This is a Statement of SOS&S (Specifications, Organizations, Standards & Supplies) Government Estimate for USCGC JUNIPER (WLB-225A) Drydock Availability in FY2026, presented as a blank cost estimate template in Excel format. The document outlines 93 definite line items and multiple optional line items representing comprehensive drydock maintenance and repair services for the Coast Guard cutter, including hull inspection and preservation, propulsion system overhaul, tank cleaning and inspection, rudder maintenance, cathodic protection renewal, compartment insulation, and various equipment upgrades such as the Fluxgate Digital Compass System and Steering System PLC upgrade. All unit prices in this template are listed at $0.00, indicating this is a blank form awaiting cost data completion.

The estimate template includes detailed cost breakdown sections organized by labor categories (Engineering Tech, Machinist/Pipe Fitter, Electrician, Shipfitter, Welder, Firewatch, Insulator/Lagger, Painter, General Labor/Helper/Rigger, and Supervisor/QA/NDT), with assumed composite labor rates of $55 per hour, G&A factor of 15%, and profit factor of 10%. Work locations are specified across multiple shipyards including Baltimore, Biloxi, Boston, Charleston, Corpus Christi, Honolulu, Houston, Los Angeles, and other coastal facilities. The template accommodates material and subcontractor costs, with drydock services (item D-068) explicitly identified at a unit price of $149,250.00 with 1,600 labor hours as the primary cost driver. This government estimate serves as the baseline for the RFQ solicitation 70Z08526QIBCT0026 for ship repair services scheduled to commence April 28, 2026, through August 26, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

GOVERNMENT ESTIMATE FOR:
USCGC JUNIPER (WLB-225A) DRYDOCK AVAILABILITY FY2026
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Fire Prevention Requirements$0.00NSP1$0.00
D-002Hull Plating, U/W Body, Inspect$0.00JOB1$0.00
D-003Hull Plating, U/W Body, Ultrasonic Testing$0.00JOB1$0.00
D-004Hull Plating, Freeboard, Ultrasonic Testing$0.00JOB1$0.00
O-005U/W Body, Preserve, 100 percent$0.00JOB1$0.00
D-006U/W Body, Preserve, Partial, Condition A$0.00JOB1$0.00
O-007U/W Body, Preserve, Partial, Condition B$0.00JOB1$0.00
O-008U/W Body, Preserve, Partial, Condition C$0.00JOB1$0.00
D-009Hull Plating Freeboard, Preserve, Partial$0.00JOB1$0.00
O-010Hull Plating Freeboard, Preserve, 100 Percent$0.00JOB1$0.00
D-011Appendages, U/W, Leak Test$0.00JOB1$0.00
D-012Propulsion Shaft Fairwaters And Rope Guards, Inspect$0.00JOB1$0.00
D-013Appendages, U/W, Internal, Preserve$0.00JOB1$0.00
D-014Chain Lockers, Clean and Inspect$0.00JOB1$0.00
D-015Voids, Non-Accessible, Leak Test$0.00JOB1$0.00
D-016Voids, Non-Accessible, Internal Surfaces, Preserve$0.00JOB1$0.00
D-017Tanks, Potable Water, Clean and Inspect$0.00JOB1$0.00
D-018Tanks, Ballast, Clean and Inspect$0.00JOB1$0.00
D-019Tanks, Dirty Oil and Waste, Clean and Inspect$0.00JOB1$0.00
D-020Main Reduction Gear, Overhaul$0.00JOB1$0.00
D-021Propulsion Shafting; Remove, Inspect, and Reinstall$0.00JOB1$0.00
D-022Propulsion Shaft Seals, Mechanical Overhaul And Inflatable Renewal$0.00JOB1$0.00
D-023Propulsion Shaft Seals, Bulkhead, Overhaul$0.00JOB1$0.00
D-024Strain Gage Alignment, Check$0.00JOB1$0.00
O-025Propulsion Tail Shaft Sleeve, Skim Cut$0.00JOB1$0.00
D-026Propulsion Shaft Bearings, External, Check Clearances$0.00JOB1$0.00
O-027Propulsion Shaft Bearing, Stave Renewal$0.00JOB1$0.00
O-028Stern Tube Interior Surfaces, Preserve, 100 Percent$0.00JOB1$0.00
D-029Controllable Pitch Propellers, Clean and Inspect$0.00JOB1$0.00
D-030Controllable Pitch Propeller Hub, General Maintenance with EAL, Perform$0.00JOB1$0.00
D-031Controllable Pitch Propeller Hub, Remove and Reinstall$0.00JOB1$0.00
D-032Heat Exchangers, Clean, Inspect And Hydro$0.00JOB1$0.00
D-033Ship Service Diesel Generator, Clean and Inspect$0.00JOB1$0.00
D-034Emergency Diesel Generator, Clean & Inspect$0.00JOB1$0.00
D-035Fathometer Transducer, General Maintenance$0.00JOB1$0.00
D-036Sea Valves and Waster Pieces, Overhaul Or Renew$0.00JOB1$0.00
D-037Sea Strainers, Duplex, All Sizes, Overhaul$0.00JOB1$0.00
D-038Sea Strainers, Simplex, All Sizes, Clean and Inspect$0.00JOB1$0.00
D-039Sea Bay, Clean and Inspect$0.00JOB1$0.00
D-040Sea Bay, Preserve 100%$0.00JOB1$0.00
D-041Rudders, Preserve, 100 Percent$0.00JOB1$0.00
D-042Rudder Stock Bearings, Check Clearances$0.00JOB1$0.00
D-043Rudder, Inspect And Repair$0.00JOB1$0.00
D-044Rudder and Rudder Stock, Remove and Inspect$0.00JOB1$0.00
D-045Rudder Bearings, Renewal$0.00JOB1$0.00
D-046Thruster Units, Overhaul Fluid Change to EAL$0.00JOB1$0.00
D-047Thruster Generator, Clean & Inspect$0.00JOB1$0.00
D-048Anchor Windlass, Inspect and Service$0.00JOB1$0.00
D-049Anchor Chains and Ground Tackle, Inspect and Repair$0.00JOB1$0.00
D-050Anchor Chain and Ground Tackle, Preserve$0.00JOB1$0.00
D-051Anchors, Preserve$0.00JOB1$0.00
D-052Hawse Pipes, Preserve$0.00JOB1$0.00
D-053Hull Fittings (Mooring and Towing), Inspect and Test$0.00JOB1$0.00
D-054Accessible Voids, Preserve, 100 Percent$0.00JOB1$0.00
O-055Tanks, Ballast, Preserve, 100 Percent$0.00JOB1$0.00
O-056Tanks, Ballast, Preserve, Partial$0.00JOB1$0.00
D-057Chain Locker, Preserve, 100 Percent$0.00JOB1$0.00
D-058Chain Lockers, Preserve, Partial$0.00JOB1$0.00
D-059Accessible Void(s), Preserve, Partial,$0.00JOB1$0.00
D-060Tanks, Potable Water Preserve, 100 Percent$0.00JOB1$0.00
D-061Tanks, Potable Water, Preserve, Partial,$0.00JOB1$0.00
D-062Decks – Exterior (Buoy or Construction Deck), Preserve 100%$0.00JOB1$0.00
D-063Hull Plating Freeboard (Buoy Port Areas), Preserve$0.00JOB1$0.00
O-064Superstructure, Preserve, Partial$0.00JOB1$0.00
D-065Cathodic Protection, Zinc Anodes, Renew,$0.00JOB1$0.00
D-066Impressed Current Cathodic Protection System, Inspect and Maintain$0.00JOB1$0.00
D-067Impressed Current, Cathodic Protection System, Reference Cells, Renew$0.00JOB1$0.00
D-068Drydock$0.00JOB1$0.00
D-069Temporary Services, Provide - Cutter$0.00JOB1$0.00
D-070Sea Trial Performance, Support, Provide$0.00JOB1$0.00
D-071ATON Tie Down Installation$0.00JOB1$0.00
D-072Compartment Insulation, General, Renew$0.00JOB1$0.00
D-073Firemain Valves, Overhaul or Renew$0.00JOB1$0.00
D-074Space or Component, Preserve$0.00JOB1$0.00
D-075Welin Lambie Dual Point Davit TWPIV 5.0B, Renew$0.00JOB1$0.00
D-076ATON Tie-down Install$0.00JOB1$0.00
D-077Anchor Tripping Bracket Install$0.00JOB1$0.00
D-078Fluxgate Digital Compass System, Upgrade$0.00JOB1$0.00
D-079Pilothouse Exterior Safety Rail, Renew$0.00JOB1$0.00
D-080Forecastle Raised Hatch, Renew$0.00JOB1$0.00
D-081Buoy Deck Quick Acting Watertight Door, Renew$0.00JOB1$0.00
D-082Air Escape (AE) Piping, Renew$0.00JOB1$0.00
D-083Weathertight Doors, Renew$0.00JOB1$0.00
D-084Directional Control Valve, Upgrade$0.00JOB1$0.00
D-085Pilot House Windows and Frame, Repair and Reseal$0.00JOB1$0.00
D-086Tanks, MP Fuel Stowage and Overflow, Clean and Inspect$0.00JOB1$0.00
D-087Decks - Exterior, Preserve, Non-Skid Broadcast Grit System$0.00JOB1$0.00
D-088Potable Water Pump Room Deck, Preserve$0.00JOB1$0.00
D-089Steering Gear Heat Exchanger, Modify$0.00JOB1$0.00
D-090Steering System PLC, Upgrade$0.00JOB1$0.00
D-091Buoy Deck Incline Ladders, Renew$0.00JOB1$0.00
D-092Tenting, Provide$0.00NSP1$0.00
D-093Independent NACE Inspector (Level 3), Provide$0.00NSP1$0.00
O-00AComposite Labor Rate0Hour5000
D-00CTravel and Perdiem$500.00JOB$0.00
O-00ZLaydays$0.00Day5$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(7/9/2025) Rev-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
D-001Fire Prevention Requirements TYPE$ - 00062Baltimore, MD11293193
D-002Hull Plating, U/W Body, Inspect$ - 00052Biloxi, MS5089120
D-003Hull Plating, U/W Body, Ultrasonic Testing$ - 00056Boston, MA231WLB 225A
D-004Hull Plating, Freeboard, Ultrasonic Testing$ - 00050Charleston, SC399910
D-005U/W Body, Preserve, 100 percent$ - 00060Corpus Christi, TX1705116
D-006U/W Body, Preserve, Partial, Condition A$ - 00051Hampton Roads5221125
D-007U/W Body, Preserve, Partial, Condition B$ - 00064Honolulu, HI5231FY2026
D-008U/W Body, Preserve, Partial, Condition C$ - 00055Houston, TX5241DD
D-009Hull Plating Freeboard, Preserve, Partial$ - 00056Los Angeles, CA52361cutter
D-010Hull Plating Freeboard, Preserve, 100 Percent$ - 00055Median Rate54041JUNIPER (WLB 225A) DD FQ2 KAH 26R0.doc
D-011Appendages, U/W, Leak Test$ - 00049Miami51581
D-012Propulsion Shaft Fairwaters And Rope Guards, Inspect$ - 00050Narragansett Bay, RI54051
D-013Appendages, U/W, Internal, Preserve$ - 00055New London, CN421
D-014Chain Lockers, Clean and Inspect$ - 00045New Orleans461
D-015Voids, Non-Accessible, Leak Test$ - 00062NYNY541
D-016Voids, Non-Accessible, Internal Surfaces, Preserve$ - 00049Panama City, FL671
D-017Tanks, Potable Water, Clean and Inspect$ - 00060Philadelphia, PA751
D-018Tanks, Ballast, Clean and Inspect$ - 00051Portland, ME39961
D-019Tanks, Dirty Oil and Waste, Clean and Inspect$ - 00057Portland, OR811
D-020Main Reduction Gear, Overhaul$ - 00055San Diego, CA107571
D-021Propulsion Shafting; Remove, Inspect, and Reinstall$ - 00067San Francisco, CA51951
D-022Propulsion Shaft Seals, Mechanical Overhaul And Inflatable Renewal$ - 00055Santa Barbara, CA96791
D-023Propulsion Shaft Seals, Bulkhead, Overhaul$ - 00055SE North Carolina1751
D-024Strain Gage Alignment, Check$ - 00065Seattle, WA97071
D-025Propulsion Tail Shaft Sleeve, Skim Cut$ - 00048Tampa-St. Petersburg2011
D-026Propulsion Shaft Bearings, External, Check Clearances$ - 00060Wilmington, DE107731
D-027Propulsion Shaft Bearing, Stave Renewal$ - 000111391
D-028Stern Tube Interior Surfaces, Preserve, 100 Percent$ - 0005261
D-029Controllable Pitch Propellers, Clean and Inspect$ - 00085001
D-030Controllable Pitch Propeller Hub, General Maintenance with EAL, Perform$ - 000106781
D-031Controllable Pitch Propeller Hub, Remove and Reinstall$ - 00010761
D-032Heat Exchangers, Clean, Inspect And Hydro$ - 0002451
D-033Ship Service Diesel Generator, Clean and Inspect$ - 0002741
D-034Emergency Diesel Generator, Clean & Inspect$ - 0007991
D-035Fathometer Transducer, General Maintenance$ - 000101011
D-036Sea Valves and Waster Pieces, Overhaul Or Renew$ - 00020651
D-037Sea Strainers, Duplex, All Sizes, Overhaul$ - 0003141
D-038Sea Strainers, Simplex, All Sizes, Clean and Inspect$ - 0003151
D-039Sea Bay, Clean and Inspect$ - 00027741
D-040Sea Bay, Preserve 100%$ - 00027751
D-041Rudders, Preserve, 100 Percent$ - 00018691
D-042Rudder Stock Bearings, Check Clearances$ - 00012421
D-043Rudder, Inspect And Repair$ - 00012441
D-044Rudder and Rudder Stock, Remove and Inspect$ - 00066801
D-045Rudder Bearings, Renewal$ - 00012481
D-046Thruster Units, Overhaul Fluid Change to EAL$ - 000108161
D-047Thruster Generator, Clean & Inspect$ - 000111901
D-048Anchor Windlass, Inspect and Service$ - 00077071
D-049Anchor Chains and Ground Tackle, Inspect and Repair$ - 0007181
D-050Anchor Chain and Ground Tackle, Preserve$ - 00017871
D-051Anchors, Preserve$ - 00013941
D-052Hawse Pipes, Preserve$ - 00018901
D-053Hull Fittings (Mooring and Towing), Inspect and Test$ - 00066041
D-054Accessible Voids, Preserve, 100 Percent$ - 00039851
D-055Tanks, Ballast, Preserve, 100 Percent$ - 00051081
D-056Tanks, Ballast, Preserve, Partial$ - 0004891
D-057Chain Locker, Preserve, 100 Percent$ - 00024161
D-058Chain Lockers, Preserve, Partial$ - 0004911
D-059Accessible Void(s), Preserve, Partial,$ - 0005051
D-060Tanks, Potable Water Preserve, 100 Percent$ - 00028771
D-061Tanks, Potable Water, Preserve, Partial,$ - 0004991
D-062Decks – Exterior (Buoy or Construction Deck), Preserve 100%$ - 00028651
D-063Hull Plating Freeboard (Buoy Port Areas), Preserve$ - 00052951
D-064Superstructure, Preserve, Partial$ - 00050451
D-065Cathodic Protection, Zinc Anodes, Renew,$ - 0005421
D-066Impressed Current Cathodic Protection System, Inspect and Maintain$ - 00021811
D-067Impressed Current, Cathodic Protection System, Reference Cells, Renew$ - 00016481
D-068Drydock$ 149,250.00160061250$1,600.00$49,000.005551
D-069Temporary Services, Provide - Cutter$ - 0005561
D-070Sea Trial Performance, Support, Provide$ - 0005631
D-071ATON Tie Down Installation$ - 000111291
D-072Compartment Insulation, General, Renew$ - 0006881
D-073Firemain Valves, Overhaul or Renew$ - 0006691
D-074Space or Component, Preserve$ - 00068424
D-075Welin Lambie Dual Point Davit TWPIV 5.0B, Renew$ - 000100000
D-076ATON Tie-down Install$ - 000100000
D-077Anchor Tripping Bracket Install$ - 000100000
D-078Fluxgate Digital Compass System, Upgrade$ - 000100000
D-079Pilothouse Exterior Safety Rail, Renew$ - 000100000
D-080Forecastle Raised Hatch, Renew$ - 000100000
D-081Buoy Deck Quick Acting Watertight Door, Renew$ - 000100000
D-082Air Escape (AE) Piping, Renew$ - 000100000
D-083Weathertight Doors, Renew (2)$ - 000100000
D-084Directional Control Valve, Upgrade$ - 000100000
D-085Pilot House Windows and Frame, Repair and Reseal$ - 000100000
D-086Tanks, MP Fuel Stowage and Overflow, Clean and Inspect$ - 000511
D-087Decks - Exterior, Preserve, Non-Skid Broadcast Grit System$ - 00040001
D-088Potable Water Pump Room Deck, Preserve$ - 00025611
D-089Steering Gear Heat Exchanger, Modify$ - 000100000
D-090Steering System PLC, Upgrade$ - 000100000
D-091Tenting, Provide$ - 000100000
D-092Independent NACE Inspector (Level 3), Provide$ - 000100000
D-093Buoy Deck Incline Ladders, Renew$ - 000100000

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
Sub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDT
DESCRIPTIONUNIT PRICELab RateArea
$00$062Baltimore, MD
$00$052Biloxi, MS
$00$056Boston, MA
$00$050Charleston, SC
$00$060Corpus Christi, TX
$00$064Honolulu, HI
$00$055Houston, TX
$00$056Los Angeles, CA
$00$055Median Rate
$00$055Median Rate
$00$050Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE