JA09- 01 57 19 Appendix A_Waste Disposal Borrow Pit Plan.pdf

PDF 141 KB Posted

Attached to
Maintain Boiler 4 Federal contract opportunity
Solicitation number
FA500422C0006
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document contains a federal contract opportunity solicitation for maintenance services on a boiler at Eielson Air Force Base in Alaska. The solicitation is for a firm fixed price contract between $5 million and $10 million to repair and maintain boiler 4 at the base's Central Heat and Power Plant. Interested parties must visit the site on April 21st and submit any questions by April 25th. Only electronic bids will be accepted by May 12th. The solicitation is set aside for small businesses with a North American Industry Classification System code of 236220 and $39.5 million size standard. The solicitation also includes an appendix outlining waste disposal and borrow pit coordination requirements for the project.

View the file

Other files for this federal contract opportunity

Other files attached to Maintain Boiler 4, newest first.
File Type Posted
Solicitation Amendment FA500422B00060001 SF 30.pdf PDF
JA18 - FTQW 11-1044D Boiler 4 Site Visit 4-21-22.pdf PDF
Solicitation Amendment - FA500422B00060002.pdf PDF
JA17 - RFI Log Maintain Boiler 4_GovResponse.pdf PDF
Solicitation Amendment FA500422B00060002 SF 30.pdf PDF
Solicitation Amendment - FA500422B00060001.pdf PDF
JA01- FTQW 11-1044D Maintain Boiler 4 SOW 06Jan22.pdf PDF
JA03- FTQW 11-1044D Maintain Boiler 4_Submittal Register.pdf PDF
JA06- SOW APPENDIX B_REHABILITATE BOILER1 CHPP DRAWINGS.pdf PDF
JA08- SOW APPENDIX D_REPAIR SOOT BLOWER BOILER4.pdf PDF
JA12- 01 57 19 Appendix D_hazardous_material_inventory_log.pdf PDF
JA13- 01 57 19 Appendix E_Sample Non-Haz Solid Waste Rpt.pdf PDF
JA16- 01 57 19 Appendix H_Fugitive Dust Plan Eielson AFB.pdf PDF
JA04- Wage_Determination AK20220001.pdf PDF
JA07- SOW APPENDIX C_REPAIR ECONOMIZER_SUPERHEATER BOILER4.pdf PDF
JA10- 01 57 19 Appendix B_Spruce Lake Disposal Checklist.pdf PDF
JA15- 01 57 19 Appendix G_Eielson Spill Magnets Template.pdf PDF
Solicitation Amendment FA500422B00060001 SF 30.pdf PDF
JA02- FTQW 11-1044D Maintain Boiler 4_Specifications.pdf PDF
JA05- SOW APPENDIX A_Secuirty and Access to Controlled Areas.pdf PDF
JA11- 01 57 19 Appendix C_EAFB Waste Determination Form.pdf PDF
JA14- 01 57 19 Appendix F_Aerosol Can Disposal Mgt Procedure.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Eielson AFB Waste Disposal / Borrow Pit Worksheet

FTQW 20-1010, Canopy Replacement B2200

-Page 1 -

Air Force Project Manager / Office Symbol / Telephone Number: Joseph Rupp/ CEMN/377-3157

Contractor Project Engineer / Company / Telephone Number: TBD

--PART I (To be completed by the Contractor, and reviewed by the Project Manager)--

ATTACH PROJECT SCOPE OF WORK FOR PROJECT (SOW)

The proponent must submit an electronic copy of the SOW with the “Waste Disposal / Borrow Pit Worksheet”.

HISTORICAL: Is this work occurring on the run-way (1131) or at one of the following buildings, note the new building numbers are in parentheses: 1120 (2287), 1121 (2311), 1123 (2339), 1124 (2341), 1125 (2347), 1127 (2355), 1128 (2357), 1132 (2359), 1133 (2383), 1134 (2381), 1135 (2379), 1136 (2377), 1138 (2421), 1140 (2511), 1141 (2509), 1146 (2577), 1161 (2615), 1183 (2681), 1190 (2685) or 3112 (354)?

Yes ☐ No ☒

REQUIRED SURVEYS:

1. Lead-based paint survey accomplished? Yes ☐ No ☒ Scan and attach the results or state why a survey is not required: Survey to be completed as part of the contact by the Contractor

2. Asbestos survey accomplished? Yes ☐ No ☒ Scan and attach the results or state why a survey is not required: Survey to be completed as part of the contact by the Contractor

2. WASTES TO BE GENERATED:

1. Trees: 0 number, square feet, or acres

2. Trees and brush or hydro-axed vegetation and soil mixture: 0 cubic yards

3. Clean soil: 0 cubic yards - give brief description (percent silt, sand, gravel, etc):

4. Contaminated soil: cubic yards. Type of contaminate(s): 0 CUBIC YARDS

Please Note: Proponent must provide CEIE a soil sampling site map and copies of the sample results.

5. Concrete: 0 cubic yards

6. Asphalt:

a. Chunk: 0 cubic yards

b. Milled: 0 cubic yards

-Page 2 -

WASTES TO BE GENERATED (continued):

7. Asbestos: TBD cubic yards

8. Lead-Based Paint Debris: TBD Give brief description:

XRF Results:

TCLP Results:

9. Construction / Demolition Wastes (wood, glass, sheetrock, pipe, etc):

a. Give brief description: 0

b. Items to be salvaged: 0

c. Items to be recycled:

BORROW PITS: Materials required for the project:

1. Gravel: 0 cubic yards

Please Note: Bailed gravel/topsoil stored adjacent to an active gravel pit shall become property of the Government on 31 December of year it is bailed. To retain rights to the gravel/topsoil the following year the Contractor shall provide written coordination prior to 31 December informing 354 CES/CEIE of their gravel needs for current existing awarded contracts.

2. Topsoil: _0__ cubic yards

-Page 3 -

--PART II (To be completed by 354 CES/CEIE)--

INSTRUCTIONS FOR THE DISPOSAL OF WASTES:

1. Tree Protection, Transplanting, Replacement, and Methods:

2. Wastes to be disposed on base:

a. Trees:

b. Soil:

c. Concrete:

d. Asbestos:

e. Asphalt (RAP may be placed on existing roads only with CEIEA approval, all other must go off base):

3. Wastes to be disposed off base: All construction wastes (except hazardous wastes) not listed for on base disposal shall be disposed off base by the contractor in an approved landfill in accordance with applicable state and federal regulations. Estimated quantities or copies of landfill weight tickets of wastes disposed off base must be reported to the Solid Waste Manager for tracking at 377-3313.

Please Note: Prior to project completion the proponent shall provide CEIE written sampling result(s) and copy of the disposal tare for debris, e.g., lead painted materials disposed at the Fairbanks North Star Borough Landfill.

BORROW PITS:

1. Borrow pit(s) to be used:

Gravel -

Topsoil -

2. Pit development, rehabilitation, and/or expansion work will be required for the privilege of using borrow pit(s). Pit development will depend on amount of gravel/topsoil required: Note: Notify the Eielson Natural Resources Office (CEIEA) (377-5182) when pit development is about to begin.

Reviewers:

CEIEA (NR)

Date of Issue This Coordination Review becomes invalid if the project is not awarded within one year from the date of issue.

File details come from the government source that posted it. Updated .