This document is a PowerPoint presentation that provides guidance on using the SpecsIntact software to create specification packages for federal construction projects at Joint Base San Antonio (JBSA). It outlines the steps for job creation, publishing the specification package, and creating the submittal register. Key details include:
The presentation is focused on JBSA projects and provides detailed instructions on setting up the SpecsIntact software, selecting relevant specification sections, publishing the package, and generating the submittal register. It specifies requirements for header/footer formatting, section tailoring, and other publication options based on the stage of the project (in-progress, IFB, IFC, or record submittal). The guidance is intended to ensure a consistent, standardized approach to specification development and publication for JBSA construction contracts.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Joint Base San Antonio 802d CES/CENMP
SpecsIntact Guidance for KTRs v20230828
One Team, One Mission: Your Success!
Joint Base San Antonio: The Premier Installation in the Department of Defense!
Contents Job Creation Publishing Specification Package Submittal Register Creation
Job Creation
Step 1 – SpecsIntact Main View
Click on the Green Folder icon on the toolbar
Go to Step 2
Step 2 – Job Setup
Job name: Enter the Government supplied project number
Title: Enter the Government supplied project title
Contract number: Enter the contract number. If this is a T.O. that enter the T.O. number.
Location: Enter the JBSA location of the project
Path: Leave as default location unless you have an alternate working directory to store it in
Ensure the Primary Master is set to UFGS
Go to Step 3
Step 3 – Section Add
By default, the following sections are automatically added:
01 33 00 01 42 00
Add additional sections as needed based on project design scope
Click the OK button once all desired sections have been added
Go to Step 4
Step 4 – Section Add
Turn off all non-applicable Tailoring Options Sections where Army is listed as a Tailoring Option shall leave the Army option selected.
When an individual section is edited, read the notes of the section to determine if the Army option is applicable as some sections say Air Force projects shall use the Army tailoring tags.
Click the OK button once all desired selections have been turned off
Go to Step 5
Step 5 – Job Main View
Delete section 01 33 00; Government will provide this section
If additional sections are needed, click on the Green Cross icon to start the process shown in Step 3 and Step 4
Publishing Specification Package
Step 1 – Project Folder View
You must have the desired project folder selected before continuing
Click on the Printer icon on the toolbar
Go to Step 2
Step 2 – Select Specs
Select Sections Subsection:
Choose between the 2 choices
Printing and Renumbering Subsection:
Make sure both check boxes are selected
Reconcile Subsection:
Make sure all 3 check boxes are selected
In the selection window, make sure all of the project specifications are selected that you want to be published
Go to Step 3
Step 3 – Select Related Reports
Reports Subsection:
Make sure the first 5 check boxes are selected. Other selections are optional.
(Opt) List reports can be created as needed
Project Table of Contents Subsection:
Choose the 2nd check box, no others are required
Section Table of Contents Subsection:
Choose the 2nd check box
Go to Step 4
Step 4 – Select Other
No choices required for this selection window at this time
Go to Step 5
Step 5a – Choose Options
USE THESE STEPS FOR IN-PROGRESS SUBMISSIONS ONLY
Show Subsection:
Choices Section Dates, Revisions, Color, and Tailoring tags must be selected.
Pages and Numbering Subsection:
Make sure all 3 check boxes are selected. Do not change other options.
Tables Subsection:
Leave the default selection
Go to Step 6
Step 5b – Choose Options
USE THESE STEPS FOR IFB & IFC SUBMISSIONS ONLY
Show Subsection:
Choices Section Dates and Color must be selected.
Pages and Numbering Subsection:
Make sure all 3 check boxes are selected. Do not change other options.
Tables Subsection:
Step 5c – Choose Options
USE THESE STEPS FOR CLOSEOUT SUBMISSION ONLY
Show Subsection:
Choices Section Dates, Revisions, and Color must be selected.
Pages and Numbering Subsection:
Make sure all 3 check boxes are selected. Do not change other options.
Tables Subsection:
Step 6a – Header/Footer
USE ONLY FOR IN-PROGRESS SUBMITTALS
Header Subsection:
1st Header – Left: Use default 1st Header – Right: Use default 2nd Header – Left: Use variable {contract}. If a T.O., enter the IDIQ contract number and “T.O.” similar to as seen in the image.
2nd Header – Right: Enter the phase of design similar to as seen in the image.
Footer Subsection:
1st Footer – Center: Use default 2nd Footer – Left: Use version control for each design submittal. Reset version numbering after each submittal approval. Advance numbering if design submittal is rejected.
Footer Subsection:
2nd Footer – Right: Use variable {mmm dd, yyyy}
Go to Step 7
Step 6a – Non T.O. Example
Step 6b – Header/Footer
USE ONLY FOR IFB SUBMITTAL
Header Subsection:
1st Header – Left: Use default 1st Header – Right: Use default 2nd Header – Left: Use variable {contract}. If this is a T.O., enter the IDIQ contract number and “T.O.” similar to as seen in the image.
2nd Header – Right: Enter the phase “Issued For Bid”
Footer Subsection:
1st Footer – Center: Use default
Step 6c – Header/Footer
USE ONLY FOR IFC SUBMITTAL
Header Subsection:
1st Header – Left: Use default 1st Header – Right: Use default 2nd Header – Left: Use variable {contract}. If this is a T.O., enter the IDIQ contract number and “T.O.” similar to as seen in the image.
2nd Header – Right: Enter the phase “Issued For Construction”
Footer Subsection:
1st Footer – Center: Use default
Step 6d – Header/Footer
USE ONLY FOR RECORD SUBMITTAL
Header Subsection:
1st Header – Left: Use default 1st Header – Right: Use default 2nd Header – Left: Use variable {contract}. If this is a T.O., enter the IDIQ contract number and “T.O.” similar to as seen in the image.
2nd Header – Right: Enter the phase “Record Specifications”
Footer Subsection:
1st Footer – Center: Use default
Step 7 – PDF Publish
PDF Documents Subsection:
Make sure checkboxes are selected according to the image on the right
Printer Subsection:
Make sure the printer titled ‘SpecsIntact PDF’ is selected
Click Process & Publish when ready
Submittal Register Creation
Step 1 – Project Folder View
You must have the desired project folder selected before continuing
Select Process
Select Export Submittal Register…
Step 2 – Export Pop-up Window
Format Options Subsection:
Select spreadsheet file as output file type Select output file formatting options as shown
File Name Options Subsection:
Use default file name Do not change default output location
Email Options Subsection:
(Opt) Attach to email message if desired
Click Ok when ready to begin the export image3.jpeg image4.png image5.jpeg image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image24.png image25.png image1.jpeg image2.jpeg