About this file

This is a technical specification document for equipment integration at the Dallas Consolidated Mail Outpatient Pharmacy (CMOP) facility in Lancaster, Texas, which is part of a larger Low to Medium Volume TCA and Sorting Loops Project under Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 15.

The document addresses the West KNAPP return puck conveyor system that operates through the new TCA (Totally Computerized Automation) area and specifies that this conveyor can be removed or modified to accommodate new equipment installation and design. The document notes that pucks are not tracked during return to puck ponds, but feeder spirals have readers that track pucks to loops and puck packing stations. A critical requirement is that if the feeder spirals are modified, the contractor must be capable of integrating modifications into the new system without degrading the existing KNAPP system performance. The CMOP processes approximately 90,000 prescriptions daily and requires reliable, efficient automation infrastructure to maintain operational performance and support anticipated increases in workload. The related solicitation (36C77026T0007) was updated with an RFP extended deadline of August 20, 2026.

View the file

Other files

File Type Posted
1 day snapshot.xlsx XLSX spreadsheet
G. Dallas Manual Dispensing for New TCA.xlsx XLSX spreadsheet
H. Dallas TCA Products 07132026.xlsx XLSX spreadsheet
K. L034.00113-510A.pdf PDF
I. Dallas_CMOP_Floor Plan.pdf PDF
L. CHIP Programming job aid 1.pdf PDF
B. Attachment 1 for Dallas CMOP TCA Low to Medium Volume.docx DOCX document
A. PWS TCA System Installation_Final_updated 7.8.26.docx DOCX document
E. BOT2000.pdf PDF
RFP_36C77026R0007_extended.docx DOCX document
D. Past Performance Questionnaire.docx DOCX document
F. CAP1185CL-foil-lined- CAP1190CL-foam-lined.pdf PDF
C. BUSINESS ASSOCIATE AGREEMENT.pdf PDF
M. CHIP Program Deleting job aid 2.pdf PDF
S06_Amendment_36C77026R0007.docx DOCX document
S05_Questions and Clarifications_R0007.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Note: The West KNAPP return puck conveyor that runs through the new TCA area, can be removed and or modified for ease of new equipment installation and design. Pucks are not tracked going back to the puck ponds. The feeder spirals all have readers that track pucks to the loops and puck packing. If these are modified, contractor must be able to integrate into the new system without de grading the KNAPP system.