Questions and Answers 2 - FA309922R0004 - Repair Deer Fence Clear Zone Area.pdf

PDF 113 KB Posted

Attached to
Fencing Replacement, Clear Zone Area
Solicitation number
FA309922R0004
Issued by

View the file

Other files

File Type Posted
I - Drawings 25 FEB 2022 (Rev 1).pdf PDF
Amendment 2 - FA309922R00040002 SF 30.pdf PDF
Conformed Solicitation - FA309922R00040002.pdf PDF
Questions and Answers Attachment 3 - Laydown Yard.pdf PDF
Conformed Solicitation - FA309922R00040001.pdf PDF
Amendment 1 - FA309922R00040001 SF 30.pdf PDF
Questions and Answers - FA309922R0004 - Repair Deer Fence Clear Zone Area.pdf PDF
P - AF IMT 3000 Material Approval Submittal.pdf PDF
Questions and Answers Attachment 1 - Overruns_Oct2014_2014-525 Final Geotech Report.pdf PDF
Questions and Answers Attachment 2 - Apron detail.pdf PDF
Attendance Sheet.pdf PDF
F - MXDP 10-1002 Schedule of Material Submittals.xlsx XLSX spreadsheet
M - Financial Institution Reference Sheet.pdf PDF
G - UFC 4-022-03 Security Fences and Gates.pdf PDF
A - Existing Photographs.pdf PDF
O - Wage Determination.pdf PDF
D - Division 01 Specifications_11 Mar 21.docx DOCX document
E - Blank Progress Schedule and Progress Report.xlsx XLSX spreadsheet
C - Blank FAA Form 7460-01.pdf PDF
N - Past Performance Questionnaire.pdf PDF
H - UFGS 32 31 13.53 High-Security Fences Chain Link and Gates.docx DOCX document
K - Notification of Compliance with Contract Insurance Requirements.pdf PDF
J - Work Clearance Request Form.pdf PDF
Solicitation - FA309922R0004.pdf PDF
L - AETC 47.pdf PDF
B - Environmental Quality Construction Specs Mar 2021_Final.pdf PDF
I - Drawings 25 FEB 2022.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers #2

FA309922R0004

# Contractor Question Government Response

This detail shows the top rail of the fence in line with the posts. It then shows the bottom rail of the fence on the outside of the post this is atypical for chain-link fence.

Does the government want the fence fabric running at an angle from top to bottom as shown on this detail?

If referencing detail titled “apron detail” submitted with Amendment #1, the chain link fabric shall run on the outside of the of the posts, top rail and bottom rail on the non-airfield side of the fence.

It also shows a 45 degree turn in the fence fabric after attachment to the rail and before it enters the ground. Is this detail correct or can the fence fabric just curve to the ground?

Fence fabric is required to be set in ground at a 45 degree angle to prevent critters from burrowing in the ground.

Gate B – Please confirm that the gate and both large posts with hinges welded to post holding the vehicle gate remain. Only work is to replace mesh with new fence fabric and remove reinstall signs.

Vehicle gate and both large post with vehicle gate hinges welded to post holding the vehicle gate shall remain on C-007.

Gate B – Also the pedestrian gate attached to this gate has two more posts making up the total gate assembly are to remain since they are built as an integral section for the pedestrian gate. Only work is to replace mesh with new fence fabric and remove reinstall signs.

Pedestrian gate attached to this gate has two more posts making up the total gate assembly shall remain.

Gate B – Also note on gate B sheet C003 notes new latch – not specified on Sheet C 006.

Contractor shall be responsible for providing and installing gate latch mentioned in sheet C-003 and C- 006 (item G under Gate B notes).

Gate C –Do sections that support gate on each side of gate remain as they appear to be designed as structural support for the gate post? Just replace mesh with new fence fabric and remove and reinstall signs?

For Gate C, Contractor shall reuse two large metal posts on the latch side of the vehicle gate and two large metal posts on the hinge side of the vehicle gate. Contractor shall remove existing fence fabric and replace with chain link fencing fabric. Contractor shall remove existing signs, store signs to avoid damage and reinstall sings when new chain link fabric has been reinstalled.

Gate D – Do sections that support gate on each side of gate remain as they appear to be design as structural support for the gate post? Just replace mesh with new fence fabric and remove and reinstall signs?

For Gate D, Contractor shall reuse the two large metal posts on the latch side of the vehicle gate and two large metal posts on the hinge side of the vehicle gate. Contractor shall remove existing fence fabric and replace with chain link fencing fabric. Contractor shall remove existing signs, store signs to avoid damage and reinstall sings when new chain link fabric has been reinstalled.

Gate E – Similar to gate B – vehicle gate is integral to gate frame construction. All existing framing to remain - replace mesh with new fence fabric and remove and reinstall signs?

For Gate E, Contractor shall reuse the two existing metal posts on the latch side of the vehicle gate and one large metal post on the hinge side of the vehicle gate. Contractor shall reuse the one existing metal post on the latch side of the pedestrian gate. Contractor shall reuse the one existing metal post on the corner connected to pedestrian gate latch side post. Contractor shall remove existing fence fabric and replace with chain link fencing fabric. Contractor shall remove existing signs, store signs to avoid damage and reinstall sings when new chain link fabric has been reinstalled.

Please verify that Statement of Work Attachment I - Drawings, are complete. It seems its only 7 sheets when the drawings state 12 sheets?

Statement of Work, Attachment I - Drawings 25 FEB 2022, has been replaced with the correct, complete file.

Since funds are not available, will you be holding our bond until available or can we hold off?

In accordance with Solicitation Block 10, #11, and Block 13, b, hard copy Certified Bid Bonds with corporate seal are required in office at the time proposals are due.

In reference to Questions and Answers Attachment 2, Apron detail, provided with Amendment 1. (Questions 26 and 27 below)

-- Last Entry --

In reference to Sheets C-006 and C-007 Gate work. (Questions 28-33 below)