This is a Grant Agreement and scope of work document between the State of California's Board of State and Community Corrections (BSCC) and Sacramento County for the Edward Byrne Memorial Justice Assistance Grant (JAG) Equipment and Training Program. The Sacramento County Sheriff's Office serves as the lead agency for this non-competitive grant application. Sacramento County identified four primary infrastructure projects to support violent crime reduction initiatives: a Firewall Check Point upgrade ($582,000), an upgraded security camera system for the Communications Center and Real-Time Crime Center ($111,355), walk-in evidence freezers for the property warehouse ($220,073), and a public safety semi-autonomous quadruped unmanned ground vehicle ($351,710, with Sacramento County covering a $26,604 overage). The grant period runs from October 1, 2025, through September 30, 2026. Quarterly progress reports are due January 15, 2026, April 15, 2026, July 15, 2026, and October 15, 2026, with corresponding invoicing periods due February 15, 2026, May 15, 2026, August 15, 2026, and November 15, 2026.
The total grant award is $1,238,535 allocated entirely to equipment and fixed assets with no indirect costs claimed. Payment will be made quarterly in arrears based on actual expenditures, with all project costs requiring documentation and support. The grantee must establish separate accounting records, maintain documentation for a minimum of three years after project closeout, and comply with extensive federal conditions including Part 200 Uniform Requirements, employment eligibility verification, non-discrimination requirements, and reporting obligations for fraud and waste. Key project officials include Sheriff Jim Cooper as the Authorized Officer, Captain John Homen as Project Director, and Jennifer Griffin as the Financial Officer. The agreement incorporates multiple federal conditions related to civil rights compliance, prohibited equipment restrictions, data collection requirements, and audit obligations, with potential sanctions including fund withholding or award termination for non-compliance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sacramento County
BSCC 1508-25
EXHIBIT A: SCOPE OF WORK
Rev 10/2022
1. GRANT AGREEMENT
This Grant Agreement is between the State of California, Board of State and Community Corrections (hereafter referred to as BSCC) and xxx County (hereafter referred to as the Grantee or Contractor).
2. PROJECT SUMMARY AND ADMINISTRATION
The Edward Byrne Memorial Justice Assistance Grant (JAG) Program allows states and units of local government, including tribes, to support a broad range of activities to prevent and control crime based on their own state and local needs and conditions. JAG Equipment and Training Program funds may be used ONLY for the purchase of equipment/fixed assets and/or supplies to support activities that fall under any one or more of the following program purpose areas: 1) law enforcement programs; 2) prosecution and court programs; 3) prevention and education programs;
5) drug treatment and enforcement programs; and 8) mental health programs and related law enforcement and corrections programs.
Grantee agrees to administer the project in accordance with Attachment 1: JAG Equipment and Training Program Request for Applications (by reference) and Attachment 2: JAG Equipment and Training Program Application for Funding, which is attached and hereto and made part of this agreement.
3. PROJECT OFFICIALS
A. The BSCC's Executive Director or designee shall be the BSCC's representative for administration of the Grant Agreement and shall have authority to make determinations relating to any controversies that may arise under or regarding the interpretation, performance, or payment for work performed under this Grant Agreement.
B. The Grantee’s project officials shall be those identified as follows:
Authorized Officer with legal authority to sign:
Name: Jim Cooper Title: Sheriff Address: 700 H Street, Room 3650, Sacramento, CA 95814 Phone: 916-874-5659 Email: cooperj@sacsheriff.com
Designated Financial Officer authorized to receive warrants:
Name: Jennifer Griffin Title: Chief of Administrative Services Address: 4500 Orange Grove Avenue, Sacramento, CA 95841 Phone: 916-874-6032 Email: jgriffin@sacsheriff.com
Project Director authorized to administer the project:
Name: John Homen Title: Captain Address: 4500 Orange Grove Avenue, Sacramento, CA 95841 Phone: 916-874-9074 Email: jhomen@sacsheriff.com
EXHIBIT A: SCOPE OF WORK
Rev 10/2022
C. Either party may change its project representatives upon written notice to the other party.
D. By signing this Grant Agreement, the Authorized Officer listed above warrants that he or she has full legal authority to bind the entity for which he or she signs.
4. DATA COLLECTION
Grantees will be required to comply with all data collection and reporting requirements as described in Attachment 1: JAG Equipment and Training Program Request for Applications (by reference) and Attachment 2: JAG Equipment and Training Program Application for Funding
5. REPORTING REQUIREMENTS
A. Grantee will submit quarterly progress reports, including results for the federal performance indicators, in a format prescribed by the BSCC. These reports, which will describe progress made on program objectives and include required data, shall be submitted according to the following schedule:
Quarterly Progress Report Periods Due no later than:
1. October 1, 2025 to December 31, 2025 January 15, 2026
2. January 1, 2026 to March 31, 2026 April 15, 2026
3. April 1, 2026 to June 30, 2026 July 15, 2026
4. July 1, 2026 to September 30, 2026 October 15, 2026
B. The grantee shall submit all other reports and data as required by the BSCC
6. PROJECT RECORDS
A. The Grantee shall establish an official file for the project. The file shall contain adequate documentation of all actions taken with respect to the project, including copies of this Grant Agreement, approved program/budget modifications, financial records and required reports.
B. The Grantee shall establish separate accounting records and maintain documents and other evidence sufficient to properly reflect the amount, receipt, and disposition of all project funds, including grant funds and any matching funds by the Grantee and the total cost of the project.
Source documentation includes copies of all awards, applications, approved modifications, financial records and narrative reports.
C. Personnel and payroll records shall include the time and attendance reports for all individuals reimbursed under the grant, whether they are employed full-time or part-time. Time and effort reports are also required for all subcontractors and consultants.
D. The grantee shall maintain documentation of donated goods and/or services, including the basis for valuation.
E. Grantee agrees to protect records adequately from fire or other damage. When records are stored away from the Grantee’s principal office, a written index of the location of records stored must be on hand and ready access must be assured.
F. All Grantee records relevant to the project must be preserved a minimum of three (3) years after closeout of the grant project and shall be subject at all reasonable times to inspection, examination, monitoring, copying, excerpting, transcribing, and auditing by the BSCC or designees. If any litigation, claim, negotiation, audit, or other action involving the records has been started before the expiration of the three-year period, the records must be retained until
EXHIBIT B: BUDGET DETAIL AND PAYMENT PROVISIONS
Rev 10/2022
1. INVOICING AND PAYMENTS
A. The Grantee shall be paid in quarterly in arrears by submitting an invoice (Form 201) to the
BSCC that outlines actual expenditures claimed for the invoicing period.
Quarterly Invoicing Periods: Due no later than:
1. October 1, 2025 to December 31, 2025 February 15, 2026
2. January 1, 2026 to March 31, 2026 May 15, 2026
3. April 1, 2026 to June 30, 2026 August 15, 2026
4. July 1, 2026 to September 30, 2026 November 15, 2026
B. All project expenditures must be incurred by the end of the grant project period, September 30, 2026, and included on the invoice due November 15, 2026. Project expenditures incurred after September 30, 2026 will not be reimbursed.
C. The Grantee shall submit an invoice to the BSCC each invoicing period, even if grant funds are not expended or requested during the invoicing period.
D. Supporting documentation must be submitted for expenditures upon BSCC’s request. All supporting documentation must be maintained by the grantee on site and be readily available for review during BSCC site visits.
2. GRANT AMOUNT AND LIMITATION
A. In no event shall the BSCC be obligated to pay any amount in excess of the grant award.
Grantee waives any and all claims against the BSCC, the Federal Government, and the State of California on account of project costs that may exceed the sum of the grant award.
B. Under no circumstance will a budget item change be authorized that would cause the project to exceed the amount of the grant award identified in this Grant Agreement.
3. BUDGET CONTINGENCY CLAUSE
A. It is mutually agreed that if the Budget Act of the current year and/or any subsequent year covered under this Grant Agreement does not appropriate funds for the purposes of this program, this Grant Agreement shall be of no further force and effect. In this event, the BSCC shall have no liability to pay any funds whatsoever to Grantee or to furnish any other considerations under this Agreement and Grantee shall not be obligated to perform any provisions of this Grant Agreement.
B. This Grant Agreement is valid and enforceable only if sufficient funds are made available by the United States Department of Justice, Office of Justice Programs. Grantee agrees that the BSCC’s obligation to pay any sum to the Grantee under any provision of this agreement is contingent upon the availability of sufficient funds.
C. If JAG funding is reduced or falls below estimates contained within the JAG Request for Proposals, the BSCC shall have the option to either cancel this Grant Agreement with no liability occurring to the BSCC or offer an amendment to this agreement to the Grantee to reflect a reduced amount.
D. If BSCC cancels the agreement pursuant to Paragraph 3(B) or Grantee does not agree to an amendment in accordance with the option provided by Paragraph 3(B), it is mutually agreed
EXHIBIT B: BUDGET DETAIL AND PAYMENT PROVISIONS
Rev 10/2022 that the Grant Agreement shall have no further force and effect. In this event, the BSCC shall have no liability to pay any funds whatsoever to Grantee or to furnish any other considerations under this Agreement and Grantee shall not be obligated to perform any provisions of this Grant Agreement except that Grantee shall be required to maintain all project records required by Paragraph 6 of Exhibit A for a period of three (3) years following the termination of this agreement.
4. PROJECT COSTS
Grantee is responsible for ensuring that actual expenditures are for eligible project costs. “Eligible and “ineligible” project costs are set forth in the July 2023 BSCC Grant Administration Guide, which can be found under Grantee Resources, here:
https://www.bscc.ca.gov/s_correctionsplanningandprograms/ A. The provisions of the BSCC Grant Administration Guide are incorporated by reference into this agreement and Grantee shall be responsible for adhering to the requirements set forth therein.
To the extent any of the provisions of the BSCC Grant Administration Guide and this agreement conflict, the language in this agreement shall prevail.
B. Grantee is responsible for ensuring that invoices submitted to the BSCC claim actual expenditures for eligible project costs.
C. Grantee shall, upon demand, remit to the BSCC any grant funds not expended for eligible project costs or an amount equal to any grant funds expended by the Grantee in violation of the terms, provisions, conditions, or commitments of this Grant Agreement.
D. Grant funds must be used to support new program activities or to augment existing funds that expand current program activities. Grant funds shall not replace (supplant) any federal, state and/or local funds that have been appropriated for the same purpose. Violations can result in recoupment of monies provided under this grantor suspension of future program funding through BSCC grants.
5. PROMPT PAYMENT CLAUSE
Payment will be made in accordance with, and within the time specified in, Government Code Chapter 4.5, commencing with Section 927.
6. WITHHOLDING OF GRANT DISBURSEMENTS
A. The BSCC may withhold all or any portion of the grant funds provided by this Grant Agreement in the event the Grantee has materially and substantially breached the terms and conditions of this Grant Agreement.
B. At such time as the balance of state funds allocated to the Grantee reaches five percent (5%), the BSCC may withhold that amount as security, to be released to the Grantee upon compliance with all grant provisions, including:
1) submittal and approval of the final invoice;
2) submittal and approval of the final progress report; and
3) submittal and approval of any additional required reports.
https://www.bscc.ca.gov/s_correctionsplanningandprograms/
EXHIBIT B: BUDGET DETAIL AND PAYMENT PROVISIONS
Rev 10/2022
C. The BSCC will not reimburse Grantee for costs identified as ineligible for grant funding. If grant funds have been provided for costs subsequently deemed ineligible, the BSCC may either withhold an equal amount from future payments to the Grantee or require repayment of an equal amount to the State by the Grantee.
D. In the event that grant funds are withheld from the Grantee, the BSCC’s Executive Director or designee shall notify the Grantee of the reasons for withholding and advise the Grantee of the time within which the Grantee may remedy the failure or violation leading to the withholding.
7. EXECUTIVE ORDER N-6-22 – RUSSIA SANCTIONS
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. The EO directs state agencies to terminate contracts with, and to refrain from entering any new contracts with, individuals or entities that are determined to be a target of Economic Sanctions. Accordingly, should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for termination of this agreement. The State shall provide Contractor advance written notice of such termination, allowing Contractor at least 30 calendar days to provide a written response. Termination shall be at the sole discretion of the State.
ET
California EO requires specific language to be included in all contracts and grant agreements. Please see SSMI or Stefanie for specific language and guidance for our internal process.
EXHIBIT B: BUDGET DETAIL AND PAYMENT PROVISIONS
Rev 10/2022
8. PROJECT BUDGET
Project Budget
Line Item Grant Funds
1. Services and Supplies $0
2. Equipment/Fixed Assets $1,238,535
3. Training Expenses $0
4. Indirect Costs $0
TOTAL $1,238,535
EXHIBIT C: GENERAL TERMS AND CONDITIONS (04/2017)
Rev 10/2022
1. APPROVAL: This Agreement is of no force or effect until signed by both parties and approved by the Department of General Services, if required. Contractor may not commence performance until such approval has been obtained.
2. AMENDMENT: No amendment or variation of the terms of this Agreement shall be valid unless made in writing, signed by the parties and approved as required. No oral understanding or Agreement not incorporated in the Agreement is binding on any of the parties.
3. ASSIGNMENT: This Agreement is not assignable by the Contractor, either in whole or in part, without the consent of the State in the form of a formal written amendment.
4. AUDIT: Contractor agrees that the awarding department, the Department of General Services, the Bureau of State Audits, or their designated representative shall have the right to review and to copy any records and supporting documentation pertaining to the performance of this Agreement.
Contractor agrees to maintain such records for possible audit for a minimum of three (3) years after final payment, unless a longer period of records retention is stipulated. Contractor agrees to allow the auditor(s) access to such records during normal business hours and to allow interviews of any employees who might reasonably have information related to such records. Further, Contractor agrees to include a similar right of the State to audit records and interview staff in any subcontract related to performance of this Agreement. (Gov. Code §8546.7, Pub. Contract Code §10115 et seq., CCR Title 2, Section 1896).
5. INDEMNIFICATION: Contractor agrees to indemnify, defend and save harmless the State, its officers, agents and employees from any and all claims and losses accruing or resulting to any and all contractors, subcontractors, suppliers, laborers, and any other person, firm or corporation furnishing or supplying work services, materials, or supplies in connection with the performance of this Agreement, and from any and all claims and losses accruing or resulting to any person, firm or corporation who may be injured or damaged by Contractor in the performance of this Agreement.
6. DISPUTES: Contractor shall continue with the responsibilities under this Agreement during any dispute.
7. TERMINATION FOR CAUSE: The State may terminate this Agreement and be relieved of any payments should the Contractor fail to perform the requirements of this Agreement at the time and in the manner herein provided. In the event of such termination the State may proceed with the work in any manner deemed proper by the State. All costs to the State shall be deducted from any sum due the Contractor under this Agreement and the balance, if any, shall be paid to the Contractor upon demand.
8. INDEPENDENT CONTRACTOR: Contractor, and the agents and employees of Contractor, in the performance of this Agreement, shall act in an independent capacity and not as officers or employees or agents of the State.
9. RECYCLING CERTIFICATION: The Contractor shall certify in writing under penalty of perjury, the minimum, if not exact, percentage of post-consumer material as defined in the Public Contract Code Section 12200, in products, materials, goods, or supplies offered or sold to the State regardless of whether the product meets the requirements of Public Contract Code Section 12209. With respect to printer or duplication cartridges that comply with the requirements of Section 12156(e), the certification required by this subdivision shall specify that the cartridges so comply (Pub. Contract Code §12205).
10. NON-DISCRIMINATION CLAUSE: During the performance of this Agreement, Contractor and its subcontractors shall not deny the contract’s benefits to any person on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic
EXHIBIT C: GENERAL TERMS AND CONDITIONS (04/2017)
Rev 10/2022 information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status, nor shall they discriminate unlawfully against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status.
Contractor shall insure that the evaluation and treatment of employees and applicants for employment are free of such discrimination. Contractor and subcontractors shall comply with the provisions of the Fair Employment and Housing Act (Gov. Code §12900 et seq.), the regulations promulgated thereunder (Cal. Code Regs., tit. 2, §11000 et seq.), the provisions of Article 9.5, Chapter 1, Part 1, Division 3, Title 2 of the Government Code (Gov. Code §§11135-11139.5), and the regulations or standards adopted by the awarding state agency to implement such article.
Contractor shall permit access by representatives of the Department of Fair Employment and Housing and the awarding state agency upon reasonable notice at any time during the normal business hours, but in no case less than 24 hours’ notice, to such of its books, records, accounts, and all other sources of information and its facilities as said Department or Agency shall require to ascertain compliance with this clause. Contractor and its subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement. (See Cal. Code Regs., tit. 2, §11105.)
Contractor shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the Agreement.
11. CERTIFICATION CLAUSES: The CONTRACTOR CERTIFICATION CLAUSES contained in the document CCC 04/2017 are hereby incorporated by reference and made a part of this Agreement by this reference as if attached hereto.
12. TIMELINESS: Time is of the essence in this Agreement.
13. COMPENSATION: The consideration to be paid Contractor, as provided herein, shall be in compensation for all of Contractor's expenses incurred in the performance hereof, including travel, per diem, and taxes, unless otherwise expressly so provided.
14. GOVERNING LAW: This contract is governed by and shall be interpreted in accordance with the laws of the State of California.
15. ANTITRUST CLAIMS: The Contractor by signing this agreement hereby certifies that if these services or goods are obtained by means of a competitive bid, the Contractor shall comply with the requirements of the Government Codes Sections set out below.
A. The Government Code Chapter on Antitrust claims contains the following definitions:
1) "Public purchase" means a purchase by means of competitive bids of goods, services, or materials by the State or any of its political subdivisions or public agencies on whose behalf the Attorney General may bring an action pursuant to subdivision (c) of Section 16750 of the Business and Professions Code.
2) "Public purchasing body" means the State or the subdivision or agency making a public purchase. Government Code Section 4550.
B. In submitting a bid to a public purchasing body, the bidder offers and agrees that if the bid is accepted, it will assign to the purchasing body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, materials, or services by the bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective http://bscchomepageofh6i2avqeocm.usgovarizona.cloudapp.usgovcloudapi.net/ccc-042017-contractor-certification-clause/
EXHIBIT C: GENERAL TERMS AND CONDITIONS (04/2017)
Rev 10/2022 at the time the purchasing body tenders final payment to the bidder. Government Code Section 4552.
C. If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under this chapter, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, attributable to overcharges that were paid by the assignor but were not paid by the public body as part of the bid price, less the expenses incurred in obtaining that portion of the recovery. Government Code Section 4553.
D. Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under this part if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action.
See Government Code Section 4554.
16. CHILD SUPPORT COMPLIANCE ACT: For any Agreement in excess of $100,000, the contractor acknowledges in accordance with Public Contract Code 7110, that:
A. The contractor recognizes the importance of child and family support obligations and shall fully comply with all applicable state and federal laws relating to child and family support enforcement, including, but not limited to, disclosure of information and compliance with earnings assignment orders, as provided in Chapter 8 (commencing with section 5200) of Part 5 of Division 9 of the Family Code; and
B. The contractor, to the best of its knowledge is fully complying with the earnings assignment orders of all employees and is providing the names of all new employees to the New Hire Registry maintained by the California Employment Development Department.
17. UNENFORCEABLE PROVISION: In the event that any provision of this Agreement is unenforceable or held to be unenforceable, then the parties agree that all other provisions of this Agreement have force and effect and shall not be affected thereby.
18. PRIORITY HIRING CONSIDERATIONS: If this Contract includes services in excess of $200,000, the Contractor shall give priority consideration in filling vacancies in positions funded by the Contract to qualified recipients of aid under Welfare and Institutions Code Section 11200 in accordance with Pub. Contract Code §10353.
19. SMALL BUSINESS PARTICIPATION AND DVBE PARTICIPATION REPORTING
REQUIREMENTS:
A. If for this Contract Contractor made a commitment to achieve small business participation, then
Contractor must within 60 days of receiving final payment under this Contract (or within such other time period as may be specified elsewhere in this Contract) report to the awarding department the actual percentage of small business participation that was achieved. (Govt.
Code § 14841.)
B. If for this Contract Contractor made a commitment to achieve disabled veteran business enterprise (DVBE) participation, then Contractor must within 60 days of receiving final payment under this Contract (or within such other time period as may be specified elsewhere in this Contract) certify in a report to the awarding department: (1) the total amount the prime Contractor received under the Contract; (2) the name and address of the DVBE(s) that participated in the performance of the Contract; (3) the amount each DVBE received from the prime Contractor; (4) that all payments under the Contract have been made to the DVBE; and (5) the actual
EXHIBIT C: GENERAL TERMS AND CONDITIONS (04/2017)
Rev 10/2022 percentage of DVBE participation that was achieved. A person or entity that knowingly provides false information shall be subject to a civil penalty for each violation. (Mil. & Vets. Code § 999.5(d); Govt. Code § 14841.)
20. LOSS LEADER: If this contract involves the furnishing of equipment, materials, or supplies then the following statement is incorporated: It is unlawful for any person engaged in business within this state to sell or use any article or product as a “loss leader” as defined in Section 17030 of the Business and Professions Code. (PCC 10344(e).)
EXHIBIT D: SPECIAL TERMS AND CONDITIONS
Rev 10/2022
1. GRANTEE’S GENERAL RESPONSIBILITY
A. Grantee agrees to comply with all terms and conditions of this Grant Agreement. Review and approval by the BSCC are solely for the purpose of proper administration of grant funds and shall not be deemed to relieve or restrict the Grantee’s responsibility.
B. Grantee is responsible for the performance of all project activities identified in Attachment 1:
JAG Equipment and Training Program Request for Applications, and Attachment 2: JAG Equipment and Training Program Application for Funding.
C. Grantee shall immediately advise the BSCC of any significant problems or changes that arise during the course of the project.
2. GRANTEE ASSURANCES AND COMMITMENTS
A. Compliance with Laws and Regulations This Grant Agreement is governed by and shall be interpreted in accordance with the laws of the State of California. Grantee shall at all times comply with all applicable State laws, rules and regulations, and all applicable local ordinances.
B. Compliance with Federal Laws and Regulations The Grantee hereby assures and certifies compliance with all federal statutes, regulations, policies, guidelines and requirements, including any federal conditions, which are included in this Grant Agreement as Exhibit E.
C. Fulfillment of Assurances and Declarations Grantee shall fulfill all assurances, declarations, representations, and statements made by the Grantee in Attachment 1: JAG Equipment and Training Program Request for Applications, and Attachment 2: JAG Equipment Program and Training Application for Funding, documents, amendments, approved modifications, and communications filed in support of its request for grant funds.
D. Permits and Licenses Grantee agrees to procure all permits and licenses necessary to complete the project, pay all charges and fees, and give all notices necessary or incidental to the due and lawful proceeding of the project work.
3. POTENTIAL SUBCONTRACTORS
A. In accordance with the provisions of this Grant Agreement, the Grantee may subcontract for services needed to implement and/or support program activities. Grantee agrees that in the event of any inconsistency between this Grant Agreement and Grantee’s agreement with a subcontractor, the language of this Grant Agreement will prevail.
B. Nothing contained in this Grant Agreement or otherwise, shall create any contractual relation between the BSCC and any subcontractors, and no subcontract shall relieve the Grantee of his responsibilities and obligations hereunder. The Grantee agrees to be as fully responsible to the BSCC for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by any of them as it is for the acts and omissions of persons directly employed by the Grantee. The Grantee's obligation to pay its subcontractors is an independent obligation from the BSCC's obligation to make payments to the Grantee. As a result, the BSCC shall have no obligation to pay or to enforce the payment of any moneys to any subcontractor.
EXHIBIT D: SPECIAL TERMS AND CONDITIONS
Rev 10/2022
C. Grantee shall ensure that all subcontractors comply with the eligibility requirements stated in the JAG Equipment and Training Program RFA and described in Appendix B.
D. Grantee assures that for any subcontract awarded by the Grantee, such insurance and fidelity bonds, as is customary and appropriate, will be obtained.
E. Grantee agrees to place appropriate language in all subcontracts for work on the project requiring the Grantee’s subcontractors to:
1) Books and Records
Maintain adequate fiscal and project books, records, documents, and other evidence pertinent to the subcontractor’s work on the project in accordance with generally accepted accounting principles. Adequate supporting documentation shall be maintained in such detail so as to permit tracing transactions from the invoices, to the accounting records, to the supporting documentation. These records shall be maintained for a minimum of three
(3) years after the acceptance of the final grant project audit under the Grant Agreement and shall be subject to examination and/or audit by the BSCC or designees, state government auditors or designees, or by federal government auditors or designees.
2) Access to Books and Records Make such books, records, supporting documentations, and other evidence available to the BSCC or designee, the State Controller’s Office, the Department of General Services, the Department of Finance, California State Auditor, and their designated representatives during the course of the project and for a minimum of three (3) years after acceptance of the final grant project audit. The Subcontractor shall provide suitable facilities for access, monitoring, inspection, and copying of books and records related to the grant-funded project.
4. PROJECT ACCESS
Grantee shall ensure that the BSCC, or any authorized representative, will have suitable access to project activities, sites, staff and documents at all reasonable times during the grant period including those maintained by subcontractors. Access to program records will be made available by both the grantee and the subcontractors for a period of three (3) years following the end of the grant period.
5. ACCOUNTING AND AUDIT REQUIREMENTS
A. All funds received by the Grantee shall be deposited into separate fund accounts which identify the funds and clearly show the manner of their disposition. Grantee agrees that accounting procedures for grant funds received pursuant to this Grant Agreement shall be in accordance with generally accepted government accounting principles and practices, and adequate supporting documentation shall be maintained in such detail as to provide an audit trail.
Supporting documentation shall permit the tracing of transactions from such documents to relevant accounting records, financial reports and invoices.
B. Federal Audit Requirement: Grantee is required to complete an audit annually for each fiscal year/audit period, or fraction thereof, for the entire three-year grant cycle. See Exhibit A: Scope of Work, Section 8. Audit, for federal audit requirements.
C. The BSCC reserves the right to call for a program or financial audit at any time between the execution of this Grant Agreement and three years following the end of the grant period. At any time, the BSCC may disallow all or part of the cost of the activity or action determined to not be in compliance with the terms and conditions of this Grant Agreement or take other remedies legally available.
EXHIBIT D: SPECIAL TERMS AND CONDITIONS
6. DEBARMENT, FRAUD, THEFT OR EMBEZZLEMENT
It is the policy of the BSCC to protect grant funds from unreasonable risks of fraudulent, criminal, or other improper use. As such, the Board will not enter into contracts or provide reimbursement to grantees that have been:
1. debarred by any federal, state, or local government entities during the period of debarment; or
2. convicted of fraud, theft, or embezzlement of federal, state, or local government grant funds for a period of three years following conviction.
Furthermore, the BSCC requires grant recipients to provide an assurance that there has been no applicable debarment, disqualification, suspension, or removal from a federal, state or local grant program on the part of the grantee at the time of application and that the grantee will immediately notify the BSCC should such debarment or conviction occur during the term of the Grant contract.
BSCC also requires that all grant recipients include, as a condition of award to a subgrantee or subcontractor, a requirement that the subgrantee or subcontractor will provide the same assurances to the grant recipient. If a grant recipient wishes to consider a subgrantee or subcontractor that has been debarred or convicted, the grant recipient must submit a written request for exception to the BSCC along with supporting documentation.
All Grantees must have on file with the BSCC a completed and signed Certification of Compliance with BSCC Policies on Debarment, Fraud, Theft and Embezzlement (Required as Attachment E of the original Proposal Package).
7. MODIFICATIONS
No change or modification in the project will be permitted without prior written approval from the BSCC. Changes may include modification to project scope, changes to performance measures, compliance with collection of data elements, and other significant changes in the budget or program components contained in Attachment 1: JAG Equipment and Training Program Request for Applications, and Attachment 2: JAG Equipment Program and Training Application for Funding.
8. TERMINATION
A. This Grant Agreement may be terminated by the BSCC at any time after grant award and prior to completion of project upon action or inaction by the Grantee that constitutes a material and substantial breach of this Grant Agreement. Such action or inaction includes but is not limited to:
1) substantial alteration of the scope of the grant project without prior written approval of the
BSCC;
2) refusal or inability to complete the grant project in a manner consistent with Attachment 1:
JAG Equipment and Training Program Request for Applications, and Attachment 2: JAG Equipment Program and Training Application for Funding
3) failure to provide the required local match share of the total project costs; and
4) failure to meet prescribed assurances, commitments, recording, accounting, auditing, and reporting requirements of the Grant Agreement.
EXHIBIT D: SPECIAL TERMS AND CONDITIONS
Rev 10/2022
B. Prior to terminating the Grant Agreement under this provision, the BSCC shall provide the Grantee at least 30 calendar days written notice stating the reasons for termination and effective date thereof. The Grantee may appeal the termination decision in accordance with the instructions listed in Exhibit D: Special Terms and Conditions, Number 8. Settlement of Disputes.
9. SETTLEMENT OF DISPUTES
A. The parties shall deal in good faith and attempt to resolve potential disputes informally. If the dispute persists, the Grantee shall submit to the BSCC Corrections Planning and Grant Programs Division Deputy Director a written demand for a final decision regarding the disposition of any dispute between the parties arising under, related to, or involving this Grant Agreement. Grantee’s written demand shall be fully supported by factual information. The BSCC Corrections Planning and Grant Programs Division Deputy Director shall have 30 days after receipt of Grantee’s written demand invoking this Section “Disputes” to render a written decision. If a written decision is not rendered within 30 days after receipt of the Grantee’s demand, it shall be deemed a decision adverse to the Grantee’s contention. If the Grantee is not satisfied with the decision of the BSCC Corrections Planning and Grant Programs Division Deputy Director, the Grantee may appeal the decision, in writing, within 15 days of its issuance (or the expiration of the 30-day period in the event no decision is rendered), to the BSCC Executive Director, who shall have 45 days to render a final decision. If the Grantee does not appeal the decision of the BSCC Corrections Planning and Grant Programs Division Deputy Director, the decision shall be conclusive and binding regarding the dispute and the Contractor shall be barred from commencing an action in court, or with the Victims Compensation Government Claims Board, for failure to exhaust Grantee’s administrative remedies.
B. Pending the final resolution of any dispute arising under, related to or involving this Grant Agreement, Grantee agrees to diligently proceed with the performance of this Grant Agreement, including the providing of services in accordance with the Grant Agreement. Grantee’s failure to diligently proceed in accordance with the State’s instructions regarding this Grant Agreement shall be considered a material breach of this Grant Agreement.
C. Any final decision of the State shall be expressly identified as such, shall be in writing, and shall be signed by the Executive Director, if an appeal was made. If the Executive Director fails to render a final decision within 45 days after receipt of the Grantee’s appeal for a final decision, it shall be deemed a final decision adverse to the Grantee’s contentions. The State’s final decision shall be conclusive and binding regarding the dispute unless the Grantee commences an action in a court of competent jurisdiction to contest such decision within 90 days following the date of the final decision or one (1) year following the accrual of the cause of action, whichever is later.
D. The dates of decision and appeal in this section may be modified by mutual consent, as applicable, excepting the time to commence an action in a court of competent jurisdiction.
10. WAIVER
The parties hereto may waive any of their rights under this Grant Agreement unless such waiver is contrary to law, provided that any such waiver shall be in writing and signed by the party making such waiver.
2022 JAG Award Federal Conditions
This award is offered subject to the conditions or limitations set forth in the Award Information, Project Information, Financial Information, and Award Conditions.
1. Compliance with general appropriations-law restrictions on the use of federal funds (FY 2022)
The recipient, and any subrecipient ("subgrantee") at any tier, must comply with all applicable restrictions on the use of federal funds set out in federal appropriations statutes. Pertinent restrictions, including from various "general provisions" in the Consolidated Appropriations Act, 2022, are set out at https://ojp.gov/funding/Explore/FY22AppropriationsRestrictions.htm, and are incorporated by reference here.
Should a question arise as to whether a particular use of federal funds by a recipient (or a subrecipient) would or might fall within the scope of an appropriations-law restriction, the recipient is to contact OJP for guidance, and may not proceed without the express prior written approval of
OJP.
2. Applicability of Part 200 Uniform Requirements
The Uniform Administrative Requirements, Cost Principles, and Audit Requirements in 2 C.F.R.
Part 200, as adopted and supplemented by DOJ in 2 C.F.R. Part 2800 (together, the "Part 200 Uniform Requirements") apply to this FY 2022 award from OJP.
The Part 200 Uniform Requirements were first adopted by DOJ on December 26, 2014. If this FY 2022 award supplements funds previously awarded by OJP under the same award number (e.g., funds awarded during or before December 2014), the Part 200 Uniform Requirements apply with respect to all funds under that award number (regardless of the award date, and regardless of whether derived from the initial award or a supplemental award) that are obligated on or after the acceptance date of this FY 2022 award.
For more information and resources on the Part 200 Uniform Requirements as they relate to OJP awards and subawards ("subgrants"), see the OJP website at https://ojp.gov/funding/Part200UniformRequirements.htm.
Record retention and access: Records pertinent to the award that the recipient (and any subrecipient ("subgrantee") at any tier) must retain -- typically for a period of 3 years from the date of submission of the final expenditure report (SF 425), unless a different retention period applies -- and to which the recipient (and any subrecipient ("subgrantee") at any tier) must provide access, include performance measurement information, in addition to the financial records, supporting documents, statistical records, and other pertinent records indicated at 2 C.F.R. 200.334.
In the event that an award-related question arises from documents or other materials prepared or distributed by OJP that may appear to conflict with, or differ in some way from, the provisions of the Part 200 Uniform Requirements, the recipient is to contact OJP promptly for clarification.
https://ojp.gov/funding/Explore/FY22AppropriationsRestrictions.htm https://ojp.gov/funding/Part200UniformRequirements.htm
3. Requirement to report actual or imminent breach of personally identifiable information (PII)
The recipient (and any "subrecipient" at any tier) must have written procedures in place to respond in the event of an actual or imminent "breach" (OMB M-17-12) if it (or a subrecipient) --
(1) creates, collects, uses, processes, stores, maintains, disseminates, discloses, or disposes of "Personally Identifiable Information (PII)" (2 CFR 200.1) within the scope of an OJP grant-funded program or activity, or (2) uses or operates a "Federal information system" (OMB Circular A-130).
The recipient's breach procedures must include a requirement to report actual or imminent breach of PII to an OJP Program Manager no later than 24 hours after an occurrence of an actual breach, or the detection of an imminent breach.
4. OJP Training Guiding Principles
Any training or training materials that the recipient -- or any subrecipient ("subgrantee") at any tier -- develops or delivers with OJP award funds must adhere to the OJP Training Guiding Principles for Grantees and Subgrantees, available at https://www.ojp.gov/funding/implement/training-guiding-principles-grantees-and-subgrantees.
5. Required training for Grant Award Administrator and Financial Manager
The Grant Award Administrator and all Financial Managers for this award must have successfully completed an "OJP financial management and grant administration training" by 120 days after the date of the recipient's acceptance of the award. Successful completion of such a training on or after October 15, 2020, will satisfy this condition.
In the event that either the Grant Award Administrator or a Financial Manager for this award changes during the period of performance, the new Grant Award Administrator or Financial Manager must have successfully completed an "OJP financial management and grant administration training" by 120 calendar days after the date the Entity Administrator enters updated Grant Award Administrator or Financial Manager information in JustGrants. Successful completion of such a training on or after January 1, 2020, will satisfy this condition.
A list of OJP trainings that OJP will consider "OJP financial management and grant administration training" for purposes of this condition is available at https://www.ojp.gov/training/fmts.htm. All trainings that satisfy this condition include a session on grant fraud prevention and detection.
The recipient should anticipate that OJP will immediately withhold ("freeze") award funds if the recipient fails to comply with this condition. The recipient's failure to comply also may lead OJP to impose additional appropriate conditions on this award.
6. Effect of failure to address audit issues
The recipient understands and agrees that the DOJ awarding agency (OJP or OVW, as appropriate) may withhold award funds, or may impose other related requirements, if (as determined by the DOJ awarding agency) the recipient does not satisfactorily and promptly address outstanding issues from audits required by the Part 200 Uniform Requirements (or by the terms of this award), or other outstanding issues that arise in connection with audits, investigations, or reviews of DOJ awards.
https://www.ojp.gov/funding/implement/training-guiding-principles-grantees-and-subgrantees https://www.ojp.gov/funding/implement/training-guiding-principles-grantees-and-subgrantees https://www.ojp.gov/training/fmts.htm
7. Requirements of the award; remedies for non-compliance or for materially false statements
The conditions of this award are material requirements of the award. Compliance with any assurances or certifications submitted by or on behalf of the recipient that relate to conduct during the period of performance also is a material requirement of this award.
Limited Exceptions. In certain special circumstances, the U.S. Department of Justice ("DOJ") may determine that it will not enforce, or enforce only in part, one or more requirements otherwise applicable to the award. Any such exceptions regarding enforcement, including any such exceptions made during the period of performance, are (or will be during the period of performance) set out through the Office of Justice Programs ("OJP") webpage entitled "Legal Notices: Special circumstances as to particular award conditions" (ojp.gov/funding/Explore/LegalNotices-AwardReqts.htm), and incorporated by reference into the award.
By signing and accepting this award on behalf of the recipient, the authorized recipient official accepts all material requirements of the award, and specifically adopts, as if personally executed by the authorized recipient official, all assurances or certifications submitted by or on behalf of the recipient that relate to conduct during the period of performance.
Failure to comply with one or more award requirements -- whether a condition set out in full below, a condition incorporated by reference below, or an assurance or certification related to conduct during the award period -- may result in OJP taking appropriate action with respect to the recipient and the award. Among other things, the OJP may withhold award funds, disallow costs, or suspend or terminate the award. DOJ, including OJP, also may take other legal action as appropriate.
Any materially false, fictitious, or fraudulent statement to the federal government related to this award (or concealment or omission of a material fact) may be the subject of criminal prosecution (including under 18 U.S.C. 1001 and/or 1621, and/or 34 U.S.C. 10271-10273), and also may lead to imposition of civil penalties and administrative remedies for false claims or otherwise (including under 31 U.S.C. 3729-3730 and 3801-3812).
Should any provision of a requirement of this award be held to be invalid or unenforceable by its terms, that provision shall first be applied with a limited construction so as to give it the maximum effect permitted by law. Should it be held, instead, that the provision is utterly invalid or -unenforceable, such provision shall be deemed severable from this award.
8. Compliance with DOJ regulations pertaining to civil rights and nondiscrimination - 28 C.F.R. Part
The recipient, and any subrecipient ("subgrantee") at any tier, must comply with all applicable requirements of 28 C.F.R. Part 38 (as may be applicable from time to time), specifically including any applicable requirements regarding written notice to program beneficiaries and prospective program beneficiaries.
Currently, among other things, 28 C.F.R. Part 38 includes rules that prohibit specific forms of discrimination on the basis of religion, a religious belief, a refusal to hold a religious belief, or refusal to attend or participate in a religious practice. Part 38, currently, also sets out rules and requirements that pertain to recipient and subrecipient ("subgrantee") organizations that engage in or conduct explicitly religious activities, as well as rules and requirements that pertain to recipients and subrecipients that are faith-based or religious organizations.
The text of 28 C.F.R. Part 38 is available via the Electronic Code of Federal Regulations (currently accessible at https://www.ecfr.gov/cgi-bin/ECFR?page=browse), by browsing to Title 28-Judicial Administration, Chapter 1, Part 38, under e-CFR "current" data.
9. Compliance with DOJ regulations pertaining to civil rights and nondiscrimination - 28 C.F.R. Part
The recipient, and any subrecipient ("subgrantee") at any tier, must comply with all applicable requirements of 28 C.F.R. Part 42, specifically including any applicable requirements in Subpart E of 28 C.F.R. Part 42 that relate to an equal employment opportunity program.
10. Compliance with DOJ regulations pertaining to civil rights and nondiscrimination - 28 C.F.R. Part
The recipient, and any subrecipient ("subgrantee") at any tier, must comply with all applicable requirements of 28 C.F.R. Part 54, which relates to nondiscrimination on the basis of sex in certain "education programs."
11. Compliance with 41 U.S.C. 4712 (including prohibitions on reprisal; notice to employees)
The recipient (and any subrecipient at any tier) must comply with, and is subject to, all applicable provisions of 41 U.S.C. 4712, including all applicable provisions that prohibit, under specified circumstances, discrimination against an employee as reprisal for the employee's disclosure of information related to gross mismanagement of a federal grant, a gross waste of federal funds, an abuse of authority relating to a federal grant, a substantial and specific…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .