This is Addendum No. 2 issued by Owen-Ames-Kimball Co. for the West Elementary Media Center Renovation project at Kelloggsville Public Schools in Grand Rapids, Michigan, dated February 1, 2019. The addendum contains architectural clarifications including the issuance of Sheet A602 showing carpet tile installation diagrams and RFI responses. Key changes include the removal of Alternate #1 (EIFS with Metal Siding), clarifications on door/frame specifications, lintel sizing, hardware updates, and confirmation that the sides of the canopy will be metal to match the roofing.
The addendum addresses multiple technical clarifications through RFI responses, including updates to hardware specifications (reduced from 18 sets to 4 sets), confirmation that Bid Category 1 - General Trades is responsible for solid surfacing fabrications and visual display units, and the addition of specifications for visual display units. The document also clarifies various construction details such as CMU sills at borrowed lites, demising wall requirements, and electrical/mechanical drawing updates. Sheet A602 provides detailed carpet tile installation diagrams for the media center renovation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OWEN-AMES-KIMBALL CO. WEST ELEMENTARY MEDIA CENTER RENOVATION
300 IONIA AVENUE N.W. KELLOGGSVILLE PUBLIC SCHOOLS
GRAND RAPIDS, MI 49503
ADDENDUM NO. 2
February 1, 2019
The following items are changes, clarifications, corrections of errors, etc., with respect to the Contract Documents previously issued. This addendum shall be a part of the Contract Documents.
Items listed below may or may not affect the cost of the Contractor's Proposal. Changes in cost shall be incorporated in the Contractor's Proposal.
ARCHITECTURAL ITEMS
Item No. A1-1 – Issue Sheet - A602
Item No. A1-2 – Issue RFI Responses
End of Addendum No. 2.
Prebid RFIs & Clari�cations
# Question O�cial Response Add 1 - Bid
RFI
What is the extent of the scope for Alternate #1 covering EIFS with Metal Siding at Exterior, there is nothing shown on the drawings?
What is the extent of the scope for Alternate #1 covering EIFS with Metal Siding at Exterior, there is nothing shown on the drawings? - Alternate #1 has been removed from the scope of work on the project. Drawings were updated for this, but the spec was not. This will be formally documented in the addendum write-up.
Add 1 - Bid
RFI
Are there structural steel details for: -lintels above borrowed lites -lintels above doors 112, 115A, 116B -lintel above alcove of door 112 Borrowed lites – hollow metal ? Door 115A is not clear on print what it is – HM, wood, aluminum? Door schedule is missing hardware group numbers Are sills required at borrowed lites? If so, details on proDle/ material
Are there structural steel details for: Lintel sizes will be issued in the addendum. -lintels above borrowed lites -lintels above doors 112, 115A, 116B -lintel above alcove of door 112 Borrowed lites – hollow metal ? - Hollow Metal Door 115A is not clear on print what it is – HM, wood, aluminum? - Door is wood. Frame is hollow metal. Refer to door schedule for 115A. If you are referring to door 115B, that information will be issued in the addendum. Door schedule is missing hardware group numbers - This information will be updated in the issued addendum. Are sills required at borrowed lites? If so, details on proDle/material - Double bullnose CMU. A detail will be shown in issued addendum.
Add 1 - Bid
RFI
Is there a spec for the visual display units? Is there a spec for the visual display units? - A spec will be issued in the addendum.
Add 1 - Bid
RFI
What is the framing/Dnish at sides of canopy and are there structural steel details for the canopy framing? See Addendum 1
Add 1 - Bid
RFI
The hardware schedule appears to not be correct, there are over 18 sets listed and we don't have that many doors. This will be addressed in the addendum. The hardware spec will be updated to show 4 sets.
Add 1 - Bid
RFI
Electrical pages E101 and T 101 have keyed notes but doesn’t have any notes listed.
Please provided keyed notes for these pages. Refer to Addendum 1
Add 1 - Bid
RFI
Page A 101 room 115 does not have a demising wall to separate the room into two rooms. All electrical and mechanical pages shows a wall. Is there a wall? Refer to Addendum 1
Add 1 - Bid
RFI
Who is responsible for added speciDcations 06 6116 Solid Surfacing Fabrications and 10 1100 Visual Display Units? Bid Category 1 - General Trades
Add 1 - Bid
RFI
1.) Which bid category is to include sealing watertight the RTU curb and the gas pipe?
2.) Per the architect this is a prevailing wage project and the CM manual will have the wage rates. Is that correct? 3.) Snow Guards are speciDed but they are not shown. Are snow guards required?
Add 1 -
1. There is a demo note #4 at Secure Vestibule that does not seam to apply?2. There is an additional modular wall not shown on the drawings that needs to be removed.3.
1. There is a demo note #4 at Secure Vestibule that does not seam to apply? 1. Demo note #4 has been removed from the sheet. 2. There is an additional modular wall not shown on the drawings that needs to be removed. 2. This wall will be shown for removal in the addendum. 3. FE and FEC are assigned, there
Owen-Ames-Kimball Co.
Printed on Fri Feb 1, 2019 at 09:15 am EST
KPS - West Elementary Media Center Renovation 4555 Magnolia SW
Grand Rapids, Michigan 9548
# Question O�cial Response Pre- Bid
RFI
FE and FEC are assigned, there does not appear to be any, what qty do you require?4.
The structural steel lintels at doors and tube steel at the canopy are not sized anywhere.5. Display Board Spec?
does not appear to be any, what qty do you require? 3. ClariDcations will be shown in issued addendum. 4. The structural steel lintels at doors and tube steel at the canopy are not sized anywhere. 4. Lintel sizes will be shown in the addendum. 5. Display Board Spec? 5. A display board spec will be issued in the addendum.
Pre- Bid
RFI
What are the side of the canopy to be? Metal to match the roof or EFIS to match the SawDt? Metal to match the canopy rooDng.
Pre- Bid
RFI
The note on the Dnish Eoor plan A601 for the Media Center room 112 says to refer to sheet A602 for the carpet tile install diagram, but there is no plan. Is there a layout plan available?
Sheet A602 is issued as part of Addendum 2.
Owen-Ames-Kimball Co.
Printed on Fri Feb 1, 2019 at 09:15 am EST
KPS - West Elementary Media Center Renovation 4555 Magnolia SW
Grand Rapids, Michigan 9548
Tower Pinkster Titus Associates Inc.
242 East Kalamazoo Avenue, Suite 200 Kalamazoo, Michigan 49007-5828
269.343.6133 PHONE 269.343.6633 FAX
TOWERPINKSTER.COM
ALL RIGHTS RESERVED2019©
DATE
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
4 East Fulton Street, Suite 200 Grand Rapids, Michigan 49503
616.456.9944 PHONE 616.456.5936 FAX
JANUARY 10, 2019
WEST
ELEMENTARY
MEDIA CENTER
RENOVATION
Grand Rapids, Michigan
ENLARGED
CARPET
INSTALLATION
DIAGRAM
12-194.45 A 602
KELLOGGSVILLE
PUBLIC
SCHOOLS