20210301 Part A RIPSA Cost Price Workbook.xlsx
XLSX spreadsheet 46 KB Posted
- Attached to
- Screening Information Request (SIR) for Runway Incursion Prevention through Situational Awareness (RIPSA)
- Solicitation number
- 693KA8-21-R-00000
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J002 Labor Category and Skill Level Descriptions.pdf | ||
| J011 RIPSA FA CDRL List.doc | DOC document | |
| J004 Predelivery Document Checklist.pdf | ||
| J007 SAT Checklist - Copy.pdf | ||
| J008 CAI Checklist.pdf | ||
| J016 RIPSA Tech Description DIDs.doc | DOC document | |
| J005 FAT Checklist.pdf | ||
| J001 Preliminary Program Requirements for RIPSA.pdf | ||
| J013 RIPSA PM CDRL List.doc | DOC document | |
| J014 RIPSA PM DIDs.doc | DOC document | |
| J012 RIPSA FA DIDs.doc | DOC document | |
| J015 RIPSA Tech Desription CDRL List.doc | DOC document | |
| J010 Past Performance Questionnaire.doc | DOC document | |
| RIPSA SIR Final.docx | DOCX document | |
| J006 First Article Delivery Checklist.pdf | ||
| J009 Field Checkout Checklist.pdf | ||
| J003 Referenced Documents.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Sheet
| RUNWAY INCURSION PREVENTION THROUGH SITUATIONAL AWARENESS |
| (RIPSA) |
Part A RIPSA COST/PRICE WORKBOOK
Instructions
| No. | Tab | Instructions |
| 1 | General | There is a Tab A for each site. |
- Capital letter A designates T&M CLINs
- Lower case letter a designates San Antonio Airport
- Lower case letter b designates Daytona Airport
- Lower case letter c designates Tucson Airport
| 2 | Total Proposed Price | For each proposed site, input the First Article proposed price. |
| 3 | A-a, A-b, A-c | Populate T&M Rates Table for each Labor Category and for each proposed site - the T&M Rate Tables for each site are linked to the respective T&M CLINs within Tabs A, which are linked to the Total Proposed Price Tab. In accordance to SIR Section L3.2.1 Part B, Offerors must clearly explain and demonstrate the fully burdened rates buildup methodology and rationale used to develop the rates, inclusive of blended rates, if applicable. |
Total Proposed Price Base Period
| CLIN | IAW SOW | SUPPLIES OR SERVICES | CLIN Type | San Antonio | Daytona | Tucson | Total Proposed Price |
| 0001x | C3.1 | Airport a/b/c - First Article (FA) System in accordance with (IAW) C3.1 | FP | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002x | C3.1 | Airport a/b/c - Pre-Delivery Documentation | NSP | NSP | NSP | NSP | NSP |
| 0003x | C3.1 | Airport a/b/c - Factory Acceptance Testing | NSP | NSP | NSP | NSP | NSP |
| 0004x | C3.1 | Airport a/b/c - First Article Equipment Delivery | NSP | NSP | NSP | NSP | NSP |
| 0005x | C3.1 | Airport a/b/c - Site Acceptance Testing | NSP | NSP | NSP | NSP | NSP |
| 0006x | C3.1 | Airport a/b/c - Contractor Acceptance Inspection | NSP | NSP | NSP | NSP | NSP |
| 0007x | C3.1 | Airport a/b/c - Field Checkout Inspection | NSP | NSP | NSP | NSP | NSP |
| 0008x | C3.1, C3.2, C3.3 | Site Engineering Support - Program Management/Systems Engineering: Labor (for the total quantity of Airport a/b/c FA Systems) IAW SOW C3.1, C3.2, C3.3 | T&M | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0009x | C3.6 | Travel/Other Direct Costs (NTE) | CR | $ 20,000.00 | $ 20,000.00 | $ 20,000.00 | $ 60,000.00 |
| 0010x | C3.2 | Program Management Reports IAW C3.2 | NSP | NSP | NSP | NSP | NSP |
| 0011x | C3.2 | Technical Meeting Reports IAW C3.2 | NSP | NSP | NSP | NSP | NSP |
| Total Period | $ 20,000.00 | $ 20,000.00 | $ 20,000.00 | $ 60,000.00 |
Option Period 1
| CLIN | IAW SOW | SUPPLIES OR SERVICES | CLIN Type | San Antonio | Daytona | Tucson | Total Proposed Price |
| 1008x | C3.1, C3.2, C3.3 | Project Management/Engineering Support IAW C3.1, C3.2, C3.3 | T&M | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 1009x | C3.6 | Travel/Other Direct Costs (NTE) | CR | $ 30,000.00 | $ 30,000.00 | $ 30,000.00 | $ 90,000.00 |
| 1010x | C3.1, C3.2, C3.3 | Technical Documentation | NSP | NSP | NSP | NSP | NSP |
| Total Period | $ 30,000.00 | $ 30,000.00 | $ 30,000.00 | $ 90,000.00 |
Option Period 2
| CLIN | IAW SOW | SUPPLIES OR SERVICES | CLIN Type | San Antonio | Daytona | Tucson | Total Proposed Price |
| 2008x | C3.1, C3.2, C3.3 | Project Management/Engineering Support IAW C3.1, C3.2, C3.3 | T&M | $ - 0 | $ - 0 | $ - 0 | |
| 2009x | C3.6 | Travel/Other Direct Costs (NTE) | CR | $ 20,000.00 | $ 20,000.00 | $ 20,000.00 | $ 60,000.00 |
| 2010x | C3.1, C3.2, C3.3 | Technical Documentation | NSP | NSP | NSP | NSP | NSP |
| Total Period | $ 20,000.00 | $ 20,000.00 | $ 20,000.00 | $ 60,000.00 |
Total Price
| Subtotal First Artice (FP CLINs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal T&M CLINs | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal (NTE Government Provided - CR CLINs) | $ 70,000.00 | $ 70,000.00 | $ 70,000.00 | $ 210,000.00 |
| Total Contract Price | $ 70,000.00 | $ 70,000.00 | $ 70,000.00 | $ 210,000.00 |
&"Times New Roman,Bold"&12PART I - SECTION B &USUPPLIES OR SERVICES AND PRICE/COSTS &"Times New Roman,Bold"&12
&"Times New Roman,Bold"&12 PAGE B-&P
Tab A-a T&M CLINs San Antonio
| T&M Labor Category Rates -- these rates will be used for the T&M CLINs for this contract. Separate fully loaded labor rates are identified for each year of the potential 3-year contract period of performance. The corresponding labor category definitions and minimum qualification requirements are included in contract Attachment J002. The following labor rates will be used for all T&M Labor Hour task orders issued under this contract. | |||||||||||
| San Antonio | |||||||||||
| Base Period - FY 21 | T&M Rates Table | ||||||||||
| CLIN | IAW SOW | SUPPLIES OR SERVICES | CLIN Type | Hours | Rate | Total Price | Labor Category | FY21 | FY22 | FY23 | |
| 0008a | C3.1, C3.2, C3.3 | Site Engineering Support - Program Management/Systems Engineering: Labor (for the total quantity of Airport a FA Systems) IAW SOW C3.1, C3.2, C3.3 | T&M | $ - 0 | 1 | Program Analyst - Level 6 | $ - 0 | $ - 0 | $ - 0 | ||
| Program Analyst - Level 1 | T&M Rate | 420 | $ - 0 | $ - 0 | 2 | Program Analyst - Level 5 | $ - 0 | $ - 0 | $ - 0 | ||
| Technical Project Manager - Level 2 | T&M Rate | 60 | $ - 0 | $ - 0 | 3 | Program Analyst - Level 4 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer - Level 1 | T&M Rate | 520 | $ - 0 | $ - 0 | 4 | Program Analyst - Level 3 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Engineer - Level 2 | T&M Rate | 320 | $ - 0 | $ - 0 | 5 | Program Analyst - Level 2 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Integrator/Field Technician - Level 3 | T&M Rate | 240 | $ - 0 | $ - 0 | 6 | Program Analyst - Level 1 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Hours | 1560 | 7 | Technical Project Manager - Level 5 | $ - 0 | $ - 0 | $ - 0 | |||||
| Option Period 1 | 8 | Technical Project Manager - Level 4 | $ - 0 | $ - 0 | $ - 0 | ||||||
| CLIN | IAW SOW | SUPPLIES OR SERVICES | CLIN Type | Hours | Rate | Total Price | 9 | Technical Project Manager - Level 3 | $ - 0 | $ - 0 | $ - 0 |
| 1008a | C3.1, C3.2, C3.3 | Project Management/Engineering Support IAW C3.1, C3.2, C3.3 | T&M | $ - 0 | 10 | Technical Project Manager - Level 2 | $ - 0 | $ - 0 | $ - 0 | ||
| Program Analyst - Level 1 | T&M Rate | 420 | $ - 0 | $ - 0 | 11 | Technical Project Manager - Level 1 | $ - 0 | $ - 0 | $ - 0 | ||
| Technical Project Manager - Level 2 | T&M Rate | 40 | $ - 0 | $ - 0 | 12 | Systems Engineer - Level 6 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer - Level 1 | T&M Rate | 520 | $ - 0 | $ - 0 | 13 | Systems Engineer - Level 5 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Engineer - Level 2 | T&M Rate | 160 | $ - 0 | $ - 0 | 14 | Systems Engineer - Level 4 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Integrator/Field Technician - Level 3 | T&M Rate | 400 | $ - 0 | $ - 0 | 15 | Systems Engineer - Level 3 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Hours | 1540 | 16 | Systems Engineer - Level 2 | $ - 0 | $ - 0 | $ - 0 | |||||
| Option Period 2 | 17 | Systems Engineer - Level 1 | $ - 0 | $ - 0 | $ - 0 | ||||||
| CLIN | IAW SOW | SUPPLIES OR SERVICES | CLIN Type | Hours | Rate | Total Price | 18 | Software Engineer - Level 6 | $ - 0 | $ - 0 | $ - 0 |
| 2008a | C3.1, C3.2, C3.3 | Project Management/Engineering Support IAW C3.1, C3.2, C3.3 | T&M | $ - 0 | 19 | Software Engineer - Level 5 | $ - 0 | $ - 0 | $ - 0 | ||
| Program Analyst - Level 1 | T&M Rate | 240 | $ - 0 | $ - 0 | 20 | Software Engineer - Level 4 | $ - 0 | $ - 0 | $ - 0 | ||
| Technical Project Manager - Level 2 | T&M Rate | 20 | $ - 0 | $ - 0 | 21 | Software Engineer - Level 3 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer - Level 1 | T&M Rate | 480 | $ - 0 | $ - 0 | 22 | Software Engineer - Level 2 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Engineer - Level 2 | T&M Rate | 80 | $ - 0 | $ - 0 | 23 | Software Engineer - Level 1 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Integrator/Field Technician - Level 3 | T&M Rate | 190 | $ - 0 | $ - 0 | 24 | Systems Integrator/Field Technician - Level 6 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Hours | 1010 | 25 | Systems Integrator/Field Technician - Level 5 | $ - 0 | $ - 0 | $ - 0 | |||||
| Total T&M CLINs | $ - 0 | 26 | Systems Integrator/Field Technician - Level 4 | $ - 0 | $ - 0 | $ - 0 | |||||
| 27 | Systems Integrator/Field Technician - Level 3 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 28 | Systems Integrator/Field Technician - Level 2 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 29 | Systems Integrator/Field Technician - Level 1 | $ - 0 | $ - 0 | $ - 0 |
Tab A-b T&M CLINs Daytona
| T&M Labor Category Rates -- these rates will be used for the T&M CLINs for this contract. Separate fully loaded labor rates are identified for each year of the potential 3-year contract period of performance. The corresponding labor category definitions and minimum qualification requirements are included in contract Attachment J002. The following labor rates will be used for all T&M Labor Hour task orders issued under this contract. | |||||||||||
| Daytona Beach | |||||||||||
| Base Period - FY 22 | T&M Rates Table | ||||||||||
| CLIN | IAW SOW | SUPPLIES OR SERVICES | CLIN Type | Hours | Rate | Total Price | Labor Category | FY21 | FY22 | FY23 | |
| 0008a | C3.1, C3.2, C3.3 | Site Engineering Support - Program Management/Systems Engineering: Labor (for the total quantity of Airport b FA Systems) IAW SOW C3.1, C3.2, C3.3 | T&M | $ - 0 | 1 | Program Analyst - Level 6 | $ - 0 | $ - 0 | $ - 0 | ||
| Program Analyst - Level 1 | T&M Rate | 420 | $ - 0 | $ - 0 | 2 | Program Analyst - Level 5 | $ - 0 | $ - 0 | $ - 0 | ||
| Technical Project Manager - Level 2 | T&M Rate | 60 | $ - 0 | $ - 0 | 3 | Program Analyst - Level 4 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer - Level 1 | T&M Rate | 520 | $ - 0 | $ - 0 | 4 | Program Analyst - Level 3 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Engineer - Level 2 | T&M Rate | 320 | $ - 0 | $ - 0 | 5 | Program Analyst - Level 2 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Integrator/Field Technician - Level 3 | T&M Rate | 240 | $ - 0 | $ - 0 | 6 | Program Analyst - Level 1 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Hours | 1560 | 7 | Technical Project Manager - Level 5 | $ - 0 | $ - 0 | $ - 0 | |||||
| Option Period 1 | 8 | Technical Project Manager - Level 4 | $ - 0 | $ - 0 | $ - 0 | ||||||
| CLIN | IAW SOW | SUPPLIES OR SERVICES | CLIN Type | Hours | Rate | Total Price | 9 | Technical Project Manager - Level 3 | $ - 0 | $ - 0 | $ - 0 |
| 1008a | C3.1, C3.2, C3.3 | Project Management/Engineering Support IAW C3.1, C3.2, C3.3 | T&M | $ - 0 | 10 | Technical Project Manager - Level 2 | $ - 0 | $ - 0 | $ - 0 | ||
| Program Analyst - Level 1 | T&M Rate | 420 | $ - 0 | $ - 0 | 11 | Technical Project Manager - Level 1 | $ - 0 | $ - 0 | $ - 0 | ||
| Technical Project Manager - Level 2 | T&M Rate | 40 | $ - 0 | $ - 0 | 12 | Systems Engineer - Level 6 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer - Level 1 | T&M Rate | 520 | $ - 0 | $ - 0 | 13 | Systems Engineer - Level 5 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Engineer - Level 2 | T&M Rate | 160 | $ - 0 | $ - 0 | 14 | Systems Engineer - Level 4 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Integrator/Field Technician - Level 3 | T&M Rate | 400 | $ - 0 | $ - 0 | 15 | Systems Engineer - Level 3 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Hours | 1540 | 16 | Systems Engineer - Level 2 | $ - 0 | $ - 0 | $ - 0 | |||||
| Option Period 2 | 17 | Systems Engineer - Level 1 | $ - 0 | $ - 0 | $ - 0 | ||||||
| CLIN | IAW SOW | SUPPLIES OR SERVICES | CLIN Type | Hours | Rate | Total Price | 18 | Software Engineer - Level 6 | $ - 0 | $ - 0 | $ - 0 |
| 2008a | C3.1, C3.2, C3.3 | Project Management/Engineering Support IAW C3.1, C3.2, C3.3 | T&M | $ - 0 | 19 | Software Engineer - Level 5 | $ - 0 | $ - 0 | $ - 0 | ||
| Program Analyst - Level 1 | T&M Rate | 240 | $ - 0 | $ - 0 | 20 | Software Engineer - Level 4 | $ - 0 | $ - 0 | $ - 0 | ||
| Technical Project Manager - Level 2 | T&M Rate | 20 | $ - 0 | $ - 0 | 21 | Software Engineer - Level 3 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer - Level 1 | T&M Rate | 480 | $ - 0 | $ - 0 | 22 | Software Engineer - Level 2 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Engineer - Level 2 | T&M Rate | 80 | $ - 0 | $ - 0 | 23 | Software Engineer - Level 1 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Integrator/Field Technician - Level 3 | T&M Rate | 190 | $ - 0 | $ - 0 | 24 | Systems Integrator/Field Technician - Level 6 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Hours | 1010 | 25 | Systems Integrator/Field Technician - Level 5 | $ - 0 | $ - 0 | $ - 0 | |||||
| Total T&M CLINs | $ - 0 | 26 | Systems Integrator/Field Technician - Level 4 | $ - 0 | $ - 0 | $ - 0 | |||||
| 27 | Systems Integrator/Field Technician - Level 3 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 28 | Systems Integrator/Field Technician - Level 2 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 29 | Systems Integrator/Field Technician - Level 1 | $ - 0 | $ - 0 | $ - 0 |
Tab A-c T&M CLINs Tucson
| T&M Labor Category Rates -- these rates will be used for the T&M CLINs for this contract. Separate fully loaded labor rates are identified for each year of the potential 3-year contract period of performance. The corresponding labor category definitions and minimum qualification requirements are included in contract Attachment J002. The following labor rates will be used for all T&M Labor Hour task orders issued under this contract. | |||||||||||
| Tucson | |||||||||||
| Base Period - FY 23 | T&M Rates Table | ||||||||||
| CLIN | IAW SOW | SUPPLIES OR SERVICES | CLIN Type | Hours | Rate | Total Price | Labor Category | FY21 | FY22 | FY23 | |
| 0008a | C3.1, C3.2, C3.3 | Site Engineering Support - Program Management/Systems Engineering: Labor (for the total quantity of Airport c FA Systems) IAW SOW C3.1, C3.2, C3.3 | T&M | $ - 0 | 1 | Program Analyst - Level 6 | $ - 0 | $ - 0 | $ - 0 | ||
| Program Analyst - Level 1 | T&M Rate | 420 | $ - 0 | $ - 0 | 2 | Program Analyst - Level 5 | $ - 0 | $ - 0 | $ - 0 | ||
| Technical Project Manager - Level 2 | T&M Rate | 60 | $ - 0 | $ - 0 | 3 | Program Analyst - Level 4 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer - Level 1 | T&M Rate | 520 | $ - 0 | $ - 0 | 4 | Program Analyst - Level 3 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Engineer - Level 2 | T&M Rate | 320 | $ - 0 | $ - 0 | 5 | Program Analyst - Level 2 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Integrator/Field Technician - Level 3 | T&M Rate | 240 | $ - 0 | $ - 0 | 6 | Program Analyst - Level 1 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Hours | 1560 | 7 | Technical Project Manager - Level 5 | $ - 0 | $ - 0 | $ - 0 | |||||
| Option Period 1 | 8 | Technical Project Manager - Level 4 | $ - 0 | $ - 0 | $ - 0 | ||||||
| CLIN | IAW SOW | SUPPLIES OR SERVICES | CLIN Type | Hours | Rate | Total Price | 9 | Technical Project Manager - Level 3 | $ - 0 | $ - 0 | $ - 0 |
| 1008a | C3.1, C3.2, C3.3 | Project Management/Engineering Support IAW C3.1, C3.2, C3.3 | T&M | $ - 0 | 10 | Technical Project Manager - Level 2 | $ - 0 | $ - 0 | $ - 0 | ||
| Program Analyst - Level 1 | T&M Rate | 420 | $ - 0 | $ - 0 | 11 | Technical Project Manager - Level 1 | $ - 0 | $ - 0 | $ - 0 | ||
| Technical Project Manager - Level 2 | T&M Rate | 40 | $ - 0 | $ - 0 | 12 | Systems Engineer - Level 6 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer - Level 1 | T&M Rate | 520 | $ - 0 | $ - 0 | 13 | Systems Engineer - Level 5 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Engineer - Level 2 | T&M Rate | 160 | $ - 0 | $ - 0 | 14 | Systems Engineer - Level 4 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Integrator/Field Technician - Level 3 | T&M Rate | 400 | $ - 0 | $ - 0 | 15 | Systems Engineer - Level 3 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Hours | 1540 | 16 | Systems Engineer - Level 2 | $ - 0 | $ - 0 | $ - 0 | |||||
| Option Period 2 | 17 | Systems Engineer - Level 1 | $ - 0 | $ - 0 | $ - 0 | ||||||
| CLIN | IAW SOW | SUPPLIES OR SERVICES | CLIN Type | Hours | Rate | Total Price | 18 | Software Engineer - Level 6 | $ - 0 | $ - 0 | $ - 0 |
| 2008a | C3.1, C3.2, C3.3 | Project Management/Engineering Support IAW C3.1, C3.2, C3.3 | T&M | $ - 0 | 19 | Software Engineer - Level 5 | $ - 0 | $ - 0 | $ - 0 | ||
| Program Analyst - Level 1 | T&M Rate | 240 | $ - 0 | $ - 0 | 20 | Software Engineer - Level 4 | $ - 0 | $ - 0 | $ - 0 | ||
| Technical Project Manager - Level 2 | T&M Rate | 20 | $ - 0 | $ - 0 | 21 | Software Engineer - Level 3 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer - Level 1 | T&M Rate | 480 | $ - 0 | $ - 0 | 22 | Software Engineer - Level 2 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Engineer - Level 2 | T&M Rate | 80 | $ - 0 | $ - 0 | 23 | Software Engineer - Level 1 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Integrator/Field Technician - Level 3 | T&M Rate | 190 | $ - 0 | $ - 0 | 24 | Systems Integrator/Field Technician - Level 6 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Hours | 1010 | 25 | Systems Integrator/Field Technician - Level 5 | $ - 0 | $ - 0 | $ - 0 | |||||
| Total T&M CLINs | $ - 0 | 26 | Systems Integrator/Field Technician - Level 4 | $ - 0 | $ - 0 | $ - 0 | |||||
| 27 | Systems Integrator/Field Technician - Level 3 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 28 | Systems Integrator/Field Technician - Level 2 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 29 | Systems Integrator/Field Technician - Level 1 | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .