J10 - Unicoi WC_Schedule of Items (SOI).pdf
PDF 49 KB Posted
- Solicitation number
- 12445223B0004
- Issued by
-
Department of Agriculture Forest Service
About this file
This document outlines a Multiple Award Indefinite Delivery/Indefinite Quantity Contract for construction and facility maintenance projects across the Cherokee National Forest in Tennessee. The scope of work includes a broad range of maintenance, repair, remodeling, renovation, and new construction projects. Examples of work specified are preparation of task order proposals, cost estimating, permitting, and developing safety plans. The IDIQ will allow ordering of services as needed, with task orders up to $250,000 to be competed among contract holders. Sole source actions under $25,000 may be issued. The total ceiling is $7 million shared across contracts, with a minimum guarantee of $2,000. Task orders over $35,000 will require bonds. This is a 100% small business set-aside for NAICS 236220, with a size standard of $39.5 million. The agency is the Department of Agriculture Forest Service.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNICOI WORK CENTER MAINTENANCE
ENGINEERING SCHEDULE
02-22-2023
ITEM DESCRIPTION QTY UNIT MM UNIT $
A = Base Bid-Shop Building
A1 Window Repair 28 EA CQ
A2 Passage Door Replacement 1 EA CQ
A3 Garage Door Replacement 1 EA CQ
A4 Siding Repair 800 SQ CQ
A5 Gutter Replacement 180 FT CQ
A6 Painting 3620 SQ CQ
Total A1-A6 Total
B = Option 1 - Storage Building QTY UNIT MM UNIT $
B1 Window Repair 6 EA CQ
B2 Passage Door Repalcement 1 EA CQ
B3 Siding Repair 740 SQ CQ
B4 Roof Shingle Replacement 20 RSQ CQ
B5 Gutter Repalcement 140 FT CQ
B6 Painting 2785 SQ CQ
Total B1-B6 Total
C = Option 2 - Office Building
QTY UNIT MM UNIT $
C1 Window Repair 16 EA CQ
C2 Passage Door Replacement 1 EA CQ
C3 Siding Repair 500 SQ CQ
C4 Gutter Replacement 100 FT CQ
C5 Painting 1680 SQ CQ
Total C1-C5 Total
Note: Contract Quantity (CQ) = Quantities provided by Forest Service have been properly calculated and contractor shall be paid the ammount they bid for that quantity. If the work is completed and quantitity is within 85% to 115%, then contractor shall still be paid the bid ammount. If completed work is less than 85% or more than 115%, then a modification will have to be performed to adjust payment.
TOTAL
TOTAL
TOTAL
UNICOI WORK CENTER MAINTENANCE
ENGINEERING SCHEDULE
02-22-2023
ITEM DESCRIPTION QTY UNIT MM UNIT $ TOTAL
D = Option 3 - Lands Building
D1 Window Repair 8 EA CQ
D2 Siding Repair 480 SQ CQ
D3 Gutter Replacement 100 FT CQ
D4 HVAC Replacement 1 EA CQ
D5 Painting 1600 SQ CQ
Total D1-D5 Total $
E = Option 4 - Bathroom
QTY UNIT MM UNIT $
E1 Shingle Roof Replacement 4 RSQ CQ
E2 Exterior Doors 2 EA CQ
E3 Painitng 400 SQ CQ
E4 Toilet 2 EA CQ
E5 Urinal 1 EA CQ
E6 Lavatory 2 EA CQ
Total E1-E6 Total $
F = Option 5 - Gas House
QTY UNIT MM UNIT $
F1 Exterior Door 3 EA CQ
F2 Painting 1060 SQ CQ
F3 Window Repair 8 EA CQ
F4 Gutter Replacement 110 FT CQ Total F1-F4 Total $
Note: Contract Quantity (CQ) = Quantities provided by Forest Service have been properly calculated and contractor shall be paid the ammount they bid for that quantity. If the work is completed and quantitity is within 85% to 115%, then contractor shall still be paid the bid ammount. If completed work is less than 85% or more than 115%, then a modification will have to be performed to adjust payment.
File details come from the government source that posted it. Updated .