ACE Permit ISRO NWPletter signed 1.pdf
PDF 3 MB Posted
- Solicitation number
- 6913G621R200006
About this file
This document summarizes a federal contract solicitation for construction services at Isle Royale National Park. The Department of Transportation is seeking a contractor to repair and expand the Rock Harbor dock facility to accommodate vessel traffic and address congestion issues. Work includes installation of silt curtains, removal and replacement of decking and hardware, installation of new pilings, fender frames, and ramps. The base work and multiple options will be awarded as a single small business set-aside contract between $1-5 million. Proposals are due by the date specified in the solicitation to be issued on January 27, 2021. Evaluation will be based on best value. The work must be performed during the Park's off-season at the island location in Lake Superior, requiring full self-sufficiency from the contractor.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, DETROIT DISTRICT
MARQUETTE FIELD OFFICE
115 SOUTH LAKESHORE BOULEVARD, SUITE C
MARQUETTE, MICHIGAN 49855-4652
January 7, 2021 REPLY TO
ATTENTION OF:
Engineering & Technical Services Regulatory Office File Number LRE-2007-00967-38-N20
Daniel Mannheim US Department of Transportation Volpe Center 55 Broadway Cambridge, Massachusetts 02142
Dear Mr. Mannheim:
Please refer to your application on behalf of Isle Royale National Park for a Department of the Army (DA) permit to repair and modify a dock in Lake Superior at Rock Harbor (Snug Harbor), Isle Royale National Park, Michigan. We have verified that the project is authorized by Nationwide Permits 3, Maintenance, and 28, Modifications of Existing Marinas, as published in the Federal Register.
You may proceed with the work per the following project description, attached drawings, and attached general and special conditions:
Install sediment curtain. Discharge 244 cubic yards of riprap in a 265’ x 25’ x 3’ (approximate maximum depth) area, to repair the existing riprap around the base of an existing crib. Remove the top timbers down to 604.25’ IGLD 1985.
Replace a 200’ x 24.5’ concrete slab deck and utilities on the existing dock.
Construct a 200’ x 15’ open pile lateral dock extension, over (12) 16” diameter cement-filled steel pilings on cement foundations placed within the existing riprap bed. Redistribute riprap as needed within the existing riprap footprint to install pilings. Install (2) 14’ x 3’ aluminum ramps to extend from the existing small boat transverse piers, and connect to a new 46’ x 6’ aluminum gangway installed over existing riprap.
Special Conditions:
1. If you discover any unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately stop work in that area and notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.
2. Prior to any work in the water, the permittee shall install commercial-grade silt curtains that extend from a floating boom on the lake surface down to the bed of the waterway. The silt curtain shall continuously and completely enclose the work area.
The silt curtain shall be properly anchored onshore, and anchored offshore at 25-
-2-foot intervals to provide a stable and functional barrier. The silt curtain shall be maintained in effective working condition until all work in the water is completed and turbidity has returned to background levels. In the event that the silt curtain remains in place overnight, the applicant will coordinate proper marking of the silt curtain with the USCG and their requirements (e.g. lighting, reflective paints, etc.)
will become special conditions under this permit.
3. The permittee shall contact the U.S. Coast Guard in writing, a minimum of 14 days prior to the start of work, and request that a notice to mariners be published.
The permittee shall provide this office a concurrent copy of their request.
4. The permittee shall contact the U.S. Coast Guard to determine whether installation of navigational lighting is required.
Any construction activity other than that shown on the plans may not qualify for the authorization. If you contemplate any changes or additional activities from those depicted on the plans, please submit them to this office for authorization review prior to any construction. On completion of the work, you must fill in and return the enclosed
COMPLETION REPORT.
This verification is invalid until you obtain an appropriate state permit/certification or waiver thereof. You must not initiate activities authorized under the NWP until all required State authorizations have been received. If local approvals are required, we recommend you contact the appropriate local government body directly.
We are obligated to provide recipients of permit verifications with a jurisdictional determination (JD) when requested to do so. The Corps of Engineers has the following options with respect to JDs: (1) Approved Jurisdictional Determinations (AJD), which are considered “official” JDs and can be administratively appealed; (2) Preliminary Jurisdictional Determinations (PJD), which are non-binding JDs and advise an affected party that the Corps of Engineers believes there may be waters of the United States on the property that fall under the Corps’ regulatory authority and enables the Corps and a permit applicant or other affected party to resolve certain jurisdiction and permit issues without expending time on making an official determination of the Corps’ jurisdiction;
and (3) No Jurisdiction Determination (NJD), which is used in situations where issuance of a JD is deemed unnecessary by a permit applicant or other affected party because Corps’ jurisdiction is undisputed (e.g., work is in a navigable water of the United States) or not subject to question. The NJD option requires less documentation than a PJD and likewise enables the Corps and a permit applicant or other affected party to resolve jurisdiction and permit issues without expending time on an official determination of the Corps’ jurisdiction.
This verification is valid until the NWP is modified, reissued, or revoked. All of the existing NWPs are scheduled to be modified, reissued, or revoked prior to March 18, 2022. It is incumbent upon you to remain informed of changes to the NWPs. We will issue a public notice when the NWPs are reissued. Furthermore, if you commence or
-3-are under contract to commence this activity before the date that the relevant nationwide permit is modified or revoked, you will have twelve (12) months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this nationwide permit.
As per 33 CFR 325, Appendix A, representatives from this office are allowed to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of the Nationwide Permit.
Should you have any questions, please contact me at the above address, by E-Mail at Jean.M.Battle2@usace.army.mil, or by telephone at (906) 228-2833. In all communications, please refer to File Number LRE-2007-00967-38-N20.
We are interested in your thoughts and opinions concerning your experience with the Detroit District, Corps of Engineers Regulatory Program. If you are interested in letting us know how we are doing, you can complete an electronic Customer Service Survey from our web site at: http://corpsmapu.usace.army.mil/cm_apex/f?p=regulatory_survey.
Alternatively, you may contact us and request a paper copy of the survey that you may complete and return to us by mail or fax. Thank you for taking the time to complete the survey, we appreciate your feedback.
Sincerely, Jean Battle Regulatory Project Manager Marquette Field Office
Enclosures
Copy Furnished
Isle Royale National Park, Chief of Maintenance EGLE, H. King (42 - ISRO Rock Harbor Dock at Lake Superior)
-4-
A. Nationwide Permit General Conditions:
To qualify for NWP authorization, the permittee must comply with the following general conditions, as appropriate. These conditions are selected from those published in the Federal Register that are particularly relevant to the construction and/or operation of this particular authorized activity. The complete text is available at our website https://www.lre.usace.army.mil/Missions/Regulatory- Program-and-Permits/ under “Detroit Regulatory Quick” select “Detroit District General Permit Types” and then choose “Nationwide Permits with Michigan Regional Conditions” OR “Nationwide Permits with Indiana Regional Conditions”; or, you may contact the Detroit District directly for the information. We have done our best to verify that your project complies with the others, where applicable.
1. Navigation. (b) Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee’s expense on authorized facilities in navigable waters of the United States.
(c) The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States.
No claim shall be made against the United States on account of any such removal or alteration.
6. Suitable Material. No activity may use unsuitable material (e.g., trash, debris, car bodies, asphalt, etc.).
Material used for construction or discharged must be free from toxic pollutants in toxic amounts (see section 307 of the Clean Water Act).
9. Management of Water Flows. To the maximum extent practicable, the pre-construction course, condition, capacity, and location of open waters must be maintained for each activity, including stream channelization, storm water management activities, and temporary and permanent road crossings, except as provided below. The activity must be constructed to withstand expected high flows. The activity must not restrict or impede the passage of normal or high flows, unless the primary purpose of the activity is to impound water or manage high flows. The activity may alter the pre- construction course, condition, capacity, and location of open waters if it benefits the aquatic environment (e.g., stream restoration or relocation activities).
11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance.
12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date. Permittees are encouraged to perform work within waters of the United States during periods of low-flow or no-flow, or during low tides.
13. Removal of Temporary Fills. Temporary fills must be removed in their entirety and the affected areas returned to pre-construction elevations. The affected areas must be revegetated, as appropriate.
14. Proper Maintenance. Any authorized structure or fill shall be properly maintained, including maintenance to ensure public safety and compliance with applicable NWP general conditions, as well as any activity-specific conditions added by the district engineer to an NWP authorization.
17. Tribal Rights. No NWP activity may cause more than minimal adverse effects on tribal rights (including treaty rights), protected tribal resources, or tribal lands.
18. Endangered Species. (a) No activity is authorized under any NWP which is likely to directly or indirectly jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such species. No activity is authorized under any NWP which ‘‘may affect’’ a listed species or critical habitat, unless ESA section 7 consultation addressing the effects of the proposed activity has been completed. Direct effects are the immediate effects on listed species and critical habitat caused by the NWP activity. Indirect effects are those effects on listed species and critical habitat that are caused by the NWP activity and are later in time, but still are reasonably certain to occur.
(e) Authorization of an activity by an NWP does not authorize the ‘‘take’’ of a threatened or endangered species as defined under the ESA. In the absence of
-5-separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with ‘‘incidental take’’ provisions, etc.) from the FWS or the NMFS, the Endangered Species Act prohibits any person subject to the jurisdiction of the United States to take a listed species, where ‘‘take’’ means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct.
The word ‘‘harm’’ in the definition of ‘‘take’’ means an act which actually kills or injures wildlife. Such an act may include significant habitat modification or degradation where it actually kills or injures wildlife by significantly impairing essential behavioral patterns, including breeding, feeding or sheltering.
19. Migratory Birds and Bald and Golden Eagles. The permittee is responsible for ensuring their action complies with the Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting appropriate local office of the U.S. Fish and Wildlife Service to determine applicable measures to reduce impacts to migratory birds or eagles, including whether ‘‘incidental take’’ permits are necessary and available under the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity.
20. Historic Properties. (e) Prospective permittees should be aware that section 110k of the NHPA (54 U.S.C. 306113) prevents the Corps from granting a permit or other assistance to an applicant who, with intent to avoid the requirements of section 106 of the NHPA, has intentionally significantly adversely affected a historic property to which the permit would relate, or having legal power to prevent it, allowed such significant adverse effect to occur, unless the Corps, after consultation with the Advisory Council on Historic Preservation (ACHP), determines that circumstances justify granting such assistance despite the adverse effect created or permitted by the applicant. If circumstances justify granting the assistance, the Corps is required to notify the ACHP and provide documentation specifying the circumstances, the degree of damage to the integrity of any historic properties affected, and proposed mitigation. This documentation must include any views obtained from the applicant, SHPO/ THPO, appropriate Indian tribes if the undertaking occurs on or affects historic properties on tribal lands or affects properties of interest to those tribes, and other parties known to have a legitimate interest in the impacts to the permitted activity on historic properties.
21. Discovery of Previously Unknown Remains and Artifacts. If you discover any previously unknown historic, cultural or archeological remains and artifacts while accomplishing the activity authorized by this permit, you must immediately notify the district engineer of what you have found, and to the maximum extent practicable, avoid construction activities that may affect the remains and artifacts until the required coordination has been completed.
The district engineer will initiate the Federal, Tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.
29. Transfer of Nationwide Permit Verifications. If the permittee sells the property associated with a nationwide permit verification, the permittee may transfer the nationwide permit verification to the new owner by submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the nationwide permit verification must be attached to the letter, and the letter must contain the following statement and signature:
When the structures or work authorized by this nationwide permit are still in existence at the time the property is transferred, the terms and conditions of this nationwide permit, including any special conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this nationwide permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below.
(Transferee) (Date)
30. Compliance Certification. Each permittee who receives an NWP verification letter from the Corps must provide a signed certification documenting completion of the authorized activity and implementation of any required compensatory mitigation. The success of any required permittee-responsible mitigation, including the achievement of ecological performance standards, will be addressed separately by the district engineer. The Corps will provide the permittee the certification document with the NWP verification letter. The certification document will include:
(a) A statement that the authorized activity was done in accordance with the NWP authorization, including any general, regional, or activity-specific conditions;
(b) A statement that the implementation of any required compensatory mitigation was completed in accordance with the permit conditions. If credits from a mitigation bank or in-lieu fee program are used to satisfy the compensatory mitigation requirements, the certification must include the documentation required by 33 CFR 332.3(l)(3) to confirm that the permittee secured the appropriate number and resource type of
-6-credits; and
(c) The signature of the permittee certifying the completion of the activity and mitigation. The completed certification document must be submitted to the district engineer within 30 days of completion of the authorized activity or the implementation of any required compensatory mitigation, whichever occurs later.
B. Further Information
1. District Engineers have authority to determine if an activity complies with the terms and conditions of an
NWP.
2. NWPs do not obviate the need to obtain other federal, state, or local permits, approvals, or authorizations required by law.
3. NWPs do not grant any property rights or exclusive privileges.
4. NWPs do not authorize any injury to the property or rights of others.
5. NWPs do not authorize interference with any existing or proposed Federal project.
-10-
NATIONWIDE PERMIT COMPLETION REPORT
CELRE-ERC
Chief, Compliance and Enforcement Branch Regulatory Office U.S. Army Corps of Engineers 477 Michigan Avenue Room 603 Detroit, MI 48226-2550
Dear Sir:
You are hereby notified that work verified as qualifying for Nationwide Permit under File No. LRE-2007-00967-38-N20 to modify a dock in Lake Superior at Rock Harbor, Isle Royale National Park, Keweenaw County, Michigan, issued to Daniel Mannheim USDOT, was completed in accordance with the verification on:
(Date work completed)
(Permittee's Signature)
I M P O R T A N T
1. This COMPLETION REPORT MUST BE MAILED to the above addressee within 10 days after completion of work covered by the NATIONWIDE PERMIT to insure an accurate Government record of data affecting navigation.
2. Where dredging soundings are made of projects which include dredging, a copy of the soundings should accompany this report. If the soundings are measured from the water surface and have not been corrected to International Great Lakes Datum plane, the hour and date soundings was made should be noted on sounding reports.
CHARLES
MARSHALL
ROBERTS
No. 50339
MASSACHUSETTS
OF
CO
M
MO
NW
EALTH
REG IS T ERED
PRO FES S IO NA L ENGIN
EE
R
CIVIL
H7RGMJMB
Typewritten Text
NUMBER: LRE-2007-00967-38-N20
ISLE ROYALE NATIONAL PARK- RIPRAP, MODIFY DOCK
Lake Superior; Rock Harbor (Snug Harbor) Keweenaw Co.; MICHIGAN
SHEET 1 OF 10
CHARLES
MARSHALL
ROBERTS
No. 50339
MASSACHUSET TS
OF
CO
M
M O
NW
EA
LTH
REG IS T ERED
P
RO
FES S IONA L ENGIN
EE
R
CIVIL
H7RGMJMB
Typewritten Text
NUMBER: LRE-2007-00967-38-N20
ISLE ROYALE NATIONAL PARK- RIPRAP, MODIFY DOCK
Lake Superior; Rock Harbor (Snug Harbor)
SHEET 2 OF 10
NUMBER: LRE-2007-00967-38-N20
ISLE ROYALE NATIONAL PARK- RIPRAP, MODIFY DOCK
Lake Superior; Rock Harbor (Snug Harbor)
SHEET 3 OF 10
NUMBER: LRE-2007-00967-38-N20
ISLE ROYALE NATIONAL PARK- RIPRAP, MODIFY DOCK
Lake Superior; Rock Harbor (Snug Harbor)
SHEET 4 OF 10
NUMBER: LRE-2007-00967-38-N20
ISLE ROYALE NATIONAL PARK- RIPRAP, MODIFY DOCK
Lake Superior; Rock Harbor (Snug Harbor)
SHEET 5 OF 10
NUMBER: LRE-2007-00967-38-N20
ISLE ROYALE NATIONAL PARK- RIPRAP, MODIFY DOCK
Lake Superior; Rock Harbor (Snug Harbor)
SHEET 6 OF 10
NUMBER: LRE-2007-00967-38-N20
ISLE ROYALE NATIONAL PARK- RIPRAP, MODIFY DOCK
Lake Superior; Rock Harbor (Snug Harbor)
SHEET 7 OF 10
NUMBER: LRE-2007-00967-38-N20
ISLE ROYALE NATIONAL PARK- RIPRAP, MODIFY DOCK
Lake Superior; Rock Harbor (Snug Harbor)
SHEET 8 OF 10
NUMBER: LRE-2007-00967-38-N20
ISLE ROYALE NATIONAL PARK- RIPRAP, MODIFY DOCK
Lake Superior; Rock Harbor (Snug Harbor)
SHEET 9 OF 10
NUMBER: LRE-2007-00967-38-N20
ISLE ROYALE NATIONAL PARK- RIPRAP, MODIFY DOCK
Lake Superior; Rock Harbor (Snug Harbor)
SHEET 10 OF 10
| 2021-01-08T15:39:18-0500 | |
| BATTLE.JEAN.MARY.1230519427 |
File details come from the government source that posted it. Updated .