This federal contract opportunity solicitation seeks replacement of four water-to-water heat pumps at the Oakland Air Traffic Control Tower. The Department of Transportation Federal Aviation Administration Southwestern Region is the issuing agency. The work includes removing existing heat pumps and integrating new ground source heat pump packaged units into the existing BACnet control network and Tracer Summit system. Additional requirements comprise mechanical and electrical work to support the replacement such as new VFDs, concrete housekeeping pads, and pipe support details. The contractor must also patch and repair interior finishes affected during the project. Bids are due by the date listed in the solicitation number 697DCK-23-R-00190.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-23-R-00190 Amend 0002.pdf | ||
| Question and Answers for OAKLAND ATCT WWHP Replacement.pdf | ||
| Trane-Mechanical Control As-Builts.pdf | ||
| 697DCK-23-R-00190 _AMEND 0001.pdf | ||
| OAK ATCT Sign-in pre-bid.doc | DOC document | |
| J-1_OAK_GSHP_Replacement (Final) - Specifications.pdf | ||
| J-3_Past Performance Questionnaire (PPQ).pdf | ||
| J-2_Wage Determination CA20230018.pdf | ||
| 697DCK-23-R-00190.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV.
APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
OAKLAND
CA
OAKLAND INTERNATIONAL AIRPORT (OAK)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
8/26/2022 18034143
OAK - 18034143 -
ATCT AND BASE BUILDING
GSHP REPLACEMENT
ENGINEERING
SERVICES
TERMINAL
OAKLAND ATCT
OAKLAND
CALIFORNIA
WILLIAM CASTRO VANCE WHITESEL
PROJECT ENGINEER MANAGER: ENGINEERING
G001
E. ROLAF
E. ROLAF
W. STEVENS
COVER SHEET
VICINITY MAP
OAKLAND (OAK) ATCT AND BASE BUILDING
GSHP REPLACEMENT
FINAL SUBMISSION
August 26, 2022
A
T
O
F T
R
A
N
S
P
O
R
T
A
T
I O
N
M
E
R
I
C
A
O
F
S
T
A
T
E S
U
N
I
T
E
D
D E
P
A
R
T
M
E
N
A
V
I
A
T
I
O
N
L
A
R
E
D
E
F
T R
A
T
I
O
N
S
I
N
I
M
D
A
OAK ATCT AND
BASE BUILDING
PROJECT LOCATION:
OAK ATCT AND BASE BUILDING
1 AIR CARGO WAY
OAKLAND, CALIFORNIA 94621
N
APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
OAKLAND
CA
OAKLAND INTERNATIONAL AIRPORT (OAK)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
8/26/2022 18034143
OAK - 18034143 -
ATCT AND BASE BUILDING
GSHP REPLACEMENT
ENGINEERING
SERVICES
TERMINAL
OAKLAND ATCT
OAKLAND
CALIFORNIA
WILLIAM CASTRO VANCE WHITESEL
PROJECT ENGINEER MANAGER: ENGINEERING
G002
E. ROLAF
E. ROLAF
W. STEVENS
INDEX OF DRAWINGS, GENERAL NOTES,
LOCATION MAP, & BUILDING CODE ANALYSIS
INDEX OF DRAWINGS GENERAL NOTES BUILDING CODE ANALYSIS LOCATION MAP
REV DRAWING TITLE
DRAWING
NUMBER
GENERAL
G001
G002
G010
G015
G040
COVER SHEET
INDEX OF DRAWINGS, GENERAL NOTES, LOCATION MAP, & BUILDING CODE ANALYSIS
GENERAL ABBREVIATIONS
GENERAL, ARCHITECTURAL, AND STRUCTURAL LEGENDS
PRELIMINARY CONSTRUCTION STAGING PLAN
ARCHITECTURAL
G100
AD100
A100
FIRE RESISTANCE RATED GUIDE PLAN - FIRST FLOOR
DEMOLITION - ENLARGED FLOOR PLAN - MECHANICAL ROOM
ENLARGED FLOOR PLAN - MECHANICAL ROOM
MECHANICAL
M001
MD100
MD700 MECHANICAL DEMOLITION - FLOW DIAGRAM
HVAC DEMOLITION - ENLARGED FLOOR PLAN - MECHANICAL ROOM
MECHANICAL ABBREVIATIONS, LEGENDS, AND GENERAL NOTES
M100 HVAC - ENLARGED FLOOR PLAN - MECHANICAL ROOM
M600
M700
M800 MECHANICAL - FLOW CONTROL DIAGRAM
MECHANICAL - FLOW DIAGRAM
MECHANICAL SCHEDULES
M801 MECHANICAL - POINTS SCHEDULE
ELECTRICAL
E001
ED120
E120 MECHANICAL ROOM POWER PLAN
DEMOLITION - MECHANICAL ROOM POWER PLAN
ELECTRICAL ABBREVIATIONS, LEGENDS, AND GENERAL NOTES
A. DIMENSION LINES SHOWN ON ARCHITECTURAL SHEETS ARE FROM COLUMN CENTER LINES AND FACE OF
MASONRY, CONCRETE OR FINISHED FACE OF WALL, UNLESS OTHERWISE NOTED.
B. FIELD VERIFY EXISTING CONDITIONS & DIMENSIONS BEFORE DEMOLITION OF BUILDING SYSTEMS.
COORDINATE DEMOLITION WITH THE WORK AND NOTIFY COR OF CONFLICTS. NO DEMOLITION WORK MUST
PROCEED UNTIL CONFLICTS ARE RESOLVED TO SATISFACTION OF COR.
C. FINISHES & ASSOCIATED ADJACENT FINISHES AFFECTED BY THE WORK MUST BE PATCHED AND REPAIRED
TO MATCH EXISTING ADJACENT FINISHES.
D. VERIFY DEMOLITION REQUIRED TO FACILITATE ROUTING OF MECHANICAL AND ELECTRICAL SYSTEMS. FOR
DEMOLITION REQUIRED OUTSIDE OF AREA SHOWN ON ARCHITECTURAL DRAWINGS, REFER TO MECHANICAL
AND ELECTRICAL FOR ITEMS TO BE REMOVED.
E. ATCT AND BASE BUILDING WILL BE OCCUPIED BY FAA DURING CONSTRUCTION. COORDINATE THE WORK IN
ADVANCE WITH COR TO AVOID DISRUPTING FAA OPERATIONS. MAINTAIN A MEANS OF EGRESS DURING
DEMOLITION AND CONSTRUCTION ACTIVITIES. IF AN EXIT IS TEMPORARILY PLACED OUT OF USE DURING
THE WORK, COORDINATE WITH COR FOR TEMPORARY EGRESS MEASURES. PROVIDE NECESSARY SIGNAGE
WARNING BUILDING OCCUPANTS OF THE CHANGE, AND THE DIRECTION TO THE NEAREST EXIT. WORK
AFFECTING EGRESS MUST BE COORDINATED WITH AND APPROVED IN WRITING BY COR, A MINIMUM OF 10
DAYS PRIOR TO PERFORMANCE OF WORK.
F. CLEAN CONSTRUCTION AREAS DAILY. CONSTRUCTION DEBRIS & EQUIPMENT MUST NOT BE LEFT IN
OCCUPIED AREAS.
G. MAINTAIN SMOKE/FIRE RATINGS OF SMOKE/FIRE RATED ASSEMBLIES IN FLOORS, WALLS, CEILINGS, ROOFS
OR SMOKE BARRIERS PENETRATED BY DUCTS, ELECTRICAL CONDUITS, PIPES AND OTHER PENETRATIONS
CAUSED BY THE WORK OF THIS PROJECT WITH AN APPROVED U.L. SYSTEM.
H. REMOVAL OF FIRE RATED DOORS MUST HAVE AN INTERIM PLAN FOR WHEN DOOR(S) HAVE BEEN REMOVED.
COORDINATE FIRE RATED DOOR REMOVALS AND REPLACEMENTS WITH COR.
I. DO NOT SCALE DRAWINGS.
J. EXISTING FAA COMPUTER AND OTHER SENSITIVE EQUIPMENT MUST REMAIN OPERATIONAL DURING
CONSTRUCTION. COORDINATE WITH COR DEMOLITION WORK THAT MAY CAUSE VIBRATION OR DISRUPTION
TO EQUIPMENT IN AND/OR NEAR THE WORK AREA. PROVIDE DUST PROOF PARTITIONS AND BARRIERS AS
REQUIRED BY COR TO PROTECT ACTIVE EQUIPMENT. COORDINATE WITH COR NOT TO DISRUPT FAA
OPERATIONS, TYP. ACCOMODATE THE 24-HOUR OPERATIONAL FACILITY SCHEDULE AND REQUIREMENTS.
K. PROVIDE OPENINGS THROUGH EXISTING WALLS (GWB, MASONRY, AND CONCRETE) FOR PROVISION OF
MECHANICAL AND ELECTRICAL. COORDINATE SIZE & LOCATION WITH MECHANICAL AND ELECTRICAL.
L. IF HAZMAT IS ENCOUNTERED, CEASE WORK IN THAT AREA AND NOTIFY COR TO PLAN ON HOW TO PROCEED
WITH WORK.
M. AS REQUIRED, REMOVE, SAVE FOR REUSE, AND REINSTALL FURNITURE THAT IS AFFECTED BY THE WORK.
PROTECT FURNITURE FROM DAMAGE. DOCUMENT EXISTING FURNITURE CONDITIONS AND COORDINATE
WITH COR.
N. UNSCHEDULED INTERRUPTIONS TO BUILDING SERVICES/UTILITIES WILL NOT BE TOLERATED. WORK
REQUIRING PERMANENT, TEMPORARY OR PARTIAL OUTAGES MUST BE SCHEDULED AND APPROVED IN
WRITING BY COR AT LEAST 10 WORKING DAYS IN ADVANCE OF PERFORMANCE OF THE WORK.
O. EXISTING BUILDING FLOOR PLANS AND SITE PLANS FOR THE EXISTING BUILDING CONSTRUCTION
PRESENTED IN THIS DOCUMENT WERE OBTAINED FROM THE FAA. FIELD VERIFY EXISTING CONDITIONS
PRIOR TO ANY CONSTRUCTION WORK REQUIRED.
P. PROVIDE TEMPORARY DUST PROOF PARTITIONS (DP) WITH ACCESS DOORS WHERE INDICATED ON
DRAWINGS. TEMPORARY DP PARTITIONS MUST BE ACCESSIBLE TO FAA PERSONNEL AND NOT RESTRICT
ACCESS TO MECH, ELEC, FAA, OR FIRE PROTECTION EQUIPMENT. VERIFY FINAL LOCATIONS & SPECIAL
REQUIREMENTS WITH COR BEFORE INSTALLATION. ANCHORING DEVICES FOR DUSTPROOF
CONSTRUCTIONS, INTO CONCRETE, MUST BE REMOVED UPON COMPLETION OF THE WORK. ANCHORING
HOLES IN CONCRETE SURFACES MUST BE PATCHED AND REPAIRED TO MATCH ADJACENT SURFACES.
Q. WORK SPECIFIED IN ROOMS/AREAS WITH BREAKLINES INCLUDES WORK FOR ENTIRE AREA, UNLESS
OTHERWISE NOTED.
R. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS OR PIPE VALVES. REQUEST PERMISSION IN
WRITING OF FAA 10 DAYS IN ADVANCE FOR EACH CASE OF BREAKER OR PIPE VALVE OPERATION.
CONTRACTOR MUST NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER OR PIPE
VALVE. COORDINATE DE-ENERGIZING, AND ENERGIZING, OF ANY PANELBOARD FOR CIRCUIT BREAKER
REPLACEMENT WITH COR.
S. WORK IN CONFINED SPACES OR AREAS MUST BE DONE IN ACCORDANCE WITH OSHA REQUIREMENTS, 29
CFR 1910.146 AND 29 CFR 1926.
T. PRIOR TO CUTTING CONCRETE, USE MAGNETIC STEEL LOCATOR TO LOCATE ELECTRICAL CONDUITS
EMBEDDED IN CONCRETE. AVOID CUTTING CONDUITS AS THEY MAY BE CRITICAL TO THE OPERATION OF THE
FACILITY. CONCRETE WORK MUST COMPLY WITH SILICA MANAGEMENT REQUIREMENTS.
U. REFER TO OTHER DISCIPLINES FOR ADDITIONAL DEMOLITION REQUIRED. COORDINATE REMOVING EXISTING
PARTITIONS AND ENCLOSURES TO ENABLE DEMOLITION OF CONCEALED SYSTEMS TO BE DEMOLISHED.
PATCH AND REPAIR DAMAGED FINISHES, AND/OR FIRE RATED ASSEMBLIES TO MATCH EXISTING ADJACENT
SURFACES.
V. PROVIDE CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PER SECTION 01 74 19.
THIS BUILDING CODE ANALYSIS IS BASED ON THE ASSUMPTION THAT THE ATCT AND BASE BUILDING ARE FULLY
SPRINKLERED AS INDICATED ON PROVIDED FAA-PROVIDED AS-BUILTS.
APPLICABLE CODES AND REGULATIONS:
A. INTERNATIONAL BUILDING CODE (IBC), 2018 EDITION
B. INTERNATIONAL FIRE CODE (IFC), 2018 EDITION
C. INTERNATIONAL MECHANICAL CODE (IMC), 2018 EDITION
D. INTERNATIONAL PLUMBING CODE (IPC) 2018 EDITION
E. NFPA 101 - LIFE SAFETY CODE, 2018 EDITION
F. NFPA 70 - NATIONAL ELECTRICAL CODE (NEC), 2020 EDITION
G. NFPA 75 - STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT, 2020
EDITION
H. ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS - 2015
I. OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA) GENERAL INDUSTRY SAFETY & HEALTH
STANDARDS (29 CFR 1910 AND 1926) - CURRENT ISSUE
J. TERMINAL FACILITIES DESIGN STANDARD (TFDS), VERSION 1.0, MARCH 31, 2021
OCCUPANCY CLASSIFICATION:
A. ATCT: BUSINESS (GROUP B) / LOW-HAZARD STORAGE (GROUP S-2)
B. BASE BUILDING: BUSINESS (GROUP B) / LOW-HAZARD STORAGE (GROUP S-2)
CONSTRUCTION TYPE:
A. ATCT: TYPE IB (IBC)
B. BASE BUILDING: TYPE IIB (IBC)
SEISMIC DESIGN CATEGORY: D
OAK ATCT AND
BASE BUILDING
N
MD800 MECHANICAL DEMOLITION - FLOW CONTROL DIAGRAM
E501 PANEL SCHEDULES
STRUCTURAL
S001
S110
S501
GENERAL NOTES
ENLARGED FOUNDATION PLAN - MECHANICAL ROOM
PIPE SUPPORT DETAILS
M500 MECHANICAL DETAILS
APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
OAKLAND
CA
OAKLAND INTERNATIONAL AIRPORT (OAK)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
8/26/2022 18034143
OAK - 18034143 -
ATCT AND BASE BUILDING
GSHP REPLACEMENT
ENGINEERING
SERVICES
TERMINAL
OAKLAND ATCT
OAKLAND
CALIFORNIA
WILLIAM CASTRO VANCE WHITESEL
PROJECT ENGINEER MANAGER: ENGINEERING
G010
E. ROLAF
E. ROLAF
W. STEVENS
GENERAL ABBREVIATIONS
GENERAL ABBREVIATIONS
X
XFER, XFR TRANSFER
XFMR TRANSFORMER
Y
Y WYE CONNECTION
YD YARD
SP SUMP PUMP/SEWAGE PUMP, STATIC PRESSURE
INDICATOR
SPEC SPECIFICATIONS
SQ SQUARE
SRF SAFETY RUBBER FLOOR TILE
SRGG SIGNAL REFERENCE GROUND GRID
SRS SIGNAL REFERENCE STRUCTURE
SSDI SECURITY SYSTEMS DESIGN AND INTEGRATION
SSTL, SS STAINLESS STEEL
ST STEAM, STREET
STA STATION
STC SOUND TRANSMISSION CLASS
STD STANDARD
STE STANDARD TAPERED END
STGP SIGNAL TRANSPORT GROUND PLANE
STL STEEL
STOR STORAGE
STRUC STRUCTURAL, STRUCTURE
SUCT SUCTION
SUSP SUSPENDED
SW SWITCH
SYM SYMMETRICAL
T
T THERMOSTAT, TREAD
TBD TO BE DETERMINED
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TC TEMPERATURE CONTROL SWITCH
TELCO TELECOMMUNICATION, TELEPHONE COMPANY LINE
TEMP TEMPERATURE
TI TEMPERATURE INDICATOR
TIC TEMPERATURE INDICATING CONTROLLER
TK TANK
TM&O TELECOMMUNICATIONS MANAGEMENT AND
OPERATIONS
TO TOP OF
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TOW TOP OF WALL
TRACON TERMINAL RADAR APPROACH CONTROL FACILITY
TRANS TRANSVERSE
TS TEMPERATURE SENSOR, TAMPER SWITCH
TYP TYPICAL
U
UBC UNIFORM BUILDING CODE
UH UNIT HEATER
UL UNDERWRITER'S LABORATORIES, INC.
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SYSTEM
UTIL UTILITY
UV UNIT VENTILATOR
V
V VOLT
VAT VINYL ASBESTOS TILE
VAV VARIABLE VOLUME TERMINAL
VB VINYL BASE
VBT VINYL BASE & TRIM COMPONENTS
VC VERTICAL CURVE
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
VF VERTICAL FEET, VENTILATION FAN
VFD VARIABLE FREQUENCY DRIVE
VGWB VINYL SURFACED GYPSUM WALL BOARD
VIF VERIFY IN FIELD
VP VELOCITY PRESSURE, VACUUM PRODUCER
VS VIBRATION SWITCH
VWC VINYL WALL COVERING
W
W WATT
W/ WITH
WD WOOD
WG WATER GAGE
W/O WITHOUT
WP WEATHERPROOF
WT WEIGHT
M
M MOTOR
MAINT MAINTENANCE
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MET METAL
MFG(R) MANUFACTURER
MG MOTOR GENERATOR
MIL MILLIMETER
MIN MINIMUM
MO MASONRY OPENING
MOD MODIFICATION
MS MOISTURE SENSOR
MTG MOUNTING, MOUNTED
N
N/A NOT APPLICABLE
NAM NEGATIVE AIR MACHINE
NARACS NATIONAL RADIO COMMUNICATIONS SYSTEM
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO, # NUMBER
NOM NOMINAL
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
O
OA OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER, OPEN DRAIN
OF OUTSIDE FACE
OFD OVERFLOW DRAIN
OGG THE IATA AIRPORT CODE FOR KAHULUI AIRPORT
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSHA OCCUPATIONAL SAFETY & HEALTH
ADMINISTRATION
OSW OPERATIONS SUPPORT WING
P
P PUMP, PHASE, POLE
PACM PRESSUMED ASBESTOS CONTAINING MATERIAL
PBX PRIVATE BRANCH EXCHANGE
PC PRESSURE CONTROL SWITCH
PCB POLYCHLORINATED BIPHENYLS
PCF POUNDS PER CUBIC FOOT
PD PRESSURE DIFFERENTIAL
PDI PRESSURE DIFFERENTIAL INDICATOR
PDS PRESSURE DIFFERENTIAL SENSOR
PH PHASE
PHC PREHEAT COIL
PI POINT OF INTERSECTION, PRESSURE INDICATOR
PIV POST INDICATOR VALVE
PL PROPERTY LINE, PLATE
PLAM PLASTIC LAMINATE
PLF POUNDS PER LINEAR FOOT
PNL PANEL
POC POINT OF CONNECTION
PREP PREPARE
PRV PRESSURE REDUCING VALVE
PS PRESSURE SENSOR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSM POWER SYSTEMS MODIFICATION
PT PAINT, POINT OF TANGENCY
PTVC POINT OF VERTICAL CURVATURE
PVC POLYVINYL CHLORIDE
PVDS PORTABLE VISUAL DISPLAY SYSTEM
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
R
R RISER, RADIUS
RA RETURN AIR
RAD RADIUS
RCP REFLECTED CEILING PLAN
RCRA RESOURCE CONSERVATION AND RECOVERY ACT
RD ROOF DRAIN
RECEPT,
RPTS
RECEPTACLE
REF REFERENCE
REG REGISTER
REINF REINFORCING
REQ'D REQUIRED
REV REVERSE, REVISION
RF RETURN FAN
RGS RIGID GALVANIZED STEEL
RHC REHEAT COIL
RM ROOM
RO ROUGH OPENING
RV REFRIGERANT VENT
S
S SMOKE DETECTOR
SA SUPPLY AIR
SAN SANITARY
SAP SOUND ABSORBING PANEL
SCH,
SCHED
SCHEDULE
SCWD SOLID CORE WOOD
SD SMOKE DAMPER
SEC SECTION
SECM SAFETY AND ENVIRONMENTAL COMPLIANCE
MANAGER
SF SUPPLY FAN, SQUARE FEET
SHT SHEET
SIG SIGNAL
SIM SIMILAR
SM SPRINKLER MAIN
FIN FINISH
FIX, FIXT FIXTURE
FL, FLR FLOOR
FLA FULL LOAD AMPERES
FLEX FLEXIBLE DUCT
FLG FLANGE
FLUOR FLUORESCENT
FM FLOW METER, FIRE MAIN
FO FIBER OPTIC
FOL FUEL OIL LEVEL
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOT FIBER OPTIC TERMINAL
FOV FUEL OIL VENT
FPM FEET PER MINUTE
FPU FIELD PROGRAMMING UNIT
FRP FIBER GLASS REINFORCED PLASTIC
FS FLOW SWITCH
FT, ' FEET
FTR FINNED TUBE RADIATION
FV FULL VOLTAGE
FZ FREEZESTAT
G
G GAS
GA GAGE, GAUGE
GALV GALVANIZED
GEN GENERATOR
GFE GOVERNMENT FURNISHED EQUIPMENT
GFM GOVERNMENT FURNISHED MATERIAL
GL GLASS
GND GROUND, GROUND CONNECTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRILLE
GRV GRAVITY VENT
GS GAS SENSOR
GV GATE VALVE
GW GLYCOL WASTE
GWB GPYSUM WALLBOARD
GWH GAS WATER HEATER
H
H HUMIDISTAT
HAZMAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HEATING COIL
HCS HOST COMPUTER ROOM
HDW HARDWARE
HE HEAT EXCHANGER
HERM HERMETIC
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSE POWER, HEAT PUMP, HIGH PRESSURE
HPL HIGH PRESSURE LAMINATE
HPS HIGH PRESSURE SODIUM, HIGH PRESSURE STEAM
HPT HIGH POINT
HR HOUR
HS HIGH STRENGTH, HUMIDITY SENSOR
HT HEIGHT
HTG HEATING
HTP HOT TAP (W/ STOPPLE FITTING)
HTR HEATER
HU HUMIDIFIER
HVAC HEATING/VENTILATING/AIR CONDITIONING
HW DOMESTIC HOT WATER
HWL HIGH WATER LEVEL
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HZ HERTZ
HWY HIGHWAY
I
IATA INTERNATIONAL AIR TRANSPORT ASSOCIATION
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
ID IDENTIFICATION OR IDENTIFY
IEWH INSTANTANEOUS ELECTRIC WATER HEATER
IF INSIDE FACE, INTERNAL FILTER
IN, " INCH
INST INSTRUMENTATION
INSUL INSULATION
INT INTERIOR
INT'L INTERNATIONAL
INV INVERT
ITEA INFORMATION TECHNOLOGY EQUIPMENT AREA
ITER INFORMATION TECHNOLOGY EQUIPMENT ROOM
J
J JUNCTION
JB JUNCTION BOX
JC JANITOR'S CLOSET
JT JOINT
K
KCMIL THOUSAND CIRCULAR MILS
KVA KILOVOLT AMPERE
KW KILOWATTS
L
LAN LOCAL AREA NETWORK
LBS, # POUNDS
LCC LEAD CONTAINING COATING
LCP LOCAL CONTROL PANEL
LCV LEVEL CONTROL VALVE
LF LINEAR FEET
LG LEVEL GAUGE
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LP LOW POINT
LPS LOW PRESSURE STEAM
LS LEVEL SWITCH
LT LIGHT
LTG LIGHTING
COL COLUMN
COMB COMBINATION, COMBINE, COMBUSTION AIR
COMM COMMUNICATIONS
COMP COMPRESSIBLE, COMPRESSED
CONC CONCRETE
COND CONDITION, CONDENSATE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS, CONTINUATION
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICERS REPRESENTATIVE
CP CONTROL PANEL, CIRCULATING PUMP
CPC CRITICAL POWER CENTER
CPDS CRITICAL POWER DISTRIBUTION SYSTEM
CPT CARPET
CPU CENTRAL PROCESSING UNIT
CR CEILING REGISTER, CONTROL RELAY
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
CRAH COMPUTER ROOM AIR HANDLING UNIT
CRU COMPUTER ROOM UNIT
CS CONTROL SWITCH
CT CABLE TRAY, COOLING TOWER
CTR CENTER, COOLING TOWER WATER RETURN
CTS COOLING TOWER WATER SUPPLY
CU CONDENSING UNIT
CW DOMESTIC COLD WATER
CWR CHILLER WATER RETURN
CWS CHILLER WATER SUPPLY
CWV COMBINATION WASTE AND VENT
CU CONDENSING UNIT
CV CONTROL VALVE, CONSTANT VOLUME TERMINAL
CYD CUBIC YARD
D
D DRAIN, DELTA CONNECTION, DIFFUSER, DAMPER
DB DIRECT BURIAL, DRY BULB
DBL DOUBLE
DC DIRECT CURRENT
DDCP DIRECT DIGITAL CONTROL PANEL
DEG DEGREE(S)
DET DETAIL
DGP DATA GATHERING PANEL
DI DROP INLET, DAMPER POSITION INDICATOR,
DIGITAL INPUT
DIA DIAMETER
DIAG DIAGONAL
DIM. DIMENSION
DISC DISCONNECT
DISP DISPENSER
DIST DISTRIBUTION
DL DEAD LOAD
DM DEMAND METER
DN DOWN
DO DIGITAL OUTPUT
DOM DOMESTIC
DP DUSTPROOF PARTITION, DIFFERENTIAL PRESSURE
SWITCH
DPDT DOUBLE POLE DOUBLE THROW
DPNL DISTRIBUTION PANEL
DPST DOUBLE POLE SINGLE THROW
DR DOOR
DWG(S) DRAWING(S)
E
EA EACH, EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECP ENGINE CONTROL PANEL
EDAM ELECTRICAL DATA ACQUISITION AND MONITORING
EF EXHAUST FAN
EFF EFFICIENCY
EG ENGINE GENERATOR, EXHAUST GRILLE
EH ELECTRIC HEATER
EHC ELECTRIC HEATING COIL
EL, ELEV ELEVATION, ELEVATOR
ELEC ELECTRIC(AL)
EMD ESTIMATED MAXIMUM DEMAND
EMERG EMERGENCY
EMT ELECTRICAL METAL TUBING
ENT, ENTR ENTRANCE
EP EXHAUST PIPE
EPX EPOXY
EQ EQUAL
EQUIP EQUIPMENT
ER EXHAUST REGISTER
ERMS ENVIRONMENTAL REMOTE MONITORING SYSTEM
ES EXHAUST SILENCER
ESU ENVIRONMENTAL SUPPORT UNIT (BUILDING)
ET ELECTRIC HEAT TRACE
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXH EXHAUST
EXIST, EX EXISTING
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
F
F FILTER, FIRE LINE
FA FAN COOLED
FAA FEDERAL AVIATION ADMINISTRATION
FC FAN COIL UNIT
FCO FLOOR CLEANOUT
FCV FLOW CONTROL VALVE
FD FIRE DAMPER OR FLOOR DRAIN
FD/SD COMBINATION FIRE AND SMOKE DAMPER
FDR FEEDER
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FEPC FRONT END PERSONAL COMPUTER
FFE FINISHED FLOOR ELEVATION
FHC FIRE HOSE CABINET
FI FLANGE INSULATION, FLOW INDICATOR
A
A AMPERE, AIR, COMPRESSED AIR LINE
AA AIR COOLED
AAV AUTOMATIC AIR VENT
AC ALTERNATING CURRENT, ASPHALT CONCRETE, AIR
COMPRESSOR
ACC AIR COOLED LIQUID CHILLER
ACD ADDRESSABLE CONTROL DEVICE
ACF ACCESS FLOOR SYSTEM
ACM ASBESTOS CONTAINING MATERIAL
ACP ACOUSTICAL CEILING PANEL
ACT ACCESS CONTROL TERMINAL, ACOUSTICAL CEILING
TILE
ACU AIR CONDITIONING UNIT
A/C AIR CONDITIONING
AD AREA DRAIN, ACCESS DOOR
ADJ ADJACENT, ADJUSTABLE
ADR ACCESS DOOR
ADTN ADMINISTRATIVE DATA TRANSMISSION NETWORK
AED AUTOMATED EXTERNAL DEFIBRILLATOR
AF AMPERE FRAME, AIR FLOW SENSOR
AFF ABOVE FINISH FLOOR
AFMS AIR FLOW MEASURING STATION
AH AIR HANDLING UNIT
AHU AIR HANDLING UNIT
AIC AMPERES INTERRUPTING CAPACITY
AID ADDRESSABLE INTERFACE DEVICE
AIF AIR INTAKE FILTER
AL ALUMINUM
ALT ALTERNATE
AM AMP METER
AMM AMMETER
ANN ANNUNCIATOR
AO ANALOG OUTPUT
AP ANNUNCIATOR POINT
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATELY
ARCH ARCHITECT(URAL)
ARTCC AIR ROUTE TRAFFIC CONTROL CENTER
ARTS AUTOMATED RADAR TERMINAL SYSTEM
AS AIR SEPARATOR
ASSY ASSEMBLY
AT AMPERE TRIP, AIR TRAFFIC
ATB AIR TERMINAL BOX
ATCT AIRPORT TRAFFIC CONTROL TOWER
ATS AUTOMATIC TRANSFER SWITCH
AUX AUXILIARY
AV ACID VENT
AVG AVERAGE
AWG AMERICAN WIRE GUAGE
AWP ACOUSTICAL WALL PANEL
AWR AUTOMATION WING REHABILITATION
& AND
@ AT
B
B BOILER, BUILDING
BAT CHR BATTERY CHARGER
BC BARE COPPER
BD BOARD, BACK-DRAFT DAMPER, BLOWDOWN
BEL BELOW
BF BLIND FLANGE
BFP BACK FLOW PREVENTER
BFV BUTTERFLY VALVE
BFW BOILER FEED WATER
BHP BRAKE HORSE POWER
BKR BREAKER
BLDG BUILDING
BLKG BLOCKING
BLO BLOWER
BLV BALANCING VALVE
BM BENCH MARK, BEAM
BO BOTTOM OF
BOCA BUILDING OFFICIALS AND CODE ADMINISTRATORS
INTERNATIONAL, INC
BOD BOTTOM OF DUCT, BASIS OF DESIGN
BOP BOTTOM OF PIPE
BOT, BOTT BOTTOM
BPU BREAKER PROGRAMMING UNIT
BRG BEARING
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BTU/H BRITISH THERMAL UNIT PER HOUR
BV BALL VALVE
BWP BACK WATER PREVENTER
BWV BACK WATER VALVE
C
C CONDUIT
CA COMBUSTION AIR
CAB CABINET
CB CIRBUIT BREAKER
CC COOLING COIL
CCMS CENTRAL CONTROL AND MONITORING SYSTEM
CD CONTROL DAMPER, CEILING DIFFUSER,
CONDENSATE DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FOOT
CG CEILING GRILLE
CH CHILLER
CI CURB INLET, CAST IRON
CIP CAST IRON PIPE, CAST IN PLACE
CIR CIRCULATING
CKT CIRCUIT
CL CENTER LINE
CLF CURRENT LIMITING FUSE
CLG CEILING
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT, CONDUIT ONLY
SC SEALED CONCRETE
TFDS TERMINAL FACILITIES DESIGN STANDARD
GSHP GROUND SOURCE HEAT PUMP
WWHP WATER TO WATER HEAT PUMP
APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
OAKLAND
CA
OAKLAND INTERNATIONAL AIRPORT (OAK)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
8/26/2022 18034143
OAK - 18034143 -
ATCT AND BASE BUILDING
GSHP REPLACEMENT
ENGINEERING
SERVICES
TERMINAL
OAKLAND ATCT
OAKLAND
CALIFORNIA
WILLIAM CASTRO VANCE WHITESEL
PROJECT ENGINEER MANAGER: ENGINEERING
G015
E. ROLAF
E. ROLAF
W. STEVENS
GENERAL, ARCHITECTURAL, AND STRUCTURAL
LEGENDS
GENERAL LEGEND ARCHITECTURAL / GENERAL LEGEND
REFERENCE
COLUMN LINE GRID DESIGNATION
CENTER LINES
MATCH LINE SYMBOL
BREAK LINES
ELEVATION SYMBOL
DRAWING/DETAIL TITLE
DETAIL TITLE REFERENCE
SECTION CUT
ELEVATION REFERENCE
PLAN NORTH/PROJECT NORTH
ROOM/AREA NUMBER
DEMOLITION
REVISION
REVISION DESIGNATION
SHEET NOTE NUMBER
DEMOLITION NOTE
HAZMAT NOTE, ASBESTOS
HAZMAT NOTE, LEAD PAINT
GRAPHIC SCALE
Name
Elevation
A8
View Name
1/8" = 1'-0"
AXXX
SHEET ON WHICH DETAIL
IS DRAWN OR SCHEDULED
DETAIL NUMBER
A1
A001
SHEET ON WHICH
DETAIL IS DRAWN
DETAIL DESIGNATION
A1
A001
A701
A7
A6
A5
A8
E1
A001
PROJECT NORTH
MAGNETIC NORTH
KEY NORTH
Room Name
BLS202
CLOUD TO ENCOMPASS
REVISED AREA
RFI-0000
1,2,3
1,2,3
N
A1
A001
DETAIL DESIGNATION
SHEET ON WHICH
DETAIL IS DRAWN
DETAIL
DESIGNATION
SHEET ON WHICH
DETAIL IS DRAWN
ABATE ACM MANAGE ACM
IN PLACE
MATERIALS
EARTH
EARTH, ETC
GRAVEL SAND
CONCRETE TER ASPH
CONCRETE, ETC
STEEL ALUMINUM OTHER
METALS
CMU
MASONRY
BRICK TILE
FINISH EL BLKG
STUD
PARTITION
WOOD
GYPSUM
GYPSUM
PLYWOOD
LARGE SCALE SMALL SCALE
GLASS
BATT OR
LOOSE
RIGID
INSULATION
ELEVATION
SYMBOLS
CONTRACTOR'S ACCESS ROUTE
VEHICULAR TRAFFIC DIRECTION
RAISED FLOOR PANELS
PERFORATED
AIR FLOW PANEL
WALLS
DEMOLITION WALLS
SUSPENDED CEILING SYSTEM
RECESSED
LIGHT FIXTURES
LIGHT FIXTURES
SUPPLY AIR
CEILING DIFFUSER
RETURN AIR
CEILING REGISTER
TRANSFER AIR GRILLE
REFER TO ELECTRICAL
DRAWINGS
FOR SYMBOLS
REFER TO MECHANICAL
DRAWINGS
FOR SYMBOLS
LAVATORY
URINAL
WATER CLOSET
ELECTRIC WATER
COOLER
2 X 2 2 X 4
EXISTING NEW CONSTRUCTION
NEW WALLSEXISTING WALLS
TEMPORARY INTERIOR
WALL WITH DOOR
TEMPORARY DUSTPROOF
PARTITION WITH DOOR
DOOR NUMBER
WALL TYPE NUMBER
SUPPLY AIR DUCT
EMERGENCY SHOWER AND EYEWASH
FLOOR DRAIN
ELECTRICAL PANEL
SYMBOLS
WINDOW NUMBER
FLOOR SINK
FLOOR HATCH
ROOF HATCH
LADDER
SUMP
LOCKERS
FIRE EXTINGUISHER
CABINET
ACOUSTICAL BAFFLES
DPDP
2A
FIRE RESISTANCE RATING
PARTITION TYPE DESIGNATION
FD FD
FS
RH
SURFACE MOUNTED SEMI-RECESSED
W3
LOUVER NUMBER
L2
0 4'2' 8'
1/4" = 1'-0"
CT
METER
DISCONNECT
REV.
APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
OAKLAND
CA
OAKLAND INTERNATIONAL AIRPORT (OAK)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
8/26/2022 18034143
OAK - 18034143 -
ATCT AND BASE BUILDING
GSHP REPLACEMENT
ENGINEERING
SERVICES
TERMINAL
OAKLAND ATCT
OAKLAND
CALIFORNIA
WILLIAM CASTRO VANCE WHITESEL
PROJECT ENGINEER MANAGER: ENGINEERING
G040
E. ROLAF
E. ROLAF
W. STEVENS
PRELIMINARY CONSTRUCTION STAGING PLAN
F. CONSTRUCTION OFFICE
G. CONSTRUCTION TOILET FACILITIES
H. DEMOLITION AND CONSTRUCTION HOURS
A. CONSTRUCTION ACCESS
B. CONTRACTOR PARKING
C. FAA SECURITY REQUIREMENTS
D. CONSTRUCTION MATERIAL STORAGE
E. CONSTRUCTION DEBRIS
I. HAZMAT REMOVAL AND DISPOSAL
J. PARKING LOT, DRIVEWAY REPAIR, AND LANDSCAPED AREAS
K. EQUIPMENT PROTECTION
GENERAL CONSTRUCTION STAGING NOTES
G040
PRELIMINARY CONSTRUCTION STAGING PLAN
SCALE: NOT TO SCALE
NOTE:
FINAL CONSTRUCTION STAGING AREA WILL BE DETERMINED AT THE PRECONSTRUCTION MEETING.
MAIN SECURITY GATE
ACCESS GATE
PERIMETER FENCE
ACCESSIBLE PARKING
PARKING PARKING
PARKING
PARKING
PARKING
HATCHED AREA INDICATES
CONTRACTOR'S PARKING
HATCHED AREA INDICATES
PROPOSED CONSTRUCTION
DUMPSTER LOCATION
RETRACTABLE
BOLLARDS
MAIN ENTRANCE
BOLLARDS, TYP
PERIMETER FENCE
BASE BUILDING
ATCT
FAA DUMPSTER
MECH ROOM ENTRANCE
ELEC EQUIP, TYP
EXIT STAIR T103S
DISCHARGE
EXIT STAIR T102S
DISCHARGE
STAIR T120S
DISCHARGE
BUILDING SERVICE
DRIVE LANE
FIRE PUMP ROOM
ENTRANCE
MECH ROOM ENTRANCE
MECH EQUIP, TYP
PROPOSED CONSTRUCTION
STAGING AREA
THE FOLLOWING NOTES AND ACCOMPANYING "CONSTRUCTION STAGING PLAN" GRAPHICALLY REPRESENT MANY
OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENERAL REQUIREMENTS" OF THE SPECIFICATIONS. THESE
NOTES PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO MODIFY OR REPLACE DIVISION 1
REQUIREMENTS.
CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA MUST BE
COORDINATED WITH SITE PERSONNEL VIA COR; PARTICULARLY IN CONJUNCTION WITH POTENTIAL ONGOING
PROJECTS. REFER TO A8/G040 FOR LOCATION OF PROPOSED CONSTRUCTION STAGING AREA AND PROPOSED
CONSTRUCTION DUMPSTER. LOCATION OF FINAL CONSTRUCTION STAGING AREA, CONSTRUCTION DUMPSTER, AND CONTRACTOR'S PARKING TO BE DETERMINED AT PRECONSTRUCTION CONFERENCE.
1. CONTRACTOR'S VEHICLES, PEDESTRIANS AND DELIVERIES TO THE SITE MUST BE THROUGH THE MAIN SECURITY
GATE. COR OR BADGED PERSONNEL WILL ESCORT CONTRACTOR'S PERSONNEL, VEHICLES, AND DELIVERIES
THROUGH THE MAIN SECURITY GATE. COORDINATE WITH ADVANCED NOTICE OFF-HOURS ACCESS
REQUIREMENTS FOR WORK AND/OR DELIVERIES WITH COR.
2. PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND DELIVERIES ON SITE.
PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE AND FENCING TO PROTECT, WARN AND DIRECT PERSONS
NEAR CONSTRUCTION AREAS. BARRICADES, SIGNAGE, LIGHTS, FENCING ETC. MUST BE COORDINATED WITH COR
PRIOR TO BEING IMPLEMENTED.
3. CONTRACTOR'S ACCESS TO BUILDING FOR THE WORK MUST BE THROUGH MECHANICAL ROOM ENTRANCE DOORS
AND OTHER ENTRANCES IDENTIFIED BY COR.
4. KEEP BUILDING SERVICE DRIVE LANE ACCESSIBLE AT ALL TIMES FOR FAA DELIVERIES. MAINTAIN FAA ACCESS TO
FAA DUMPSTERS AT ALL TIMES.
5. USE OF BUILDING SERVICE DRIVE LANE MUST BE COORDINATED WITH COR IN ADVANCE.
6. DELIVERIES MUST BE SCHEDULED AND APPROVED IN ADVANCE WITH COR AND AT TIMES OTHER THAN FAA
EMPLOYEE SHIFT CHANGES TO AVOID CONGESTION. SHIFT CHANGES ARE STAGGERED FOR FAA PERSONNEL, COORDINATE EXACT SHIFT CHANGES WITH COR. COORDINATE DELIVERIES WITH THE COR. DELIVERY VEHICLES
MUST ONLY CONTAIN ITEMS BEING DELIVERED TO FAA. IF VEHICLE CONTAINS OTHER DELIVERIES, VEHICLES WILL
NOT BE ALLOWED ON SITE.
1. CONTRACTOR PARKING MUST BE COORDINATED WITH COR. CONTRACTOR'S PARKING MUST BE LIMITED
AS INDICATED ON PRELIMINARY CONSTRUCTION STAGING PLAN. ADDITIONAL PARKING MUST BE OFF-SITE
AND PROVIDED BY CONTRACTOR. EXISTING PARKING SPACES ARE OFF-LIMITS FOR CONTRACTOR
PARKING EXCEPT FOR INDICATED PARKING SPACES.
1. AN ADVANCE LIST AND WEEKLY LOG OF CONTRACTOR'S PERSONNEL MUST BE PROVIDED TO COR. FAA
RESERVES THE RIGHT NOT TO ACCEPT WORKERS. AT THE START OF EACH WORK SHIFT, ALLOW ADEQUATE
TIME FOR CONTRACTOR'S PERSONNEL TO SIGN-IN WITH SECURITY. TEMPORARY SECURITY BADGES MUST BE
ISSUED TO CONSTRUCTION PERSONNEL. CONTRACTOR'S SUPERVISORY PERSONNEL MUST BE RESPONSIBLE
FOR CONDUCT OF THEIR PERSONNEL WHILE ON SITE. CONTRACTOR'S VEHICLES MUST BE MARKED.
2. SITE IS A SECURE AREA AND CONSTRUCTION VEHICLES MUST REMAIN IN CONSTRUCTION AREAS.
3. THE FACILITY IS A SECURE AREA AND CONSTRUCTION PERSONNEL MUST REMAIN IN CONSTRUCTION AREAS AT
ALL TIMES. CONTRACTOR MUST MINIMIZE INGRESS AND EGRESS.
4. FAA BADGED ESCORTS AND DESIGNATED ESCORTS WILL BE REQUIRED FOR CONSTRUCTION PERSONNEL
WORKING ON SITE. COORDINATE WORK WITHIN THE BUILDING IN ADVANCE WITH COR. ESCORTS OUTSIDE
BUILDING WILL BE REQUIRED. CONTRACTOR MUST OBTAIN FAA SECURITY BADGES FOR A SUFFICIENT NUMBER
OF EMPLOYEES TO PROVIDE ESCORTS FOR ALL EMPLOYEES.
5. CONTRACTOR PERSONNEL MAY BE FINGERPRINTED AND PHOTOGRAPHED FOR FAA SECURITY COMPLIANCE.
SOCIAL SECURITY NUMBERS WILL BE REQUIRED.
1. STORAGE OF CONSTRUCTION MATERIALS ON SITE MUST BE LIMITED TO THE CONSTRUCTION STAGING AREA.
MATERIALS MUST BE NEATLY STORED AND PROTECTED. LIGHTING MUST BE INSTALLED BY THE CONTRACTOR
AT THE DISCRETION OF COR. DO NO DIGGING WITHOUT PRIOR PERMISSION FROM COR. BURIED CABLES
(UNDERGROUND UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE.
2. THE CONSTRUCTION STAGING AREA MUST BE SURROUNDED BY A LOCKABLE FENCE. CONSTRUCTION OF THE
FENCE MUST BE TO THE SATISFACTION OF THE COR. PROVIDE COR WITH KEYS TO FENCE IN CASE OF
EMERGENCY. COORDINATE NUMBER OF KEYS WITH COR.
1. ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS MUST BE PROVIDED BY CONTRACTOR IN
THE LOCATION INDICATED. AREAS AROUND DUMPSTERS MUST BE KEPT CLEAN AND FREE OF EXCESS DEBRIS
AND DUST DURING CONSTRUCTION. DEBRIS MUST BE REMOVED BY CONTRACTOR DAILY. PROVIDE SEPARATE
DUMPSTER, IF REQUIRED, FOR ABATEMENT MATERIAL. QUANTITY AND POSITION OF DUMPSTERS MUST BE
COORDINATED WITH THE COR PRIOR TO THEIR DELIVERY AND PLACEMENT. CONSTRUCTION DUMPSTER MUST
NOT INTERFERE WITH ACCESS TO FAA DUMPSTERS.
1. ROOM 133, ESU STORAGE, MAY BE USED AS PROVISIONAL OFFICE SPACE FOR THE CONTRACTOR.
CONTRACTOR MUST PROVIDE BOTTLED WATER. TEMPORARY POWER FOR SMALL OFFICE EQUIPMENT IS
AVAILABLE, IF REQUIRED FOR CONSTRUCTION PURPOSES OF THE WORK. COORDINATE SPACE REQUIREMENTS
WITHIN ROOM WITH COR. COORDINATE TEMPORARY RELOCATION OF FAA EQUIPMENT AND MATERIALS AS
REQUIRED. PRIOR TO PROJECT COMPLETION, RETURN SPACE TO ORIGINAL CONDITION, COORDINATE WITH
COR.
1. PORTABLE CHEMICAL TOILETS MUST BE PROVIDED WITHIN THE CONSTRUCTION
STAGING AREA. PORTABLE CHEMICAL TOILETS MUST NOT BE ALLOWED WITHIN THE
BUILDING. COORDINATE WITH THE COR FOR SCHEDULING OF SERVICE.
2. PROVIDE WASH STATIONS IN ADDITION TO PORTABLE TOILETS IN CONSTRUCTION
STAGING AREA.
3. TOILET ROOMS INSIDE BUILDING ARE NOT FOR THE CONTRACTOR'S USE.
1. OAK ATCT IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. THE BASE BUILDING
OPERATES UNDER NORMAL BUSINESS HOURS (MONDAY - FRIDAY, 7:00 AM - 4:00 PM).
NORMAL CONSTRUCTION HOURS MUST BE MONDAY - FRIDAY, 7:30 AM - 4:00 PM.
2. CONTRACTOR MUST NOT INTERFERE WITH THE FUNCTION OF THIS FACILITY. DEMOLITION
AND CONSTRUCTION NOISE MUST BE MINIMIZED BETWEEN 6:00 AM TO 7:00PM. WORK
DETERMINED BY THE COR TO BE DISRUPTIVE TO THE OPERATIONS MUST BE STOPPED
AND RESCHEDULED TO BE PERFORMED DURING OFF-HOURS.
3. OFF HOURS WORK MUST BE ACCOMPLISHED 7:00PM TO 6:00 AM, MONDAY - FRIDAY. OFF
HOURS WORK MUST OCCUR DURING HOURS MOST BENEFICIAL TO THE FACILITY,
INCLUDING BUT NOT LIMITED TO NIGHTS AND WEEKENDS. COORDINATE WITH COR WORK
REQUIRED TO BE PERFORMED DURING OFF HOURS, NIGHTS, AND WEEKENDS TO MINIMIZE
RISK AND DISRUPTION TO THE OPERATIONAL FACILITY.
4. FAA HAS AND MAINTAINS EQUIPMENT THAT IS CRITICAL TO ITS OPERATION THROUGHOUT
THIS FACILITY. COORDINATE WITH COR LOCATION OF CRITICAL EQUIPMENT THAT MAY BE
AFFECTED BY THE WORK DIRECTLY OR THROUGH CLOSE PROXIMITY. COORDINATE WITH
COR PROCEDURES TO PROTECT FAA/GOVERNMENT EQUIPMENT. WORK IN AREAS WITH
CRITICAL EQUIPMENT MUST BE ACCOMPLISHED DURING OFF-HOURS OR AS APPROVED BY
COR.
5. NOISY DEMOLITION (INSIDE OR OUTSIDE), OFF-HOURS CONSTRUCTION ACTIVITIES, AND
WORK AFFECTING THE EQUIPMENT ROOM MUST BE SCHEDULED, COORDINATED AND
APPROVED IN WRITING BY COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN
ADVANCE OF PERFORMANCE OF THE WORK.
6. CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING
MUST BE ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY COR. SCHEDULE,
COORDINATE AND HAVE APPROVAL BY COR IN WRITING, A MINIMUM OF 10 WORKING DAYS
BEFORE THE PERFORMANCE OF THE WORK.
1. PER FAA INFORMATION, THERE IS NO HAZMAT IN THE AREA OF WORK. IF HAZMAT IS
ENCOUNTERED OR IF ANY MATERIAL IS SUSPECTED TO CONTAIN HAZMAT, CEASE WORK IN THE
AREA AND NOTIFY COR TO PLAN HOW TO PROCEED WITH THE WORK.
1. UPON COMPLETION OF WORK, CONTRACTOR MUST REPAIR PAVED SURFACES AT AFFECTED WORK AREAS
TO ORIGINAL CONDITION, INCLUDING STRIPING OF REPAIRED PAVED SURFACES.
2. DISTURBED LAWNS AND LANDSCAPING MUST BE RESTORED TO ORIGINAL CONDITION BY CONTRACTOR TO
THE SATISFACTION OF COR. LAWN DAMAGED BY THE WORK MUST BE REPLACED TO MATCH EXISTING AND
TO SATISFACTION OF COR.
1. PROTECT FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING, FROM DAMAGE, INCLUDING BUT NOT
LIMITED TO: DAMAGE CAUSED BY IMPACT, VIBRATIONS, WATER, HAZMAT, DEBRIS AND DUST, INCLUDING
CORE DRILLING.
2. SHUTDOWNS AND SWITCHOVERS OF MECHANICAL AND ELECTRICAL SYSTEMS MUST BE ACCOMPLISHED
DURING OFF-HOURS AS INDICATED UNDER DEMOLITION AND CONSTRUCTION HOURS ON THIS SHEET. ONLY
FAA MAY SHUT OFF MECHANICAL VALVES, COORDINATE SHUTTING OFF VALVES WITH COR. PREPARATORY
WORK MUST BE COMPLETED PRIOR TO SHUTDOWN AND SWITCHOVER. SCHEDULE, COORDINATE AND HAVE
APPROVAL IN WRITING BY COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN ADVANCE OF
PERFORMANCE OF WORK. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. CONTRACTOR MUST
REQUEST PERMISSION, COORDINATE, AND HAVE APPROVAL IN WRITING BY COR WITH A MINIMUM OF 10
WORKING DAYS NOTICE IN ADVANCE FOR EACH CASE OF BREAKER OPERATION. CONTRACTOR MUST NOT
OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME.
3. ATCT IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. COORDINATE CONSTRUCTION ACTIVITY SO AS
NOT TO INTERFERE WITH FUNCTIONS OF THE FACILITY.
4. NO WELDING EQUIPMENT MUST BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING MUST NOT
BE PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN WRITING BY COR. OSHA WORK PRACTICES
MUST BE EXERCISED FOR ALL PHASES OF CONSTRUCTION INCLUDING WELDING OPERATIONS.
5. USE GREAT CARE AND CAUTION WHILE WORKING IN ALL AREAS OF THIS FACILITY. WORK MUST BE
COORDINATED WITH COR. DISRUPTION OF THIS FACILITY SHALL NOT BE PERMITTED.
6. EXISTING FAA AIR TRAFFIC EQUIPMENT MUST REMAIN OPERATIONAL THROUGHOUT DURATION OF THIS
CONTRACT. PROVIDE CONTINUOUS PROTECTION OF THIS EQUIPMENT FROM PHYSICAL OR ELECTRICAL
DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL NEGLIGENCE SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO EQUIPMENT. NOTIFY COR IMMEDIATELY OF DAMAGE OR DISRUPTION OF
ELECTRICAL AND/OR MECHANICAL SERVICES.
7. VENT TO THE EXTERIOR FUMES AND ODORS RESULTING FROM THE WORK. VENTS MUST NOT DISCHARGE
NEAR AIR INTAKES, WINDOWS OR SIMILAR OPENINGS TO THE BUILDING. TAKE CARE NOT TO EXPOSE FAA
EMPLOYEES TO FUMES, ODORS, OR OFF GASSING.
L. COVID-19 PROTOCOL AND SAFETY PLAN
1. COORDINATE WITH COR LOCAL, FEDERAL AND FAA-SPECIFIC PROTOCOL FOR COVID-19 AT THE TIME OF THE
WORK. COMPLY WITH LOCAL, FEDERAL, AND FAA-SPECIFIC PROTOCOL AS REQUIRED.
2. REFER TO SPECIFICATIONS FOR COVID-19 SAFETY PLAN REQUIREMENTS AND OTHER SPECIAL CONTRACT
REQUIREMENTS.
ELEC EQUIP
FUEL TANK
EXISTING "DELIVERY
TRUCK ONLY" PARKING
AIR CARGO WAY
T1
1 3 4 5 6 7 8 9
A
B
C
D
E
ENTRANCE
LOBBY
GUARD
GUARD
STORAGE
MECHANICAL
ESU STORAGE
EMERGENCY
GENERATOR
ESU WORKROOM
EMERGENCY
ELECTRICAL
ELECTRICAL
UPS
FIRE PUMP
140S
STAIR VESTIBULE
RECEPTION
HALL
MEN
WOMEN
OPEN AREA
TAPE PLAYBACK
CBI
OPS SUPERVISORS
AT MANAGER
120S
STAIR
AT
DEBRIEF
CONFERENCE
STORAGE
STORAGE
OPEN OFFICE
T101
ELEVATOR LOBBY
T102S
EXIT STAIR
T104
MECH
CHASE
T105
ELEC
CHASE
T103S
EXIT STAIR
ELEVATOR
148'-9" 6"
14'-10" 13'-8" 10'-4" 12'-5" 12'-6" 11'-10" 16'-2" 14'-6" 41'-6"
13'-7"
0 8'
16' 4'
1/8" = 1'-0"
A. PARTITION AND WALL FIRE/SMOKE RESISTANCE RATINGS ARE BASED UPON THE
FIRE RESISTANCE RATINGS INDICATED ON THE FAA-PROVIDED "REPLACE
AIRPORT TRAFFIC CONTROL TOWER (ATCT) AND ESTABLISH BASE BUILDING"
"CORRECTED TO AS-BUILT DRAWINGS", DATED 03/28/2014. PER THESE
"CORRECTED TO AS-BUILT DRAWINGS", BASE BUILDING IS TYPE II-B
CONSTRUCTION AND ATCT IS TYPE I-B CONSTRUCTION, WITH 3-HOUR FIRE
RESISTANCE RATED BARRIER SEPARATING THE BASE BUILDING AND ATCT.
B. THIS DRAWING ILLUSTRATES THE EXTENT AND LAYOUT OF FIRE-RATED
BARRIERS AS DOCUMENTED IN FAA-PROVIDED "CORRECTED TO AS-BUILT
DRAWINGS." VERIFY AND CONFIRM EXISTING BARRIER RATINGS PRIOR TO THE
WORK.
1. SMOKE AND FIRE-STOP TO COMPLY WITH THE INDICATED RATINGS AT
PENETRATIONS IN THESE BARRIERS RESULTING FROM THIS PROJECT'S
WORK.
2. SMOKE AND FIRE-STOP TO COMPLY WITH THE INDICATED RATINGS AT
OPENINGS/HOLES RESULTING FROM THIS PROJECT'S WORK (REMOVALS
OF EXISTING ITEMS LEAVING OPENINGS/HOLES).
REV.
APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
OAKLAND
CA
OAKLAND INTERNATIONAL AIRPORT (OAK)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
8/26/2022 18034143
OAK - 18034143 -
ATCT AND BASE BUILDING
GSHP REPLACEMENT
ENGINEERING
SERVICES
TERMINAL
KEY PLAN
N
KEY NORTH
OAKLAND ATCT
OAKLAND
CALIFORNIA
WILLIAM CASTRO VANCE WHITESEL
PROJECT ENGINEER MANAGER: ENGINEERING
G100
E. ROLAF
E. ROLAF
W. STEVENS
FIRE RESISTANCE RATED GUIDE PLAN -
FIRST FLOOR
GENERAL SHEET NOTES
G100
FIRE RESISTANCE RATED GUIDE PLAN - FIRST FLOOR
SCALE: 1/8" = 1'-0"
2-HOUR RATED SMOKE/FIRE BARRIER
1-HOUR RATED SMOKE/FIRE BARRIER
3-HOUR RATED SMOKE/FIRE BARRIER
LEGEND
NOTE:
FIRE RATINGS ARE AS IDENTIFIED IN FAA-PROVIDED "CORRECTED TO AS-BUILT DRAWINGS",
DATED 03/28/2014.
FD
FD
FD
FD
FD
FD
FD
FD
CO
CO
A. PROTECT EXIST EQUIPMENT, FURNITURE, AND FURNISHINGS TO REMAIN IN THE
AREA OF WORK FROM DAMAGE, COORD W/ COR.
B. SENSITIVE, OPERATIONAL ELECTRONIC EQUIPMENT IS LOCATED DIRECTLY ABOVE
THE MECHANICAL ROOM ON THE SECOND FLOOR. PROTECT FROM DAMAGE,
COORD W/ COR.
C. PROTECT EXISTING FINISHES TO REMAIN FROM DAMAGE.
D. PROTECT EXISTING FLOOR DRAINS FROM CLOGGING AND DAMAGE.
E. FIRE/SMOKE BARRIER RATING INFORMATION IS SHOWN ON PLAN AND IS
INDICATED BY DASHED-DOTTED LINES. REFER TO FIRE RESISTANCE RATED
GUIDE PLAN FOR LEGEND.
REV.
APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
OAKLAND
CA
OAKLAND INTERNATIONAL AIRPORT (OAK)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
8/26/2022 18034143
OAK - 18034143 -
ATCT AND BASE BUILDING
GSHP REPLACEMENT
ENGINEERING
SERVICES
TERMINAL
KEY PLAN
N
KEY NORTH
OAKLAND ATCT
OAKLAND
CALIFORNIA
WILLIAM CASTRO VANCE WHITESEL
PROJECT ENGINEER MANAGER: ENGINEERING
AD100
E. ROLAF
E. ROLAF
W. STEVENS
DEMOLITION - ENLARGED FLOOR PLAN -
MECHANICAL ROOM
GENERAL SHEET NOTES
DEMOLITION SHEET NOTES
AD100
DEMOLITION - ENLARGED FLOOR PLAN - MECHANICAL ROOM
SCALE: 1/4" = 1'-0"
0 4'2' 8'
1/4" = 1'-0"
FIRE PUMP
ESU STORAGE
ESU WORKROOM
MECHANICAL
STAIR VESTIBULE
140S
ELEC CHASE
T105
GUARD STORAGE
UPS
ELECTRICAL
EMERGENCY ELECTRICAL
EMERGENCY GENERATOR
ELEC CHASE
T103S
C
D
EXIST PARTITION TO REMAIN, PROTECT FROM DAMAGE.
1 EXIST EXTERIOR WALL ASSEMBLY TO REMAIN, PROTECT FROM DAMAGE.
EXIST CONC MAINTENANCE PAD TO REMAIN, PROTECT FROM DAMAGE.3
EXIST WALL MOUNTED EQUIP, REFER TO MECH AND ELEC.4
EXIST SHELVING TO REMAIN, PROTECT SHELVING AND CONTENTS FROM DAMAGE.6
EXIST BUILDING SERVICE DRIVE LANE AND EXTERIOR EQUIP, PROTECT FROM DAMAGE.7
EXIST HM DOOR AND DOOR FRAME ASSEMBLY TO REMAIN, PROTECT FROM DAMAGE8
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
EXIST FE TO REMAIN, PROTECT FROM DAMAGE9
10 10
EXIST PIPING TO REMAIN, PROTECT FROM DAMAGE11
EXIST EMERGENCY EYE WASH AND SHOWER STATION TO REMAIN, PROTECT FROM
DAMAGE. MAINTAIN ACCESS TO STATION FOR FAA PERSONNEL.
TYP
UON
TYP
EXISTING CONC MAINTENANCE PAD TO REMAIN, REFER TO STRUC
FD
FD
FD
FD
FD
FD
CO
CO
A. PATCH AND REPAIR FINISHES DAMAGED BY THE WORK TO MATCH ADJACENT
SURFACES TO SATISFACTION OF COR. REFER TO INTERIOR MATERIALS FINISH
SCHEDULE FOR ADDITIONAL INFORMATION.
B. SENSITIVE, OPERATIONAL ELECTRONIC EQUIPMENT IS LOCATED DIRECTLY ABOVE
THE MECHANICAL ROOM ON THE SECOND FLOOR. PROTECT FROM DAMAGE,
COORD W/ COR.
C. PATCH AND REPAIR CONC FLOOR SLAB TO MATCH ADJACENT CONC FLOOR SLAB
WHERE DAMAGED BY THE WORK.
D. SMOKE AND FIRE-STOP TO COMPLY WITH INDICATED RATINGS AT PENETRATIONS
AND OPENINGS/HOLES RESULTING FROM THIS PROJECT'S WORK.
D.1. FIRE/SMOKE BARRIER RATING INFORMATION IS SHOWN ON PLAN AND IS
INDICATED BY DASHED-DOTTED LINES. REFER TO FIRE RESISTANCE RATED
GUIDE PLAN FOR LEGEND.
REV.
APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
OAKLAND
CA
OAKLAND INTERNATIONAL AIRPORT (OAK)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
8/26/2022 18034143
OAK - 18034143 -
ATCT AND BASE BUILDING
GSHP REPLACEMENT
ENGINEERING
SERVICES
TERMINAL
KEY PLAN
N
KEY NORTH
OAKLAND ATCT
OAKLAND
CALIFORNIA
WILLIAM CASTRO VANCE WHITESEL
PROJECT ENGINEER MANAGER: ENGINEERING
A100
E. ROLAF
E. ROLAF
W. STEVENS
ENLARGED FLOOR PLAN - MECHANICAL ROOM
GENERAL SHEET NOTES
SHEET NOTES
A100
ENLARGED FLOOR PLAN - MECHANICAL ROOM
SCALE: 1/4" = 1'-0"
0 4'2' 8'
1/4" = 1'-0"
FIRE PUMP
ESU STORAGE
ESU WORKROOM
MECHANICAL
STAIR VESTIBULE
140S
ELEC CHASE
T105
GUARD STORAGE
UPS
ELECTRICAL
EMERGENCY ELECTRICAL
EMERGENCY GENERATOR
ELEC CHASE
T103S
C
D
INTERIOR MATERIALS FINISH SCHEDULE
CODE SURFACE MATERIAL COLOR REMARKS
VB
SC
PT1
EXP CEILING
WALL
WALL
FLOOR
EXPOSED TO STRUC ABOVE
PAINT
VINYL WALL BASE
SEALED CONCRETE
PT2 INTERIOR HM DOOR/FRAME PAINT
MANUFACTURER
SHERWIN-WILLIAMS
JOHNSONITE
SHERWIN-WILLIAMS
SW 6385 DOVE WHITE
40 BLACK
SW 2827 COLONIAL REVIVAL STONE
PT3 EXTERIOR HM DOOR/FRAME PAINT SHERWIN-WILLIAMS SW 7019 GAUNTLET GRAY
NOTES:
1. FINISHES SHOWN BELOW REFLECT EXISTING FINISHES AT MECHANICAL ROOM.
2. PROVIDE FINISHES FOR PATCH AND REPAIR TO MATCH EXISTING. FINAL SELECTION TO BE APPROVED BY COR.
3. PROVIDE SC AT SIDES AND TOP OF CONC MAINTENANCE PADS.
PROVIDE COLOR AND SHEEN TO MATCH EXISTING.
PROVIDE COLOR AND SHEEN TO MATCH EXISTING.
PROVIDE COLOR AND SHEEN TO MATCH EXISTING.
4" TALL; PROVIDE COLOR TO MATCH EXISTING.
EXIST PARTITION TO REMAIN, PROTECT FROM DAMAGE.
EXIST EXTERIOR WALL ASSEMBLY TO REMAIN, PROTECT FROM DAMAGE.
EXIST CONC MAINTENANCE PAD TO REMAIN, PROTECT FROM DAMAGE.
EXIST WALL MOUNTED EQUIP, REFER TO MECH AND ELEC.
EXIST SHELVING TO REMAIN, PROTECT SHELVING AND CONTENTS FROM DAMAGE.
EXIST BUILDING SERVICE DRIVE LANE AND EXTERIOR EQUIP, PROTECT FROM DAMAGE.
EXIST HM DOOR AND DOOR FRAME ASSEMBLY TO REMAIN, PROTECT FROM DAMAGE
EXIST FE TO REMAIN, PROTECT FROM DAMAGE
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
CONC MAINTENANCE PAD, REFER TO STRUCTURAL AND MECHANICAL
EXIST EMERGENCY EYE WASH AND SHOWER STATION TO REMAIN, PROTECT
FROM DAMAGE.
REV. APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
OAKLAND CAOAKLAND INTERNATIONAL AIRPORT (OAK)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
8/26/2022 18034143
OAK - 18034143 -
ATCT AND BASE BUILDING
GSHP REPLACEMENT
ENGINEERING
SERVICES
TERMINAL
OAKLAND ATCT
OAKLAND
CALIFORNIA
WILLIAM CASTRO VANCE WHITESEL
PROJECT ENGINEER MANAGER: ENGINEERING
Xref C:\Users\harneda\OneDrive - Jacobs\Desktop\FAA ZID\M001.dwg
M001
D. TRAXLER
A. BOLTON
MECHANICAL ABBREVIATIONS, LEGENDS, AND
GENERAL NOTES
K. LEDWELL
8-26-2022
'-9
GROUND LOOP SUPPLY
AND RETURN TO BORE FIELD
G
LS
G
LR
3"
CHWS
CHWR
HWR
HWS
CHWS
CHWR
HWR
HWS
FCU-7
1-1/2"
3"
3/4"
VAV-116
1-1/4"
2-1/2"
CRAC-3
GL POT FEEDER
CW POT FEEDER
HW POT FEEDER
WWHP-2
WWHP-4
WWHP-1
WWHP-3HWP-1,2
AS-1
2" CHWR BRANCH (TYP)
2" HWS/R BRANCH (TYP)
2" GLS/R BRANCH (TYP)
GLP-1,2
CWT-1
4"
4"
4"
AS-2
CWP-1,2
3/4"
3/4"
3/4" HWS/R DN
ET-3 ET-2 ET-1
1/2"
1/2"
CHILLED
WATER HIGH
POINT VENTS
1-1/2"
HWS/R UP
2"
2-1/2"
3/4" CHWS/R UP
2"
AS-3
VAV-114
CHWS
CHWR
HWR
HWS
AHU-1
2-1/2"
1-1/4"
1"
3"
3/4"
3/4"
3/4"
3/4"
VAV-115
FCU-2
1-1/4"
3/4"
H W
S H
W R
1"
CHWR
CHWS
FCU-4FCU-5
VAV-117
3/4"
3/4"3/4"3/4"
1-1/4"
C H
W R
C H
W
S HWR
HWS
3/4"
FCU-3
1-1/4"
2-1/2"
HWR
HWS
CHWR
CHWS
2-1/2"
WATER
3/4" MAKEUP
CHWS
CHWR
HWR
HWS
GLS
3"3" G
LS
C H
W S
C H
W R
3"
3" HWS
GLR
GLS
3"
3" HWR
3" CHWR
CHWS
CHWR
3"
1-1/2"
1"
1-1/2"
2-1/2" CHWS/R AND
1-1/4" HWS/R UP TO
UH-2
1/2" 2"
CHWS
CHWR
C H
W S
C H
W R
CH-1 CH-2
CHWS
CHWR
3/4" CHWS/R AND
3"
REV. APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
OAKLAND CAOAKLAND INTERNATIONAL AIRPORT (OAK)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
8/26/2022 18034143
OAK - 18034143 -
ATCT AND BASE BUILDING
GSHP REPLACEMENT
ENGINEERING
SERVICES
TERMINAL
KEY PLAN
N
KEY NORTH
OAKLAND ATCT
OAKLAND
CALIFORNIA
WILLIAM CASTRO VANCE WHITESEL
PROJECT ENGINEER MANAGER: ENGINEERING
MD100
D. TRAXLER
A. BOLTON
HVAC DEMOLITION - ENLARGED FLOOR PLAN -
MECHANICAL ROOM
GENERAL SHEET NOTES
DEMOLITION SHEET NOTES
MD100
B8 HVAC DEMOLITION - ENLARGED FLOOR PLAN - MECHANICAL ROOM
SCALE: 1/4" = 1'-0"
0 4'2' 8'
1/4" = 1'-0"
FIRE PUMP
ESU STORAGE
ESU WORKROOM
MECHANICAL
STAIR VESTIBULE
140S
ELEC CHASE
T105
GUARD STORAGE
UPS
ELECTRICAL
EMERGENCY ELECTRICAL
EMERGENCY GENERATOR
ELEC CHASE
T103S
C
D
1 CAP AND SEAL PIPE.
A. REFER TO DRAWING M001 FOR SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.
B. PROTECT EQUIPMENT TO REMAIN IN THE AREA OF WORK. COORDINATE WITH
COR.
C. FIRE/SMOKE BARRIER RATING INFORMATION IS SHOWN ON PLAN AND IS
INDICATED BY DASHED-DOTTED LINES. REFER TO FIRE RESISTANCE RATED
GUIDE PLAN FOR LEGEND.
2 WATER TREATMENT PIPING IS EXISTING TO REMAIN. IT IS NOT SHOWN ON PLANS TO
MAINTAIN CLARITY OF WORK.
K. LEDWELL
3 DEMOLISH CIRCULATING PUMPS, PIPING, SUPPORTS AND ACCESSORIES ASSOCIATED
WITH WWHP. DISCONNECT AND REMOVE ALL CONTROLS COMPONENTS INCLUDING
CONTROL/FIELD DEVICES, CONTROL WIRING AND NETWORK CABLES ASSOCIATED
WITH WWHP.
3 3
4 INSTALL LINESTOP TO ISOLATE THE CHILLED WATER SYSTEM FROM THE WWHP
BEFORE DEMOLISHING UNITS.
5 EXISTING CONTROL PANEL ASSOCIATED WITH CHW/HW SYSTEM TO REMAIN IN PLACE
AND BE FULLY OPERATIONAL.
EXISTING CONTROL PANEL, CB-1, WITH ETHERNET NETWORK SWITCH AND
QUICKSERVER SERIAL/ETHERNET GATEWAY, TO REMAIN IN PLACE AND FULLY
OPERATIONAL.
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
OAKLAND CAOAKLAND INTERNATIONAL AIRPORT (OAK)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
8/26/2022 18034143
OAK - 18034143 -
ATCT AND BASE BUILDING
GSHP REPLACEMENT
ENGINEERING
SERVICES
TERMINAL
OAKLAND ATCT
OAKLAND
CALIFORNIA
WILLIAM CASTRO VANCE WHITESEL
PROJECT ENGINEER MANAGER: ENGINEERING
MD700
D. TRAXLER
A. BOLTON
MECHANICAL DEMOLITION - FLOW DIAGRAM
3"
4"
CHWS
CHWR
2-1/2"
3"
2"
3" 2-1/2"
AS-3
3" 4"
3"
HWR
4" 3"
3/4"
3"
2"
CH-2 CH-1
ET-3 WWHP-3
3"
3"
2" 2"
1-1/2" 1-1/2"
2"
1-1/4"(TYP)
BORE FIELD
2" 1-1/2"
2"
1-1/2"
2"
GLR
GLS
GLR
GLS
GLS
GLR
GLS
GLR
GLP-1GLP-2 WWHP-1 WWHP-4 (D)WWHP-2 ET-2
HTP-3 HTP-1 HTP-4 HTP-2
CHWP-1CHWP-2 CWT-1
3"
2" 2" 2"
2" 2" 2" 2"
2"
2" 4"
LEVEL 1
3/4"
4" 2-1/2"
3"
2-1/2" 3"
HWS
2"
4"
AS-2
4" CHWS
2"
4"
2-1/2" GLR
GLS
2" 2" 4"
CHWS
CHWR
3"
3/4"
HWP-2
HWP-1
HWS
AS-1
HWR
2" BYPASS
HWS
HWR
ET-1
GLR
MD700
D6 BASE BUILDING CHILLED AND HOT WATER DEMOLITION SCHEMATIC DIAGRAM
NOT TO SCALE
3"
3"
3"
K. LEDWELL
INSIDEOUTSIDE
GENERAL SHEET NOTES
DEMOLITION SHEET NOTES
1 CAP AND SEAL PIPE.
A. REFER TO DRAWING M001 FOR SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.
B. PROTECT EQUIPMENT TO REMAIN IN THE AREA OF WORK. COORDINATE WITH
COR.
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
OAKLAND CAOAKLAND INTERNATIONAL AIRPORT (OAK)
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
8/26/2022 18034143
OAK - 18034143 -
ATCT AND BASE BUILDING
GSHP REPLACEMENT
ENGINEERING
SERVICES
TERMINAL
OAKLAND ATCT
OAKLAND
CALIFORNIA
WILLIAM CASTRO VANCE WHITESEL
PROJECT ENGINEER MANAGER: ENGINEERING
MD800
R. JEON
R. JEON
MECHANICAL DEMOLITION
FLOW CONTROL DIAGRAM
CHWS
CHWR
AS-3
HWR
CH-2 CH-1
ET-3
WWHP-3
GLR TO WELL FIELD
GLS FROM WELL FIELD
GLR TO WELL FIELD
GLS FROM WELL FIELD
GLP-1GLP-2
WWHP-1 WWHP-4 WWHP-2
ET-2
HTP-3 HTP-1 HTP-4 HTP-2
CWP-1CWP-2
CWT-1
2"
HWS
AS-2
GLR
GLS
CHWS
CHWR
HWS
AS-1
HWR
2" BYPASS ET-1
DO DI
SS CS
CWP-2
DO DI
SS CS
CWP-1
DO DI
SS CS
GLP-2
DO DI
SS CS
GLP-1
DO DI
SS CS
HTP-#
DO DI
CV VI
WWHP-#
AXSS
DO DI
M
CV
DO
VI
DI
M
DO DI
PT
AI
TS
AI
TS
AICV VI
PT
AI
TS
AI
TS
AI
CHWS
CHWR
PT
AI
TS
AI
TS
AI
PT
AI
L
H
DP
AI
AO DI
CI AX
HWP-1 VFD
AXSS
DO DI AO DI
CI AX
HWP-2 VFD
AXSS
DIDO
TS
AI
PT
AI
HWP-2HWP-1
GENERAL SHEET NOTES
DEMOLITION SHEET NOTES
MD800
E8 DEMOLITION FLOW CONTROL DIAGRAM - BASE BUILDING CHILLED AND HOT WATER SYSTEMS
NOT TO SCALE
A. REFER TO SHEETS M001 AND M002 FOR MECHANICAL ABBREVIATIONS, SYMBOLS AND
GENERAL NOTES.
DISCONNECT AND REMOVE PUMP START/STOP AND PUMP STATUS POINTS FROM
RESPECTIVE CONTROLLER(S). REMOVE POINTS AND ASSOCIATED PROGRAMMING
FROM DATABASE.
2 TYPICAL TRANE CONTROL BOARD MOUNTED IN EACH WATER TO WATER HEAT
PUMP (WWHP) UNIT. DISCONNECT AND REMOVE ALL CONTROL AND MONITORING
POINTS ASSOCIATED WITH EACH WWHP. MODIFY AND RECONNECT EXISTING
NETWORK AS REQUIRED. ALL OTHER CONTROLLERS AND BAS MUST REMAIN FULLY
OPERATIONAL.
'-9
GROUND LOOP SUPPLY
AND RETURN TO BORE FIELD
G
LS
G
LR
3"
CHWS
CHWR
HWR
HWS
CHWS
CHWR
HWR
HWS
1-1/2"
3"
3/4"
1-1/4"
2-1/2"
CRAC-3
GL POT FEEDER
CW POT FEEDER
HW POT FEEDER
4"
4"
4"
3/4"
3/4"
3/4" HWS/R DN
1/2"
CHILLED
WATER HIGH
POINT VENTS
1-1/2"
HWS/R UP
2"
2-1/2"
3/4" CHWS/R UP
2"
CHWS
CHWR
HWR
HWS
2-1/2"
1-1/4"
1"
3"
3/4"
3/4"
3/4"
3/4"
1-1/4"
3/4"
H W
S H
W…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .