JA-4 DXEB 21-1004 Form 66 R1 (04-1010).XLS
XLS spreadsheet 61 KB Posted
- Attached to
- DXEB 21-1004 - Repair WP-1, Clear SFS Federal contract opportunity
- Solicitation number
- FA500422B0011
About this file
This document contains a solicitation for a federal construction contract opportunity and the related schedule of material submittals. The solicitation is for repair work on Well Pump 1 at Building 800 of Clear Space Force Station. The contractor will be responsible for removing the current well pump turbine and motor, replacing them with a new motor and turbine from government storage, overhauling the existing pump, and conducting an initial vibration analysis. The submittal schedule outlines required documentation for items like the project schedule, environmental and waste disposal plans, quality control testing, record documents, operation manuals, and motor submittals. Bids must be submitted electronically by August 19, 2022 to two points of contact listed. The NAICS code is 236220 with a small business size standard of $39.5 million. The magnitude of the requirement is between $100,000 and $250,000. The performance period is 180 calendar days from notice to proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA500422B00110002 SF 30.pdf | ||
| Solicitation Amendment FA500422B00110001 SF 30.pdf | ||
| Solicitation - FA500422B0011.pdf | ||
| JA-3 Clear SFS Code Safety and Environmental Guide.pdf | ||
| JA-2 DXEB 21-1004 Specifications.docx | DOCX document | |
| JA-5 Wage Determination AK20220001 07-08-2022.pdf | ||
| JA-1 DXEB 21-1004 SOO Rev 4.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EAFB
| PROJECT NUMBER | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||
| SCHEDULE OF MATERIAL SUBMITTALS | DXEB-21-1004 | Repair WP-1, Bldg. 800 | ||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||
| NO. OF COPIES REQUIRED | ||||||
| LINE NUMBER | ITEM OR DESCRIPTION |
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL CERTIFICATION OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURER'S RECOMMENDATIONS MANUFACTURER'S WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SERVICE / SIZE / APPLICATION SCHEDULE Other (AS INDICATED) REQUIRED
SUB-
MISSION
DATE DATE
RECEIVED
IN CON-
TRACTING DATE TO
CIVIL
ENGINEER-
ING RETURN
SUSPENSE
DATE FOLLOW-UP DATE
CONTRACTOR
NOTIFIED CONTRAC-
TOR RE-
SUBMIT-
| TAL | FINAL APPROVAL | REMARKS | ||
| APPROVED | DIS- |
APPROVED
| 3.1 | Project Schedule | 1 | A = 20 days after NTP | |||||||
| 3.2 | Submittals | |||||||||
| 3.2.1 | Crane Safety Plan and certificates | 1 | 1 | A | ||||||
| 3.2.2 | Environmental Protection Plan | 1 | A | |||||||
| 3.2.3 | Solid Waste Disposal Reporting | 1 | B = Monthly through course of contract or at close-out, whichever occurs first. | |||||||
| 3.2.4 | Hazardous Waste Disposal . | 1 | B | |||||||
| 3.2.5 | Solid and Hazardous Waste Diversion Reporting | 1 | B | |||||||
| 3.2. | List of Hazardous Material SDSs | 1 | B | |||||||
| 3.3 | Quality Control | |||||||||
| 3.3.1 | Testing Laboratory Information | |||||||||
| Vibration Analysis Report | 1 | C = Prior to contract close-out | ||||||||
| 3.4 | Contract Closeout | |||||||||
| 3.4.1 | Record Documents | 1 | C | |||||||
| 3.4.2 | Operation & Maintenance Data | |||||||||
| for Electric Motor | 1 | C | ||||||||
| 3.4.3 | Warranties | |||||||||
| For Electric Motor | 1 | C | ||||||||
| 3.4.4 | Water well re-development report. | 1 | C | |||||||
| 4 | Demolition | |||||||||
| 4.1.1 | Demolition Debris Disposal Receipts | 3 | B | |||||||
| 5 | Well Pump Motor | |||||||||
| 5.1.1 | Electric Motor Submittals | 1 | 1 | 1 | A |
&C&"Small Fonts,Regular"&5U.S. GPO 1987-188-148&"Arial,Regular"&10 &L&"Arial,Bold"&8AF Form 66, Sep 86
File details come from the government source that posted it. Updated .