Solicitation W9127N23R0003
John Day Lock and Dam, Rufus, OR
JOHN DAY DAM TURBINE REPLACEMENT AND
GENERATOR REWIND
Project Manual
PART-2 ATTACHMENTS
DRAFT R
EVIEW
A12: Instrument List
A13: Cable and Conduit Removal and Install
A14: Commissioning Plan
A15: Tolerance Sheet
A16: Anchor Detail
A1A1: Submittal Register
A2: Transmittal Form
A3: Construction Project Identification Sign
A4: Spill Emergency - Initial Report Form
A5: Oil Accountability Form
A6: Adjustable-Blade Flow Chart
A7: Fixed-Blade Flow Chart
A8: Figure 1, Tables 1-6
A9: Blade Angle Definition
A10: Tables 1-4
A11: Tables 1-5
JOHN DAY DAM TURBINE REPLACEMENT AND GENERATOR REWIND
TABLE OF CONTENTS
ATTACHMENTS:
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 38 PAGES
John Day Turbine Replacement and Generator Rehabilitation Project
01 10 10.00 25 SD-01 Preconstruction Submittals
1.4 GSchedule for Construction
1.29Utility Outage Request
1.29Utility Connection Request
1.33 GAccess Agreements
1.34 GSecurity Procedures
1.36 GSecurity Training
1.40.1 GContractor's Planned Equipment
Methods
1.40.3 GLoading Diagram
1.43.1Gas, Vapor, Fume, Dust, and
Mist Control Program
1.43.1Gas, Vapor, Fume, Dust, and
Mist Control Program
1.28 GNotification Of Equipment Outage
To BPA
1.27Notification Of Equipment Outage
1.9Equipment List
1.40.2Plant And Equipment List
1.13Pre-Work Survey
1.16Air Purity Control Program
SD-07 Certificates
1.18Project Manager
1.18Potential Project Manager
Substitutes
1.19Installation Supervisor
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
A1-1
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 38 PAGES
01 10 10.00 25 1.20Potential Superintendent
Substitutes
1.20Project Superintendent
1.19Potential Installation Substitutes
1.21Key Personnel Substitution
SD-11 Closeout Submittals
1.8Government Issued Items
1.13Post-Work Survey
01 32 01.00 25 SD-01 Preconstruction Submittals
1.8.1 GECCCInitial Schedule
01 33 00 SD-01 Preconstruction Submittals
1.5 GSubmittal Register
SD-07 Certificates
1.10.2Authorized Shop Drawing
Approvers
01 33 16.10 26 SD-05 Design Data
3.1.2 I HDCHydraulic Design Pre-Work
Meeting Minutes
3.1.1 I HDCHydraulic Design Planning Report
3.1.4 G HDCCFD Analysis Demonstration
Meeting Minutes
3.1.6 I HDCIn-Progress Meeting Minutes
3.1.3 I HDCCompilation of Bi-Weekly
Presentations and Meeting
Minutes
01 33 16.11 26 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
A1-2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 38 PAGES
01 33 16.11 26 1.4.1 G HDCPrototype Conceptual Drawings
SD-05 Design Data
1.4.3 G HDCPrototype Neat Line Drawings
and Blade Shape Files
1.8.6 G HDCCavitation Guarantee Table
1.10 G HDCDischarge Ring Diameter
Preliminary Analyses
01 33 16.12 26 SD-05 Design Data
1.4.3 G HDCCAD and CFD Model Data
SD-09 Manufacturer’s Field
Reports
2.1.2 G HDCDraft CFD Planning Report
2.1.3 G HDCCFD Planning Report
2.2.1Draft Existing Turbine CFD
Analysis Report
2.2.1Existing Turbine CFD Analysis
Report
2.2.2CFD Analysis Report for
Preliminary Designs
2.2.3 G HDCDraft CFD Analysis Report for
Iteration Designs
2.2.3 G HDCCFD Analysis Report for Iteration
Designs
01 33 16.13 26 SD-02 Shop Drawings
1.7 G HDCModel Drawings
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 38 PAGES
01 33 16.13 26 1.8 G HDCMeasurements of Model
Components
2.5.2 G HDCGovernor 3-D Cam Data
SD-06 Test Reports
3.13 G HDCPre-test Information
3.14 G HDCIteration Testing Plan
2.3.2 G HDCModel Test Report for Preliminary
Designs
2.4.2Draft Model Test Report for
Iteration Designs
2.4.2 G HDCModel Test Report for Iteration
Designs
2.5.2 G HDCModel Test Report for Final
Design
01 33 16.14 26 SD-02 Shop Drawings
1.4 G ERDCModel Component Drawings/Data
SD-03 Product Data
1.3.2 G ERDCData For Observational Model
Testing Condition Set-Up
01 33 16.15 26 SD-05 Design Data
1.5 G HDCDesign Package
SD-07 Certificates
1.4 G HDCDesigner Of Record
01 35 26.00 25 SD-01 Preconstruction Submittals
1.6.1.3 GCrane Operators
1.7.3 GTraining Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
A1-4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 38 PAGES
01 35 26.00 25 1.7.4 GHazardous Energy Control Plan and HEC Procedures Training
Certification
1.8 GAccident Prevention Plan (APP)
1.8.2 GFall Prevention and Protection
Plan
1.8.2 GFatigue Management Plan (FMP)
1.9 GActivity Hazard Analysis (AHA)
1.17 GInclement Weather and
Heat/Cold Stress Management
Plans
3.3 GScaffolding
3.5.3 GArc Flash Hazard (AFH) Program
SD-06 Test Reports
1.4Regulatory Citations, Violations, and Corrective Action
1.5Drug and Alcohol Use Prevention
Program
1.14.2Accident or Mishap Reports
1.14.3Crane Testing Reports
SD-07 Certificates
1.7.6Arc Flash Hazard (AFH) Training
Certificate
1.10Confined Space Entry Permit
1.10Hot Work Permit
1.14.4Certificate of Compliance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
A1-5
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 38 PAGES
01 45 00.00 25 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control Plan
3.4.4Construction Quality
Management for Contractors
01 57 19.00 25 SD-01 Preconstruction Submittals
1.7.1Preconstruction Survey
1.8 GEnvironmental Protection Plan
SD-11 Closeout Submittals
1.9 GEnvironmental Records Binder
01 78 23.00 25 SD-01 Preconstruction Submittals
1.2 GO&M Manual Execution Plan
SD-10 Operation and Maintenance
Data
1.3 GOperation and Maintenance
Manual
01 78 39.00 25 SD-01 Preconstruction Submittals
1.4 GRecord Drawings Execution Plan
1.5Working As-Built Drawings
SD-11 Closeout Submittals
1.8 GPreliminary Record Drawings
1.8.2.2Preliminary CAD Drawings
1.8.2.3Final Working As-Built Drawings
1.9 GFinal Record Drawings
02 41 00.00 25 SD-01 Preconstruction Submittals
1.2.1 GDemolition and Disposal Plan
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-6
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 38 PAGES
02 41 00.00 25 1.5 GNotification
SD-11 Closeout Submittals
3.4.2.1 G ECCOil Accountability Form
02 82 14.00 25 SD-01 Preconstruction Submittals
1.7 GECDGWritten Qualifications and
Organization Report
1.8 GECDGAsbestos Sampling Plan
3.2 GECDGAsbestos Survey Report
1.9 GECDGAsbestos Hazard Abatement Plan
SD-06 Test Reports
1.15.1 GDaily Narrative Log
3.7Personnel and Area Air
Monitoring
SD-07 Certificates
1.14 GPermits and Notifications
1.12Local Exhaust System
1.13Medical Surveillance
Requirements
3.10 GECDGWaste Shipment Record (WSR)
02 83 13.00 25 SD-01 Preconstruction Submittals
1.5.2.3 G ECDGOccupational and Environmental
Assessment Data Report
1.3.1 G ECDGLead Compliance Plan
1.5.2.2 G ECDGLead Compliance Plan
3.3.2 G ECDGLead Compliance Plan
1.5.1.1 GCompetent Person
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
A1-7
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 38 PAGES
02 83 13.00 25 1.5.1.2 GTraining Certification
1.5.2.8 G ECDGLead Waste Management Plan
3.5.2.1 GTSD Facility Certification
1.5.2.4 GMedical Examinations
SD-06 Test Reports
1.5.2.3 G ECDGSampling Results
SD-07 Certificates
1.5.1.3 GTesting Laboratory
SD-11 Closeout Submittals
3.5.2.1 GHazardous waste manifest
3.5.2.1 GWaste turn-in documents or
weight tickets
03 31 26.10 25 SD-01 Preconstruction Submittals
1.3.1 G HDCQualifications
1.3.2 G HDCPlacement Plan
SD-05 Design Data
1.3.3 G HDCMaterials and Mix Design
SD-06 Test Reports
3.7.1 G HDCTest Results
03 37 13.00 25 SD-01 Preconstruction Submittals
3.7 I HDCCuring Plan
3.4.1 I HDCPlacement Plan
SD-06 Test Reports
2.2 G HDCMixture Proportions
2.1.2 I HDCAggregates
2.1.4 G HDCAccelerator Compatibility
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-8
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 38 PAGES
03 37 13.00 25 1.5.3 G HDCPreconstruction Test Panels
3.8 I HDCTESTS
SD-07 Certificates
2.1.1.1 I HDCPortland Cement
2.1.1.2 I HDCPozzolans
2.1.1.3 I HDCSilica Fume
2.1.4 I HDCAccelerating Admixtures
2.1.5 I HDCCuring Materials
2.1.6.1 I HDCSteel Fiber Reinforcement
1.5.1 G HDCQualifications
1.5.2 G HDCShotcrete Inspector
03 40 00.00 25 SD-01 Preconstruction Submittals
1.7 G HDCErection, Handling, and Storage
Plan
1.9 G HDCConcrete Mixture Proportions
SD-02 Shop Drawings
1.8 G HDCPre-Cast Floor Fill
03 50 00.00 26 SD-01 Preconstruction Submittals
1.4 G HDCEmbedment Plan
SD-02 Shop Drawings
1.6 G HDCInstallation Drawings
SD-03 Product Data
2.1 G HDCProduct Data
1.5.1 G HDCRegistered Professional Engineer
SD-05 Design Data
1.5.1 G HDCEngineering Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-9
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 38 PAGES
03 50 00.00 26 SD-06 Test Reports
1.7.1 G HDCInspection Reports
03 60 00.00 26 SD-01 Preconstruction Submittals
3.4.2 G HDCConcrete Removal and Disposal
Plan
3.4.14 G HDCRepair Procedure of Concrete
Surfaces
3.4.5 G HDCCore Drilling Procedure
3.4.5 G HDCConcrete Imaging Report
05 05 19.00 25 SD-01 Preconstruction Submittals
1.4.1 G HCDFabricator Qualifications
1.4.2 G HDCSInstaller Qualifications
1.4.3 G HDCGround Penetrating Radar
Qualifications
3.1 G HDCWork Plan
1.5 G HDCMeasurement And Layout Plan
3.10 G HDCOptional Construction Joints
3.5 G HDCUnder Cut Anchor
SD-03 Product Data
2.1.1 G HDCSteel Couplers
2.1.3 G HDCUndercut Flush Mount Anchors
2.1.6 I HDCReinforcing steel
2.1.8 I HDCWelded wire fabric
3.8 G HDCReinforcement
3.12 G HDCAbandoned Holes
3.8.2 I STSplicing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
A1-10
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 38 PAGES
05 50 03.01 26 SD-01 Preconstruction Submittals
3.2.6.1 G EC-CProcedure Qualification Record
(PQR)
3.3.2.3 G EC-CWritten NDT Practices
3.2.6.1 G EC-CWelding Procedure Specifications
(WPS)
SD-03 Product Data
3.2.3 G EC-CFiller Metal
SD-05 Design Data
3.3.2.6 G EC-CWelding Repair Plan
SD-06 Test Reports
3.3.2.4 G EC-CWeld Inspection Reports
3.3.2.2 G EC-CWeld Inspection Log
SD-07 Certificates
3.3.2.1 G EC-CCertified Welding Inspector
3.3.2.1 G EC-CNDT Inspector Certification
3.2.4 G HDCWelder Performance Qualification
Record (WPQR)
05 50 03.02 26 SD-01 Preconstruction Submittals
3.3.2.4 GNDE Written Practice
SD-03 Product Data
3.3.2.4NDE Test Equipment Calibration
Record
3.3.2.7 G HDCWeld Repair Plan
3.2.3Filler Metal Product Data
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-11
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 38 PAGES
05 50 03.02 26 3.3.2.5 G HDCWeld Inspection Reports
SD-07 Certificates
3.2.4Qualification of Welders and
Welding Operators
3.2.5.1.1 G HDCWPS Schedule
3.3.2.2 G HDCWeld Tracking
3.2.5.1 G HDCWelding Procedure Specifications
3.2.5.1Procedure Qualification Records
(PQR)
3.3.2.1 GCertified Weld Inspector's
Certification
3.3.2.4 GInspection Agency Qualifications
05 50 03.20 26 SD-01 Preconstruction Submittals
1.5 ITemporary work platform
submittals
SD-02 Shop Drawings
1.4.2 G HDCDetailed Drawings
2.1.1 G HDCShop Drawings and Materials
SD-05 Design Data
1.4.2 G HDCDesign Calculations
SD-06 Test Reports
1.7 G HDCInspection and Test Reports
SD-07 Certificates
1.4.2 G HDCRegistered Structural
Professional Engineer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
A1-12
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 38 PAGES
05 50 03.20 26 3.2.3 G HDCFilling of Depressions and Holes
Procedure
3.4.1 G HDCCleaning Corrosion Resisting
Steel
09 97 02.23 26 SD-01 Preconstruction Submittals
1.3.1 I CSafety Plan
1.3.1 I CVentilation Assessment Plan
1.3.1.7 I SORespiratory Protection Plan
1.3.2 I SOMedical Surveillance Plan
1.3.2.1 I ECCAir Monitoring Test Plan
1.3.2.1 I ECCAirborne Sampling Plan
1.3.2.2 I SOMedical Status Report
1.3.2.3 I SOChange In Medical Status Report
1.3.3.1 I ECCWaste Classification, Handling, And Disposal Plan
1.3.3.2 I ECCContainment Plan
1.3.3.3 I ECCVisible Emissions Monitoring Plan
1.3 I SOInterpretation Of Safety, Health, And Environmental Requirements
1.3.1.6 I SOConfined Spaces Plan
1.3.3 I ECCEnvironmental Protection Plan
SD-03 Product Data
1.6 G HDCProduct Data Sheet
SD-04 Samples
1.6 G HDCProduct Samples
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
A1-13
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 38 PAGES
09 97 02.23 26 3.4 G HDCInspection and Operations Report
1.3.2.1 I ECCAir Monitoring Test Report
1.3.2.2 I SOMedical Status Report
1.3.2.2 I SOMedical Status Report
1.3.2.3 I SOChange In Medical Status Report
SD-07 Certificates
1.5.1 G HDCPainting Contractor Certification
1.5.2 G HDCPaint Applicator Certification Test
Records
1.5.2 G HDCThird Party Test Agency
Certification
13 48 00.00 26 SD-02 Shop Drawings
1.5 G HDCDetail Drawings
1.6 G HDCDetail Drawings
SD-03 Product Data
3.4 G HDCConcrete Anchors
1.4.4 G HDCSeismic Equipment Certification
3.1 G HDCSeismic Sway Bracing
SD-05 Design Data
1.5 G HDCStructural Design Calculations for
Seismic Restraints
1.6 G HDCStructural Design Calculations for
Seismic Restraints
SD-06 Test Reports
3.5.2.1 G HDCConcrete Anchor Test Reports
3.5.1 G HDCContractor Qualification Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-14
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 38 PAGES
26 05 00.00 26 SD-01 Preconstruction Submittals
2.6 G HDCHeater Size Calculations
3.1.1.1 G HDCDisassembly Plan
3.1.1.3 G HDCDisassembly Plan
3.1.1.3 G HDCDisassembly Plan
3.1.1.3 G HDCDisassembly Plan
3.1.1.9 G HDCInstallation Plan
3.1.2.1 G HDCInstallation Plan
3.1.2.4 G HDCInstallation Plan
SD-02 Shop Drawings
3.1.2.1 G HDCShop Drawings
3.1.2.7 G HDCRTD Installation Drawings
3.1.2.1 G HDCGenerator and Turbine Gauge
Panel Auxiliary Enclosure
Drawings
1.7.2 G HDCInstallation Drawings
1.7.2 G HDCElectrical Wiring Diagrams
1.7.2 G HDCElectrical Control Diagrams and
Schematics
SD-03 Product Data
2.9 G HDCMotor Starters (Contactors) for
High Lift Pumps
2.8 G HDC4160 VAC Motor Starters
(Contactors) for Governor Oil
Pumps
1.7.1 G HDCConduit and Raceways
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
A1-15
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 38 PAGES
26 05 00.00 26 1.7.1 G HDCBoxes And Enclosures
2.4 G HDCReceptacles
2.11.3 G HDCControl, Instrument, and Selector
Switches
2.5 G HDCMolded Case Circuit Breakers
2.11.2 G HDCTerminal Blocks
2.13.3 G HDCIndicating Lamp Assemblies
2.12 G HDCEscutcheons and Nameplates
2.13 G HDCIndicating Instruments
2.13 G HDCIndicating Instruments
3.1.2.6 G HDCPressure Transmitters
1.7.1 G HDCLevel Monitoring Equipment and
Sensors
2.11.7.2 G HDCControl Relays
3.1.2.1 G HDCInstrumentation Components
1.7.1 G HDCControl, Monitoring, Detection, Power Systems, and Accessories
2.6 GGenerator Heaters
SD-06 Test Reports
3.8.3 G HDCTesting Plan
3.8.3.2 G HDCTesting Plan
3.8.1Certified Test Reports
3.8.1Certified Test Reports
3.8.3 G HDCField Testing Reports
3.8.3.2 G HDCField Testing Reports
3.8.3.2 G HDCField Testing Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
A1-16
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 38 PAGES
26 05 00.00 26 3.1.1.3 G HDCLarge Cable PreRemoval Test
Results
SD-08 Manufacturer’s Instructions
2.15 G HDCSpare Parts
3.1.2.1 G HDCCalibration and Setpoint Plan
3.1.2.5 G HDCCalibration and Setpoint Plan
3.8.4 G POTraining Manual
SD-10 Operation and Maintenance
Data
3.9 G POOperations And Maintenance
Data
SD-11 Closeout Submittals
1.7.3 G HDCAs-Built Record Drawings
26 05 19.00 26 SD-03 Product Data
2.1 G HDCInsulated Wire and Cable
2.3.3 G HDCSignal and Communications
Cable
3.1.8 G HDCCable Supports
2.3.1 G HDCControl Panel Shop Wiring
2.3.2 G HDCSwitchboard Wire
2.3.4Ground Conductors
3.1.11Wire Marking
2.4Terminations
SD-06 Test Reports
1.5.1 G HDCInspection and Tests
3.2.1 G HDCInsulation Resistance Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-17
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 38 PAGES
26 05 19.00 26 3.2.1 G HDCShield Resistance Test
40 05 13.00 26 SD-02 Shop Drawings
1.5.2 G HDCShop Drawings
1.5.2 G HDCPiping Layout Drawings
SD-03 Product Data
1.5.3 G HDCDescriptive Literature
SD-05 Design Data
1.5.4 G HDCPipe Schedule
1.5.5 G HDCValve and Operator Schedule
SD-06 Test Reports
3.12.5 G HDCPressure Testing Report
3.9.3List of Eroded Piping
SD-08 Manufacturer’s Instructions
3.12.4 G HDCPressure Testing Plan
40 05 13.96 26 SD-01 Preconstruction Submittals
1.6.1 G HDCWelding Procedure Specifications
1.6.1 G HDCWelding Procedure Specifications
1.6.1 G HDCProcedure Qualification Test
Records
1.6.1 G HDCProcedure Qualification Test
Records
1.6.3.2 G HDCWritten Practice Manual
SD-03 Product Data
1.6.1 G HDCElectrode and Filler Metal
SD-06 Test Reports
3.2.3 G HDCNDE Testing Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-18
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 38 PAGES
40 05 13.96 26 SD-07 Certificates
1.6.2 G HDCWelder Certification
1.6.3.1 G HDCCertified Welding Inspectors
1.6.3.2 G HDCNDE Personnel
42 13 19.00 26 SD-02 Shop Drawings
1.4.3 G HDCShop Drawings
1.6 G HDCShop Drawings
SD-03 Product Data
1.4.3 G HDCDescriptive Literature and
Specifications
1.4.3 GProduct Data
1.4.3 GProduct Data
1.4.4 GProduct Data
SD-05 Design Data
1.4.2 G HDCSurface Air Cooler Design
Calculations
SD-06 Test Reports
3.6.2 G HDCShop Pressure Test Report
3.7.2 G HDCField Pressure Test Report
3.8 G HDCOperational Test Report
SD-07 Certificates
2.1.3 G HDCFinned Tube Supplier
Qualifications
3.6 I HDCShop Pressure Test Notification
SD-08 Manufacturer’s Instructions
3.6.1 G HDCShop Pressure Test Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-19
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 38 PAGES
42 13 19.00 26 3.7.1 G HDCField Pressure Test Plan
42 13 19.01 26 SD-02 Shop Drawings
1.4.4 G HDCDrawings
SD-03 Product Data
1.4.3 G HDCDescriptive Literature and
Specifications
SD-05 Design Data
1.4.2 G HDCThrust Bearing Oil Cooler Design
Calculations
2.4.1 G HDCDesign Data
SD-06 Test Reports
3.5.2 G HDCShop Pressure Test Report
3.6.2 G HDCField Pressure Test Report
3.7 G HDCOperational Test Report
SD-07 Certificates
2.1.3 G HDCFinned Tube Supplier
Qualifications
3.5 I HDCShop Pressure Test Notification
SD-08 Manufacturer’s Instructions
3.5.1 G HDCShop Pressure Test Plan
3.6.1 G HDCField Pressure Test Plan
48 13 13.01 26 SD-02 Shop Drawings
3.2.1 G HDCDrawings, Data, and Calculations
3.2.1 G HDCAdditional Drawings, Design
Data, and Calculations
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-20
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 38 PAGES
48 13 13.01 26 2.1 G HDCDeviations in Material
Specifications
3.12 G HDCBottom Ring Evaluation Report
SD-06 Test Reports
1.6.4 G HDCStress Analysis Reports
1.7 G HDCRotating Parts Analysis Reports
1.8 G HDCThrust Bearing Structural
Analysis Reports
1.9 G HDCPrototype Blade Operating
Mechanism Analysis Report
1.10 G HDCPrototype Wicket Gate Operating
Mechanism Analysis Reports
2.1 G HDCContractor's Internal Quality, NDT, and Dimensional Inspection
Reports
3.5.13 G HDCPreliminary Runner Inspection
Report
3.5.13 G HDCFinal Runner Shop Inspection
Report
3.3 G HDCComponent Final Inspection
Reports
2.2.5 G HDCPreliminary Casting Inspection
Report
2.2.5 G HDCFinal Casting Inspection Reports
2.3.3 G HDCFinal Forging Inspection Report
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-21
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 38 PAGES
48 13 13.01 26 2.2.4 G HDCMajor Defect Notifications
2.9.1 G HDCSelf-Lubricating Bearing
Certification
2.2.5 I HDCNotification of Final Casting
Inspection
2.3.3 I HDCNotification of Final Forging
Inspection
2.2.5 I HDCNotification of Repeat Final
Casting NDT Inspection
3.5.13 I HDCNotice of Finished Runner
Inspection
SD-08 Manufacturer’s Instructions
1.11.1 G HDCMethod and Procedure for
Determining the Volume of
Cavitation Damage
1.11.2 G HDCCavitation Repair Plan
1.12.3 G HDCHomology Checking Procedure
2.2.4 G HDCMaterial Defect Repair
Procedures
3.2.2 G HDCInstallation Instructions/Drawings
3.5.14 G HDCRunner Assembly
Instructions/Drawings
3.2.3 G HDCManufacturing Plan and Schedule
48 13 13.02 26 SD-01 Preconstruction Submittals
3.3.1 G HDCPre-Disassembly Operational
Testing Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-22
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 38 PAGES
48 13 13.02 26 3.2 G HDCLaydown Plan
3.4.3.5 G HDCPre-Disassembly
Measurement/Inspection Report
3.9.18 G HDCReassembly
Measurement/Inspection Report
3.5.2 G HDCDisassembly Procedure
3.4.1 G HDCPre-Disassembly Measurement
Procedure
3.9.2 G HDCReassembly Procedure
3.10.2.1 G HDCFixed Blade Unit Commissioning
Plan
3.10.2.1 G HDCAdjustable Blade Unit
Commissioning Plan
3.9.2Unit Alignment Procedure
3.6.4In-Place Machining Procedure
SD-05 Design Data
3.1 INotification of Damaged or
Unserviceable Item
SD-06 Test Reports
3.3.6 G HDCPre-Disassembly Watered
Operational Testing Report
3.4.3.3 G HDCStationary Alignment Report and
Recommendations
3.6.2 G HDCAs-Found Inspection And Repair
Recommendations Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-23
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 38 PAGES
48 13 13.02 26 3.10.4.4 G HDCMechanical Equipment and
Systems Test Report
3.10.5 G HDCPost-Refurbishment Operational
Testing Report
SD-08 Manufacturer’s Instructions
3.6.3 G HDCProcedures for Repair of Defects
3.5.1 G HDCRequest and Procedure to Apply
Heat
48 13 13.03 26 SD-01 Preconstruction Submittals
3.3.1 GField Installation Procedure
3.3.2 GSystem Cleaning and Flushing
Procedures
1.4.1 GDesign
SD-02 Shop Drawings
1.4.1 GDrawings and Schematics
3.1 GDrawings and Schematics
SD-03 Product Data
1.5 GManufacturer's Data
SD-06 Test Reports
3.5.1 GField Testing Procedure
3.5.1 GNotice of Field Testing
3.5.1 GField Test Report
3.5.3 GField Test Report
3.6Operational Release and
Compliance Notice;
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-24
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 38 PAGES
48 13 13.03 26 SD-10 Operation and Maintenance
Data
1.6 GOperation and Maintenance
Manual
48 13 13.04 26 SD-01 Preconstruction Submittals
3.5.1 I HDCRefurbishment Procedure and
Schedule
SD-02 Shop Drawings
3.1 G HDCComponent, Shop, Detail, Assembly, Sectional, Etc.
Drawings
3.1 G HDCAdditional Drawings, Design
Data, and Calculations
SD-04 Samples
2.1 G HDCSamples of Materials
SD-05 Design Data
3.19.2.2 G HDCSelf-Lubricating Bearing
Calculations and Certificate
3.21.8 G HDCShear Pin Calculations and
Testing Results
SD-06 Test Reports
3.4.3 G HDCAs-Found Inspection And Repair
Recommendations Report
3.5.3 G HDCFinished Component Inspection
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-25
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 38 PAGES
48 13 13.04 26 3.10.5 G HDCStay Vane Component
Positioning Report
3.22.2 G HDCWicket Gate Bushing Bore
Inspection Report
3.10.5Stay Ring and Vanes As-Found
Measurement Report
SD-07 Certificates
3.5.2 G HDCNotice of Final Inspection
SD-08 Manufacturer’s Instructions
3.4 G HDCExisting Component
Inspection/Measurement Sheets
3.4.4 G HDCProcedures for Repair of Defects
3.9 G HDCThermal Repair/Refurbishment
Procedure
48 13 13.06 26 SD-01 Preconstruction Submittals
3.6.1Schedule for Thrust Runner
Refurbishment
3.7.2Schedule for Thrust Collar
Refurbishment
3.8.5Schedule for Thrust Bearing
Shoes Refurbishment
SD-02 Shop Drawings
3.6.2Thrust Runner Scaled Drawing(s)
3.7.1Thrust Collar Scaled Drawing(s)
3.8.5Thrust Bearing Shoes Scaled
Drawing(s)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-26
EVIEW
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 38 PAGES
48 13 13.06 26 SD-03 Product Data
2.1Chemical Analysis of the Babbitt
And Tin
3.9.2NDT Personnel/Laboratory
Qualifications
3.9.2NDT Personnel/Laboratory
Qualifications
SD-04 Samples
2.2Samples of Materials
SD-06 Test Reports
3.6.2 G HDCThrust Runner As-Found
Inspection Report
3.6.8 G HDCThrust Runner Finished
Inspection Report
3.7.1 G HDCThrust Collar As-Found
Inspection Report
3.7.3 G HDCThrust Collar Finished Inspection
Report
3.8.4 G HDCThrust Bearing Shoes As-Found
Inspection Report
3.8.9 G HDCThrust Bearing Shoes Finished
Inspection Report
SD-07 Certificates
3.6.2Notice of Thrust Runner
As-Found Inspection
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-27
EVIEW
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 38 PAGES
48 13 13.06 26 3.6.8Notice of Thrust Runner Finished
Inspection
3.7.1Notice of Thrust Collar As-Found
Inspection
3.7.3Notice of Thrust Collar Finished
Inspections
3.8.2Notice of Thrust Bearing Shoes
As-Found Inspection
3.8.9Notice of Thrust Bearing Shoes
Finished Inspection
3.10.2Notice of Welding Repair
SD-08 Manufacturer’s Instructions
3.6.1 G HDCThrust Runner Refurbishment
Procedure
3.7.2 G HDCThrust Collar Refurbishment
Procedure
3.8.1 G HDCThrust Bearing Shoes As-Found
Inspection Procedure
3.8.5 G HDCThrust Bearing Shoes
Refurbishment Procedure
SD-09 Manufacturer’s Field
Reports
3.2.4 G HDCPhase 1 Inspection Report
3.3.3 G HDCThrust Runner and Thrust Collar
Phase 2 Inspection Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-28
EVIEW
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 38 PAGES
48 13 13.06 26 3.3.3 G HDCThrust Shoes Phase 2 Inspection
Report
3.5.1 G HDCPre-Shipping Damage Inspection
Report
48 13 13.07 26 SD-01 Preconstruction Submittals
3.4.2Schedule for Turbine Bearing
Refurbishment
3.6.1Schedule for Generator Guide
Bearing Refurbishment
SD-03 Product Data
2.1Certified Chemical Analysis of
Babbitt and Tin
3.7.2.1NDT Personnel/Laboratory
Qualifications
SD-04 Samples
2.2Samples of Materials
SD-07 Certificates
3.1.1Notice of Site Inspection
3.4.4Notice of Turbine Guide Bearing
Finished Inspection
3.6.6Notice of Generator Guide
Bearing Finished Inspection
3.8.2Notification of Welding Repair
SD-08 Manufacturer’s Instructions
3.1.1Guide Bearing Site Inspection
Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-29
EVIEW
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 38 PAGES
48 13 13.07 26 3.4.1 G HDCTurbine Guide Bearing
Refurbishment Procedure
3.4.3 G HDCProcedure for Repair of Turbine
Bearing Split Faces
3.4.3 G HDCProcedure for Repair of Turbine
Bearing OD Spigot Fit Diameters
3.6.1 G HDCGenerator Guide Bearing
Refurbishment Procedure
SD-09 Manufacturer’s Field
Reports
3.1.3 G HDCTurbine Guide Bearing Site
Inspection Report
3.1.5 G HDCGenerator Guide Bearing Site
Inspection Reports
3.4.4 G HDCTurbine Guide Bearing Finished
Inspection Report
3.6.6 G HDCGenerator Guide Bearing
Finished Inspection Report
48 13 13.08 26 SD-05 Design Data
3.2.1 G HDCVolume Estimate(s)
3.2.1 G HDCAdditional areas for deeper
excavation
3.2.4 G HDCCavitation Repair Thickness
Report
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-30
EVIEW
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 38 PAGES
48 13 13.08 26 3.4 G HDCSurface Contour/Profile
Inspection Report
3.5.2 G HDCWeld Overlay Excavation Report
3.5.9 G HDCFinished Discharge Ring
Inspection Report
SD-08 Manufacturer’s Instructions
3.2.1 G HDCProcedure for Determining the
Excavated Volume
48 13 13.24 26 SD-01 Preconstruction Submittals
3.2Inspection Notifications
SD-02 Shop Drawings
1.3.3 G HDCShop Drawings
SD-03 Product Data
1.3.2 G HDCDescriptive Literature and
Specifications
SD-05 Design Data
3.3.2 G HDCBrake/Jack Cylinder
Refurbishment Plan
3.3.7.2 G HDCBrake/Jack Cylinder Shop
Testing Plan
SD-06 Test Reports
3.3.3Existing Pressure Data
3.3.5 G HDCBrake/Jack Cylinder Inspection
Report
3.3.7.5 G HDCBrake/Jack Cylinder Shop
Testing Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-31
EVIEW
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 38 PAGES
48 13 16.00 26 SD-01 Preconstruction Submittals
1.5 I HDCStator Winding Warranty Details
2.5.1 G HDCStator Bar Manufacturing Facility
3.3.2 G HDCStator Bar Voltage Endurance
Test Facility
3.5.1 G HDCThermal Cycling Testing Facility
2.12.1 G HDCLamination Manufacturing Facility
3.1 IStator Design Review Meeting
SD-02 Shop Drawings
2.5.1 G HDCCross-Sectional View of Stator
Bars
2.5.1 G HDCExterior Dimensions of Stator
Bars
2.5.1 G HDCWinding Diagram
2.8.1 G HDCConnection Details
2.8.1 G HDCWinding Bracing Configuration
2.8.1 G HDCCircuit Ring Configuration and
Dimensions
2.9 G HDCSurge Rings
2.10 G HDCMain and Neutral Lead Details
2.10 G HDCMain And Neutral Lead
Arrangement
2.12.1 G HDCStator Core
2.12.3 I HDCLamination Die
2.4 G HDCNameplate
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-32
EVIEW
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 38 PAGES
48 13 16.00 26 2.13.2 G HDCSurge arrester drawing and catalog cut
2.15.2 G HDCRotor Pole Assembly and Details
2.15.3 G HDCRotor Pole Connections
Assembly and Details
2.14 G HDCBrushes and Brush Holders
Drawings
SD-03 Product Data
2.5.1 G HDCStator Bar Insulation System
2.13.1 G HDCCurrent Transformer Catalog Cut
2.13.2 GDesign information on Surge
Arresters
2.11 G HDCPDA System
2.6 G HDCRTDs and RTD Extension Cable
Catalog Cuts
2.7.2 G HDCStator Assembly Materials and
Dimensions
2.10 G HDCSpring Type Washers Loading
2.15.2 G HDCData Sheets
2.14 G HDCBrush and Brush Holder Product
Data
SD-05 Design Data
2.7.8 G HDCWedging System Deflection
Characteristics
2.5.1 G HDCDC I²R Copper Losses Design
Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-33
EVIEW
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 38 PAGES
48 13 16.00 26 2.5.1 G HDCStray Load Losses Design
Calculations
2.5.1 G HDCMaximum (Hot Spot)
Temperature Rise
2.5.1 G HDCTemperature Rise Calculations
2.12.2 G HDCCore Losses Design Calculations
2.14 G HDCBrush Current Density
Calculations
SD-06 Test Reports
2.5.6 G HDCBar Test Record
3.3.2 G HDCPrototype Bar Voltage Endurance
Test Report
3.3.3 G HDCProduction Run Bar Voltage
Endurance Test Report
3.3.2 G HDCDissection and Examination
Report of Prototype Bars
3.4 G HDCDissection and Examination
Report of Prototype Bars
3.4 G HDCDissection and Examination
Report of Production Bars
3.5.1 G HDCPrototype Bar Thermal Cycling
Test Report
3.6.2 G HDCBar Factory Test Report
3.8 G HDCSpring Type Filler Material Test
Report
3.9 I HDCRTD Test Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-34
EVIEW
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 38 PAGES
48 13 16.00 26 3.22.4 G HDCPDA Test Report
3.10 G HDCLamination Test Report
3.27.3 G HDCField Winding Final Test Report
3.28.7 G HDCField Winding Final Test Report
3.23.2.1 G HDCCurrent Transformer Factory Test
Report
3.18.2 G HDCStator Frame Inspection Report
3.18.6 G HDCStator Core Final Check Report
3.25.1 G HDCSurge arrester conformance and
design test report
3.26.1 G HDCCollector Ring Assembly
Inspection Report
3.28.4 G HDCRotor Pole Factory Test Report
SD-08 Manufacturer’s Instructions
3.3.1 G HDCVoltage Endurance Test Methods
3.5.1 G HDCThermal Cycling Test Methods
3.6.2 G HDCBar Factory Test Procedure
3.19.2 G HDCStator Winding Installation
Procedure
3.14.2 G HDCInterlaminar Insulation Test
Procedure
3.31 G HDCInitial Acceptance Test
Procedures
3.34 G HDCFinal Acceptance Test
Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-35
EVIEW
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 38 PAGES
48 13 16.00 26 3.35.1 G HDCGenerator Special Field Tests
Procedure
3.13.1 G HDCStator Core Cleaning and
Inspection Procedure
3.13.1 G HDCStator Core Cleaning and
Inspection Procedure
3.13.2 G HDCStator Core Repair Procedure
2.12.4 G HDCStator Core Keybars Installation
Procedure
3.10 G HDCLamination Test Procedure
3.26.2 G HDCCollector Ring Refurbishment
Procedure
3.26.2.1 G HDCBrush and Brush Holder
Replacement Procedure
3.29 G HDCField Leads Reinsulation
Procedure
3.28.2 G HDCRotor Pole Removal and
Reinstallation Procedure
3.28.2 G HDCPole Transportation Procedure
3.28.3 G HDCField Coil Reinsulation Procedure
and Materials
SD-09 Manufacturer’s Field
Reports
3.13.1 G HDCStator Core Inspection Report
3.14.1 G HDCInterlaminar Insulation Test
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-36
EVIEW
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 38 PAGES
48 13 16.00 26 3.18.7 G HDCInterlaminar Insulation Test
Report
3.19.11 G HDCStator Winding Final Inspection
Report
3.20 G HDCWinding Installation Test Report
3.27.2 G HDCRotor Inspection Report
3.31 G HDCInitial Acceptance Test Report
3.34 G HDCFinal Acceptance Test Report
3.35.1 G HDCGenerator Special Field Test
Report
3.23.2.2 G HDCCurrent Transformer Field Test
Report
3.19.6 I HDCInitial Deflection of Spring-Type
Filler Material Record
SD-10 Operation and Maintenance
Data
2.13.2 G HDCSurge arrester maintenance and
testing manual
2.16.1 I HDCSpare Parts List
2.17 G HDCGenerator Operations and
Maintenance Manual
48 13 16.02 26 SD-03 Product Data
1.5.2 G HDCMachine Condition Monitoring
System Product Data
1.5.3 G HDCMachine Condition Monitoring
System Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-37
EVIEW
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 38 PAGES
48 13 16.02 26 2.3 G HDCMachine Condition Monitoring
System Drawings
48 70 01.00 26 SD-05 Design Data
3.1 G HDCModel Validation Test Procedures
3.2 G HDCPersonnel Qualifications for
Model Validation Testing
SD-06 Test Reports
3.4 G HDCModel Validation Test Report
3.4 G HDCRaw Test Data
3.4 G HDCDynamic Data File
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
A1-38
EVIEW
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR
MANUFACTURER'S CERTIFICATES OF COMPLIANCE
For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.
DATE TRANSMITTAL NO.
SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)
TO:
PROJECT TITLE AND LOCATIONSPECIFICATION SEC. NO. (Cover only one section with each transmittal)
FROM: CONTRACT NO. CHECK ONE:
THIS TRANSMITTAL IS FOR: (Check one)
THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL OF
TRANSMITTAL
FIO GA DA CR DA/CR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .