This document is a Cost Estimate Breakdown for a federal contract opportunity. The opportunity is for the REPAIR TRUEMPER ROAD project at JBSA-LACKLAND TX, with a solicitation number of JBSF236851. The magnitude of the project is between $1,000,000.00 and $5,000,000.00 and is 100% set-aside for Women Owned Small Businesses. The cost estimate breakdown includes line items for general construction costs, labor burden, subcontractor overhead and profit, prime contractor overhead and profit, bonding, and contingency. The proposed project amount and the period of performance are to be determined. The document includes a detailed cost breakdown by line item for materials, labor, equipment, and other costs.

View the file

Other files

File Type Posted
REPAIR HARDEE ROAD RECORD OF BIDS 26 JUL 24.pdf PDF
Bid Openinig Hardee Road Sign In sheet.pdf PDF
Attachment 13- RFI Questions and Goverment Response Hardee Road.pdf PDF
Attachment 9- Section L.pdf PDF
Solicitation Amendment FA301624B00010001 SF 30.pdf PDF
Attachment 13- RFI Questions and Goverment Response Hardee Road.pdf PDF
Attachment 1- SOW JBSF236851 Repair William Hardee (Letterman Road)_rev1.pdf PDF
Attachment 3- Appendix B Utility Maps (FOR REFERENCE ONLY) _rev1.pdf PDF
Attachment 6 Heavy and Highway 5 JAN 2024.pdf PDF
Attachment 4- Appendix C Site Maps William Hardee road_rev1.pdf PDF
Attachment 7- Appendix D Material Submittal Register_rev1.xlsx XLSX spreadsheet
Attachment 12- Appendix I Soil Management Plan.pdf PDF
Hardee Road site visit.pdf PDF
FA301624B0001- SOLICITATION REPAIR HARDEE ROAD.pdf PDF
Attachment 3 Appendix B Utility Maps (FOR REFERENCE ONLY).pdf PDF
Attachment 10 - Section M.pdf PDF
Attachment 2 Appendix A Site Maps William Hardee road V4.pdf PDF
Attachment 7 Appendix D Material Submittal Register.xlsx XLSX spreadsheet
Attachment 5-Climatology Report.pdf PDF
Attachment 1 SOW JBSF236851 Repair William Hardee (Letterman Road).pdf PDF
Attachment 8 - Appendix E SpecIntact Guidance (KTR Distro).pptx PPTX presentation
Attachment 9- Section L.pdf PDF
Attachment 4 Appendix C Environment Lead Base Paint 2023-04-19 SAM William Hardee.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Details

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
General Construction Subtotal$0.00
General Construction Labor Burden%ERROR:#VALUE!
%RSMeans San Antonio, TX CCIERROR:#VALUE!ERROR:#VALUE!
General Construction Subcontractor Overhead0.00%ERROR:#VALUE!
General Construction Subcontractor Profit0.00%ERROR:#VALUE!
General Construction Prime Contractor OverheadERROR:#VALUE!
General Construction Prime Contractor ProfitERROR:#VALUE!
General Construction Prime Contractor BondingERROR:#VALUE!
General Construction Contingency0.00%ERROR:#VALUE!
CONTRACT FOR (Work to be performed)This cost proposal is valid for XX calendar daysProposed Project AmountERROR:#VALUE!
The period of performance to perform this work is XX calendar days.
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
LINE
NO.ITEM DESCRIPTIONUNIT OF
MEASUREMATERIAL COSTSLABOR COSTSEQUIPMENT COSTSOTHER COSTSLINE

TOTAL

QUANTITYUNITTOTALCREWLABOR
HOURSAVERAGE
RATETOTALUNITTOTALUNITTOTAL
1$0.00
2$0.00
3$0.00
4$0.00
5$0.00
6$0.00
7$0.00
8$0.00
9$0.00
10$0.00
11$0.00
12$0.00
13$0.00
14$0.00
15$0.00
16$0.00
17$0.00
18$0.00
19$0.00
20$0.00
21$0.00
22$0.00
23$0.00
24$0.00
25$0.00
26$0.00
27$0.00
28$0.00
29$0.00
30$0.00
31$0.00
32$0.00
33$0.00
4634$0.00
4735$0.00
36$0.00
37$0.00
38$0.00
39$0.00
400.0000$0.00
41$0.00
42$0.00
43$0.00
44$0.00$0.00
45$0.00$0.00