J015 RIPSA Tech Desription CDRL List.doc

DOC document 628 KB Posted

Attached to
Screening Information Request (SIR) for Runway Incursion Prevention through Situational Awareness (RIPSA)
Solicitation number
693KA8-21-R-00000
Issued by

View the file

Other files

File Type Posted
J002 Labor Category and Skill Level Descriptions.pdf PDF
J011 RIPSA FA CDRL List.doc DOC document
20210301 Part A RIPSA Cost Price Workbook.xlsx XLSX spreadsheet
J004 Predelivery Document Checklist.pdf PDF
J007 SAT Checklist - Copy.pdf PDF
J008 CAI Checklist.pdf PDF
J016 RIPSA Tech Description DIDs.doc DOC document
J005 FAT Checklist.pdf PDF
J001 Preliminary Program Requirements for RIPSA.pdf PDF
J013 RIPSA PM CDRL List.doc DOC document
J014 RIPSA PM DIDs.doc DOC document
J012 RIPSA FA DIDs.doc DOC document
J010 Past Performance Questionnaire.doc DOC document
RIPSA SIR Final.docx DOCX document
J006 First Article Delivery Checklist.pdf PDF
J009 Field Checkout Checklist.pdf PDF
J003 Referenced Documents.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 002x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A001
System Description Document
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A001
C.3.1.2
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

NLT 30 days after PAC
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

· Adobe Acrobat Reader

CO

PMO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 002x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A002
Software Design Description Document
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A002
C.3.1.2
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

NLT 30 days after PAC
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

· Adobe Acrobat Reader Detailed design documentation generated using a documentation generation tool, such as Doxygen, readable by Microsoft’s web browser, Internet Explorer, Version 6 or later is also acceptable.

CO

PMO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 002x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A003
Software Interface Control Document
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A003
C.3.1.2
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

NLT 30 days after PAC
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

· Adobe Acrobat Reader

CO

PMO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 002x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A005
EMC/EMI Test Report
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A005
C.3.1.2
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

SEE BLOCK 14
13. Date of Subsequent

Submission

SEE BLOCK 14
15. Distribution
14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

· Adobe Acrobat Reader

BLOCK 12

· The EMC/EMI Test Report shall be submitted within 30 days after the Joint Kick-Off meeting, or as applicable.

BLOCK 13

· Government response to the Draft EMC/EMI Test Report should not be expected until 30 days after receipt.

· Date of subsequent submission is 10 working days after receipt of comments

CO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 004x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A006
Project Implementation Plan

N/A

4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A006
C.3.1.3
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

SEE BLOCK 14
13. Date of Subsequent

Submission

SEE BLOCK 14
15. Distribution
14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

· Adobe Acrobat Reader

BLOCK 12

· The Project Implementation Plan shall be submitted within 30 days after the Joint Kick-Off meeting.

BLOCK 13

· Government response to the Project Implementation Plan should not be expected until 30 days after receipt.

· Date of subsequent submission is 10 working days after receipt of comments

CO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 004x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A008
Site Survey Report Review/Comments
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A007
C.3.1.3
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

SEE BLOCK 14
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

· Adobe Acrobat Reader

BLOCK 12

10 days after Receipt of Draft Site Survey Report.

CO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 004x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A008
Engineering Drawings
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A008
C.3.1.3
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

SEE BLOCK 14
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

30 days after Receipt of Final Site Survey Report.

CO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 004x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A009
Site Engineering Report Review/Comments
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A009
C.3.1.3
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

SEE BLOCK 14
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

· Adobe Acrobat Reader

10 days after Receipt of Site Engineering Report.

CO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 004x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A010
First Article Equipment Delivery
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A010
C.3.1.4.1
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)

LT

N/A
ONE/R
N/A

12. Date of First

Submission

SEE BLOCK 14
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

BLOCK 12

60 days after Receipt of Final Site Engineering Report.

CO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 004x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A011
Installation Manual
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A011
C.3.1.4.3
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

SEE BLOCK 14
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

60 Business Days Before system installation.

CO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 005x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A012
System Optimization
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A012
C.3.1.4.4
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

SEE BLOCK 14
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

BLOCK 12

30 days after Equipment Installation

CO

PMO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 005x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A013
External Interface Test Support
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A013
C.3.1.4.5
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

SEE BLOCK 14
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

BLOCK 12

45 BDB Integration at First Designated Airport, or as applicable

CO

PMO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 005x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A014
Site Acceptance Test Procedures
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A014
C.3.1.4.6
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

SEE BLOCK 14
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

· Adobe Acrobat Reader

BLOCK 12

60 BDB before conduct of SAT

CO

PMO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 005x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A015
Conduct Site Acceptance Test
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A015
C.3.1.4.6
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

SEE BLOCK 14
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

BLOCK 12

30 days after System Optimization

CO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 005x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A016
Site Acceptance Test Report
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A016
C.3.1.4.6
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

SEE BLOCK 14
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

· Adobe Acrobat Reader

5 days after completion of SAT

CO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 006x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A017
Contractor Acceptance Inspection Meeting
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A017
C.3.1.4,6
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

10 days after SAT
13. Date of Subsequent

Submission

15. Distribution

a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

CO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 007x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A018
Configuration Items List
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A018
C.3.1.4.7
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

SEE BLOCK 14
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

· Adobe Acrobat Reader

5 days after completion of System Optimization

CO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 007x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A019
Maintenance Plan
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A019
C.3.1.5
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

NLT 45 days after PAC
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

· Adobe Acrobat Reader

CO

PMO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 007x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A020
Engineering Maintenance Manual
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A020
C.3.1.5.1
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

TBD
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

· Adobe Acrobat Reader

CO

PMO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 007x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A021
Maintenance training Conference Briefing
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A021
C.3.1.5.2
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

TBD
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

Contractor format is acceptable. All electronic deliveries shall be without restrictions that would prevent the Government from reproducing or editing the information. Electronic deliveries shall be submitted via a secure online internet based web site that is vendor managed in .DOC format and/or compatible with:

· Microsoft Office Suite ’2010

· Microsoft Project ‘2010

· Adobe Acrobat Reader

CO

PMO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Page 1 of 1
A. Contract line Item No.
B. Exhibit
C. Category (Check appropriate one)
CLIN 007x
SYS
TDP FORMCHECKBOX

TM FORMCHECKBOX

Other FORMCHECKBOX

D. System/Item
E. Contract/PR No.
F. Contractor
RIPSA
TBD
TBD
1. Data Item No.
2. Title of Data Item
3. Subtitle
A022
De Installation/Disposal of First Article System
N/A
4. Authority
5. Contract Reference
6. Requiring Office
RIPSA A022
C.3.1.6
7. DD 250 Req’d
8. APP Code
9. Distribution Statement Required
10. Frequency
11. As of Date (AOD)
ONE/R
N/A

12. Date of First

Submission

SEE BLOCK 14
13. Date of Subsequent

Submission

15. Distribution

14. REMARKS:
a.
b. Draft
c. Final Copies
Addressee
Copies
Reg.
Electronic

BLOCK 12

90 days after receipt of request by CO

CO

16. Total
2
2
2
G. Prepared By:
H. Date
I. Approved By
J. Date

OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (reverse) (6/98)

File details come from the government source that posted it. Updated .