Jefferson Site Plan.pdf

PDF 3 MB Posted

Attached to
Construction Manager at Risk for Jefferson and Albia
Solicitation number
645-RFP-1728-2025
Issued by
Jasper County, Alburnett City, Iowa

About this file

This is a site plan document for the Jefferson maintenance facility project under the Iowa Department of Transportation's Construction Manager at Risk (CMaR) solicitation (645-RFP-1728-2025). The plan depicts a comprehensive redesign of the Jefferson site, including a 1,500-ton salt storage facility (50/50 split), brine tanks, a seven-stall cold storage area, a 600-ton salt storage section, drive-through wash bays, drive-through mechanic bays, office and break room facilities, parts storage areas, and employee parking. The site plan indicates demolition of the existing maintenance garage, brine containment, and salt hoop, while retaining the existing heated storage building with storage bays and maintaining existing generator and transformer equipment. The layout spans approximately 375 feet in length and includes multiple mechanical bays and utility areas configured for operational efficiency. Proposal submissions are due May 15, 2025, at 1:00 PM CDT, with pre-proposal virtual conferences scheduled for April 30, 2025.

The Jefferson project will be evaluated separately from the companion Albia maintenance facility project, with the potential for separate awards to qualified Construction Managers. Evaluation criteria emphasize firm history, project experience, project team composition, project approach, and location responsiveness, with cost serving as a secondary consideration. Respondents must submit three years of financial statements, profit and loss statements, Dun & Bradstreet reports or tax returns, and three financial references. Firms will be required to indicate a percentage fee for construction costs, though the Iowa DOT reserves the right to negotiate fees with the most qualified Construction Manager. The RFP documentation does not specify explicit set-aside designations or disadvantaged enterprise restrictions. The procurement process will culminate in a comprehensive evaluation by an evaluation committee, with final selections publicly posted on the IMPACS Business Opportunities site.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S A

L T

S T

O R

A G

E

T O

N

/5

S

T O

R A

G E

50' - 0"

175' - 0" B

R

IN

E

B R

IN

E

T A

N K

S

C O

L D

S T

O R

A G

E

S

T A

L L

C O

L D

S T

O R

A G

E

KEEP EXISTING STORAGE

BUILDING WITH HEATED

STORAGE BAYS

PAVED DRIVE

GENERATOR AND TRANSFORMER

TO REMAIN

DEMOLISH STORAGE BUILDING

P A

V E

D D

R

IV

E

DEMOLISH SALT HOOP

DEMOLISH EXISTING MAINTENANCE

GARAGE, BRINE AND CONTAINMENT

40' - 0"

D R

IV

E

T H

R U

W A

S H

B A

Y S

D R

IV

E

T H

R U

M E

C H

A N

IC

B

A Y

S

U T

IL

IT

Y

M E

C H

A N

IC

O

F F

IC

E

P A

R T

S R

O O

M

O F

F

IC

E

B R

E A

K

R E

S T

R O

O M

S

U T

IL

IT

Y

P A

R T

S S

T O

R A

G E

T

O T

A L

D R

IV

E

T H

R U

S T

O R

A G

E B

A Y

S 123' - 2 1/16"

/8

50' - 0"

/3

E M

P L

O Y

E E

P A

R K

IN

G asmelse Snapshot asmelse Text Box

600 TON

asmelse Text Box 60'-0" asmelse Length Measurement 35'-2 1/2" asmelse Length Measurement 30'-3/4" asmelse Length Measurement 375'-4" asmelse Length Measurement 35'-8" asmelse Rectangle asmelse Length Measurement 40'-1/2" asmelse Polygon asmelse Length Measurement 9'-3 1/4" asmelse Length Measurement 8'-7 1/4"

Floor Plans
Level 1

File details come from the government source that posted it. Updated .