This document is a set of construction drawings and specifications for the replacement of the existing cooling tower at the Jackson County Courthouse in Jefferson, Georgia. The intent of the project is to demolish and replace the existing nominal 500-ton, two-cell, counterflow cooling tower (CT-1) with a new cooling tower of equal capacity. The demolition work includes the removal of the existing cooling tower, portions of the associated above-ground condenser piping, and one of the two variable frequency drives (VFDs) located in the basement mechanical room. The new cooling tower is to be a direct replacement of the existing tower with accessory upgrades. The electrical scope includes the modification of the power supply for connection to the replacement cooling tower, associated basin heaters, heat trace, and VFDs. The BAS controls sequence of operations and points are to remain the same as currently programmed.
The design basis includes the applicable building codes and standards, as well as the design intent and general notes for the project. A cooling tower schedule is provided detailing the specifications of the new tower. The drawings include demolition and new work plans, elevations, and details for the mechanical yard and basement mechanical and electrical rooms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUGUST 30, 2024
Cooling Tower Replacement
JOHNSON, SPELLMAN & ASSOCIATES, INC
350 RESEARCH COURT, SUITE 130
PEACHTREE CORNERS, GA 30092
CONTACT - BRAD WAGES
PHONE - 678-336-5419
PROJECT MANAGER - KASON RHENEY
PHONE - 678-336-5431
PRIME CONSULTANT /
MECHANICAL ENGINEER
Jackson County Courthouse
FOR CONSTRUCTION DOCUMENTS
SITE LOCATION MAP
SCALE: NONE
VICINITY MAP
SCALE: NONE
JACKSON COUNTY
JEFFERSON, GA
PROJECT SITE
Jackson County Government
ELECTRICAL ENGINEER
BARNETT CONSULTING ENGINEERS
655 ENGINEERING DRIVE, SUITE 150
PEACHTREE CORNERS, GA 30092
CONTACT - LEAH BENINCASA
PHONE - 404-382-9554
at The Jackson County Courthouse 5000 Jackson Parkway Jefferson, GA 30549
SHEETS
JOB NUMBER
DRAWN BY
CHECKED BY
DATE
DRAWING NUMBER
Phone (770) 447-4555
350 Research Court, Suite 130 visit us at www.jsace.com
Peachtree Corners, Georgia 30092
Johnson, Spellman & Associates, Inc.
RE
VI
SI
O
N S
N O
D
AT
E
JA
CK
SO
N
C O
U N
TY
CO
U
RT
H O
U
SE
C O
O
LI
N G
TO
W
ER
R
EP
LA
CE
M
EN
T
JE
FF
ER
SO
N , G
A
COVER SHEET
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text
DRAWING INDEX
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
FOR CONSTRUCTION DOCUMENTS 8/30/2024
AutoCAD SHX Text
GENERAL DRAWINGS
AutoCAD SHX Text
COVER
AutoCAD SHX Text
COVER SHEET, MAP
AutoCAD SHX Text X
AutoCAD SHX Text
MECHANICAL DRAWINGS
AutoCAD SHX Text M-0
AutoCAD SHX Text
HVAC GENERAL NOTES, LEGEND, SCHEDULES, DESIGN INTENT, & DETAILS
AutoCAD SHX Text X
AutoCAD SHX Text M-1
AutoCAD SHX Text
HVAC PART PLANS - DEMOLITION & NEW WORK, ELEVATIONS
AutoCAD SHX Text X
AutoCAD SHX Text c 2024 Johnson, Spellman & Associates, Inc.
AutoCAD SHX Text
24JS63
AutoCAD SHX Text
KKR
AutoCAD SHX Text
BSW
AutoCAD SHX Text 08/30/2024
OF SHEETS
JOB NUMBER
DRAWN BY
CHECKED BY
DATE
DRAWING NUMBER
Phone (770) 447-4555
350 Research Court, Suite 130 visit us at www.jsace.com
Peachtree Corners, Georgia 30092
Johnson, Spellman & Associates, Inc.
RE
VI
SI
O
N S
N O
D
AT
E
JA
CK
SO
N
C O
U N
TY
CO
U
RT
H O
U
SE
C O
O
LI
N G
TO
W
ER
R
EP
LA
CE
M
EN
T
JE
FF
ER
SO
N , G
A
HVAC GENERAL NOTES,
LEGEND, SCHEDULES,
DESIGN INTENT, & DETAILS
AutoCAD SHX Text
DESIGN INTENT
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
1. EXISTING EQUIPMENT AND PIPING TO REMAIN, UNLESS NOTED TO BE REMOVED. EXISTING EQUIPMENT AND PIPING TO REMAIN, UNLESS NOTED TO BE REMOVED. 2. VERIFY LOCATIONS OF EXISTING PIPING AND EQUIPMENT PRIOR TO BEGINNING VERIFY LOCATIONS OF EXISTING PIPING AND EQUIPMENT PRIOR TO BEGINNING WORK. 3. REMOVE CONDENSER WATER PIPING TO EQUIPMENT AS NOTED ON DRAWINGS. REMOVE CONDENSER WATER PIPING TO EQUIPMENT AS NOTED ON DRAWINGS. 4. ALL EXISTING EQUIPMENT AND PIPING IS SHOWN DASHED, NEW EQUIPMENT AND ALL EXISTING EQUIPMENT AND PIPING IS SHOWN DASHED, NEW EQUIPMENT AND PIPING SHOWN SOLID. 5. ROUTE PIPING AS TIGHT TO STRUCTURE AS POSSIBLE, UNLESS OTHERWISE ROUTE PIPING AS TIGHT TO STRUCTURE AS POSSIBLE, UNLESS OTHERWISE NOTED. 6. PROTECT ALL MATERIALS AND EQUIPMENT FROM DAMAGE. PROTECT ALL MATERIALS AND EQUIPMENT FROM DAMAGE. 7. CONTRACTOR SHALL VERIFY EQUIPMENT & PIPING'S AREA OF SERVICE PRIOR TO CONTRACTOR SHALL VERIFY EQUIPMENT & PIPING'S AREA OF SERVICE PRIOR TO DEMOLISHING OR RELOCATING ANY PIECE OF EQUIPMENT. 8. CONTRACTOR SHALL MAKE ALL ACCOMMODATIONS REQUIRED TO LEAVE THE JOB CONTRACTOR SHALL MAKE ALL ACCOMMODATIONS REQUIRED TO LEAVE THE JOB SITE IMPACTED BY THE REPLACEMENT OF THE COOLING TOWER IN A MANNER SIMILAR TO PRE-CONSTRUCTION STATE.
AutoCAD SHX Text
HVAC LEGEND & ABBREVIATIONS
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
OR
AutoCAD SHX Text
CONCENTRIC REDUCER
AutoCAD SHX Text
PIPE UNION
AutoCAD SHX Text
PIPE RISE
AutoCAD SHX Text
PIPE DROP
AutoCAD SHX Text
ISOLATION VALVE
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
BALANCING VALVE
AutoCAD SHX Text
TWO WAY MODULATING MOTORIZED CONTROL VALVE
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
PIPING OR EQUIPMENT TO BE REMOVED
AutoCAD SHX Text
PIPE FLOW ARROW
AutoCAD SHX Text
GRADE ARROW-INDICATES RISE OR DROP IN DUCT OR PIPE
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
OR
AutoCAD SHX Text
CONDENSER WATER RETURN
AutoCAD SHX Text
CWR
AutoCAD SHX Text
CONDENSER WATER SUPPLY
AutoCAD SHX Text
CWS
AutoCAD SHX Text
ECCENTRIC REDUCER FLAT SIDE ON BOTTOM OR FLAT SIDE ON TOP
AutoCAD SHX Text
EXTENT OF DEMO
AutoCAD SHX Text
EWT
AutoCAD SHX Text
DESIGN BASIS
AutoCAD SHX Text
COOLING TOWER SCHEDULE
AutoCAD SHX Text
EVAPCO AT 29-221
AutoCAD SHX Text
95%%DF
AutoCAD SHX Text
AutoCAD SHX Text
MARK
AutoCAD SHX Text
CT-1
AutoCAD SHX Text
LWT
AutoCAD SHX Text
85%%DF
AutoCAD SHX Text
GPM
AutoCAD SHX Text 1,200
AutoCAD SHX Text
78%%DF
AutoCAD SHX Text
FAN HP
AutoCAD SHX Text 2@7.5
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text (1)(2)
AutoCAD SHX Text
VOLTAGE
AutoCAD SHX Text 480v/3%%C
AutoCAD SHX Text
AutoCAD SHX Text
NOMINAL TONNAGE
AutoCAD SHX Text
NO. CELLS
AutoCAD SHX Text
WET BULB
AutoCAD SHX Text
(1) PROVIDE INVERTER DUTY MOTOR FOR USE WITH VARIABLE FREQUENCY DRIVE. PROVIDE INVERTER DUTY MOTOR FOR USE WITH VARIABLE FREQUENCY DRIVE. (2) EXISTING COOLING TOWER IS AN EVAPCO, MODEL AT 29-221, SERIAL NUMBER M035229. THE NEW COOLING TOWER EXISTING COOLING TOWER IS AN EVAPCO, MODEL AT 29-221, SERIAL NUMBER M035229. THE NEW COOLING TOWER IS TO BE FABRICATED TO BE A EXACT REPLACEMENT OF THE EXISTING TOWER, WITH ACCESSORY UPGRADES. SEE SPECIFICATIONS.
AutoCAD SHX Text A. APPLICABLE CODES AND STANDARDS APPLICABLE CODES AND STANDARDS 1. INTERNATIONAL BUILDING CODE, 2018 EDITION, WITH GEORGIA AMENDMENTS (2020), (2022), (2024) INTERNATIONAL BUILDING CODE, 2018 EDITION, WITH GEORGIA AMENDMENTS (2020), (2022), (2024) 2. INTERNATIONAL PLUMBING CODE, 2018 EDITION, WITH GEORGIA AMENDMENTS (2020), (2022), (2023), (2024) INTERNATIONAL PLUMBING CODE, 2018 EDITION, WITH GEORGIA AMENDMENTS (2020), (2022), (2023), (2024) 3. INTERNATIONAL MECHANICAL CODE, 2018 EDITION, WITH GEORGIA AMENDMENTS (2020), (2024) INTERNATIONAL MECHANICAL CODE, 2018 EDITION, WITH GEORGIA AMENDMENTS (2020), (2024) 4. INTERNATIONAL FUEL GAS CODE, 2018 EDITION, WITH GEORGIA AMENDMENTS (2020), (2022) INTERNATIONAL FUEL GAS CODE, 2018 EDITION, WITH GEORGIA AMENDMENTS (2020), (2022) 5. NATIONAL ELECTRICAL CODE, 2020 EDITION, WITH GEORGIA AMENDMENTS (2021) NATIONAL ELECTRICAL CODE, 2020 EDITION, WITH GEORGIA AMENDMENTS (2021) 6. INTERNATIONAL ENERGY CONSERVATION CODE, 2015 EDITION, WITH GEORGIA SUPPLEMENTS AND AMENDMENTS (2020), (2022), (2023) INTERNATIONAL ENERGY CONSERVATION CODE, 2015 EDITION, WITH GEORGIA SUPPLEMENTS AND AMENDMENTS (2020), (2022), (2023) 7. ALL CITY, COUNTY, STATE, REGIONAL, AND OTHER ORDINANCES APPLICABLE TO THE WORK SHALL APPLY. ALL CITY, COUNTY, STATE, REGIONAL, AND OTHER ORDINANCES APPLICABLE TO THE WORK SHALL APPLY. B. PROJECT DESIGN SCOPE PROJECT DESIGN SCOPE 1. The intent of the project is to demolish and replace the existing nominal 500 ton, two cell, counterflow The intent of the project is to demolish and replace the existing nominal 500 ton, two cell, counterflow Cooling Tower (CT-1). The new Cooling Tower shall be of equal capacity as the existing. The new Cooling CT-1). The new Cooling Tower shall be of equal capacity as the existing. The new Cooling ). The new Cooling Tower shall be of equal capacity as the existing. The new Cooling Tower is to be fabricated to be a direct replacement of the existing Cooling Tower with accessory upgrades. 2. Demolition work shall include the removal of the existing Cooling Tower and portions of the associated Demolition work shall include the removal of the existing Cooling Tower and portions of the associated above-ground condenser piping, and one of the two Variable Frequency Drive (VFDs) in the Basement Mechanical Room. 3. The electrical scope shall include the modification of the power supply for connection to the replacement The electrical scope shall include the modification of the power supply for connection to the replacement Cooling Tower, associated basin heaters, heat trace, and VFDs. 4. The BAS controls sequence of operations and points shall remain the same as currently programmed by The BAS controls sequence of operations and points shall remain the same as currently programmed by Convergint. Convergint shall provide the same sequence of operations and points for all new and existing equipment.
AutoCAD SHX Text
CONNECT TO EXISTING
AutoCAD SHX Text
BULB
AutoCAD SHX Text
AS SPECIFIED
AutoCAD SHX Text
HEAT TAPE WRAP
AutoCAD SHX Text
CONDUIT
AutoCAD SHX Text
CONDUIT BY ELECTRICAL
AutoCAD SHX Text
JUNCTION BOX AND
AutoCAD SHX Text
EXPOSED TO AMBIENT
AutoCAD SHX Text
WATER PIPE
AutoCAD SHX Text
INSULATION
AutoCAD SHX Text NOTE: 1. PROVIDE A FULLY FUNCTIONAL HEAT TRACE SYSTEM FOR ALL PROVIDE A FULLY FUNCTIONAL HEAT TRACE SYSTEM FOR ALL EXISTING/NEW ABOVE GRADE CONDENSER WATER PIPING.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
HEAT TAPE DETAIL
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
COOLING TOWER PIPING DETAIL
AutoCAD SHX Text
AutoCAD SHX Text
CWR
AutoCAD SHX Text
CWS
AutoCAD SHX Text
TWO CELL COOLING TOWER
AutoCAD SHX Text
3" DRAIN/OVERFLOW, TYP.
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
NO
AutoCAD SHX Text
8" EQUALIZATION
AutoCAD SHX Text
3" DRAIN/OVERFLOW
AutoCAD SHX Text 6,000
AutoCAD SHX Text
MBH
AutoCAD SHX Text
3/4" DRAIN WITH VALVE AND MALE HOSE END CONNECTION
AutoCAD SHX Text c 2024 Johnson, Spellman & Associates, Inc.
AutoCAD SHX Text
24JS63
AutoCAD SHX Text
KKR
AutoCAD SHX Text
BSW
AutoCAD SHX Text 08/30/2024
AutoCAD SHX Text
OF SHEETS
JOB NUMBER
DRAWN BY
CHECKED BY
DATE
DRAWING NUMBER
Phone (770) 447-4555
350 Research Court, Suite 130 visit us at www.jsace.com
Peachtree Corners, Georgia 30092
Johnson, Spellman & Associates, Inc.
RE
VI
SI
O
N S
N O
D
AT
E
JA
CK
SO
N
C O
U N
TY
CO
U
RT
H O
U
SE
C O
O
LI
N G
TO
W
ER
R
EP
LA
CE
M
EN
T
JE
FF
ER
SO
N , G
A
HVAC PART PLANS -
DEMOLITION & NEW
WORK, ELEVATIONS
AutoCAD SHX Text
KEYNOTES - DEMOLITION
AutoCAD SHX Text 1 EXISTING COOLING TOWER IN MECHANICAL YARD AND ASSOCIATED VARIABLE EXISTING COOLING TOWER IN MECHANICAL YARD AND ASSOCIATED VARIABLE FREQUENCY DRIVE VFD-CT-1 IN BASEMENT MECHANICAL ROOM TO BE DRIVE VFD-CT-1 IN BASEMENT MECHANICAL ROOM TO BE REMOVED AND REPLACED. EXISTING VFD CT-2 IS TO REMAIN. COORDINATE WITH NEW WORK. 2 REMOVE EXISTING PORTIONS OF CONDENSER WATER PIPING FROM THE 6" REMOVE EXISTING PORTIONS OF CONDENSER WATER PIPING FROM THE 6" BUTTERFLY VALVE TO LIMITS SHOWN ON DRAWINGS. EXISTING CONTROL VALVES TO REMAIN AND BE REUSED. 3 EXISTING SUPPORTS CONSISTING OF CONCRETE PEDESTALS AND WIDE FLANGED EXISTING SUPPORTS CONSISTING OF CONCRETE PEDESTALS AND WIDE FLANGED BEAMS TO REMAIN AND BE REUSED. COORDINATE WITH NEW WORK. 4 EXISTING PORTIONS OF UNDERGROUND CONDENSER WATER PIPING TO REMAIN AND EXISTING PORTIONS OF UNDERGROUND CONDENSER WATER PIPING TO REMAIN AND BE REUSED. COORDINATE WITH NEW WORK. 5 REMOVE AND REPLACE ALL EXISTING OVERFLOW/DRAIN PIPING. COORDINATE WITH REMOVE AND REPLACE ALL EXISTING OVERFLOW/DRAIN PIPING. COORDINATE WITH NEW WORK. 6 EXISTING DRAIN UNDERNEATH COOLING TOWER TO REMAIN AND BE REUSED. EXISTING DRAIN UNDERNEATH COOLING TOWER TO REMAIN AND BE REUSED. COORDINATE WITH NEW WORK. 7 REMOVE PORTIONS OF EXISTING HEAT TRACE SYSTEM AS REQUIRED BY PIPING REMOVE PORTIONS OF EXISTING HEAT TRACE SYSTEM AS REQUIRED BY PIPING REMOVAL. COORDINATE WITH NEW WORK. 8 COORDINATE WITH DIVISION 23 TO DISCONNECT POWER SERVING COOLING TOWER COORDINATE WITH DIVISION 23 TO DISCONNECT POWER SERVING COOLING TOWER BASIN HEATERS FOR REPLACEMENT OF EQUIPMENT. REPLACE EXISTING 30A/3/NF/WP DISCONNECT AND HOMERUN WIRING. PROTECT EXISTING CONDUIT BACK TO PANELBOARD HOMA FOR RECONNECTION TO NEW EQUIPMENT. 9 COORDINATE WITH DIVISION 23 TO DISCONNECT POWER SERVING COOLING TOWER COORDINATE WITH DIVISION 23 TO DISCONNECT POWER SERVING COOLING TOWER FANS FOR REPLACEMENT OF EQUIPMENT. REPLACE EXISTING 100A/3/NF/WP DISCONNECTS AND HOMERUN WIRING. PROTECT EXISTING CONDUIT BACK TO VARIABLE FREQUENCY DRIVES FOR RECONNECTION TO NEW EQUIPMENT. 10 COORDINATE WITH DIVISION 23 TO DISCONNECT MISCELLANEOUS 120V POWER COORDINATE WITH DIVISION 23 TO DISCONNECT MISCELLANEOUS 120V POWER SERVING VIBRATION SWITCHES, LEVEL CONTROLLER, AND HEAT TAPE FOR THE REPLACEMENT OF THE COOLING TOWER. PROTECT EXISTING WIRING FOR RECONNECTION.
AutoCAD SHX Text
%%UEXIST. CT
AutoCAD SHX Text
EXIST. 6"CWS&R (BELOW GRADE)
AutoCAD SHX Text
EXIST. 3"D (OVERFLOW)
AutoCAD SHX Text
EXIST. 6"CWS&R (BELOW GRADE)
AutoCAD SHX Text
EXIST. 8"CWS&R (BELOW GRADE)
AutoCAD SHX Text
CELL CT-1
AutoCAD SHX Text
CELL CT-2
AutoCAD SHX Text
EXIST. 6"CWS&R (BELOW GRADE)
AutoCAD SHX Text
EXIST. 6"CWS&R (BELOW GRADE)
AutoCAD SHX Text
3"D (OVERFLOW)
AutoCAD SHX Text
6"CWS&R
AutoCAD SHX Text
6"CWS&R
AutoCAD SHX Text
EXIST. 8"CWS&R (BELOW GRADE)
AutoCAD SHX Text
3"D (OVERFLOW)
AutoCAD SHX Text
CELL CT-1
AutoCAD SHX Text
CELL CT-2
AutoCAD SHX Text
8"EQUALIZATION
AutoCAD SHX Text
CT-1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M-1
AutoCAD SHX Text
AutoCAD SHX Text M-1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
6"CWR
AutoCAD SHX Text
6"CWS
AutoCAD SHX Text
EXIST. 6"CWS&R BELOW GRADE
AutoCAD SHX Text
CT-1
AutoCAD SHX Text
3"D (OVERFLOW)
AutoCAD SHX Text
EXIST. CWR BUTTERFLY VALVE
AutoCAD SHX Text
EXIST. CWS BUTTERFLY VALVE
AutoCAD SHX Text
3"D (OVERFLOW)
AutoCAD SHX Text
EXIST. CWR CONTROL VALVE
AutoCAD SHX Text
8"EQUALIZATION
AutoCAD SHX Text
KEYNOTES - NEW WORK
AutoCAD SHX Text 1 INSTALL NEW COUNTERFLOW COOLING TOWER ON EXISTING CONCRETE PEDESTALS INSTALL NEW COUNTERFLOW COOLING TOWER ON EXISTING CONCRETE PEDESTALS AND BEAMS AS SHOWN. SEE DETAILS AND SCHEDULES FOR MORE INFORMATION. 2 CONNECT NEW CONDENSER WATER PIPING TO EXISTING AS SHOWN ON CONNECT NEW CONDENSER WATER PIPING TO EXISTING AS SHOWN ON DRAWINGS. HEAT TAPE TO BE ADDED TO ALL NEW CONDENSER PIPING. 3 ROUTE NEW OVERFLOW PIPING TO EXISTING DRAIN AS SHOWN. ROUTE NEW OVERFLOW PIPING TO EXISTING DRAIN AS SHOWN. 4 REPLACE PORTIONS OF HEAT TRACE SYSTEM AS NEEDED TO PROVIDE A FULLY REPLACE PORTIONS OF HEAT TRACE SYSTEM AS NEEDED TO PROVIDE A FULLY OPERATIONAL HEAT TRACE SYSTEM FOR ALL ABOVE GROUND PORTIONS OF NEW AND EXISTING CONDENSER WATER PIPING. 5 EXISTING CONTROL VALVE AND ASSOCIATED WEATHERPROOF ENCLOSURES TO EXISTING CONTROL VALVE AND ASSOCIATED WEATHERPROOF ENCLOSURES TO REMAIN. 6 PROVIDE NEW HEAVY-DUTY 30A/3/NF/WP DISCONNECT FOR NEW BASIN HEATER PROVIDE NEW HEAVY-DUTY 30A/3/NF/WP DISCONNECT FOR NEW BASIN HEATER CONNECTION AT COOLING TOWER. PROVIDE 3#10, #10G IN EXISTING CONDUIT BACK TO PANELBOARD HOMA-8,10,12. REPLACE EXISTING 20A/3p BREAKER WITH NEW 30A/3p BREAKER. REFER TO COOLING TOWER SHOP DRAWINGS. MAKE FINAL CONNECTION TO HEATERS IN ACCORDANCE WITH MANUFACTURER'S SHOP DRAWINGS. 7 PROVIDE NEW REAPLACEMENT HEAVY-DUTY 100A/3/NF/WP DISCONNECTS FOR PROVIDE NEW REAPLACEMENT HEAVY-DUTY 100A/3/NF/WP DISCONNECTS FOR NEW COOLING TOWER FANS. PROVIDE 3#4, #8G (VFD CABLE) IN EXISTING CONDUIT FROM VARIABLE FREQUENCY DRIVE TO NEW DISCONNECT SWITCH. MAKE FINAL CONNECTION TO NEW COOLING TOWER FANS. REFER TO MANUFACTURER'S SHOP DRAWINGS FOR ADDITIONAL REQUIREMENTS. 8 RECONNECT EXISTING MISCELLANEOUS 120V CIRCUITS TO VIBRATION SWITCHES RECONNECT EXISTING MISCELLANEOUS 120V CIRCUITS TO VIBRATION SWITCHES AND LEVEL CONTROLLER. COORDINATE WITH EQUIPMENT SHOP DRAWINGS. 9 INTERCEPT EXISTING 120V CIRCUIT SERVING HEAT TAPE. PROVIDE 30A/1/NF/WP INTERCEPT EXISTING 120V CIRCUIT SERVING HEAT TAPE. PROVIDE 30A/1/NF/WP DISCONNECT AT TOWER. EXTEND TO EXISTING HEAT TRACE AND NEW FAN MOTOR WINDING HEATERS. REPLACE EXISTING 20A/1p BREAKER IN PANELBOARD LOR WITH 20A/1p BREAKER WITH GROUND FAULT PROTECTION FOR EQUIPMENT. 10 EXISTING VARIABLE FREQUENCY DRIVES SERVING COOLING TOWER FANS ARE EXISTING VARIABLE FREQUENCY DRIVES SERVING COOLING TOWER FANS ARE EXISTING TO REMAIN. 11 8" EQUALIZATION PIPING, THIS IS A DEVIATION FROM EXISTING COOLING TOWER.8" EQUALIZATION PIPING, THIS IS A DEVIATION FROM EXISTING COOLING TOWER.
AutoCAD SHX Text
6"CWR
AutoCAD SHX Text
6"CWS
AutoCAD SHX Text
6"CWR
AutoCAD SHX Text
CT-1
AutoCAD SHX Text
EXIST. 6"CWS&R BELOW GRADE
AutoCAD SHX Text
EXIST. 6"CWS&R BELOW GRADE
AutoCAD SHX Text
6"CWS
AutoCAD SHX Text
3"D (OVERFLOW)
AutoCAD SHX Text
3"D (OVERFLOW)
AutoCAD SHX Text
EXIST. CONTROL VALVE
AutoCAD SHX Text
EXIST. CONTROL VALVE
AutoCAD SHX Text
8"EQUALIZATION
AutoCAD SHX Text
8"CHWR
AutoCAD SHX Text
VFD SP-1
AutoCAD SHX Text
1-1/2"RR
AutoCAD SHX Text
VFD CT-2
AutoCAD SHX Text
VFD CT-1
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text E-01
AutoCAD SHX Text
HDP
AutoCAD SHX Text
EHDP
AutoCAD SHX Text
EHEQ
AutoCAD SHX Text
HOL
AutoCAD SHX Text
LC
AutoCAD SHX Text
LOR
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text M-01
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C-04
AutoCAD SHX Text
HOMA
AutoCAD SHX Text c 2024 Johnson, Spellman & Associates, Inc.
AutoCAD SHX Text
24JS63
AutoCAD SHX Text
KKR
AutoCAD SHX Text
BSW
AutoCAD SHX Text 08/30/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
HVAC MECHANICAL YARD DEMOLITION PART PLAN
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text %%uKEY PLAN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text N
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
HVAC MECHANICAL YARD NEW WORK PART PLAN
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
HVAC MECHANICAL YARD NEW WORK - ELEVATION 1
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
HVAC MECHANICAL YARD NEW WORK - ELEVATION 2
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text HVAC BASEMENT MECHANICAL ROOM REFERENCE PLAN - COOLING TOWER VFDs
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
HVAC BASEMENT ELECTRICAL ROOM - HDP PANEL
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
HVAC BASEMENT MECHANICAL ROOM - HOMA PANEL
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: PART PLAN SHOWN FOR REFERENCE ONLY
NOTE: PART PLAN SHOWN FOR REFERENCE ONLY
| COVER |
| M-0 |
| M-1 |
File details come from the government source that posted it. Updated .