Amnd 2 - Q and As from COR Jay Chapman.pdf
PDF 119 KB Posted
- Solicitation number
- 12445223B0004
- Issued by
-
Department of Agriculture Forest Service
About this file
This document provides details for a Multiple Award Indefinite Delivery/Indefinite Quantity Contract for facility maintenance, repair, renovation, and construction projects on the Cherokee National Forest in Tennessee. The contract includes a broad range of services such as project scoping, cost estimating, developing specifications and requirements for task orders, obtaining permits, developing safety plans, coordinating with utilities, and negotiating with state and local officials. Task orders will be competed among IDIQ holders and can range from $2,000 to $250,000, with construction over $35,000 requiring bonds. The total shared ceiling for all task orders is $7 million over the life of the contracts. This is a 100% total small business set-aside, with a primary NAICS code of 236220 and size standard of $39.5 million. The Department of Agriculture Forest Service is the contracting agency.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 12445223B0004, Amendment 0001
Q&A below. This should be ready for posting but you and I may need to confirm #3 and #4. Regardless, probably best to get these out for interested vendors to stay on schedule with proposals due 5/26/2023 NLT 2:00pm
1. From Tellico Site Visit, related to damaged siding, sheathing, and framing and “Unforeseen Conditions”?
This would be extensive and unexpected. For example one contractor asked about if extensive framing damage is found and would he need to account for complete sill replacement. Our reply was we do not anticipate that extensive nature of damage. One damaged siding section may get into framing but this is expected to be localized (within a 6 ft area or less)
2. The Forest Service made an erroneous statement regarding inclusion of an exterior door (Tellico Office Basement, Building number 1000 on drawings). This is not included in this work. The scope and schedule of items remains unchanged.
3. Are interested contractors required to respond to both seed projects?
No, but pricing is needed on at least one seed project in order to be evaluated for price reasonableness.
4. Wages, Construction wages vs Service wages?
Service Contract Act wages are posted, please post the Davis Bacon/Construction wages.
5. From Unicoi Site Visit, related to condition of windows and level of effort:
Overall, our intent is to repair and paint the exterior building shell to prevent moisture intrusion. We are not seeking restoration. Our intent is to repair existing windows, not replace. Only remove old glazing that is cracked and loose and necessary to secure glass. Repair and caulk so that paint can be applied for a generally uniform appearance. Ensure operable windows remain operable; Currently inoperable windows will remain inoperable. (See Revised Scope)
6. What is the roof pitch at Unicoi Buildings?
8:12. (Field verify prior to starting work.)