J3-Critical Path Checklist -CPM Checklist.pdf

PDF 3 MB Posted

Attached to
Renovate the Male Dormitory Building 54, Potomac Job Corps Center in Washington, DC
Solicitation number
1605AE-24-R-00005
Issued by

About this file

This document appears to be a Critical Path Checklist related to a federal contract opportunity to renovate the Male Dormitory Building 54 at the Potomac Job Corps Center in Washington, DC.

The key details of the federal contract opportunity are: The solicitation number is 1605AE-24-R-00005, the requirement is being procured as an 8(a) Competitive Set-Aside with a NAICS code of 236220 and a $45M small business size standard. The work includes design and construction services for interior renovations of the 1st and 2nd floors, as well as HVAC system replacement, plumbing upgrades, fire alarm and security system upgrades, and exterior stairwell and roof repairs. A pre-proposal conference and site visit is scheduled for October 2, 2024, and proposals are due by October 16, 2024. The contracting agency is the Department of Labor's Office of the Assistant Secretary for Administration and Management.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .