J.1.(b).7 PWS Requirements _Past Performance Relevancy Matrix.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Aircraft and Spaceflight Systems Engineering Support Services (ASSESS) Federal contract opportunity
- Solicitation number
- 80ARC023R0006
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS Requirements Matrix
| 80ARC023R0006 | Attachment J.1.(b).7 | |||||||
| Proposed Allocation of PWS Requirements by Team Member | ||||||||
| State Percentage of Requirements Proposed to be Performed on this Contract for the Offeror and its Major Subcontractor(s) | ||||||||
| PWS | ||||||||
| Section | PWS | |||||||
| Description | (Insert Company Name of Prime Offeror) | (Insert Company Name of Major Subcontract #1, if proposed) | (Insert Company Name of Major Subcontract #2, if proposed) | (Insert Company Name of Major Subcontract #3, if proposed) | (Insert Company Name of Major Subcontract #4, if proposed) | Total | ||
| 2.1 | Contract Management | 0% | ||||||
| 2.2.2.1 | Aerodynamics | 0% | ||||||
| 2.2.2.2 | Aerothermodynamics | 0% | ||||||
| 2.2.2.3 | Aeroacoustics | 0% | ||||||
| 2.2.2.4 | Machine Learning | 0% | ||||||
| 2.2.2.5 | Materials Design/Manufacturing/Test/Evaluation/Development and Implementation | 0% | ||||||
| 2.2.2.6 | Systems Analysis, Engineering, Design, and Development | 0% | ||||||
| 2.2.2.7 | Structures Analysis | 0% | ||||||
| 2.2.2.8 | Engineering Risk Anaysis | 0% | ||||||
| 2.2.2.9 | Systems Integration | 0% | ||||||
| 2.2.2.10 | Project Management Support | 0% | ||||||
| Instructions to Offerors: |
The Offeror (Prime Contractor and its Major Subcontractor(s), if proposed) must complete this PWS Requirements Matrix to state its proposed approach for which PWS requirements for this contract will be performed by the Prime Contractor, and its Major Subcontractors, if proposed. For each PWS Section above, state the percentage of work the Prime Contractor and each of its Major Subcontractors, if proposed, will perform on this contract. The percentages assigned to the Prime Contractor and its Major Subcontractor(s), if proposed, should sum to 100% for each PWS Section in Column H. In any instance where the total for a PWS Section is less than 100% in Column H then the Government will conclude that the remaining percentage of work will be performed by the Offeror's subcontracts that do not meet the criteria to clasify as a Major Subcontractor. In any instance where the total for a PWS Section is greater than 100% in Column H then the Government will reduce the percentage of work to be performed for that PWS Section for the Prime and each Major Subcontractor by the average percentage over 100% (i.e., (Proposed percentage over 100%/total prime and major subcontracts = amount each prime and major subcontractor proposed to perform). Enter numbers in the green fields only. The template will automatically sum the inputs. The Offeror may add additional colums between current Column E and F if the Offeror has more than 4 Major Subcontractors.
Examples to Offeror to Demonstrate How to Procvide Inputs in Matrix:
Example 1 (1 Prime/1 Sub): Prime Contractor is proposed to perform all the work for Section 2.1 Phase-In. Enter "100" in cell C4 and "0" in cells D4 through G4. Cell H4 will display "100%". Example 2 (1 Prime/2 Major Subs): Major Subs are proposed to perform all the work for PWS Section 2.6 Permitting & Compliance equally. Enter "0" in cell C9, "50" in cell D9, "50" in cell E9, and "0" in cell F9 and G9. Cell H9 will display "100%". Please verify that inputs accurately reflect your proposed breakdown of PWS work before submitting the completed Matrix with the Offerors proposal.
Past Perf. Relevancy Matrix
| Proposed Relevance of Past Performance Contract References in Relations to the Contract PWS Requirements by Team Member (Prime and Major Subcontracors) | ||||||||||||
| Identify which PWS Requirements from this Contract were Performed on Each Past Performance Reference by Team Member (Prime and Major Subcontracors) | ||||||||||||
| Performed as a Prime or Subfactor on Past Performance Contract Reference | PWS Section 2.1 Contract Management | PWS 2.2.2.1 Aerodynamics | PWS Section 2.2.2.2 Aerothermodynamics | PWS Section 2.2.2.3 Aeroacoustics | PWS Section 2.2.2.4. Machine Learning | PWS Section 2.2.2.5 Materials Design/Manufacturing/Test/Evaluation/Development and Implementation | PWS Section 2.2.2.6 Systems Analysis, Engineering, Design, and Development | PWS Section 2.2.2.7 Structures Analysis | PWS Section 2.2.2.8 Engineering Risk Analysis | PWS Section 2.2.2.9 Systems Integration | PWS Section 2.2.2.10 Project Management Support | |
| Prime Offeror Past Performance References: |
(Insert Company Name)
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| Major Subcontractor #1 Past Performance References: |
(Insert Company Name)
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| Major Subcontractor #2 Past Performance References: |
(Insert Company Name)
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| Major Subcontractor #3 Past Performance References: |
(Insert Company Name)
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| Major Subcontractor #4 Past Performance References: |
(Insert Company Name)
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
| (Insert Contract Number and Name) |
Instructions to Offerors:
Offerors shall complete this past performance contract reference proposed relevancy matrix. In Column A, for each individual past performance contract reference, provide the name of the Prime Contractor or Major Subcontractor the past performance contract reference applies to. Also, include the contract number and contract name for each past performance contract reference. In Column B, include a “P” or “S” to indicate whether the Prime Offeror or its Major Subcontractor(s) was a Prime Contractor or a Subcontractor for that particular past performance contract reference. For all remaining columns, state an “X” in each column where the individual past performance contract reference included similar experience to the requirements in PWS Section identified in Row 3 of Columns B-L. The Offeror may add additional rows after row 23 if the Offeror has more than 4 Major Subcontractors.
File details come from the government source that posted it. Updated .