J-2 USNS LUCY STONE PSA 26R6052.xlsx
XLSX spreadsheet 29 KB Posted
- Solicitation number
- N3220526R6052
About this file
This is a Government Price Breakdown document for Work Package J-2 related to the USNS Lucy Stone (T-AO 205) Post Shakedown Availability (PSA) contract N3220526R6052. The spreadsheet outlines Category "A" items with corresponding labor hours and material costs for both prime contractors and subcontractors across multiple work categories, though all line items currently show zero labor hours and zero dollar amounts, indicating this is a template or preliminary pricing structure awaiting actual cost data.
The work package encompasses comprehensive ship maintenance and modernization services organized into nine major categories: General Services and Requirements (including office furnishings, IT services, safety programs, and vessel delivery); Hull and Structural (fire screen doors, stability tests, access platforms, flight deck preservation); Propulsion Machinery (main engine overhaul support, gear inspections, automation surveys); Electrical (UPS services, switchboard cleaning, thermography surveys, generator inspections); Communication and Navigation (antenna maintenance, integrated bridge equipment, gyro services, radio equipment recertification); Auxiliary Machinery (engine services, HVAC maintenance, cargo systems, pressure vessel inspections, firefighting systems, personnel elevators); Habitability Outfitting and Furnishings (galley and laundry equipment, lifeboat inspections, life raft certification); HVAC (package air units, ventilation system cleaning); and Drydocking (vessel undocking, propeller maintenance, hull preservation, cathodic protection). The document serves as a pricing framework for the Navy's post-shakedown availability work on the T-AO 205 vessel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3220526R6052 Solicitation Amendment 0001.pdf | ||
| J-7 MSC Ship Repair Facility Survey.docx | DOCX document | |
| J-13- Past Perf Questionaire.docx | DOCX document | |
| J-9 Disclsr Lobbying Activities SF-LLL.doc | DOC document | |
| J-14 Technical NDA.docx | DOCX document | |
| Solicitation - N3220526R6052.pdf | ||
| J-4 GFP Attachment (LUCY STONE) (PSA-2027-01-15).xlsx | XLSX spreadsheet | |
| J-11 Dry Dock Evaluation Form (for N10) MILK PSA.docx | DOCX document | |
| J-3 USNS LUCY STONE PSA.xlsx | XLSX spreadsheet | |
| J-12 Past Perf Data.docx | DOCX document | |
| J-10 Interport Differential LST PSA.doc.docx | DOCX document | |
| J-8-RFC(2022.12.28).docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WorkPackage J-2 Report
| GOVERNMENT PRICE BREAKDOWN | |||||||||
| CATEGORY "A" ITEMS | |||||||||
| N3220526R6052 | |||||||||
| GENERAL REQUIREMENT | PRIME CONTRACTOR | SUBCONTRACTOR | OTHER COSTS | ||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | TOTAL PRICE | |
| CATEGORY "A" | |||||||||
| 000 | GENERAL SERVICES AND REQUIREMENTS | ||||||||
| 010 | TAO205-SWI-FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 011 | TAO205-SWI-GENERAL SERVICES FOR SHIP (T-AO 205) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 012 | TAO205-SWI-INFORMATION TECHNOLOGY SERVICES | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 013 | TAO205-SWI-PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 014 | TAO205-SWI-WEIGHT AND MOMENT REPORT | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 015 | TAO205-SWI-ILS GFM | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 016 | TAO205-SWI-FIRE PROTECTION AND SHIPS SAFETY PROGRAM | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 017 | TAO205-SWI-HANDLING SHIPS STORES | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 018 | TAO205-SWI-DELIVERY AND REDELIVERY OF THE VESSEL | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 019 | TAO205-SWI-SHIPBOARD ACCESS AND SECURITY | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 020 | TAO205-SWI-GAS FREE CERTIFICATES | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 021 | TAO205-SWI-CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS, AND SPACES | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 022 | TAO205-SWI-MACHINERY SPACE TURN-OVER DOCK TRIALS AND SEA TRIALS | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 023 | TAO205-SWI-HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 100 | HULL AND STRUCTURAL | ||||||||
| 101 | 208AF CHANGE FIRE SCREEN DOORS (T-ALT 205-0167) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 128 | TAO205 STABILITY TEST | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 130 | PERSONNEL ACCESS AMR to MMR 1st PLT ACCESS (T-ALT 205-0016) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 134 | 208AF ATFP GUN STATION AWNING INSTALLATION (T-ALT 205-0175) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 135 | CARGO POTABLE WATER ROOM PERSONNEL ACCESS INSTALL (T-ALT 205-0055) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 137 | REMOVABLE HANDRAILS ON TANK DECK(T-ALT 205-0069) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 140 | BRIDGE WING STEP PLATFORMS(T-ALT 205-0101) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 156 | T-AO 205 CCSI FLIGHT DECK PRESERVATION (10YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 163 | T-AO 205 CCSI FLIGHT DECK SAFETY NET INSPECTION AND TEST | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 170 | EXHAUST STACK PRESERVATION | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 177 | MISC. TANK PRESERVATION | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 200 | PROPULSION MACHINERY | ||||||||
| 201 | STL MODIFICATIONS (T-ALT 205-0081) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 203 | T-AO 205 MAIN ENGINE OVERHAUL INDUSTRIAL SUPPORT | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 210 | SWAP CPP OD BOX MECHANICAL & ELECTRONIC INDICATORS (T-ALT 205-0082) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 217 | T-AO 205 CSI ABS AUTOMATION SURVEY (1 YR) (SCSI) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 252 | T-AO 205 CCSI MAIN REDUCTION GEAR INSPECTION (5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 300 | ELECTRICAL | ||||||||
| 301 | 208 AF ATFP CEASE FIRE ALARM (T-ALT 205-0174) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 306 | TAO205-CSI-UPS MAJOR SERVICE (5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 307 | T-AO 205 CSI PTO PTI SERVICE (1 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 310 | UPS EMERGENCY SOURCE OF POWER (T-ALT 205-0006) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 312 | REFRIGERANT LEAK DETECTION (T-ALT 205-0010) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 313 | POTABLE WATER SYSTEM ALTERNATE POWER (T-ALT 205-0010) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 315 | 208AF GALLEY DOOR HOLDBACKS (T-ALT 205-0168) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 321 | REDUCTION GEAR PLC BATTERY BACKUP (T-ALT 205-0073) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 351 | TAO205-CSI-SWITCHBOARD CLEANING (2.5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 352 | TAO205-CCSI-LOAD CENTER CLEANING (2.5YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 353 | TAO205-CCSI-THERMOGRAPHY SURVEY (1 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 354 | TAO205-CSI-GENERATOR CLEANING AND INSPECTION (5YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 400 | COMMUNICATION AND NAVIGATION | ||||||||
| 401 | NGW ANTENNA FOUNDATION INDUSTRIAL SUPPORT | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 403 | T-AO205-CSI-DOPPLER SPEED LOG MAINTENANCE (2.5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 404 | T-AO205-CSI-TV DTS SERVICE (1YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 421 | 208AF DIAL TELEPHONE ADDITION (T-ALT 205-0166) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 450 | T-AO 205 CSI ANNUAL INTEGRATED BRIDGE EQUIPMENT | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 453 | T-AO205-CSI-ANNUAL GYRO SERVICE | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 454 | T-AO205-CCSI-ANNUAL VDR RECERTIFICATION | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 455 | T-AO208-CCSI-ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 456 | T-AO205-CCSI-MAGNETIC COMPASS SERVICE (2YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 457 | T-AOB205 CCSI EPIRB SHORE BASED MAINTENANCE | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 458 | T-AO 205 CCSI ANTENNA MAINTENANCE \(5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 459 | TAO205-CCSI-ECHO SOUNDER SERVICE (2.5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 460 | TAO205-CCSI-ANNUAL INSPECTION OF MANUALLY OPERATED ALARMS | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 469 | CIVMARWIN INDUSTRIAL SUPPORT | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 500 | AUXILIARY MACHINERY | ||||||||
| 501 | TAO205 -CSI-SSDG ENGINE SERVICE (5 YRS) (SCSI) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 502 | VCHT MODIFICATIONS (T-ALT 205-0102) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 503 | LTFW HEAD TANK EQUALIZATION LINE (T-ALT 205-0121) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 504 | 209 STEERING GEAR MODIFICATIONS (T-ALT 205-0169) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 505 | CHLOROPACPUMP STRAINER RECONFIGURATION (T-ALT 205-0126) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 506 | T-AO 205 CSI SSDG ENGINE FUEL INJECTOR MAINTENANCE | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 508 | T-AO205-CSI-HVAC WATER HEATER SERVICE (2.5YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 512 | CARGO FUEL TANK VENT MODIFICATIONS (T-ALT 205-0512) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 513 | TAO205-CSI-START AIR COMPRESSOR MAINTENANCE (6K HRS) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 520 | TAO205-CSI-AIR COMPRESSOR SERVICE (1YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 523 | TAO205-CSI-ENGINE ROOM OWS SERVICE AND OCM CERTIFICATION (SCSI) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 524 | TAO205-CSI-PTO COUPLING ALIGNMENT CHECKS (1 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 525 | FLUSH LT FRESH WATER SYSTEM | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 526 | TAO205 CSI- SCBA CASCADEFILL STATION HYDRO TEST (5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 527 | TAO205-CSI-CARGO CRANE INSPECTION (1YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 528 | CARGO REFRIGERATION RECEIVER REPLACEMENT (T-ALT 205-0124) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 529 | 208AF GAYLORD BOOSTER HEATER PIPING (T-AO 205-0171) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 531 | SHIP SERVICE AIR REDUNDANCY (T-ALT 205-0124) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 532 | PIPING SYSTEM ISOLATION VALVES (T-ALT 205-0003) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 533 | FUEL OIL PURIFIER CROSS CONNECT PIPING MODIFICATION (TAO 205-0004) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 534 | AIR SYSTEM INSTRUMENTATION & MONITORING (T-Alt 205-0008) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 535 | CONDENSATE DRAIN OVERBOARD MODIFICATIONS (T-ALT 205-0172) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 536 | STERN TUBE SEAL SWITCH TO CONTROL AIR (T-ALT 205-0013) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 537 | PUMP OVERHAULS | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 538 | SW STRAINER DRAINS PIPING MODS (T-Alt 205-0036) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 539 | WASTE OIL TANK DECANTING REQUIREMENTS (T-ALT 205-0027) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 540 | LTFW COOLER CLEANING SYSTEM (T-ALT 205-0031) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 541 | TAO205 CSI-CPP HYDRAULIC POWER PACK INSPECTION 91YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 542 | FORK TRUCK CHARGER REQUIREMENTS (T-Alt 205-0038) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 543 | TAO205 CSI-ANNUAL INCINERATOR SERVICE (ABS) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 544 | CARGO PUMP ROOM WATER & AIR CONNECTION MODS (T-ALT 205-0042) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 545 | INSTALL FLASH EVAPORATOR (T-ALT 205-0068) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 548 | WATER FOUNTAIN INSTALL (T-ALT 205-0058) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 550 | HTFW BUTTERFLY VALVE SEAT REPLACEMENT (T-ALT 205-0056) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 551 | LTFW BUTTERFLY VALVE SEAT REPLACEMENT (T-ALT 205-0056) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 552 | LTFW BUTTERFLY VALVE SEAT REPLACEMENT FOR ISO VALVES (T-ALT 205-0056) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 553 | TAO205-CCSI-PRESSURE VESSELS AND RELIEF VALVES (5YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 554 | TAO205-CCSI-INSPECT TEST AND CERTIFY MACHINERY SPACE CRANES AND HOISTS (1 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 558 | TAO205-CCSI-PERSONNEL ELEVATOR ANNUAL INSPECTION | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 561 | TAO205-CCSI-GAUGE CALIBRATION (1YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 562 | TAO205-CCSI-SCBA ANNUAL INSPECTION | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 563 | TAO205-CCSI-SCBA COMPRESSOR AND FILLING STATION INSPECTION | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 565 | TAO205-CCSI-FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 567 | TAO205-CCSI-FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1YR) (SCSI) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 568 | TAO205-CCSI-WATER MIST SPRAY SPRINKLER INSPECTION | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 569 | TAO205-CCSI-FIRE SMOKE DETECTION AND ALARM SYSTEM (1 YR) (SCSI) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 570 | TAO205-CCSI-PORTABLE FIRE EXTINGUISHING SERVICE (1 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 571 | TAO205-CCSI-FIRE AND SMOKE DAMPER SERVICE (1 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 572 | TAO205-CCSI-DEEP FAT FRYER AND RANGE HOOD FIRE EXTINGUISHING SYSTEM (1YR)(SCSI) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 573 | TAO205-CCSI-FIRE STATIONS AND HOSES (1 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 574 | TAO205-CCSI-FIRE DOORS AND SHUTTERS (1 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 575 | TAO205-CSI-SALT WATER SPRINKLING SYSTEM (1 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 592 | ADD SIGHT GLASSES TO CPP HEAD TANKS (T-ALT 205-0084) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 594 | MHE RHIB REFEULING SYSTEM ISOLATION VALVE REV A (T-ALT 205-0091) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 596 | CARGO REEFER SYSTEM MODIFICATIONS (T-ALT 205-0114) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 597 | CARGO STORES RELIEF PIPING MOD (T-ALT 0205-0193) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 600 | HABITABILITY OUTFITTING AND FURNISHINGS | ||||||||
| 601 | T-AO205-CSI-GALLEY EQUIPMENT SERVICE (2.5YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 602 | T-AO205-CSI-ANNUAL LAUNDRY EQUIPMENT SERVICE | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 603 | T-AO 205 CSI SPIDER MAN BASKETS OVERHAUL (1 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 605 | T-AO 205CSI LIFEBOAT DIESEL ENGINE MAINTENANCE (1 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 611 | CARGO PUMP ROOM MODIFICATIONS (T-ALT 205-0020) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 614 | CO2 HOSE REEL MODS (T-ALT 205-0040) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 619 | RAS FAS LOCKER WORKSPACE MODS (T-ALT 205-0014) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 623 | 208AF SHIPS LAUNDRY WASHER AND DRYER REPLACEMENT (T-ALT 205-0173) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 624 | 208AF GALLEY MODIFICATIONS (T-ALT 205-0164) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 651 | T-AO205-CSI-ANNUAL LIFEBOAT AND RESCUE BOAT AND DAVIT INSPECTION | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 653 | T-AO205-CCSI-ANNUAL RESCUE BOAT AND DAVIT INSPECTION | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 656 | T-AO205-CCSI-ANNUAL LIFE RAFT CERTIFICATION | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 657 | T-AO205-CSI-ACCOMMODATION LADDER INSPECTION (1 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 659 | T-AO 205 CCSI PILOT BOARDING EQUIPMENT (1YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 662 | T-AO205-CCSI-DEEP FAT FRYER INSPECTION (1 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 800 | HVAC | ||||||||
| 801 | 208AF PACKAGE AC UNITS IN EOS & RADIO (T-ALT 205-0170) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 851 | T-AO205-CCSI-GALLEY VENTILATION SYSTEM AND GAYLORD HOOD CLEANING (2.5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 852 | T-AO205-CCS-LAUNDRY VENT CLEANING (2.5YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 853 | T-AO205-CCSI-ACCOMMODATION SPACE VENT CLEANING (5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 900 | DRYDOCKING | ||||||||
| 901 | T-AO205-CCSI-DRYDOCKING AND UNDOCKING VESSEL | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 902 | T-AO205-CSI-PROPULSION SHAFT WEAR DOWN READINGS (2.5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 903 | T-AO205-CSI-SPUR CUTTER REPAIRS (2.5YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 904 | T-AO205-CSI-ZINC ANODE INSPECTION AND REPLACEMENT (2.5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 906 | T-AO205-CSI-PROPELLER SYSTEM MAINTENANCE (2.5 YR)(SCSI) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 907 | T-AO205-CSI-STERN TUBE SEAL SYSTEM MAINTENANCE (2.5 YR)(SCSI) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 916 | CPP BLADE BOLT MODIFICATION | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 953 | T-AO 205 CCSI ANCHORS, CHAINS, AND LOCKERS FULL BLAST (5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 954 | T-AO205-CCSI-RUDDER AND STERN FRAME EXAM (5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 956 | T-AO205-CCSI-OVERHAULING SEA VALVES (5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 957 | T-AO205-CCSI-PROPELLER CLEAN AND POLISH - ON DOCK (2.5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 959 | T-AO205-CCSI-UNDERWATER HULL CLEANING AND PAINTING SPOT BLAST (2.5YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 961 | T-AO205-CCSI-FREEBOARD PRESERVATION | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 962 | T-AO205-CCSI-CATHODIC PROTECTION SYSTEM (2.5YR OR 5YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 963 | T-AO205-CSI-SEA CHEST MARINE GROWTH PROTECTION SYSTEM (2.5 YR) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 965 | MAIN SEACHEST VALVE DISC REPLACEMENTS | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 966 | T-AO205-CCSI-SHAFT ALIGNMENT AND BEARING REACTION CHECKS (2.5YR)(SCSI) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 000 | UNDERWAY REPLENISHMENT EQUIPMENT | ||||||||
| 1001 | MESSENGER LINE HANDLING MODIFICATIONS (T-ALT 205-0039) | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| 1002 | DRIVE BREAKER UPGRADE | 0 | $ 0.00 | $ 0.00 | 0 | $ 0.00 | $ 0.00 | $ 0.00 | |
| TOTAL |
File details come from the government source that posted it. Updated .