JA05- SOW APPENDIX A_Secuirty and Access to Controlled Areas.pdf

PDF 101 KB Posted

Attached to
Maintain Boiler 4 Federal contract opportunity
Solicitation number
FA500422C0006
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document contains a solicitation for a construction project and related security requirements. Eielson Air Force Base is seeking bids to repair and maintain Boiler 4 at its Central Heat and Power Plant under a firm fixed price contract. The project scope involves preparing the work site and performing all necessary repairs. The estimated value is between $5 million and $10 million. The response deadline is May 12, 2022. Security protocols detailed in an appendix require contractors to submit personnel and vehicle access lists in advance for background checks. On-site security will inspect vehicles and passes. The site visit will take place on April 21, 2022 and questions must be submitted by April 25, 2022. The solicitation is designated as a total small business set-aside with a size standard of $39.5 million.

View the file

Other files for this federal contract opportunity

Other files attached to Maintain Boiler 4, newest first.
File Type Posted
Solicitation Amendment FA500422B00060001 SF 30.pdf PDF
JA18 - FTQW 11-1044D Boiler 4 Site Visit 4-21-22.pdf PDF
Solicitation Amendment - FA500422B00060002.pdf PDF
JA17 - RFI Log Maintain Boiler 4_GovResponse.pdf PDF
Solicitation Amendment FA500422B00060002 SF 30.pdf PDF
JA06- SOW APPENDIX B_REHABILITATE BOILER1 CHPP DRAWINGS.pdf PDF
JA08- SOW APPENDIX D_REPAIR SOOT BLOWER BOILER4.pdf PDF
JA12- 01 57 19 Appendix D_hazardous_material_inventory_log.pdf PDF
JA13- 01 57 19 Appendix E_Sample Non-Haz Solid Waste Rpt.pdf PDF
JA16- 01 57 19 Appendix H_Fugitive Dust Plan Eielson AFB.pdf PDF
Solicitation Amendment - FA500422B00060001.pdf PDF
JA01- FTQW 11-1044D Maintain Boiler 4 SOW 06Jan22.pdf PDF
JA03- FTQW 11-1044D Maintain Boiler 4_Submittal Register.pdf PDF
JA09- 01 57 19 Appendix A_Waste Disposal Borrow Pit Plan.pdf PDF
JA04- Wage_Determination AK20220001.pdf PDF
JA07- SOW APPENDIX C_REPAIR ECONOMIZER_SUPERHEATER BOILER4.pdf PDF
JA10- 01 57 19 Appendix B_Spruce Lake Disposal Checklist.pdf PDF
JA15- 01 57 19 Appendix G_Eielson Spill Magnets Template.pdf PDF
Solicitation Amendment FA500422B00060001 SF 30.pdf PDF
JA02- FTQW 11-1044D Maintain Boiler 4_Specifications.pdf PDF
JA11- 01 57 19 Appendix C_EAFB Waste Determination Form.pdf PDF
JA14- 01 57 19 Appendix F_Aerosol Can Disposal Mgt Procedure.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A

SECURITY AND ACCESS TO CONTROLLED AREAS

a. The Central Heat and Power Plant (CHPP) and surrounding areas are access controlled and have additional security requirements beyond those for general Base installation access.

b. Contractor shall provide a personnel and vehicle list for all personnel and vehicles requiring access to the installation and CHPP, including subcontractors to the Contracting Officer. This list shall be updated at least weekly by the Contractor. This list will be used to clear personnel and vehicles for access on to the installation.

The required information on each list is as follows:

1. Personnel lists shall include, for each person, the full name, date of birth, social security number (SSN) and employing company.

2. Vehicle lists shall include, for each employee and company vehicle, the make, model, serial number (VIN), year of manufacturer, color, license plate number, owner, and operating company.

c. 354th Security Forces Visitor Center will issue contractors a pictured visitor pass which will be used as verification identification to entry the CH&PP job site. A criminal background check will be conducted using Alaska State Troopers Alaska Public Safety Information Network (APSIN) prior to visitor passes being issued.

APSIN provides the ability to check all states criminal records for any outstanding wants/warrants on contractors requesting access to the CHPP job site.

d. All commercial/delivery vehicles entering Eielson AFB will be inspected by Security Forces at the Main installation gate. Expect a 20 minute delay for this inspection process.

e. Security personnel at the CH&PP visitor gate will check contractor’s CHPP visitor pass and may inspect contractor work vehicles.

f. The Contractor shall comply with the provisions of AFR 207-1, USAF Physical Security Program, and applicable security and law enforcement procedures established at the installation. The Contractor shall implement necessary security controls as prescribed by the installation commander.

g. Any infraction of security rules or regulations on the part of any Contractor employee may be considered grounds for the Eielson AFB installation Commander to prohibit reentry into restricted areas or on to the installation.

File details come from the government source that posted it. Updated .