J - Work Clearance Request Form.pdf

PDF 29 KB Posted

Attached to
Fencing Replacement, Clear Zone Area
Solicitation number
FA309922R0004
Issued by

View the file

Other files

File Type Posted
I - Drawings 25 FEB 2022 (Rev 1).pdf PDF
Amendment 2 - FA309922R00040002 SF 30.pdf PDF
Conformed Solicitation - FA309922R00040002.pdf PDF
Questions and Answers 2 - FA309922R0004 - Repair Deer Fence Clear Zone Area.pdf PDF
Questions and Answers Attachment 3 - Laydown Yard.pdf PDF
Conformed Solicitation - FA309922R00040001.pdf PDF
Amendment 1 - FA309922R00040001 SF 30.pdf PDF
Questions and Answers - FA309922R0004 - Repair Deer Fence Clear Zone Area.pdf PDF
P - AF IMT 3000 Material Approval Submittal.pdf PDF
Questions and Answers Attachment 1 - Overruns_Oct2014_2014-525 Final Geotech Report.pdf PDF
Questions and Answers Attachment 2 - Apron detail.pdf PDF
Attendance Sheet.pdf PDF
F - MXDP 10-1002 Schedule of Material Submittals.xlsx XLSX spreadsheet
M - Financial Institution Reference Sheet.pdf PDF
G - UFC 4-022-03 Security Fences and Gates.pdf PDF
A - Existing Photographs.pdf PDF
O - Wage Determination.pdf PDF
D - Division 01 Specifications_11 Mar 21.docx DOCX document
E - Blank Progress Schedule and Progress Report.xlsx XLSX spreadsheet
C - Blank FAA Form 7460-01.pdf PDF
N - Past Performance Questionnaire.pdf PDF
H - UFGS 32 31 13.53 High-Security Fences Chain Link and Gates.docx DOCX document
K - Notification of Compliance with Contract Insurance Requirements.pdf PDF
Solicitation - FA309922R0004.pdf PDF
L - AETC 47.pdf PDF
B - Environmental Quality Construction Specs Mar 2021_Final.pdf PDF
I - Drawings 25 FEB 2022.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

DATE PREPARED

BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST

(See Instructions on Reverse)

1. Clearance is requested to proceed with work at on Work Order No.

, Contract No.

, involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.

2. TYPE OF FACILITY/WORK INVOLVED

G. AIRCRAFT OR VEHICULAR TRAFFIC FLOW

A. PAVEMENTS

D. FIRE DETECTION & PROTECTION SYSTEMS

H. SECURITY

B. DRAINAGE SYSTEMS

E. UTILITY

OVERHEAD

UNDERGROUND

I. OTHER

C. RAILROAD TRACKS

F. COMM

OVERHEAD

UNDERGROUND

4. DATE OF CLEARANCE

3. DATE CLEARANCE REQUIRED

5. SIGNATURE OF REQUESTING OFFICIAL

6. TELEPHONE NO.

7. ORGANIZATION

REMARKS

(Use Reverse for additional comments)

REVIEWER'S NAME AND INITIALS

ORGANIZATION

8.

A. ELECTRICAL DISTRIBUTION

B A S

B. STEAM DISTRIBUTION

E

C. WATER DISTRIBUTION

C I

D. POL DISTRIBUTION

V I L

E. SEWER DISTRIBUTION

E N

F. ENVIRONMENTAL

G I

G. PAVEMENTS/ GROUNDS

N E E

H. FIRE PROTECTION

R I

I. ZONE

N G J. OTHER (Specify)

9. SECURITY POLICE

10. SAFETY

11. COMMUNICATIONS

12. BASE OPERATIONS

13. CABLE TV

14. COMMERCIAL UTILITY COMPANY

TELEPHONE

GAS

ELECTRIC

15. OTHER (Specify)

APPROVED

DISAPPROVED

16. REQUESTED CLEARANCE

17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED

PREVIOUS EDITIONS ARE OBSOLETE.

AF IMT 103, 19940801, V3

Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign Click to sign

INSTRUCTIONS

The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.

18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)

AF IMT 103, 19940801, V3

(REVERSE)

8.2.1.3158.1.475346.466429

HAS: 0
HASNOT: 0
APPRVD: 0
DAPPRVD: 0
Entery date as YYYYMMDD.:
LOCA:
WONO:
CTRNO:
ABC: 0
ABC_2: 0
ABC_3: 0
D: 0
E: 0
F: 0
OVHA: 0
OVHB: 0
UNDGA: 0
UNDGB: 0
GHI: 0
GHI_2: 0
GHI_3: 1
OTH:
Enter date as YYYYMMDD.: 2020-05-18
ReqOffclSig:
TELE:
ORGN:
REMKA:
SIGNATURE1:
REMKA_2:
SIGNATURE2:
REMKA_3:
SIGNATURE3:
REMKA_4:
SIGNATURE4:
REMKA_5:
SIGNATURE5:
REMKA_6:
SIGNATURE6:
REMKA_7:
SIGNATURE7:
REMKA_8:
SIGNATURE8:
ZONE:
REMKB:
SIGNATURE9:
OTHB:
REMKC:
SIGNATURE10:
REMKD:
SIGNATURE11:
REMKD_2:
SIGNATURE12:
REMKD_3:
SIGNATURE13:
REMKD_4:
SIGNATURE14:
REMKD_5:
OTHC:
REMKE:
COMUTIL: 0
COMUTIL_2: 0
COMUTIL_3: 0
AppOffcrSig:
SIGNATURE16:
SIGNATUREfor13:
EF_1:
EF_2:
REMKSF: Note: For the duration of this AF Form 103 Work Clearance Request, grounds shall be maintained to keep a professional appearance and ensure grass height matches surrounding areas. Pick up rocks, debris, and litter prior to mowing. Mow, trim and edge grounds located within the project area. Remove or mulch visible grass clippings before leaving work area. Site shall be returned to the government in the same conditions as it was before work began.
SignatureStyle1:
SignatureStyle2:

File details come from the government source that posted it. Updated .