Attachment J.25 Relevant Corporate Experience Offeror must submit this form, Relevant Corporate Experience, addressing the following:
Factor 1, Scope - The Offeror must demonstrate scope for Relevant Corporate Experience, provide no more than three (3) recent contracts/projects, within five (5) years of the issuance of this SIR. The Offeror must provide three (3) different types of design (SOW Section 3.2.6) and/or installation (SOW Section 3.2.7) projects of the five (5) following classifications, a minimum of one submission must be for an installation project:
i. Engine Generator (EG), 20 kW or larger;
ii. Uninterruptible Power Supplies (UPS), facility size 10 kVA or larger;
iii. Fuel Storage Tank (FST) Systems, 250 gallon tank or larger with environmental monitoring;
iv. Underground cabling (direct buried) for Electrical Line Distribution (ELD) of a minimum of 1,000 feet, to include splicing and terminations; and
v. Lightning Protection, Grounding, Bonding and Shielding (LPGBS).
Factor 2, Complexity - Must demonstrate complexity by completion of Block 9 of the contracts/projects submitted simultaneously at multiple facilities throughout the United States and/or its territories that overlap by a minimum of fourteen (14) calendar days. If two (2) of the three (3) projects listed in Block 8 do not have Project Start/Completion dates that overlap by a minimum of fourteen (14) calendar days, the Offeror must supply associated information for another project that meets the scope of Section 1.0 of the SOW. The work identified from Section 1.0 must overlap by a minimum of fourteen (14) calendar days with another project submitted in Block 8.
This form must be completed, in its entirety in 12 point Times New Roman font, to be considered. Offerors submitting an incomplete form may be considered non-responsive and given no further consideration.
This form can be on completed government and/or commercial sector design and/or installations. Scope and complexity may be represented on one contract/project or be represented on separate contract(s)/project(s) providing same or similar services; within five (5) years of the issuance of the SIR. Offeror must not use more space than provided and must not modify the form in anyway.
Block 2 must be completed with only one email address, and be for the individual authorized to communicate on behalf of the Offeror.
1. Offeror Name:
2. Offeror Email Address:
| 3. Contract Number (s): |
| A. |
B.
C.
4. Issuing Office:
A.
| 5. Total Estimated Value of the Contract/Projects (s): |
| A. |
| 6. Period of Performance(s): |
| A. |
| 7. Place(s) of Performance: |
| A. |
8. Factor 1, Scope - The information provided in this Block must reference the information submitted in Blocks 3 through 7. Provide no more than three (3) recent contracts/projects, within five (5) years of the issuance of the SIR directly relating to design (SOW Section 3.2.6) and/or installation (SOW Section 3.2.7) projects of the five (5) following types:
EG, 20 kW or larger? YES☐ or NO ☐ Project Title:
Select the letter for the contract number from Block 3 for this project? A B C Please check the appropriate box. ☐ DESIGN ☐ INSTALLATION If yes, provide details of effort to include type of facility:
START DATE: COMPLETION DATE: FACILITY TYPE:
UPS, 10 kVA facility size or larger? YES☐ or NO ☐ Project Title:
Select the letter for the contract number from Block 3 for this project? A B C Please check the appropriate box. ☐ DESIGN ☐ INSTALLATION
START DATE: COMPLETION DATE: FACILITY TYPE:
FST Systems, 250 gallon tank or larger with environmental monitoring?
YES☐ or NO ☐ Project Title:
Select the letter for the contract number from Block 3 for this project? A B C Please check the appropriate box. ☐ DESIGN ☐ INSTALLATION
START DATE: COMPLETION DATE: FACILITY TYPE:
Underground cabling (direct buried) for Electrical Line Distribution of a minimum of 1,000 feet, to include splicing and terminations?
Select the letter for the contract number from Block 3 for this project? A B C Please check the appropriate box. ☐ DESIGN ☐ INSTALLATION
START DATE: COMPLETION DATE: FACILITY TYPE:
Lightning Protection, Grounding, Bonding and Shielding (LPGBS)?
Select the letter for the contract number from Block 3 for this project? A B C Please check the appropriate box. ☐ DESIGN ☐ INSTALLATION
START DATE: COMPLETION DATE: FACILITY TYPE:
9. Factor 2, Complexity - Select A or B.
☐A) Which work, outlined in Block 8, was performed simultaneously and that overlap by a minimum of 14 Calendar days? Select at least two of the following:
I. EG ☐
II. UPS ☐
III. FST ☐
IV. ELD ☐
V. LPGBS ☐
☐B) If 2 of the 3 projects listed in Block 8 do not have Project Start/Completion dates that overlap by a minimum of 14 Calendar days, the offeror must supply associated information for another project that meets the scope of Section 1.0 of the SOW. The work identified from Section 1.0 must overlap by a minimum of 14 Calendar days with another project submitted in Block 8.
Please check the appropriate box. ☐ DESIGN ☐ INSTALLATION
START DATE: COMPLETION DATE: FACILITY TYPE: