J-3 USNS LUCY STONE PSA.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
USNS LUCY STONE (T-AO 209) FY27 Post Shakedown Availability (PSA)
Solicitation number
N3220526R6052
Issued by

About this file

This is a contractor price breakdown document for Work Package J-3 related to the USNS LUCY STONE (T-AO 209) Post Shakedown Availability (PSA) contract (N3220526R6052) awarded to a prime contractor with potential subcontractor involvement. The pricing template establishes the cost structure for Category "B" items across multiple service and maintenance work areas.

The document outlines pricing for three primary service categories: General Services and Requirements (including physical security at the contractor facility with four condition-based events/days); Continuation of Services (covering 15-day periods for overhaul management, general ship services, information technology, project planning, fire protection, shipboard access/security, and gas-free certifications); and Drydocking services (including CPP blade machining repairs and vessel drydocking/undocking with unit pricing up to 15 days). All line items in the submitted document show zero or placeholder pricing, indicating this is a template structure. The breakdown requires contractors to separately identify prime contractor labor and material costs, subcontractor labor and material costs, mandated subcontractor pricing, and other associated costs for each work item, with subtotal calculations provided for each major work section.

View the file

Other files

File Type Posted
N3220526R6052 Solicitation Amendment 0001.pdf PDF
J-13- Past Perf Questionaire.docx DOCX document
J-9 Disclsr Lobbying Activities SF-LLL.doc DOC document
J-14 Technical NDA.docx DOCX document
Solicitation - N3220526R6052.pdf PDF
J-7 MSC Ship Repair Facility Survey.docx DOCX document
J-2 USNS LUCY STONE PSA 26R6052.xlsx XLSX spreadsheet
J-4 GFP Attachment (LUCY STONE) (PSA-2027-01-15).xlsx XLSX spreadsheet
J-11 Dry Dock Evaluation Form (for N10) MILK PSA.docx DOCX document
J-12 Past Perf Data.docx DOCX document
J-10 Interport Differential LST PSA.doc.docx DOCX document
J-8-RFC(2022.12.28).docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WorkPackage J-3 Report

CONTRACTOR PRICE BREAKDOWN
CATEGORY "B" ITEMS
N3220526R6052
Contractor's price will be broken down for each item of the specification, as follows:
GENERAL REQUIREMENTQTYUIUNIT PRICETOTALPRIME CONTRACTORSUBCONTRACTORMANDATED SUBOTHER COSTS
ITEM NO.TITLE CAT B ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICEPRICETOTAL PRICE
CATEGORY "B"
000GENERAL SERVICES AND REQUIREMENTS
025TAO205-SWI-PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY REV 20FEB21
7.1Establish Condition Delta1Event$ 0.00$ 0.000$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.1Establish Condition Charlie1Event$ 0.00$ 0.000$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.2Maintain Condition Delta1Day$ 0.00$ 0.000$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.2Maintain Condition Charlie1Day$ 0.00$ 0.000$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
NAEstimate0NA$ 0.00$ 0.000$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
WI 025 SUBTOTAL4
030TAO205-SWI-CONTINUATION OF SERVICES REV 20FEB21
7.1Overhaul Management Team15Day$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.2General Services for the ship15Day$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.3Information Technology Services15Day$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.4Project Planning and Monitoring15Day$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.5Fire Protection and Ship's Safety15Day$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.6Shipboard Access and Security15Day$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
7.7Gas Free Certificates15Day$ - 0$ - 00$ - 0$ - 00$ - 0$ - 0$ - 0$ - 0
WI 030 SUBTOTAL
900DRYDOCKING
917CPP BLADE MACHINING
7.0Machining Repairs to the CPP BLADES1lot$ 0.00$ 0.000$ 0.00$ 0.000$ 0.00$ - 0$ - 0$ - 0
WI 911 SUBTOTAL1
951TAO205-CCSI-DRYDOCKING AND UNDOCKING THE VESSEL
7.1Submit unit price per day up to a maximum of 15 days to continue all services in accordance with parent item if directed15DAY$ 0.00$ 0.000$ 0.00$ 0.000$ 0.00$ - 0$ - 0$ - 0
WI 951 SUBTOTAL15
TOTAL