J1_1240LU25R0011WD.pdf

PDF 2 MB Posted

Attached to
LOLO NATIONAL FOREST - Upper West Fork Fish Creek Trail Bridge Replacement
Solicitation number
1240LU25R0011
Issued by

About this file

This document is a Davis-Bacon wage determination for highway construction projects in Montana, effective 01/03/2025. The wage determination provides detailed hourly rates and fringe benefits for various construction job classifications, including carpenters ($36.05-$40.87), cement masons ($33.41), divers ($45.30-$92.66), electricians ($38.38-$50.11), ironworkers ($30.43), laborers ($27.71-$32.12), painters ($36.00), power equipment operators ($32.47-$41.95), and truck drivers ($28.21-$35.74). The document includes comprehensive labor group descriptions, depth pay scales for divers, and notes on Executive Order requirements regarding minimum wage rates, paid sick leave, and worker protections for federal contracts subject to the Davis-Bacon Act, with rates to be updated annually and applicable to contracts entered into on or after January 30, 2022.

View the file

Other files

File Type Posted
1240LU25R0011QandA.pdf PDF
J4_1240LU25R0011PastPerformanceQuestionnaire.pdf PDF
J2_1240LU25R0011Plans.pdf PDF
J3_1240LU25R0011FSSS.pdf PDF
J5_1240LU25R0011SiteVisitQ_A.pdf PDF
1240LU25R0011.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .