View the file

Other files

File Type Posted
J002 Labor Category and Skill Level Descriptions.pdf PDF
J011 RIPSA FA CDRL List.doc DOC document
20210301 Part A RIPSA Cost Price Workbook.xlsx XLSX spreadsheet
J004 Predelivery Document Checklist.pdf PDF
J007 SAT Checklist - Copy.pdf PDF
J016 RIPSA Tech Description DIDs.doc DOC document
J005 FAT Checklist.pdf PDF
J001 Preliminary Program Requirements for RIPSA.pdf PDF
J013 RIPSA PM CDRL List.doc DOC document
J014 RIPSA PM DIDs.doc DOC document
J012 RIPSA FA DIDs.doc DOC document
J015 RIPSA Tech Desription CDRL List.doc DOC document
J010 Past Performance Questionnaire.doc DOC document
RIPSA SIR Final.docx DOCX document
J006 First Article Delivery Checklist.pdf PDF
J009 Field Checkout Checklist.pdf PDF
J003 Referenced Documents.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J008 – Contractor Acceptance Inspection (CAI) Checklist

The requirements specified in the table below are to be verified before Phase 1 Contractor Acceptance Inspection (CAI) can be completed.

Contractor Acceptance Inspection (CAI) Completed YES ____ NO ____

FAA Comments

Requirement/ Deliverable number

Requirement Details Requirement met (Y/N)

CDRL A013 External Interface Interface Test Support CDRL A014 Site Acceptance Test Procedures CDRL A015 Conduct Site Acceptance Test CDRL A016 Site Acceptance Test Report CDRL A017 Contractor Acceptance Inspection Meeting

File details come from the government source that posted it. Updated .