J08 SOI LaMina.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
La Mina Trail Repairs/Construction
Solicitation number
12445225R0030
Issued by

About this file

This document is a Schedule of Items (SOI) for the La Mina Trail Repairs/Construction project for the Department of Agriculture Forest Service. The comprehensive schedule details multiple construction and design requirements across various trail segments, including retaining wall structures, trail reconstruction, passing lanes, drainage crossings, stairway widening, bridge improvements, and associated work.

Key scope elements include designing and constructing retaining walls with veneer facing and trail guardrails at multiple stationing points, trail reconstruction and widening totaling 410 linear feet, 29 passing lanes with reinforced concrete surfaces, 15 drainage crossings, trail guardrail installation spanning 515 feet, stairway widening and reconstruction at several locations, a new 78-foot trail bridge, improvements to existing bridges, riprap installation, tree removal, and site restoration activities. The project involves extensive design requirements, with all design deliverables requiring 85% and 100% submissions for government review, and mandates specific technical specifications for materials, concrete work, erosion control, and historic structure protection.

View the file

Other files

File Type Posted
Amend 01 12445225R0030.pdf PDF
12445225R0030.pdf PDF
J02 FS Supplemental Specifications.pdf PDF
J04 Attachment Construction Experience Form.docx DOCX document
J05 Attachment Architect- Engineering Experience Form.docx DOCX document
J07 Attachment Key Personnel Resume.docx DOCX document
ATTACHMENT J01 STATMENT OF OWRK.docx DOCX document
J03 La Mina Trail Rehab - Supporting Drawings.pdf PDF
J06 Attachment Past Performance.docx DOCX document
J09 WD PR.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF ITEMS
***ALL DESIGN PAY ITEMS SHALL REQUIRE A 85% AND 100% DELIVERABLE BY THE DB CONTRACTOR (NO EXCEPTION). CONTRACTOR SHALL ALLOW 7 CALENDAR DAYS FOR GOVERNMENT REVIEW TIME OF EACH CONTRACTOR'S DESIGN DELIVERBALES. ALL CONTRACTORS 100% DESIGN DELIVERABLE SHALL BE APPROVED BY THE C.O. AND/OR DESIGNATED C.O.R. BEFORE CONSTRUCTION OF THE RESPECTIVE DESIGN CAN BE IMPLEMENTED.

ALL RETAINING WALL, FILL SLOPES, AND CUTSLOPE TRAIL GUARDRAILS SHALL BE INCIDENTAL TO THE RETAINING WALL, FILL SLOPE, AND CUTSLOPE FAILURE REPAIRS

Item No.DescriptionPay UnitEst. Qty.Unit PriceTotal Price
MOBILIZATION
15101MobilizationLump Sum1$ - 0$ - 0
SOIL EROSION & POLLUTION CONTROL
15713Soil Erosion & Pollution Control (Includes all erosion control measures from mitigating sediment into river in its entirety and also includes protection of all historic structures in its entirety. Erosion Control Plan & Protection of Historic Structures Plan Required).Lump Sum1$ - 0$ - 0
RETAINING WALL, FILL SLOPES, AND CUTSLOPE REPAIR STRUCTURES
1Design Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 11+53.46 to 11+65.46) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot12$ - 0$ - 0
2Construction Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 11+53.46 to 11+65.46) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot12$ - 0$ - 0
3Design Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail, and Stairway w/ Railings, Handrails, and Reinforced Concrete Posts For River Access, and Culvert (Stat: 15+48.10 to 16+19.10) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot71$ - 0$ - 0
4Construction Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail, and Stairway w/ Railings, Handrails, and Reinforced Concrete Posts For River Access, and Culvert (Stat: 15+48.10 to 16+19.10) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot71$ - 0$ - 0
5Design Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 20+00.00 to 20+18.00) - The Proposed Wall is Next To River (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot18$ - 0$ - 0
6Construction Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 20+00.00 to 20+18.00) - The Proposed Wall is Next To River (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot18$ - 0$ - 0
7Design Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 20+60.32 to 21+17.32) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot57$ - 0$ - 0
8Construction Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 20+60.32 to 21+17.32) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot57$ - 0$ - 0
9Design Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 22+46.64 to 22+63.46) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot17$ - 0$ - 0
10Construction Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 22+46.64 to 22+63.46) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot17$ - 0$ - 0
11Design Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 22+78.75 to 23+00.37) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot22$ - 0$ - 0
12Construction Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 22+78.75 to 23+00.37) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot22$ - 0$ - 0
13Design Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 27+10.32 to 27+18.75) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot9$ - 0$ - 0
14Construction Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 27+10.32 to 27+18.75) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot9$ - 0$ - 0
15Design Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 27+40.67 to 27+56.21) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot16$ - 0$ - 0
16Construction Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 27+40.67 to 27+56.21) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot16$ - 0$ - 0
17Design Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 28+63.51 to 28+71.65) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot9$ - 0$ - 0
18Construction Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 28+63.51 to 28+71.65) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot9$ - 0$ - 0
19Design Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 29+15.30 to 29+52.32) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot38$ - 0$ - 0
20Construction Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 29+15.30 to 29+52.32) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot38$ - 0$ - 0
21Design Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 29+90.35 to 30+05.82) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot16$ - 0$ - 0
22Construction Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 29+90.35 to 30+05.82) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot16$ - 0$ - 0
23Design Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 34+43.97 to 34+57.66 ) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot14$ - 0$ - 0
24Construction Of Retaining Wall Structure w/ Veneer Facing and Cap and Trail Guardrail (Stat: 34+43.97 to 34+57.66 ) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot14$ - 0$ - 0
25Design Of Retaining Wall Structure on Cutslope Side w/ Veneer Facing and Cap and Trail Guardrail (Stat: 35+12.72 to 35+42.72) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot30$ - 0$ - 0
26Construction Of Retaining Wall Structure on Cutslope Side w/ Veneer Facing and Cap and Trail Guardrail (Stat: 35+12.72 to 35+42+72) (Refer to attached red line drawings for key notes and requirements, and for wall type allowed in this segment)Foot30$ - 0$ - 0
TRAIL RECONSTRUCTIONERROR:#REF!
27Design Of Trail ReconstructionFoot337$ - 0$ - 0
28Construction Of Trail Reconstruction (Anticipate a grand total of 487 tons of gabion rock, 100 tons Aggregate Base Grading C, 21 cubic yards of Concrete (1,134 total bags of 60-pounds concrete bags or 945 total bags of 80-pounds concrete bags), 357 cubic yards of excavation and excessive excavation material removal from project site to an approved legal landfill, and 824 Square Yards of Geotextile, and 10 tons of angular stone for concrete finished surface embedment)Foot337$ - 0$ - 0
29Design Of Trail WideningFoot73$ - 0$ - 0
30Construction Of Trail Widening (Anticipate a grand total of 37 tons of gabion rock, 17 tons Aggregate Base Grading C, 5 cubic yards of Concrete (270 total bags of 60-pounds concrete bags or 225 total bags of 80-pounds concrete bags), 46 cubic yards of excavation and excessive excavation material removal from project site to an approved legal landfill, and 138 Square Yards of Geotextile, and 1.5 tons of angular stone for concrete finished surface embedment)Foot73$ - 0$ - 0
PASSING LANES
31Design Of Passing Lane with Angular Stone Embedded in 4" Depth Reinforced Concrete Walking Surface with a Reinforced Concrete Box Culvert Beneath It and riprap at inlet & outlet invert. The Reinforced Concrete Box Culvert Length is For the Full Length of the Passing LaneEach29$ - 0$ - 0
32Construction Of Passing Lane with Angular Stone Embedded in 4" Depth Reinforced Concrete Walking Surface with a Reinforced Concrete Box Culvert Beneath It For Drainage and riprap at inlet & outlet invert. The Reinforced Concrete Box Culvert Length is For the Full Length of the Passing Lane (Anticipate a grand total of about 63 cubic yards of excavation & 63 cubic yards of excessive excavation removal from project site. Also anticipate a grand total of about 13 cubic yards of concrete for the (29)-finished passing lanes concrete surfacing and a grand total of 50 cubic yards of concrete for the reinforced concrete box culverts. That's about 3,402 total 60-pounds concrete bags or 2,835 total of 80-pounds concrete bags. Also includes a grand total of 3,836 pounds of #4 rebar for the box culverts beneath the passing lanes. A grand total of 8 tons of cleaned washed aggregate to embeded into the concrete surface. Anticipate a grand total of 144 tons of Aggregate base Grading C for the passing lane embankment build-up, 6" bedding beneath box culvert and 6" compaction beneath finished concrete surface. Also includes 116 tons of Class 2 Riprap & 174 SY of geotextile)Each29$ - 0$ - 0
DRAINAGE CROSSINGS
33Design Of Reinforced Concrete Drainage Crossing with Angular Stone Embedded in 4" Depth Reinforced Concrete Walking Surface with veneer installed on facing, sides, and top beyond the culvert fill slope hinge point and riprap at inlet & outlet invert with geotextileEach15$ - 0$ - 0
34Construction Of Reinforced Concrete Drainage Crossing with Angular Stone Embedded in 4" Depth Reinforced Concrete Walking Surface with veneer installed on facing, sides, and top beyond the culvert fill slope hinge point and riprap at inlet & outlet invert with geotextile (Includes tearing out and removing existing drainage in its entirety and diposing off govt. lands as completed by the previous vendor. Also includes constructing new 4-sided reinforced concrete drainage construction in undisturbed location. Anticipate a grand total of about 48 cubic yards of excavation & 48 cubic yards of excessive excavation removal from project site, 25 cubic yards of concrete for the (15)-reinforced concrete box culverts. That's about 1,350 total 60-pounds concrete bags or 1,125 total of 80-pounds concrete bags. Also includes a grand total of 2,566 pounds of #4 rebar for the box culverts. A grand total of 4 tons of cleaned washed aggregate to embeded into the concrete surface. Also anticipate a grand total of 34 tons of Aggregate base Grading C for 6" bedding beneath box culvert and 6" above culvert assumign culvert is buried. Also includes 64 tons of Class 2 Riprap & 100 SY of geotextile)Each15$ - 0$ - 0
TRAIL GUARDRAIL
35Guardrail system, type Trail Guard Railing w/ Reinforced Concrete
Post Constructed at 5'-0" On Center on Left Side of Trail (Excluding all fill slopes failure repairs, stairways, and excluding all trail bridges)Foot515$ - 0$ - 0
STAIRWAY WIDENING (STAIRWAY SPECIAL DESIGN & CONSTRUCTION)
36Design, of 2'-6" Stairway Widening (Stat: 26+68.31 to 27+10.32) (Includes widening existing stairway an additional 2'-6" wide with new finished concrete surface w/ embedded stone and new handrails and posts. Also includes protecting historic CCC stairway. All structural analysis, topographic survey, structural calculations, geotechnical report, and scour analysis is 100% responsibility of the DB Contractor and their respective P.E. Engineer on record)Foot42$ - 0$ - 0
37Construction, of Design 2'-6" Stairway Widening (Stat: 26+68.31 to 27+10.32) (Includes widening existing stairway an additional 2'-6" wide with new finished concrete surface w/ embedded stone and new handrails and posts. Also includes protecting historic CCC stairway, construction surveying and staking etc)Foot42$ - 0$ - 0
38Design, of 3'-0" Stairway Widening (Stat: 35+41.81 to 35+96.40 ) (Includes widening existing stairway an additional 3'-0" wide with new finished concrete surface w/ embedded stone and new handrails and posts. Also includes protecting historic CCC stairway. All structural analysis, topographic survey, structural calculations, and geotechnical report is 100% responsibility of the DB Contractor and their respective P.E. Engineer on record)Foot55$ - 0$ - 0
39Construction, of Design 3'-0" Stairway Widening (Stat: 35+41.81 to 35+96.40 (Includes widening existing stairway an additional 3'-0" wide with new finished concrete surface w/ embedded stone and new handrails and posts. Also includes protecting historic CCC stairway, construction surveying and staking etc)Foot55$ - 0$ - 0
40Design, of 1'-6" Stairway Widening (Stat: 36+46.92 to 37+23.13) (Includes widening existing stairway an additional 1'-6" wide with new finished concrete surface w/ embedded stone and new handrails and posts. Also includes protecting historic CCC stairway. All structural analysis, topographic survey, structural calculations, and geotechnical report is 100% responsibility of the DB Contractor and their respective P.E. Engineer on record)Foot77$ - 0$ - 0
41Construction, of Design 1'-6" Stairway Widening (Stat: 36+46.92 to 37+23.13) (Includes widening existing stairway an additional 1'-6" wide with new finished concrete surface w/ embedded stone and new handrails and posts. Also includes protecting historic CCC stairway, construction surveying and staking etc)Foot77$ - 0$ - 0
42Design, of 2'-0" Stairway Widening (Stat: 37+68.80 to 37+80.70) (Includes widening existing stairway an additional 2'-0" wide with new finished concrete surface w/ embedded stone and new handrails and posts. Also includes protecting historic CCC stairway. All structural analysis, topographic survey, structural calculations, and geotechnical report is 100% responsibility of the DB Contractor and their respective P.E. Engineer on record)Foot12$ - 0$ - 0
43Construction, of Design 1'-6" Stairway Widening (Stat: 37+68.80 to 37+80.70) (Includes widening existing stairway an additional 2'-0" wide with new finished concrete surface w/ embedded stone and new handrails and posts. Also includes protecting historic CCC stairway, construction surveying and staking etc)Foot12$ - 0$ - 0
44Design, of Reinforced Concrete Post with Footings, Railings and Handrails to Bridge #11 Access to River (Includes PE design to provide reinforced concrete posts with anchoring, railings, handrails, and footings to river access located at Bridge #11 as designed by DB P.E. Engineer. All structural analysis, topographic survey, structural calculations, and geotechnical report is 100% responsibility of the DB Contractor and their respective P.E. Engineer on record)Foot26$ - 0$ - 0
45Construction, of Designed Reinforced Concrete Post with Footings, Railings and Handrails to Bridge #11 Access to RiverFoot26$ - 0$ - 0
STAIRWAY TO BE IMPROVED & WIDENED
46Stairway to be Improved & Widened (Includes widening existing stairway an additional 1'-6" wide, 18"x18" footings, epoxy anchors, reinforced concrete posts, 4" compacted aggregate base, reinforcement, new 6" minimum thickness finished concrete surface w/ embedded stone and new handrails and reinforced concrete posts. Also includes protecting historic CCC stairway)Foot335$ - 0$ - 0
STAIRWAY TO BE RECONSTRUCTED
47Stairway to be Reconstructed (Includes removing existing stairway and disposing legally at an approved landfil. Also include reconstructing new stairway to have a 5-feet wide inside-to-inside clearance, 18"x18" footings, epoxy anchors, reinforced concrete posts, 4" compacted aggregate base, reinforcement, new 6" minimum thickness finished concrete surface w/ embedded stone and new handrails and reinforced concrete posts)Foot55$ - 0$ - 0
STONE REVETMENT
48Grouted Stone Swale Revetment (Includes furnishing, and machine placing riprap (18-inches in diameter) with grout. Grout shall be a very dark grey, almost dark blue color. Color submittal required for govt. approval. Grout shall be placed to a depth of 1/3 the size of the largest rip-rap. Rip-rap grout requirements shall comfort to the FP-14 section 725.13.)Ton13$ - 0$ - 0
TREE REMOVAL
49Removal of 14-inch diameter tree & root wad (Located at Stat: 23+00.00), disposal method, Legally Off NF's LandsEach1$ - 0$ - 0
TRAIL BRIDGES
NEW BRIDGE
50Design, of New Proposed 78'-0" Span (plus/minus 1') x 6'-0 Clear Width Reinforced Concrete and/or Prestressed Concrete Trail Bridge (Trail bridge shall be designed by P.E. Engineer licensed in PR. Trail bridge shall be designed to the requirements of AASHTO LRFD which shall include but not limited to: dynamic load allowance, resistance factors, Strength I, Strength II, Service I AASHTO LRFD Limit states, 75 years structure life, trail bridge guardrails, and designed for a minimum live load of 158 pounds square foot (psf). Design deliverable shall include DB contractor submitting to the CO a 35%, 85%, and 100% design deliverable. 35% design deliverbale shall reflect a 100% Licensed Surveyor Stamped/Sealed topographic survey, 100% H&H Analysis Report, and proposed trail bridge conceptual plan and profile reflecting the 100-Yr flood event elevation with 3-feet of freeboard. 85% design deliverbale shall reflect a 100% Stamped/Sealed Geotechnical Exploration, and 85% trail trail bridge design effort. 100% design deliverbale shall reflect 100% P.E. Stamped/Sealed structural calculations, and 100% design drawings deliverable with P.E. Stamp/Seal)Foot79$ - 0$ - 0
51Construction, of New Proposed 78'-0" Span (plus/minus 1') x 6'-0 Clear Width Reinforced Concrete and/or Prestressed Concrete Trail BridgeFoot79$ - 0$ - 0
BRIDGE 2
52Trail Bridge Surface ImprovementSquare Feet70$ - 0$ - 0
BRIDGE 7
53Trail Bridge Guardrail Construction (Refer to Drawings Subsheet C-405 and L-907.30. Trail Bridge Guardrail shall extend beyond the start of the trail bridge abutment)Foot20$ - 0$ - 0
54Trail Bridge Surface ImprovementSquare Feet28$ - 0$ - 0
BRIDGE 8
55Trail Bridge Guardrail Construction (Refer to Drawings Subsheet C-405 and L-907.30. Trail Bridge Guardrail shall extend beyond the start of the trail bridge abutment)Foot28$ - 0$ - 0
56Trail Bridge Surface ImprovementSquare Feet48$ - 0$ - 0
BRIDGE 9
57Machine Furnished, Placed, and Colored Grouted Riprap, class 3Ton13.0$ - 0$ - 0
58Trail Bridge Guardrail Construction (Refer to Drawings Subsheet C-405 and L-907.30. Trail Bridge Guardrail shall extend beyond the start of the trail bridge abutment)Foot28$ - 0$ - 0
59Trail Bridge Surface ImprovementSquare Feet42$ - 0$ - 0
BRIDGE 10
60Machine Furnished, Placed, and Colored Grouted Riprap, class 3Ton10.00$ - 0$ - 0
61Trail Bridge Guardrail Construction (Refer to Drawings Subsheet C-405 and L-907.30. Trail Bridge Guardrail shall extend beyond the start of the trail bridge abutment)Foot22$ - 0$ - 0
62Trail Bridge Surface ImprovementSquare Feet32$ - 0$ - 0
BRIDGE 11
63Construction survey and staking, method I, tolerance B,LS1$ - 0$ - 0
64Contractor testing, Trail Bridge structural concreteLump Sum1$ - 0$ - 0
65Dewatering Structures -- Installation and RemovalLump Sum1$ - 0$ - 0
66Clearing and grubbing, disposal method Legally off National Forest LandsAcre0.15$ - 0$ - 0
67Removal of Existing Trail Bridge Guard Railing w/ Reinforced Concrete Posts and Galvanized Railing, disposal method Legally off National Forest LandsFoot120$ - 0$ - 0
68Machine Furnished, Placed, and Color Grouted Riprap, class 3 (Includes 50 square yards of geotextile)Ton35$ - 0$ - 0
69Rock Bolts and DowelsLump Sum1$ - 0$ - 0
70W14x30 H BeamFoot80$ - 0$ - 0
71Structural concrete, Class A, Trail Bridge substructure & superstructure (foundation, footings, existing pier repairs, encasements, new piers, abutment, columns, viewing platform deck, viewing platform deck infill, and all reinforcement in its entirety)Cubic Yard12$ - 0$ - 0
72Trail Bridge Surface ImprovementSquare Feet368$ - 0$ - 0
73Expansion Joints, Elastomeric expansion joint sealFoot58$ - 0$ - 0
74Trail Bridge Guardrail Construction (Refer to Drawings Subsheet C-408 and L-907.30. Trail Bridge Guardrail shall extend beyond the start of the trail bridge abutment)Foot128$ - 0$ - 0
TREE PLANTING & MULCHING
75Mulching, dry methodSquare Yard400$ - 0$ - 0
76Plantings, Refer to FSSS Section 626 For RequirementsEach400$ - 0$ - 0
CLEANING DEBRIS FROM TRAIL STATIONING: 5+85.22 TO 8+54.39
77Removing and Cleaning trail stationing 5+85.22 to 8+54.39 (270-feet)of all existing debris which include removing all plywood, 2x4 posts, boards, metals, old geotextile fabrics, pvc pipes, and removing excessive sediment material and disposing legally at an approved landfill. Also includes installing, 100% biogradable erosion control blankets (plastic free) on existing disturb slopeFoot270$ - 0$ - 0
SUBTOTAL PRICE$ - 0
$ - 0