About this file

This file is a schematic floor plan document for the Albia Maintenance Facility prepared by the Iowa Department of Transportation (Iowa DOT). The floor plan depicts the first floor layout of a proposed maintenance building in Albia, Iowa, with a total building length of approximately 190 feet to 250 feet. The facility includes multiple functional areas such as mechanics bays (111A, 111B, 111C, 111D), wash bays (116A, 116B, 116C), storage bays, parts storage (102, 113), a brine maker (115), office spaces (102, 114), support facilities including men's and women's restrooms (109, 108), a break/training room (106), locker room (105), utility rooms (107, 112), and administrative areas. The plan specifies technical details including trolley hoist bridges, drainage slopes (1/4 inch per foot and 1/8 inch per foot to drain), dimensions of various sections (ranging from approximately 23 feet to 85 feet in width), and equipment placement such as an AED unit. The document is explicitly marked as schematic and not for construction purposes, with a notation that the final building may include additional storage bays beyond those shown.

This floor plan document serves as a reference for the Construction Manager at Risk procurement process (Solicitation 645-RFP-1728-2025) issued by the Iowa DOT for the Albia maintenance facility project. The plan demonstrates the scope and complexity of the facility layout that prospective construction managers must understand when preparing proposals. Proposal submissions are due May 15, 2025, at 1:00 PM CDT, with pre-proposal virtual conferences scheduled for April 30, 2025. The floor plan indicates the schematic nature of the project planning phase, suggesting that detailed design development and construction documentation will be part of the construction manager's responsibilities as the project progresses.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Refrigerator

STORAGE BAYS

WOMENS

RESTROOM

MENS RESTROOM

UTILITY ROOM

BREAK/TRAINING

ROOM

CORRIDOR

VESTIBULE

LOCKER ROOM

OFFICE

SUPPLY/PARTS

STORAGE

COMM CLOSET

UTILITY ROOM

PARTS STORAGE

MECHANICS

OFFICE

WASH BAYS

BRINE MAKER

MECHANICS

BAYS

115B

111A

116C

116B

116A

112B

114A

106E

106D

106B

106A

102C

102D

100A100B

102A

111B

112A

110F 110G 110H

111D 110E 110D 110C 110B

115A

102B

106C

114B

110J

1/4" SLOPE PER FT TO DRAIN

1/8" PER FT SLOPE TO DRAIN1/8" PER FT SLOPE TO DRAIN

AED

23' - 0"

111C

110A

110K

TROLLEY HOIST RAIL

TROLLEY HOIST RAIL

TROLLEY HOIST RAIL

TROLLEY HOIST RAIL

T R

O L L E

Y H

O

IS

T B

R

ID

G E

T R

O L L E

Y H

O

IS

T B

R

ID

G E

/4

32' - 0 15/16"

28' - 0 15/16"

26' - 8 9/16"

190' - 4 3/16"

85' - 7" jsheph1 PolyLine jsheph1 Architect

ALBIA - IOWA DOT MAINTENANCE BUILDING FLOOR PLAN

(THIS IS SCHEMATIC ONLY AND THE BUILDING MAY INCLUDE MORE STORAGE BAYS - NOT FOR CONSTRUCTION) jsheph1 Architect

TBD (190'-0" - 250'-0")

Floor Plans
1ST FLOOR PLAN

File details come from the government source that posted it. Updated .