This is a bid schedule addendum document for the City of Tucson Parks and Recreation's Invitation for Bid (IFB) No. 250103 covering comprehensive improvements to Jacobs Park and Ochoa Soccer Complex. The project encompasses extensive infrastructure development including four softball fields with LED sports lighting, soccer field upgrades with LED infrastructure, pickleball courts, tennis courts, volleyball courts, a splash pad, restroom facilities, parking improvements, irrigation systems, landscape enhancements, site furnishings (ramadas, bleachers, game tables, barbecues, benches), fencing, signage, and demolition/site preparation work. The base bid applies to both park locations, with quantities specified in unit measurements including lump sum (LS), each (EA), linear feet (LF), square feet (SF), and cubic yards (CY). Several bid items marked with asterisks indicate quantities to be determined by bidders per specifications. The bid submission deadline is April 1, 2025, at 2:00 pm, with a pre-bid conference scheduled for March 11, 2025, at 11:00 am. The procurement includes 10 add alternates for selective funding purposes, covering LED lighting upgrades, field irrigation rotor replacement, asphalt paths, post and cable fencing, ramada installation, and volleyball court construction.
The bid schedule requires unit pricing for labor, materials, and equipment across all line items, with bidders calculating total prices for each component. The project timeline specifies a 365 consecutive calendar day completion requirement with liquidated damages set at $2,710 per calendar day of delay. Bid, performance, and payment bonds are each required at 100% of the contract amount. Funding sources include 407 Bond funds, impact fees, federal Land and Water Conservation Fund monies passed through the Arizona State Parks Department, and ward funding, with the estimated project value ranging between $5,000,000 and $10,000,000. The city will retain 10% of each estimate as a performance guarantee. The solicitation includes provisions for Small Business Enterprise and Disadvantaged Business Enterprise participation with a 0% DBE goal requiring Good Faith Efforts documentation. Award will be made on an available funding basis, allowing the city to select the base bid and alternates based on budgetary constraints and departmental priorities.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jacobs Ochoa Park Bid Tab
| Jacobs Park Bid Schedule - IFB 250103 Addendum 2 | |||||
| Tucson, AZ | |||||
| FOR BID ITEMS CONTAINING AN ASTERIK *, QUANTITIES ARE TO BE DETERMINED BY EACH BIDDER PER THE SPECIFICATIONS | |||||
| JACOBS PARK BASE BID | |||||
| MOBILIZATION, ETC. | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Mobilization | LS | ||||
| Survey and Layout | LS | ||||
| Temporary: Fencing, barricades, traffic control, public protection from work site | LS | ||||
| SWPP | LS | ||||
| DEMOLITION/SITE PREP (to include but not limited to all site prep, demo, turf removal/eradication, and disposal of material-Includes demo and disposal of existing Ramada 1 on east side of park just south of the existing play area) | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Demolition of comfort station, ramadas, playground equipment, and other structures | LS | ||||
| Demolition and salvage of site amenities | LS |
| Demolition and salvage of electrical pedestals/cabinets/panels/scoreboards etc. | LS | ||||
| Demolition of asphalt pavement, concrete curbs, concrete pads, flatwork, etc. | LS | ||||
| Demolition of fencing, gates, bollards etc. | LS | ||||
| Demolition and salvage of signs | LS | ||||
| Clear and grub | LS | ||||
| Trimming of existing trees | EA | ||||
| Tree removal - includes grinding stump below grade | EA | ||||
| Turf Removal / Eradication | SF | ||||
| Removal of irrigation equipment | LS | ||||
| EARTHWORK | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Earthwork, Grading, and Drainage | CY | ||||
| Grading for rainwater harvesting basins | CY | ||||
| SEWER AND WATER | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Trenching | LF | ||||
| Water | LS | ||||
| Septic System Connection (including coordination with Tucson Water, County -Sewer) | LS | ||||
| PARKING LOT | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Asphalt paving | SF | ||||
| Striping | LS | ||||
| Concrete wheel stops | EA | ||||
| RESTROOM BUILDING | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Foundation and Flatwork | SF | ||||
| CMU Block | LS | ||||
| Roof | LS | ||||
| Plumbing | LS | ||||
| Electrical | LS | ||||
| Mechanical | LS | ||||
| Doors/Windows | LS | ||||
| Toilets | LS | ||||
| Other | LS | ||||
| ELECTRICAL | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| New Sports Lighting for Softball Fields 2 and 4 | LS | ||||
| Sports Lighting Infrastructure for Softball Fields 1 and 3 | LS | ||||
| Pickleball Court Lighting | LS | ||||
| Tennis/Futsol Lighting | |||||
| Dog Park Lighting | LS | ||||
| Ramada Lighting | LS | ||||
| Site Lighting (ramada lights, bating cages, etc.) | LS | ||||
| Trenching | LF | ||||
| Conduit | LF | ||||
| Other | LS | ||||
| CONCRETE | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Flatwork | SF | ||||
| Post-tension slab and pickleball striping | SF | ||||
| 8" Depth Curbs | LF | ||||
| 13" Depth Curbs | LF | ||||
| MASONRY | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Dumpster Enclosure | |||||
| SITE FURNISHINGS | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Removeable Bollards | EA | ||||
| 10'x10' Ramada | EA | ||||
| 20'x20' Ramada | EA | ||||
| 15'x30' Ramada | EA | ||||
| 24'x44' Ramada | EA | ||||
| Bleachers | EA | ||||
| Game Tables | EA | ||||
| Bag toss game board set | EA | ||||
| Horseshoe Pit | EA | ||||
| Concrete Picnic Tables | EA | ||||
| BBQ - Standard | EA | ||||
| BBQ - Large | EA | ||||
| Bench | EA | ||||
| Leash Post | EA | ||||
| Pet Station | EA | ||||
| Drinking Fountain | EA | ||||
| Dugout Bench | EA | ||||
| PLAY EQUIPMENT/MISCELLANEOUS | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Foul Pole | EA | ||||
| Softball/Baseball bases, home plate, pitchers plate system | EA | ||||
| Softball/Baseball fence guard | EA | ||||
| Pickleball net post system | EA | ||||
| Futsal goal | EA | ||||
| Tennis court net replacement | EA | ||||
| Bike rack | EA | ||||
| Basketball backboard and nets | EA | ||||
| Splash pad play equipment | LS | ||||
| Fitness equipment | LS | ||||
| GATES/FENCING/SIGNAGE | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Pool Fence and gate | LF | ||||
| Splash pad fence and gate | LF | ||||
| 4' ht. chain-link fence and gates | LF | ||||
| 6' ht. chain-link fence and gates | LF | ||||
| 10' ht. chain-link fence | LF | ||||
| Backstops | LF | ||||
| Dug Outs | LF | ||||
| Batting cages | LF | ||||
| ADA Signage | EA | ||||
| LWCF Signage | EA | ||||
| Trash enclosure gate | EA | ||||
| SURFACING | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Asphalt Path | SF | ||||
| Decomposed granite - 1/2" screened | SF | ||||
| Decomposed granite - 3/8" minus | SF | ||||
| Fractured Rock - 4"-8" | SF | ||||
| Compost Mulch (for bottom of rainwater basins) | CY | ||||
| Infield Diamond Mix | SF | ||||
| Engineered wood fiber | SF | ||||
| Rubberized play surfacing | SF | ||||
| Tennis Court Resurfacing and Striping | SF | ||||
| Pool Deck Resurfacing | SF | ||||
| Basketball Resurfacing and Striping | SF | ||||
| LANDSCAPE | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| 15 Gallon Trees | EA | ||||
| 5 Gallon Shrubs | EA | ||||
| 5 Gallon Accents | EA | ||||
| 1 Gallon Grasses | EA | ||||
| TifTuf Bermuda Hybrid Grass - Hydrostolons | SF | ||||
| Existing Turf Repair - Hydrostolons | SF | ||||
| Topsoil | CF | ||||
| Root barriers | LF | ||||
| IRRIGATION | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Controller Upgrades and Installation | EA | ||||
| Gate Valves | EA | ||||
| Quick Couplers | EA | ||||
| Master Valve | EA | ||||
| Flow Sensor | EA | ||||
| Turf Valve Assembly | EA | ||||
| Drip Valve Assembly | EA | ||||
| Rotors | EA | ||||
| PVC Sleeving | LF | ||||
| PVC Mainline | LF | ||||
| Turf and Drip Laterals | LF | ||||
| End Caps | EA | ||||
| Emitters | EA | ||||
| Controller Wire | LF | ||||
| Other - tape, wire caps, etc. | LS |
JACOBS PARK BASE BID TOTAL:
| Ochoa Soccer Complex Bid Schedule | |||||
| Tucson, AZ | |||||
| FOR BID ITEMS CONTAINING AN ASTERIK *, QUANTITIES ARE TO BE DETERMINED BY EACH BIDDER PER THE SPECIFICATIONS | |||||
| OCHOA SOCCER COMPLEX BASE BID | |||||
| MOBILIZATION, ETC. | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Mobilization | LS | ||||
| Survey and Layout | LS | ||||
| Temporary: Fencing, barricades, traffic control, public protection from work site | LS | ||||
| SWPP | LS | ||||
| DEMOLITION/SITE PREP (to include but not limited to all site prep, demo, turf eradication, and disposal of demolished material) | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Demolition and salvage of electrical pedestals/cabinets/panels etc. | LS | ||||
| Demolition/saw cut/remove asphalt pavement, concrete sidewalk, concrete curbs & gutters, concrete pads etc. | LS | ||||
| Demolition and salvage of signs | LS | ||||
| Remove tree and stump | |||||
| Trimming of existing trees | EA | ||||
| EARTHWORK | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Earthwork, Grading, and Drainage | CY | ||||
| CONCRETE/PAVEMENT | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Flatwork, Sidewalk, Pavement | SF | ||||
| Concrete Curb & Gutter | LF | ||||
| Concrete Pad Scupper | EA | ||||
| ADA Access Ramp | EA | ||||
| Handrail at ADA Access Ramp | LF | ||||
| Asphaltic Pavement | SF | ||||
| Pavement Marking | SF | ||||
| Detectable Warning Strip | EA | ||||
| Precast Concrete Wheelstops | EA | ||||
| MASONRY | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Dumpster Enclosure | LS | ||||
| GATES/FENCING/SIGNAGE | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| LWCF Signage | EA | ||||
| ADA Signage | EA | ||||
| LANDSCAPE | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| 15 Gallon Trees | EA | ||||
| Existing Turf Repair - Hydrostolons | SF | ||||
| Topsoil | CF | ||||
| Sand | |||||
| Root barriers | LF | ||||
| IRRIGATION | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Rotors and Swing Joints | EA | ||||
| Drip Laterals (Sch. 40 PVC) | LF | ||||
| End Caps | EA | ||||
| Multi-port Emitters | EA | ||||
| 1/4" Drip tubing | LF | ||||
| Other - tape, wire caps, etc. | LS |
| OCHOA SOCCER COMPLEX BASE BID TOTAL: | |
| JACOBS AND OCHOA BASE BID TOTAL |
| OCHOA SOCCER COMPLEX ADD ALTERNATIVES | |||||
| ADD ALT 1 - FIELD 3 UPGRADED LIGHTING TO LED AND I NFRASTRUCTURE FOR FIELD 1 AND 2 | |||||
| ELECTRICAL | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Upgrade lighting to LED on Field 3 | LS | ||||
| Infrastructure for Fields 1 and 2 | LS | ||||
| Trenching | LF | ||||
| Conduit | LF | ||||
| Existing Turf Repair - Hydrostolons | SF | ||||
| Other | LS | ||||
| ADD ALT 1 SUBTOTAL: | |||||
| OCHOA SOCCER COMPLEX ADD ALT 1 TOTAL: |
| OCHOA SOCCER COMPLEX ADD ALTERNATIVES | |||||
| ADD ALT 2 - FIELD 1 AND 2 UPGRADE LIGHTING TO LED | |||||
| ELECTRICAL | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Upgrade lighting to LED on Field 1 and 2 | LS | ||||
| Trenching | LF | ||||
| Conduit | LF | ||||
| Existing Turf Repair - Hydrostolons | SF | ||||
| Other | LS | ||||
| ADD ALT 2 SUBTOTAL: | |||||
| OCHOA SOCCER COMPLEX ADD ALT 2 TOTAL: |
| JACOBS PARK ADD ALTERNATIVES | |||||
| ADD ALT 3 - NEW SOFTBALL FIELD LIGHTING ON FIELDS 1 AND 3 | |||||
| ELECTRICAL | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| New Sports Lighting for Softball Fields 1 and 3 | LS | ||||
| Trenching | LF | ||||
| Conduit | LF | ||||
| Other | LS | ||||
| ADD ALT 3 SUBTOTAL: | |||||
| JACOBS PARK ADD ALT 3 TOTAL: |
| OCHOA SOCCER COMPLEX ADD ALTERNATIVES | |||||
| ADD ALT 4 - ASPHALT PATH AND POST AND CABLE | |||||
| CONCRETE | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Flatwork | SF | ||||
| SURFACING | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Asphalt Path | SF | ||||
| FENCING | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Post and Cable | LF | ||||
| ADD ALT 4 SUBTOTAL: | |||||
| JACOBS PARK ADD ALT 4 TOTAL: |
| OCHOA SOCCER COMPLEX ADD ALTERNATIVES | |||||
| ADD ALT 5 - POST AND CABLE | |||||
| GATES/FENCING/SIGNAGE | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Post and Cable | LF | ||||
| ADD ALT 5 SUBTOTAL: | |||||
| OCHOA SOCCER COMPLEX ADD ALT 5 TOTAL: |
| OCHOA SOCCER COMPLEX ADD ALTERNATIVES | |||||
| ADD ALT 6 - RAMADA 1 (EAST SIDE) | |||||
| SITE PREP | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Earthwork, Grading, and Drainage | CY | ||||
| CONCRETE | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Flatwork | SF | ||||
| SURFACING | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Asphalt Path | SF | ||||
| GATES/FENCING/SIGNAGE | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Post and Cable Fencing | LF | ||||
| SITE FURNISHINGS | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| 24'x44' Ramada | EA | ||||
| Concrete Picnic Tables | EA | ||||
| BBQ - Standard | EA | ||||
| ADD ALT 6 SUBTOTAL: | |||||
| JACOBS PARK ADD ALT 6 TOTAL: |
| OCHOA SOCCER COMPLEX ADD ALTERNATIVES | ||||||
| ADD ALT 7 - VOLLEYBALL COURTS | ||||||
| SITE PREP | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | ||
| Earthwork, Grading, and Drainage | CY | |||||
| Tree removal - includes grinding stump below grade | ea | |||||
| ELECTRICAL | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | ||
| New Poles and Fixtures | LS | |||||
| Trenching | LF | |||||
| Conduit | LF | |||||
| Other | LS | |||||
| CONCRETE | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | ||
| Flatwork | SF | |||||
| Mow Curb | LF | |||||
| 18" Concrete Header | LF | |||||
| SURFACING | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | ||
| Sand | TON | |||||
| GATES/FENCING/SIGNAGE | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | ||
| Perimeter Fencing (4' Ht. Chain Link Fence) | LF | |||||
| Gate (4' Ht. Chain Link) | EA | |||||
| EQUIPMENT | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | ||
| Volleyball Posts (set of 2) | EA | $3,200.00 | ||||
| Volleyball Nets | EA | $300.00 | ||||
| Boundary Rope and Tie Downs | EA | $300.00 | ||||
| SITE FURNISHINGS | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | ||
| Bench | EA | |||||
| ADD ALT 7 SUBTOTAL: | ||||||
| JACOBS PARK ADD ALT 7 TOTAL: | ||||||
| OCHOA SOCCER COMPLEX ADD ALTERNATIVES | ||||||
| ADD ALT 8 - FIELD 1 REPLACE IRRIGATION ROTORS | ||||||
| DEMOLITION/SITE PREP (to include but not limited to all site prep, demo, turf eradication, and disposal of demolished material) | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | ||
| Removal of irrigation equipment | LS | |||||
| IRRIGATION | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | ||
| Rotors | EA | |||||
| Other - tape, wire caps, etc. | LS | |||||
| Existing Turf Repair - Hydrostolons | SF | |||||
| ADD ALT 8 SUBTOTAL: | ||||||
| OCHOA SOCCER COMPLEX ADD ALT 8 TOTAL: |
| OCHOA SOCCER COMPLEX ADD ALTERNATIVES | |||||
| ADD ALT 9 - FIELD 2 REPLACE IRRIGATION ROTORS | |||||
| DEMOLITION/SITE PREP (to include but not limited to all site prep, demo, turf eradication, and disposal of demolished material) | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Removal of irrigation equipment | LS | ||||
| IRRIGATION | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Rotors | EA | ||||
| Other - tape, wire caps, etc. | LS | ||||
| Existing Turf Repair - Hydrostolons | SF | ||||
| ADD ALT 9 SUBTOTAL: | |||||
| OCHOA SOCCER COMPLEX ADD ALT 9 TOTAL: |
| OCHOA SOCCER COMPLEX ADD ALTERNATIVES | |||||
| ADD ALT 10 - FIELD 3 REPLACE IRRIGATION ROTORS | |||||
| DEMOLITION/SITE PREP (to include but not limited to all site prep, demo, turf eradication, and disposal of demolished material) | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Removal of irrigation equipment | LS | ||||
| IRRIGATION | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Rotors | EA | ||||
| Other - tape, wire caps, etc. | LS | ||||
| ADD ALT 10 SUBTOTAL: | |||||
| OCHOA SOCCER COMPLEX ADD ALT 10 TOTAL: |
Ochoa Park Bid Tabs
| Ochoa Soccer Complex Bid Schedule | |||||
| Tucson, AZ | |||||
| FOR BID ITEMS CONTAINING AN ASTERIK *, QUANTITIES ARE TO BE DETERMINED BY EACH BIDDER PER THE SPECIFICATIONS | |||||
| OCHOA SOCCER COMPLEX BASE BID | |||||
| MOBILIZATION, ETC. | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Mobilization | LS | ||||
| Survey and Layout | LS | ||||
| Temporary: Fencing, barricades, traffic control, public protection from work site | LS | ||||
| SWPP | LS | ||||
| DEMOLITION/SITE PREP (to include but not limited to all site prep, demo, turf eradication, and disposal of demolished material) | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Demolition and salvage of electrical pedestals/cabinets/panels etc. | LS | ||||
| Demolition/saw cut/remove asphalt pavement, concrete sidewalk, concrete curbs & gutters, concrete pads etc. | LS | ||||
| Demolition and salvage of signs | LS | ||||
| Remove tree and stump | |||||
| Trimming of existing trees | EA | ||||
| EARTHWORK | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Earthwork, Grading, and Drainage | CY | ||||
| CONCRETE/PAVEMENT | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Flatwork, Sidewalk, Pavement | SF | ||||
| Concrete Curb & Gutter | LF | ||||
| Concrete Pad Scupper | EA | ||||
| ADA Access Ramp | EA | ||||
| Handrail at ADA Access Ramp | LF | ||||
| Asphaltic Pavement | SF | ||||
| Pavement Marking | SF | ||||
| Detectable Warning Strip | EA | ||||
| Precast Concrete Wheelstops | EA | ||||
| MASONRY | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Dumpster Enclosure | LS | ||||
| GATES/FENCING/SIGNAGE | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| LWCF Signage | EA | ||||
| ADA Signage | EA | ||||
| LANDSCAPE | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| 15 Gallon Trees | EA | ||||
| Existing Turf Repair - Hydrostolons | SF | ||||
| Topsoil | CF | ||||
| Sand | |||||
| Root barriers | LF | ||||
| IRRIGATION | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Rotors and Swing Joints | EA | ||||
| Drip Laterals (Sch. 40 PVC) | LF | ||||
| End Caps | EA | ||||
| Multi-port Emitters | EA | ||||
| 1/4" Drip tubing | LF | ||||
| Other - tape, wire caps, etc. | LS | ||||
| BASE BID SUBTOTAL: | |||||
| OCHOA SOCCER COMPLEX BASE BID TOTAL: |
| OCHOA SOCCER COMPLEX ADD ALTERNATIVES | |||||
| ADD ALT 1 - FIELD 3 UPGRADED LIGHTING TO LED AND I NFRASTRUCTURE FOR FIELD 1 AND 2 | |||||
| ELECTRICAL | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Upgrade lighting to LED on Field 3 | LS | ||||
| Infrastructure for Fields 1 and 2 | LS | ||||
| Trenching | LF | ||||
| Conduit | LF | ||||
| Existing Turf Repair - Hydrostolons | SF | ||||
| Other | LS | ||||
| ADD ALT 1 SUBTOTAL: | |||||
| OCHOA SOCCER COMPLEX ADD ALT 1 TOTAL: |
| ADD ALT 2 - FIELD 1 AND 2 UPGRADE LIGHTING TO LED | |||||
| ELECTRICAL | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Upgrade lighting to LED on Field 1 and 2 | LS | ||||
| Trenching | LF | ||||
| Conduit | LF | ||||
| Existing Turf Repair - Hydrostolons | SF | ||||
| Other | LS | ||||
| ADD ALT 2 SUBTOTAL: | |||||
| OCHOA SOCCER COMPLEX ADD ALT 2 TOTAL: |
| ADD ALT 5 - POST AND CABLE | |||||
| GATES/FENCING/SIGNAGE | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Post and Cable | LF | ||||
| ADD ALT 5 SUBTOTAL: | |||||
| OCHOA SOCCER COMPLEX ADD ALT 5 TOTAL: |
| ADD ALT 8 - FIELD 1 REPLACE IRRIGATION ROTORS | |||||
| DEMOLITION/SITE PREP (to include but not limited to all site prep, demo, turf eradication, and disposal of demolished material) | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Removal of irrigation equipment | LS | ||||
| IRRIGATION | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Rotors | EA | ||||
| Other - tape, wire caps, etc. | LS | ||||
| Existing Turf Repair - Hydrostolons | SF | ||||
| ADD ALT 8 SUBTOTAL: | |||||
| OCHOA SOCCER COMPLEX ADD ALT 8 TOTAL: |
| ADD ALT 9 - FIELD 2 REPLACE IRRIGATION ROTORS | |||||
| DEMOLITION/SITE PREP (to include but not limited to all site prep, demo, turf eradication, and disposal of demolished material) | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Removal of irrigation equipment | LS | ||||
| IRRIGATION | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Rotors | EA | ||||
| Other - tape, wire caps, etc. | LS | ||||
| Existing Turf Repair - Hydrostolons | SF | ||||
| ADD ALT 9 SUBTOTAL: | |||||
| OCHOA SOCCER COMPLEX ADD ALT 9 TOTAL: |
| ADD ALT 10 - FIELD 3 REPLACE IRRIGATION ROTORS | |||||
| DEMOLITION/SITE PREP (to include but not limited to all site prep, demo, turf eradication, and disposal of demolished material) | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Removal of irrigation equipment | LS | ||||
| IRRIGATION | QTY. | UNIT | UNIT PRICE | TOTAL PRICE | |
| Rotors | EA | ||||
| Other - tape, wire caps, etc. | LS | ||||
| ADD ALT 10 SUBTOTAL: | |||||
| OCHOA SOCCER COMPLEX ADD ALT 10 TOTAL: |