JA-4 DXEB 21-1004 Form 66 R1 (04-1010).XLS

XLS spreadsheet 61 KB Posted

Attached to
DXEB 21-1004 - Repair WP-1, Clear SFS Federal contract opportunity
Solicitation number
FA500422B0011
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document contains a solicitation for a federal construction contract opportunity and the related schedule of material submittals. The solicitation is for repair work on Well Pump 1 at Building 800 of Clear Space Force Station. The contractor will be responsible for removing the current well pump turbine and motor, replacing them with a new motor and turbine from government storage, overhauling the existing pump, and conducting an initial vibration analysis. The submittal schedule outlines required documentation for items like the project schedule, environmental and waste disposal plans, quality control testing, record documents, operation manuals, and motor submittals. Bids must be submitted electronically by August 19, 2022 to two points of contact listed. The NAICS code is 236220 with a small business size standard of $39.5 million. The magnitude of the requirement is between $100,000 and $250,000. The performance period is 180 calendar days from notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to DXEB 21-1004 - Repair WP-1, Clear SFS, newest first.
File Type Posted
Solicitation Amendment FA500422B00110002 SF 30.pdf PDF
Solicitation Amendment FA500422B00110001 SF 30.pdf PDF
Solicitation - FA500422B0011.pdf PDF
JA-3 Clear SFS Code Safety and Environmental Guide.pdf PDF
JA-2 DXEB 21-1004 Specifications.docx DOCX document
JA-5 Wage Determination AK20220001 07-08-2022.pdf PDF
JA-1 DXEB 21-1004 SOO Rev 4.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EAFB

PROJECT NUMBERPROJECT TITLESOLICITATION/CONTRACT NO.
SCHEDULE OF MATERIAL SUBMITTALSDXEB-21-1004Repair WP-1, Bldg. 800
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL CERTIFICATION OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURER'S RECOMMENDATIONS MANUFACTURER'S WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SERVICE / SIZE / APPLICATION SCHEDULE Other (AS INDICATED) REQUIRED

SUB-

MISSION

DATE DATE

RECEIVED

IN CON-

TRACTING DATE TO

CIVIL

ENGINEER-

ING RETURN

SUSPENSE

DATE FOLLOW-UP DATE

CONTRACTOR

NOTIFIED CONTRAC-

TOR RE-

SUBMIT-

TALFINAL APPROVALREMARKS
APPROVEDDIS-

APPROVED

3.1Project Schedule1A = 20 days after NTP
3.2Submittals
3.2.1Crane Safety Plan and certificates11A
3.2.2Environmental Protection Plan1A
3.2.3Solid Waste Disposal Reporting1B = Monthly through course of contract or at close-out, whichever occurs first.
3.2.4Hazardous Waste Disposal .1B
3.2.5Solid and Hazardous Waste Diversion Reporting1B
3.2.List of Hazardous Material SDSs1B
3.3Quality Control
3.3.1Testing Laboratory Information
Vibration Analysis Report1C = Prior to contract close-out
3.4Contract Closeout
3.4.1Record Documents1C
3.4.2Operation & Maintenance Data
for Electric Motor1C
3.4.3Warranties
For Electric Motor1C
3.4.4Water well re-development report.1C
4Demolition
4.1.1Demolition Debris Disposal Receipts3B
5Well Pump Motor
5.1.1Electric Motor Submittals111A