J.5 Pricing Schedule.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 6913G621R200006
About this file
This solicitation seeks proposals for the repairs and expansion of the Rock Harbor dock at Isle Royale National Park. The scope of work includes preparing existing dock components, installing new dock upgrades, an emergency sewage pump-out station, wheelchair accessible ramp, contractor housing, and replacing or repairing structural timbers and hardware. Offerors must provide all necessary labor, equipment, materials and supervision. Proposals are due on the date specified in the solicitation, which is anticipated to be issued on January 27, 2021. The contract will be awarded as a 100% small business set-aside with a period of performance from time of award through July 31, 2021. Evaluation will be conducted in accordance with FAR Part 15. The estimated value is between $1-5 million.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 7
| CLIN | Description | Unit of Measure | Quantity | Unit Price | Total Price |
| 00100 | Preconstruction Documentation: HASP: The Contractor shall develop a Health and Safety Plan (HASP), including COVID precautions (PSC =Y1PZ) Period of Performance = Time of Award through 31 July 2021. | EA | 1 | ||
| 00200 | The Contractor shall prepare the existing Rock Harbor dock crib sections and other components of the existing dock (PSC =Y1PZ) Period of Performance = Time of Award through 31 July 2021. | EA | 1 | ||
| 00300 | Install the new dock upgrades in accordance with the provided Technical Design Package (Reference 1) and permits (PSC =Y1PZ) Period of Performance = Time of Award through 31 July 2021. | EA | 1 | ||
| Total BASE CLINS Amount |
OPTION CLIN Description Totals
| 00400 | Emergency Sewage Pump-out Station (PSC =Y1PZ) Period of Performance = 30 Days after Award through 31 July 2021. | EA | 1 |
| 00500 | Install a new wheelchair accessible ramp between the Rock Harbor dock and the private boat fueling dock (PSC =Y1PZ) Period of Performance = 30 Days after Award through 31 July 2021. | EA | 1 |
| 00600 | Contractor Provided Housing (PSC =X1FA?) Period of Performance = 30 Days after Award through 31 July 2021. | EA | 1 |
| 00700 | Replace/Repair any structural timbers, loose or missing crib structure & ice plate hardware showing signs of damage/degradation (PSC =Y1PZ) Period of Performance = 30 Days after Award through 31 July 2021. | EA | 1 |
| Total OPTION CLINs Amount |
Total Contract Price (Inclusive of Base and all Options): ERROR:#VALUE!
File details come from the government source that posted it. Updated .