About this file
This document is a Schedule of Items for the Leon Sinks Automatic Fee Machine (AFM) Installation project. The project involves the excavation, concrete work, electrical installations, asphalt repair, speed hump installation, and site cleanup for the future installation of an AFM by the USDA Forest Service at the Apalachicola National Forest in Florida.
The project has an estimated magnitude of less than $25,000 and a 30-day period of performance after the notice to proceed. A site visit is scheduled for July 31, 2024, and bids are due on August 8, 2024. Award will be made to the lowest priced, responsible offeror who is responsive to the solicitation. The Schedule of Items lists 8 line items, including mobilization, excavation, electrical, concrete work, speed hump installation, bollards, and site cleanup.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA FOREST SERVICE
NATIONAL FORESTS IN FLORIDA
APALACHICOLA NATIONAL FOREST
LEON SINKS AUTOMATIC FEE MACHINE
BID SCHEDULE OF ITEMS
ITEM NO. DESCRIPTON
METHOD OF
MEASUREMENT
PAY UNIT EST. QTY. UNIT PRICE AMOUNT
1 MOBILIZATION AND DEMOBILIZATION LSQ LPSM 1
ASPHALT CUTTING, TRENCHING, &
EXCAVATION
LSQ LPSM 1
3 CONDUIT , & ELECTRICAL INSTALATION LSQ LPSM 1
4 ASPHALT REPAIR LSQ LPSM 1
5 SECTIONAL SPEED HUMP INSTALLATON CQ EA 5
FORM WORK, REINFORCING BAR,
CONCRETE POURING, & FINISHING.
LSQ LPSM 1
7 INSTALL BOLLARDS CQ EA 2
8 SITE CLEAN UP, SOD, & REPLANTING LSQ LPSM 1
LEON SINKS AFM PAD AND ELECTRICAL
SUBTOTAL
BID SCHEDULE TRENCH AND PATCH