Items. Jul 2021 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). Apr 1984
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Sep 2013 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. Dec 2019 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. May 2016
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
Jan 2021
252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. Sep 2014 252.223-7008 Prohibition of Hexavalent Chromium. Jun 2013
252.223-7999 Deviation 2021-O0009 Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors (Deviation 2021-O0009)
Oct 2021
252.225-7001 Buy American and Balance of Payments Program. Dec 2017 252.225-7002 Qualifying Country Sources as Subcontractors. Dec 2017 252.225-7048 Export-Controlled Items. Jun 2013 252.232-7010 Levies on Contract Payments. Dec 2006
252.232-7017 Accelerating Payments to Small Business Subcontractors-Prohibition on Fees and Consideration.
Apr 2020
252.236-7005 Airfield Safety Precautions. Dec 1991 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jun 2013 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.243-7002 Requests for Equitable Adjustment. Dec 2012 252.244-7000 Subcontracts for Commercial Items. Oct 2020 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military Operations. Oct 2010
FAR Clauses Incorporated by Full Text
52.204-1 Approval of Contract. Dec 1989
As prescribed in 4.103 , insert the following clause:
Approval of Contract (Dec 1989)
This contract is subject to the written approval of the contracting officer[identify title of designated agency official here] and shall not be binding until so approved.
(End of clause)
52.211-10 Commencement, Prosecution, and Completion of Work. Apr 1984
As prescribed in 11.404(b), insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.
Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 days.* The time stated for completion shall include final cleanup of the premises.
* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
(End of clause)
52.211-12 Liquidated Damages-Construction. Sep 2000
As prescribed in 11.503(b), insert the following clause in solicitations and contracts:
Liquidated Damages-Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $234.00 [Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.219-14 Deviation 2020-O0008 Limitations on Subcontracting (DEVIATION 2020-O0008)(Revision 1) Sep 2021
52.219-14 Limitations on Subcontracting (DEVIATION 2020-O0008).
Insert the following clause in solicitations and contracts for supplies, services, and construction, if any portion of the requirement is to be set aside for small business and the contract amount is expected to exceed the simplified acquisition threshold. This includes multiple-award contracts when orders may be set aside for small business concerns, as described in 8.405-5 and 16.505(b)(2)(i)(F), and when orders may be issued directly to a small business concern as described in 19.504(c)(1)(ii). For contracts that are set aside, the contracting officer shall indicate in paragraph (g) of the clause whether compliance with the limitations on subcontracting is required at the contract or order level:
Limitations on Subcontracting (MAR 2020) (DEVIATION 2020-O0008)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) “Similarly situated entity,” as used in this clause, means a first-tier subcontractor, including an independent contractor, that—Definition.
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) This clause applies only to—Applicability.
(1) Contracts that have been set aside for small business concerns or 8(a) participants;
(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) participants;
(3) Contracts that have been awarded on a sole-source basis in accordance with subpart 19.8;
(4) Orders set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F), if the order amount is expected to exceed the simplified acquisition threshold;
(5) Orders competed among 8(a) participants in accordance with subpart 19.8 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F), regardless of dollar value;
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference; and
(7) Orders issued directly to small business concerns or 8(a) participants under multiple-award contracts as described in 19.504(c)(1)(ii).
(d) An independent contractor shall be considered a subcontractor.Independent contractors.
(e) By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract Limitations on subcontracting.
assigned a NAICS code for—
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. Other direct costs are excluded to the extent they are not the principal purpose of the contract and cannot be obtained from small business concerns;
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 75 percent subcontract amount that cannot be exceeded.
(f) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
(g) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1) and (2) of this clause—
[ ]Contracting Officer check as appropriate.
By the end of the base term of the contract and then by the end of each subsequent option period; or
By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(3) and (4) of this clause, by the end of the performance period for the order.
(End of clause)
52.225-9 Buy American-Construction Materials. Feb 2021
As prescribed in , insert the following clause:25.1102(a)
BUY AMERICAN-CONSTRUCTION MATERIALS (FEB 2021)
. As used in this clause-(a) Definitions
-Commercially available off-the-shelf (COTS) item
Means any item of supply (including construction material) that is-(1)
A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation (FAR) 2.101);(i)
Sold in substantial quantities in the commercial marketplace; and(ii)
Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in (iii) the commercial marketplace; and
Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.(2)
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.
However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
-Cost of components means
For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the (1) construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation (2) costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
means-Domestic construction material
For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-(1)
An unmanufactured construction material mined or produced in the United States; or(i)
A construction material manufactured in the United States, if-(ii)
The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its (A) components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
The construction material is a COTS item; or(B)
For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material (2) manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, Fastener rivets, nails, clips, and screws.
means a construction material other than a domestic construction material.Foreign construction material means iron or steel products not produced in the United States. Produced in the United States means that all Foreign iron and steel manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
means that the cost of the iron and steel content exceeds 50 percent of the total cost of Predominantly of iron or steel or a combination of both all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.Steel
"United States" means the 50 States, the District of Columbia, and outlying areas.
Domestic preference. (b) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction (1) material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
This requirement does not apply to information technology that is a commercial item or to the construction materials or components (2) listed by the Government as follows:
[Contracting Officer to list applicable excepted materials or indicate "none"]None
The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government (3) determines that-
The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to (i) the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
The application of the restriction of the Buy American statute to a particular construction material would be impracticable or (ii) inconsistent with the public interest; or
The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available (iii) commercial quantities of a satisfactory quality.
Request for determination of inapplicability of the Buy American statute. (c) (1) Any Contractor request to use foreign construction material (i) in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
A description of the foreign and domestic construction materials;(A)
Unit of measure;(B)
Quantity;(C)
Price;(D)
Time of delivery or availability;(E)
Location of the construction project;(F)
Name and address of the proposed supplier; and(G)
A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this (H) clause.
A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the (ii) format in paragraph (d) of this clause.
The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a (iii) duty-free certificate may be issued).
Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably (iv) foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer (2) and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is (3) noncompliant with the Buy American statute.
. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the (d) Data following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description
Unit of Measure
Quantity Price
(dollars)
Item1:
Foreign construction material ____ ____ ____
Domestic construction material ____ ____ ____
Item2: ____ ____ ____
Foreign construction material ____ ____ ____
Domestic construction material
[* ].Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)
[ ]List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
[ ]Include other applicable supporting information.
(End of clause)
52.228-15 Performance and Payment Bonds-Construction. Jun 2020
As prescribed in , insert a clause substantially as follows:28.102-3(a)
PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION (JUN 2020)
. As used in this clause-(a) Definitions means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; Original contract price or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition (b) Amount of required bonds Regulation 28.102-1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
. The penal amount of performance bonds at the time of contract award shall be 100 percent of (1) Performance bonds (Standard Form 25) the original contract price.
. The penal amount of payment bonds at the time of contract award shall be 100 percent of the (2) Payment Bonds (Standard Form 25A) original contract price.
Additional bond protection. (3) The Government may require additional performance and payment bond protection if the contract price is (i) increased. The increase in protection generally will equal 100 percent of the increase in contract price.
The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond (ii) or to obtain an additional bond.
. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the (c) Furnishing executed bonds Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names (d) Surety or other security for bonds appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the or may be obtained from the:Federal Register
U.S. Department of the Treasury, Financial Management, Service Surety Bond Branch, 3700 East West Highway, Room 6 F01, Hyattsville, MD 20782.
Or via the internet at http://www.fms.treas.gov/c570/.
(40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in (e) Notice of subcontractor waiver of protection writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
(End of clause)
52.232-5 Payments under Fixed-Price Construction Contracts. May 2014
As prescribed in , insert the following clause:32.111(a)(5)
PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)
. The Government shall pay the Contractor the contract price as provided in this contract.(a) Payment of price
. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as (b) Progress payments determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
The Contractor's request for progress payments shall include the following substantiation:(1)
An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment (i) requested.
A listing of the amount included for work performed by each subcontractor under the contract.(ii)
A listing of the total amount of each subcontract under the contract.(iii)
A listing of the amounts previously paid to each such subcontractor under the contract.(iv)
Additional supporting data in a form and detail required by the Contracting Officer.(v)
In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be (2) taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if-
Consideration is specifically authorized by this contract; and(i)
The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform (ii) this contract.
. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment (c) Contractor certification shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that-
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
____ ( )Name
____ ( )Title
____ ( )Date
. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of (d) Refund of unearned amounts such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-
Notify the Contracting Officer of such performance deficiency; and(1)
Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this (2) clause) equal to interest on the unearned amount from the 8 thday after the date of receipt of the unearned amount until-
The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or(i)
The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the (ii) unearned amount.
. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be (e) Retainage made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
. All material and work covered by progress payments made shall, at the time of payment, become (f) Title, liability, and reservation of rights the sole property of the Government, but this shall not be construed as-
Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration (1) of any damaged work; or
Waiving the right of the Government to require the fulfillment of all of the terms of the contract.(2)
. In making these progress payments, the Government shall, upon request, reimburse the Contractor for (g) Reimbursement for bond premiums the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
. The Government shall pay the amount due the Contractor under this contract after-(h) Final payment
Completion and acceptance of all work;(1)
Presentation of a properly executed voucher; and(2)
Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that (3) the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .