J-7 MSC Ship Repair Facility Survey.docx
DOCX document 200 KB Posted
- Solicitation number
- N3220526R6052
About this file
This is a Military Sealift Command (MSC) Ship Repair Facility Survey form used to collect detailed information about shipyard capabilities and infrastructure. The form is associated with the Post Shakedown Availability (PSA) repair contract for USNS LUCY STONE (T-AO 209), a naval auxiliary oiler, identified under solicitation number N3220526R6052.
The survey captures comprehensive facility data including building ways dimensions, launching capabilities, dry dock specifications (floating, graving, and marine railway), berthing capacity, and depth of water at various locations measured at mean low water (MLW). It documents available shipyard services such as fresh water, steam, electric power, fire protection, salt water, compressed air, and sanitary sewer capabilities, with specifications for gallons per minute, pressure, voltage, and amperage ratings. The form also requires detailed information on cranes and lifting equipment (3 tons or over), including capacity, reach, height, and certification dates; navigational restrictions including channel depth/width and bridge clearances; storage space dimensions for components and materials; principal shop locations and dimensions (fabricating, sheet metal, welding, machine, electrical, pipe, foundry, and other specialized shops); and equipment capabilities. Required submittals include a yard plot plan, certified water depth plot, machine tool inventories by shop, a statement of previous ship repair work completed with dates and dollar amounts, personnel qualifications, employment levels across management and production categories, and point of contact information. The form also requests certification status as a small business.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3220526R6052 Solicitation Amendment 0001.pdf | ||
| J-2 USNS LUCY STONE PSA 26R6052.xlsx | XLSX spreadsheet | |
| J-4 GFP Attachment (LUCY STONE) (PSA-2027-01-15).xlsx | XLSX spreadsheet | |
| J-11 Dry Dock Evaluation Form (for N10) MILK PSA.docx | DOCX document | |
| J-3 USNS LUCY STONE PSA.xlsx | XLSX spreadsheet | |
| J-12 Past Perf Data.docx | DOCX document | |
| J-10 Interport Differential LST PSA.doc.docx | DOCX document | |
| J-8-RFC(2022.12.28).docx | DOCX document | |
| J-13- Past Perf Questionaire.docx | DOCX document | |
| J-9 Disclsr Lobbying Activities SF-LLL.doc | DOC document | |
| J-14 Technical NDA.docx | DOCX document | |
| Solicitation - N3220526R6052.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220526R6052 USNS LUCY STONE(T-AO 209)
MSC SHIP REPAIR FACILITY SURVEY
NOTE: If survey form has been previously submitted, then enter changes only.
DATE:
SHIPYARD AND ADDRESS
Commander (Code M-4E3) Military Sealift Command Norfolk, VA 23511
SHIPYARD DATA
Telephone No:
Telex No:
Date Found:
BUILDING WAYS (M. I. W.)
NO. LAUNCHING DIMENSIONS MAXIMUM SHIP SIZE
OF (check one) (ton 2,240 lbs)
WAY
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
DEPTH OF WATER
CRANES SERVING WAY
CERTIFICATION DATE &
CERTIFIED BY WHOM
LIFT CAPACITY
(std. tons)
TYPE
NO.
AT DROP
OFF
OVER
WAY END
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] BASIN WIDTH: WIDTH:
[ ] BASIN WIDTH: WIDTH:
[ ] BASIN WIDTH: WIDTH:
[ ] BASIN WIDTH: WIDTH:
LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.
TIDAL RANGE (DIFF. OF M.L. M.H)
IS SNUBBING NECESSARY?
YES NO
IS FIRE PROTECTION AVAILABLE
ON BUILDING WAY?
YES NO
SHEET 1 OF 5
DOCK
MAXIMUM SHIP SIZE
ACCOMMODATED
LENGTH OA-BEAM
LENGTH
at coping (GD), at keel blocks OVERALL on cradle (MR), on PONTOON
(FD)
CLEAR WIDTH
at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height
DEPTH/DRAFT
OVER OVER OVER
SILL FLOOR KEEL
(GD) BLOCKS
LIFTING CAPACITY
(ton 2,240)
DATE CERTIFIED, CERTIFIED BY WHOM, &
DATE CERTIFICATION EXPIRES
DRY DOCKS (continued)
MATERIAL TYPE
Floating--(FD) Graving--(GD) Marine Railway (MR)
DOCK
SERVICES AVAILABLE
(use abbreviation of service below)
USE
REPAIR/
OUTFIT-
ING
HEIGHT
OF
DOCK
(M.L.W.)
OUT-
BOARD
IN-
BOARD
TYPE
LENGTH
(actual & usable)
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
WATER DEPTH
(M. L. W.)
| BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.) | DRY DOCKS (means high water) | ||
| MSC SHIP REPAIR FACILITY SURVEY (continued) | SHIPYARD: |
LEGEND (abbreviation of services) Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.
Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO
MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:
BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)
MAX REACH HEIGHT OF HOOK
NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM & (STD TONS) (BRIDGE) AT REACH LENGTH HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES
DISTANCE TO NEAREST DISTANCE TO NEAREST AIRPORT
RAILROAD CONNECTION (identify)
NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)
MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES
LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions)
| SHIPYARD: | |
| MSC SHIP FACILITY SURVEY (continued) |
STORAGE SPACE FOR COMPONENTS AND MATERIALS
(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)
PRINCIPAL SHOPS AND BUILDINGS
ALL OTHER SHOPS
(LIST NAMES AND DIMENSIONS)
LARGEST EXIT
WIDTH HEIGHT
DIMENSIONS OF
SHOP OR BUILDING
NAME OF SHOP
OR BUILDING
FABRICATING
PLATE
SHEET METAL
SUBASSEMBLY
WOOD WORKING
BOAT ASSEMBLY
OR MOLDING
BOILER
MACHINE
ELECTRICAL
ELECTRONIC
PIPE
FOUNDRY
RIGGER
RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________
WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________
ACREAGE LEGALLY CONTROLLED
IN USE DEVELOPED TOTAL
LIST TYPES OF WORK NORMALLY SUBCONTRACTED
| SHIPYARD: | |
| MSC SHIP REPAIR FACILITY SURVEY (continued) |
LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM
REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:
1. PLOT PLAN OF YARD.
2. CERTIFIED DEPTH OF WATER PLOT
3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND
EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.
4. A GENERAL STATEMENT (INCLUE, NAME OF SHIP, DATES, AND
DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN
ACCOMPLISHED BY THE APPLICANT.
5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP
REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE LINE
6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN
LIST EACH FACILITY AND ITS LOCATION.
7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM
(NAME/TITLE/PHONE NUMBER).
NORMAL
SHIFTS
NORMAL
MAXIMUM
POTENTIAL MAXIMUM
CURRENT
CURRENT
EMPLOYMENT
MANAGEMENT, ADMINISTRATION
PROFESSIONAL ENGINEERING
PRODUCTION SKILLED
PRODUCTION UNSKILLED
NONPRODUCTION
TOTAL:
ARE YOU CERTIFIED AS A SMALL BUSINESS ? YES NO
NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED
ATTACHMENT J - 7 MSC Form 4330/26