This is a technical application procedure document from Crown USA, Inc., a manufacturer of thermoplastic road marking materials, detailing the standard application process for KwikLine products. The document outlines comprehensive preparation and application requirements for road marking installation, including surface preparation specifications, material heating temperatures, and glass sphere application rates. The procedure emphasizes critical environmental conditions, specifying that applications should not occur when road surface and ambient temperatures fall below 50°F, with material heating maintained between 350°F and 400°F depending on ambient conditions ranging from 50°F to 90°F and above.
The document contains essential safety and quality assurance guidance for contractors applying thermoplastic road markings. Key technical specifications include curing requirements for new asphalt (3 to 5 days minimum), sealer primer application protocols for Portland cement concrete and aged asphalt surfaces, and optimal glass sphere application rates of 8 to 10 pounds per 100 square feet to maintain retro-reflectivity standards. The procedure prohibits mixing hydrocarbon and alkyd materials, establishes material heating restrictions with a maximum safe temperature of 440°F to prevent flashing or ignition, and includes comprehensive safety warnings regarding hot material contact and fume inhalation. Crown USA, Inc. is headquartered in Woodbury, Georgia, and provides contact information for technical support and guidance on material specifications and Safety Data Sheets.
View the file
Other files
Show 40 more
Latest 50 of 86 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KwikLine Standard Application Procedure
1) Road must be clean and dry to maximize bonding. Sweep or blow debris from the road.
2) When applying on new concrete, all curing compound should be removed before sealer application. Apply
Crown’s recommended Sealer Primer to PCC and aged asphalt with a significant amount of exposed aggregate according to manufacturer’s recommended procedures. Make certain all solvent has evaporated and sealer has dried. Solvent left in the sealer will cause obstructions in the line commonly referred to as blistering and pin holing. If a sealer is applied at a heavier mil thickness, solvent can be trapped beneath the top dry film resulting in the same type of problem.
3) Crown USA, Inc. recommends that new asphalt be allowed to cure for 3 to 5 days before applying alkyd thermoplastic. However, tracking may still occur based on the condition of the asphalt. Using temporary paint for traffic control and giving the asphalt time to cure before applying thermoplastic will reduce tracking of the asphalt liquid onto the thermoplastic line.
4) Do not mix hydrocarbon and alkyd.
5) Heat material to 350 – 400°F in equipment with agitation. At ambient temperatures of 50 – 60°F, apply materials at 375 – 400°F. At ambient temperatures of 85 – 90°F, apply materials at 350 – 375°F.
6) Do not apply material when road surface and ambient temperatures are below 50°F. Wind will cause material cooling in spray and ribbon gun applications. To compensate for this, apply material at upper end of the application range (375 – 400°F). During high road and ambient temperatures greater than 85°F, apply material at lower end of the application range (350 – 375°F) to facilitate cooling. Set times may increase slightly when temperatures exceed 85°F.
7) Avoid contact with hot material. Do not breathe hot fumes. Heating material above 440°F may cause material to flash or ignite (refer to SDS for details).
8) Apply glass spheres uniformly using pressurized or gravity devices. Optimal rates of application range from 8
– 10 lbs./100 ft2 depending on application method and glass spheres used. Flooding of glass beads results in reduced retro-reflectivity.
9) Hot molten thermoplastic will burn skin. Do not attempt to remove the thermoplastic from the skin. Cool under running water and seek medical attention immediately (refer to SDS).
10) Always store material in a cool dry place. If stored outside, always cover material to prevent damage, which may be caused by moisture.
Crown USA, Inc.
35 Industrial Park Drive, P.O. Box 789, Woodbury, GA 30293
Phone: (706) 553-9500 Fax: (706) 553-9501 www.crownusa.com http://www.crownusa.com/