This performance work statement provides for archaeological data recovery services at Site B, a disturbed latte set on Guam, in support of a mess hall annex development project. The contractor shall conduct data recovery excavations at the site to characterize it fully and describe its relationship to other archaeological sites and the local environment. Deliverables include an archaeological data recovery plan, Health and Safety plan, preliminary and final reports, and curation of recovered artifacts and records. The contractor must also obtain munitions clearance and prepare Historic American Buildings Survey documentation for a building on the property. All work must meet professional standards and be completed by December 2023.

This federal contract opportunity is a solicitation for cultural resource management services in Hawaii, Guam, and the Commonwealth of the Northern Mariana Islands for the Naval Facilities Engineering Command, Pacific. The indefinite delivery/indefinite quantity multiple award contract has a one-year base period and four one-year options, and offers 54 types of cultural resource services including archaeological surveys, testing, monitoring, archival research, and historic structure reporting. The estimated $49 million budget will be split with approximately $5 million for unrestricted awards and $44 million set aside for small businesses. Proposals are due in July 2020 and will be evaluated on experience, small business utilization, safety, two sample projects, and past performance. The best value source selection process will be used to award up to six contracts.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J-6

SAMPLE PROJECT 2

CULTURAL RESOURCE SERVICES IN SUPPORT OF MAMIZU FUNDED J-BBB

MESS HALL ANNEX DEVELOPMENT, NAVY NORTH ANNEX, GUAM

NOTE: Sample Project scope and cultural resources described within are fictitious.

SECTION 1.0 - GENERAL

This performance work statement (PWS) provides services for archaeological data recovery level investigations and archival research in support of Mamizu Funded J-BBB Mess Hall Annex Development at Navy North Annex, Guam. Under this Task Order (TO), the Contractor shall conduct archaeological data recovery at Site B, a disturbed latte set with a surface scatter and probable buried features. This work is required on behalf of the Environmental Planning Division of Marine Corps Activity on Guam (MCAG) Public Works Department. This TO will be awarded using Government of Japan (GOJ) Mamizu funds.

Munitions and Explosives of Concern (MEC) clearance in support of data recovery efforts shall be required.

SECTION 2.0 - BACKGROUND

The J-BBB, Mess Hall Annex Development project area (9.5 acres) is located within the boundaries of Navy North Annex [Enclosure 1]. Navy North Annex covers 787 ha (1,946 acres) in east central Guam and generally slopes from the east to the west. The area has a number of existing roads and domestic well sites.

Site B Background Site B was discovered during archaeological monitoring for replacement of buried utilities connecting to Building

4. The site is 1.6 acres in size. It is comprised of a disturbed latte set with four latte stone pillars and capstones and one lusong (stone tool used to grind food). A cultural deposit about 35 cm thick is present about 10 cm below surface. Latte Period pottery, marine shell, and charcoal were recovered in the shovel tests. One Tridacna shell adze was discovered on the surface near the lusong. Site B is recommended as eligible to the National Register of Historic Places (NRHP) under Criterion D.

SECTION 3.0 PRIMARY OBJECTIVE

The Contractor shall conduct archaeological data recovery at Site B to support the Mess Hall Annex Development that will occur within the project area. This is a Government of Japan-funded (Mamizu) project. Site B, a disturbed latte set with a surface scatter and probable buried archaeological features, is located within the Mess Hall Annex Development project area. Enclosure 2 depicts the location of Site B. Data recovery is being conducted as mitigation for adversely impacting the site during development of the Mess Hall Annex. The objective of data recovery shall be to seek vertical and horizontal extends of the site; to sufficiently characterize the historic property; and to describe the temporal and spatial relationship between Site 66-04-SS2020 and nearby archaeological sites and the environment.

The Contractor shall be required to obtain Materials of Explosive Concern (MEC) clearance support services during subsurface data recovery actions (or ground disturbing activities).

The Contractor shall prepare HABS Level II documentation for Facility 4 (former 19th Bomb Wing Headquarters building), Cold War-era, an NRHP eligible building.SECTION 4.0 – DELIVERABLES

The completion date is December 31, 2023.

Item Number

Deliverable NAVFAC TO COR Due Date

1 Draft Archaeological Data Recovery Plan (with Site Safety and Health Plan)

Two (2) electronic copies (PDF on DVD/CD) + one (1) printed/hard copy

14 calendar days after award of contract

2 Final ADRP (with Site Safety and Health Plan)

6 electronic copies (PDF on DVD/CD) + 6 printed/hard copy

14 calendar days after receiving Government review-comments on Draft ADRP

3 MEC Clearance Work Plan 3 electronic copy (on DVD/CD) + 2 printed/hard copies

Prior to entering the field

4 Preliminary Draft HABS 3 printed/hard copies, + 4 electronic copies (PDF on

CD/DVD)

120 days following completion of HABS fieldwork

5 Draft HABS 6 printed/hard copies, + 6 electronic copies (PDF on

CD/DVD)

30 calendar days following receipt of Govt. comments on Preliminary Draft HABS

6 Final HABS + 4 hard photocopies of HABS transmittal package, + 5 electronic copies (on CD/DVD with PDF and source files)

45 calendar days following receipt of Govt. comments on Draft HABS

7 Final HABS Archival Transmittal Package

1 hard copy, + 1 set hard copy photographic prints, + 1 set photographic negatives, + 1 archival CD meeting transmittal requirements (all required documentation for NPS acceptance)

45 calendar days following receipt of Govt. comments on Draft HABS (with Final HABS deliverable)

8 Weekly Summaries 1 electronic copy via email Weekly, following start of monitoring fieldwork

9 End-of Fieldwork Letter One (1) electronic copy (PDF format) sent via email

14 calendar days after completion of monitoring fieldwork

10 Draft Archaeological Data Recovery Report and GIS Data

5 electronic copies (PDF on DVD/CD + 5 printed/hard copies (COR to deliver)

120 calendar days following completion of monitoring fieldwork

11 Final Archaeological Data Recovery Report and GIS Data (including GPHI forms)

5 electronic copies (PDF on DVD/CD + 5 printed/hard copies (COR to deliver)

14 calendar days after receiving Government review-comments on Draft Archaeological Monitoring Report

15 After Action MEC Report 3 electronic copy (on DVD/CD) + 3 printed/hard copies

30 calendar days after completion of data recovery fieldwork

Enclosure 1. J‐BBB Mess Hall Annex Development, Project Area at Navy North Annex, Guam.

Enclosure 2. Site B, a disturbed latte set with a surface scatter and probable buried features.