J-1a Final_D10 Plumbing_Drawings.pdf
PDF 20 MB Posted
- Attached to
- D10 Terminal Plumbing Replacement Federal contract opportunity
- Solicitation number
- 697DCK-22-R-00363
About this file
This document provides details for a federal solicitation to replace plumbing at the D10 Terminal Radar Approach Control facility in Dallas-Fort Worth, Texas. The Federal Aviation Administration is seeking to procure plumbing replacement services through competitive proposals. Offerors must be registered in the System for Award Management and submit proposals in accordance with the instructions and deadlines provided in the solicitation. A non-mandatory site visit will be held on July 19, 2022 to review the project details. Proposals are due on the date specified in the solicitation. The selected offeror will be eligible for award of a contract to complete the plumbing replacement work at the FAA facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-22-R-00363 Amd 3.pdf | ||
| J-3 Questions and Answers D10 Terminal Plumbing 24 Aug 22.pdf | ||
| 697DCK-22-R-00363_Amendment 02.pdf | ||
| 697DCK-22-R-00363 Amd 1.pdf | ||
| 697DCK-22-R-00363 SIR.pdf | ||
| L4 - Form 7460-1.pdf | ||
| L1 - BidBond SF24.pdf | ||
| J-1 Final_D10_Plumbing_Specifications.pdf | ||
| L2 - Past Performance Questionnaire.pdf | ||
| L3 - Price Proposal.xlsx | XLSX spreadsheet | |
| J-2 Wage Determiniation Dallas TX.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
ENGINEERING SERVICES
TERMINAL
TRACON
FIRST FLOOR TRACON
REPLACEMENT
DFW/D10 PLUMBING & COMPUTER ROOM UNIT
TXDFW INTERNATIONAL AIRPORTDALLAS-FORT WORTH
PROJECT ENGINEER MGR: ENGINEERING - FORT WORTH
04/07/2021 1508267
DFW-D-TRACO-M003
d f w d t r a c o m .d g n
THIS DRAWING PRODUCED ON ASW REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
C O
N S
T R
U
IO
TRACON EQUIPMENT ROOM CRAC AND CONTROLS REPLACEMENT
WITH THE CONTRACTOR'S APPROVED SEQUENCE OF WORK SUBMITTAL.
SO THAT THERE ARE NO UNSCHEDULED HVAC EQUIPMENT OUTAGES. WORK SHALL BE ACCOMPLISHED IN ACCORDANCE
AND WORK TASKS. COORDINATE CUT-OVER TO THE NEW HVAC EQUIPMENT WITH THE FAA RESIDENT ENGINEER (RE)
THIS DRAWING AND SIMILAR DRAWINGS ARE NOT INTENDED TO BE A COMPLETE LIST OF REQUIRED EQUIPMENT
PLANS AND SPECIFICATIONS. THE NEW HVAC EQUIPMENT SHALL BE CONNECTED TO THE EXISTING DDC SYSTEM.
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A NEW COMPLETE AND FULLY FUNCTIONAL EQUIPMENT PER
THE FOLLOWING EQUIPMENT IDENTIFIED ON THE DRAWING IS PART OF THE NEW CRAC EQUIPMENT PROJECT.
KEYED CONSTRUCTION NOTES:
CONTRACTOR SHALL VALVE AND CAP CHILLED WATER PIPING AT THE LOCATIONS SHOWN ON THE DRAWINGS.
COORDINATE ALL ELECTRICAL WORK REQUIRED INSIDE AN FAA POWER PANEL WITH THE RE 2 WEEKS IN ADVANCE.
DISRUPTIONS TO AREAS SERVED BY THE CRAC UNITS AND OTHER ASSOCIATED HVAC EQUIPMENT DURING INSTALLATION WORK.
THE CONTRACTOR SHALL COORDINATE WORK OF THE MECHANICAL AND CONTROL SUB-CONTRACTORS SO THAT THERE ARE NO
WITH THE CONTROL SUBCONTRACTOR.
NEW SENSORS, NEW THERMOSTATS, AND NEW FLOW METERS IN ACCORDANCE WITH PLANS AND SPECIFICATIONS. COORDINATE THIS WORK
CONTRACTOR SHALL INSTALL EXISTING DIRECT DIGITAL CONTROL (DDC) SYSTEM TO THE NEW CRU CONTROL PANELS, NEW ACTUATORS, 3/4" DIAMETER OR PER MANUFACTURER'S RECOMMENDED SIZE.
INSTALL NEW COPPER CONDENSATE TUBING FROM EACH AIR HANDLING UNIT AND COMPUTER ROOM UNIT TO THE NEAREST FLOOR DRAIN, SPECIFICATIONS.
ALL NEW HVAC EQUIPMENT. NEW PIPE INSULATION SHALL BE COVERED WITH PVC JACKET AND LABELED IN ACCORDANCE WITH PLANS AND
CONTRACTOR SHALL FURNISH AND INSTALL CELLULAR GLASS INSULATION ON ALL NEW CHILLED WATER PIPING, FITTINGS, AND VALVES FOR
RESIDENT ENGINEER (RE) 2 WEEKS IN ADVANCE.
(MINIMUM) WITHOUT ANY PROBLEMS BEFORE THE NEXT CRUs CAN BE REPLACED. ALL WORK SHALL BE COORDINATED WITH THE FAA
BE REPLACED AT A TIME AS DETERMINED BY THE APPROVED SEQUENCE OF WORK SUBMITTAL. CRUs MUST OPERATE FOR 24 HOURS
RELATED ITEMS. FOR LIEBERT EQUIPMENT ASSISTANCE, CONTRACT PHIL BONDS AT 214-693-3044. ONLY ONE GROUP OF CRAC UNITS SHALL
PRESSURE/TEMPERATURE TEST PORTS (PETE'S PLUGS), ELECTRICAL WIRING AND CONDUIT, AND ALL OTHER TEMPERATURE GAUGES, WORK INCLUDES NEW CHILLED WATER SUPPLY AND RETURN PIPING, CONDENSATE PIPING, VALVES, LIQUID FILLED PRESSURE GAUGES, THRU 15), LIEBERT MODEL CW038DC1A1-DOWNFLOW (OR APPROVED EQUAL) IN ACCORDANCE WITH PLANS AND SPECIFICATIONS. THIS
CONTRACTOR SHALL FURNISH AND INSTALL FIFTEEN (15) NEW LIEBERT CHILLED WATER COMPUTER ROOM AIR CONDITIONING UNITS (CRU-1
COOLING DURING THE REPLACEMENT OF THE CRUs.
EQUIPMENT AND OTHER NECESSARY MATERIALS ON SITE. CONTRACTOR SHALL PROVIDE FOUR (4) 2- TON SPOT COOLERS FOR EMERGENCY
PRIOR TO REMOVAL OF CRU'S AND EQUIPMENT CONTROLS, THE CONTRACTOR SHALL HAVE ALL NEW MECHANICAL, ELECTRICAL, AND CONTROL
1 2 3 4 5 6 fw -d -t ra c
-m
/0
/2
:3
:4
P
M lo tt e b y
V
-C
A E
G -E
D
B
F
H
8 7 6 5 4 3 2 1
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
REDLINE
APVD
-d lo tt e
1 1/4 "1"
1"1 1/4 "1"
1 1/4 "
1"
2 1/2" CHWS & CHWR
6" ECHWS & ECHWR
M2 M2
D D
DDD
CUH-1
BBH-2
CUH-1
CUH-2
CUH-2
BBH-3
FIRST FLOOR MECHANICAL PLAN - BELOW CEILING
1/16" = 1'-0"
SHEET M10
FOR THIS AREA
SEE ENLARGED PLAN,
ECHWS
ECHWR
CRAC-1 CRAC-2
CRAC-3
W
CRAC-9CRAC-8CRAC-7
CU-5
(TYPICAL).
AREAS ROUTE BELOW RAISED FLOOR
HYDRONIC LINES IN COMPUTER
CRAC-15CRAC-14CRAC-13
SEE ENLARGED PLAN,
SHEET M10
FOR THIS AREA
128132
111 114
CRAC-6
2" HWS & HWR
CRAC-12CRAC-11CRAC-10
EXPANSION JOINT
CRAC-4 CRAC-5
ROOM NUMBER KEY
ROOM NAME
STAIR
MECHANICAL ROOM
ELECTRICAL ROOM
NAV/COMMUNICATIONS EQUIP.
CORRIDOR
WOMEN'S TOILET
VESTIBULE
TELEPHONE
JANITOR
CENTRAL VACUUM ROOM
CABLE CHASE
ELEVATOR SHAFT
LOBBY
MEN'S TOILET
STORAGE
NOT USED
TELEPHONE ROOM
RADAR/ARTS EQUIP.
ROOM NO.
IS
dfw-d-traco-m003
2022-04-11T12:57:25-0400
KEVIN MILES
2022-04-11T06:23:23-0500
ARTURO MEDINA
MANUFACTURE PROVIDED 3-WAY VALVE
RISER DIAGRAM
04/08/2021 1508267
DFW-D-TRACO-M004
w d t r a c
-d
:0 lo tt e
2 1/2 "
2 1/2"3"3"
INDICATED BY MANUFATURE.
SHALL BE 1 3/8" UNLESS OTHERWISE
NOTE: RUN-OUTS TO COMPUTER UNITS (CU)
1 1/2 "2"
2 1/2 "1 1/4 "
1 1/2 "
1 1/2 "2"
4" 2"
3" 6"
1 3/8 "
6"2 1/2 "6"
2-1/2"
2 1/2 "6"
3"3"
3"1"1 1/2 "3"
3"4"
8"
8"
4"3"
2 1/2 "1 1/2 "
1 1/2 "3"1 1/2 "
1"1 1/2 "1 1/2 "2"
"INTERIM TRACON" RM. 203
(WEST)
FROM ESU BLDG.
UTILITY TUNNEL
COMPUTER FLOOR, SEE PLAN.
ROUTE BELOW RAISED
PIPES DROP DOWN AND
(EAST)
"END STATE" RM. 202
MECH. RM. 133
HWR
HWS
CHWS
CHWR
TCHWS
TCHWR
THE-1
(STANDBY)
TCHWP-1
CU-CU-
CRU-
CRU-CRU-CRU-
12 11 10
"NAV/COMM." RM. 131
SECOND FLOOR
THIRD FLOOR
MECH. RM. 354
AHU-6AHU-8
AHU-2AHU-4
"RADAR/ARTS" RM. 103
CU-9
CU-1CU-2CU-3
CU-6 CU-8CU-5
MECH. RM. 108
FIRST FLOOR
AHU-3AHU-1
AHU-7AHU-5
THIRD FLOOR
MECH. RM. 319
TCHWP-2
TRACON BLDG. HYDRONIC PIPING SCHEMATIC
NOT TO SCALE
ROOFTOP
P/T PORT (TYP OF 2)
CWS
CWR
CONDENSATE LINE
TO NEAREST DRAIN
BALL VALVE FOR
COLD WATER SUPPLY
COMPRESSION FITTING
SOLAR DIGITAL THERMOMETER
(TYP OF 2)
CALIBRATED BALANCING
VALVE
BALL VALVE (TYP OF 2)
FLEX CONN (TYP OF 2)
STRAINER WITH
BLOW DOWN VALVE
FLOW METER
NOT TO SCALEM004
3/4" HOSE END DRAIN, TYP
COMPUTER AIR
CONDITIONER
PIPING CONNECTION TO COMPUTER ROOM AIR CONDITIONER (CRU-1 THRU 15)
dfw-d-traco-m004
2022-04-11T12:57:34-0400
KEVIN MILES
2022-04-11T06:23:34-0500
ARTURO MEDINA
MECHANICAL SCHEDULE
05/03/2021 1508267
DFW-D-TRACO-M005
w d t r a c
-d
:1 lo tt e
BERKO #CUH3-0427-1277/1CUH-2 ELECTRIC 4.0 1 2
ESU BLDG.
CAPACITY - GALLONS
RECEIVER MINIMUM
PSI
DISCHARGE HEAD
WEIL # 4206K12330 460 3 6022.5DUPLEXCP-1
HZ
GPM REMARKSMANUFACTURER AND MODEL NO.
ELECTRICAL
PHVOLTS
MARK TYPE
STEAM CONDENSATE RETURN PUMP SCHEDULE
MOTOR
HP
10.0
CAPACITY - KW
HEATING
BERKO # HUH-1048-M
CFM
ELECTRIC UNIT HEATER SCHEDULE
LOCATIONMARK
VOLTS PH
MANUFACTURER AND MODEL NO. REMARKSTYPE
HZ
FAN HP
UH-1E
UH-2E
UH-3E
UH-4E
HORIZ. SUSPENDED
6034801/10500 BERKO # HUH-1048-M
6034801/10500
5 PRESS. INDEPENDENT BOX, SET FOR CONSTANT VOLUME.
8"]
8"]
14"]
1 180\ EWT, 140\ LWT.
HIGH CAPACITY (250 CFM).
1 INTEGRAL (TAMPER PROOF) THERMOSTAT.
4.0ELECTRICCUH-1
MANUFACTURER
& MODEL NUMBER
CABINET UNIT HEATER SCHEDULE
MARK REMARKSKWTYPE VOLTS/PHASE
277/1 BERKO #CUH3-0427-1
BERKO #BKOC-2573
5'-0"
4'-0"
3'-0"
LENGTH
NOMINAL
277/1
VOLTS/PHASE
1.25ELECTRICBBH-3
1.0ELECTRICBBH-2
TYPE KW REMARKSMARK
BASEBOARD HEATER SCHEDULE
BBH-1 ELECTRIC .75
INTEGRAL (TAMPER PROOF) THERMOSTAT1
LOUVER FIN DIFFUSER
TRANE #100-S1535 60 31.2 1.61 1.0 1/8 1550 120 1 60
SET PRIM. VALVE MIN. FLOW @ 20%2
1 HTG. FAN CAPACITIES @ MIN .125" DOWNSTREAM S.P. 35DB MAX SOUND/OCCUPIED SPACE
SERVES SECOND FLOOR4
TRANE #VSDD-24
SIZE
INLET
650 325 1/15 2.0 277/1/60 TRANE #VFPE 1104 3
850 425 1/8 2.5 277/1/60 TRANE #VFPE 1104 3
2225 - - - - 3
2225 14"] - - - - TRANE #VSDD-24 3
550 8"] 275 1/15 2.0 277/1/60 TRANE #VFPE 1104 2 3
600 8"] 260 1/15 1.5 277/1/60 TRANE #VFPE 1104 2 3
1200 10"] 600 1/8 2.0 277/1/60 TRANE #VFPE 1707 2 3
1400 10"] 700 1/8 2.0 277/1/60 TRANE #VFPE 1707 2 3
900 8"] 450 1/8 2.0 277/1/60 TRANE #VFPE 1107 2 3
400 6"] 200 1/15 .5 277/1/60 TRANE #VFPE 0604 2 3
350 6"] 175 1/15 1.0 277/1/60 TRANE #VFPE 0604 2 3
700 8"] 350 1/15 1.0 277/1/60 TRANE #VFPE 1104 2 3
800 8"] 400 1/8 1.0 277/1/60 TRANE #VFPE 1107 2 3
700 8"] 350 1/15 1.0 277/1/60 TRANE #VFPE 1104 2 3
950 8"] 475 1/8 1.0 277/1/60 TRANE #VFPE 1107 2 3
600 8"] 300 1/15 .75 277/1/60 TRANE #VFPE 1104 2 3
450 6"] 225 1/15 .5 277/1/60 TRANE #VFPE 0604 2 3
550 8"] 275 1/15 .75 277/1/60 TRANE #VFPE 1104 2 3
1550 10"] 775 1/3 4.0 277/1/60 TRANE #VFPE 1711 2 3
1300 10"] 650 1/8 4.0 277/1/60 TRANE #VFPE 1707 2 3
800 8"] 400 1/8 1.5 277/1/60 TRANE #VFPE 1107 2 3
1200 10"] 600 1/8 3.0 277/1/60 TRANE #VFPE 1707 2 3
1200 10"] 600 1/8 4.0 277/1/60 TRANE #VFPE 1707 2 3
300 6"] 150 1/15 1.0 277/1/60 TRANE #VFPE 0604 2 3
800 8"] 400 1/8 2.0 277/1/60 TRANE #VFPE 1107 2 3
400 6"] 200 1/15 .5 277/1/60 TRANE #VFPE 0604 2 3
500 8"] 250 1/15 .75 277/1/60 TRANE #VFPE 1104 2 3
1900 12"] 950 1/3 2.5 277/1/60 TRANE #VFPE 2415 2 3
600 8"] 300 1/15 1.0 277/1/60 TRANE #VFPE 1104 2 3
600 8"] 300 1/15 1.0 277/1/60 TRANE #VFPE 1104 2 3
850 8"] 425 1/8 1.0 277/1/60 TRANE #VFPE 1107 2 3
1200 10"] 600 1/8 3.0 277/1/60 TRANE #VFPE 1707 2 3
600 8"] 300 1/15 3.0 277/1/60 TRANE #VFPE 1104 2 3
1200 10"] 600 1/8 4.0 277/1/60 TRANE #VFPE 1707 2 3
700 8"] 350 1/15 2.0 277/1/60 TRANE #VFPE 1104 2 3
32TRANE #VFPE 1107277/1/603.01/85008"]1000
HORIZ. SUSPENDEDESU BLDG.
UH-12E
UH-11E
UH-10E
UH-9E
UH-8E
UH-7E
UH-6E
UH-5E
FT WG
MAX PD
GPM
MIN CAP
MBH HZ
TYPE REMARKSMANUFACTURER AND MODEL NO.
MOTOR DATA
PHVOLTSRPMHP
MARK LOCATION
HOT WATER UNIT HEATER SCHEDULE
AIR \F
ENT
VAV TERMINAL UNIT SCHEDULE
MARK
CFM FAN HP VOLTS/PH HTR. KW
MANUFACTURER AND MODEL NO. REMARKS
HTR. VOLTS/PH
COOLING
46,000
FAN CFM AT .3" MIN. ESP
INCLUDE INSECT SCREEN.1
.0622 X 221,625INTAKEIH-4E "ACME" (SKYMASTER) MODEL I.V. 1.
.1016 X 161,200INTAKEIH-3E "ACME" (SKYMASTER) MODEL I.V. 1.
.1030 X 304,500INTAKEIH-2E "ACME" (SKYMASTER) MODEL I.V. 1.
1."ACME" (SKYMASTER) MODEL I.V..1042 X 429,500INTAKEIH-1E
PROVIDE 3-WAY CONTROL VALVES
2 150 PSIG DESIGN PRESSURE (ASME)
ESSENTIAL CHW SYSTEM
7SERVED BY EMERGENCY POWER SYSTEM, AND
SECURED BY EMERGENCY PANEL SYSTEM5
1 MAX PRESS. DROP (FT.H 0) = 5.0
2-PASS, VERTICAL3,815
SIZE
THROAT
@ NOM. CFM
3-STAGE, STAINLESS STEEL FIN-TUBE.INFRARED TYPE
4 ACTUAL CAPACITY @ 105\ AMBIENT = 193.75 TONS MINIMUM.
4 2
2 304 STAINLESS STEEL PLATES.
1 145 PSIG DESIGN PRESSURE.
PATTERSON-KELLEY #DS-8-581001751801403700VERT. STM-HW
SERVES ONLY EXIST. TOWERBELL & GOSSETT # GPX258B.0001107047641070624550PLATE & FRAME
HWC-1
THE-1
MERV 11 FILTERS REQ.
10 CHW 460 3 60 113.1 115.3 75 4.8 15 460/3 DOWNFLOW 32
2 3DOWNFLOWVERTIV MODEL CW038DC1A1460/3154.875115.3113.160346046,000CHW10
CRU-15
CRU-14
CRU-13
CRU-12
CRU-11
CRU-10
CRU-9
CRU-8
CRU-7
CRU-6
CRU-5
CRU-4
CRU-3
CRU-2
CRU-1
ALL RATINGS = EMERGENCY MODE.
PACKAGED, HELICAL SCREW.
CH-4 200 105 AIR COOLED 60.5 45.0 300 460 3 60 406 TRANE #RTAA-200
CH-3 200 105 AIR COOLED 60.5 45.0 300 460 3 60 406 TRANE #RTAA-200
CH-2 200 105 AIR COOLED 60.5 45.0 300 460 3 60 406 TRANE #RTAA-200
FUTURE
TRANE #RTAA-20040660346030045.060.5AIR COOLED105200CH-1
LWT
\F
AIR COOLED CHILLER SCHEDULE
VOLTS PHASE Hz MCA
UNIT ELECTRICAL
REMARKSTYPE
FAN
COMPUTER ROOM UNIT SCHEDULE
TYPE KW
KW
ELEC REHEAT
MANUFACTURER AND MODEL NO. REMARKSVOLTS/
NOM.
TONS
AMBIENT
TEMP. \F
EWT
1 MIN. EER. = 8.0
PHASE
HUMIDIFICATIONCOOLINGUNIT ELECTRICAL
EAT
MBH
TOTAL
MBH
SENS.
HzPHASEVOLTS
TYPE
FAN
HP
F, LWT=55
EWT=451
PD-ft.
MAX.
SOURCE (COLD) SIDE
REMARKS
HEAT EXCHANGER SCHEDULE
TOWER (HOT) SIDE
PD-ft.
FOULING
FACTOR
AIR INTAKE/RELIEF HOOD SCHEDULE
MARK REMARKSTYPE
MAX.-AIR
PRESS. DROP
LBS./HR.
PSIG.
PRESS.
STEAM
HOT WATER CONVERTER SCHEDULE
REMARKS
HEATING WATER
TOTAL
CAP'Y.-MBH
VERTIV MODEL CW038DC1A1
dfw-d-traco-m005
2022-04-11T12:57:41-0400
KEVIN MILES
2022-04-11T06:23:54-0500
ARTURO MEDINA
CONTROL DIAGRAM
05/17/2021 1508267
DFW-D-TRACO-M006
w d t r a c
-d
:5 lo tt e
C E
PART OF EXISTING DIRECT DIGITAL CONTROL PANEL (DDCP)
ID
DIDI
DO
AI DI
TROUBLE
UNIT MICROPROCESSOR CONTROL
AIAI
SA
RA
AI
TS
HS
PS
FM
PS
TS
AI
AO AO
DI
DI
DETECTION
LEAK
CRU
TYP
TO
FACP
COMPUTER ROOM AIR CONDITIONER CRAC-1 THRU CRAC-15 (TRACON)
TEMPERATURE/HUMIDITY CONTROL AND AIR FLOW DIAGRAM
3-WAY VAVLE
MANUFACTURER PROVIDED
NOTES:
SEQUENCE OF OPERATION.
ACCORDANCE WITH THE ON THE UNIT SCHEMATIC IN
MONITOR THE ANALOG AND DIGITAL POINTS IDENTIFIED
EXISTING DDC CONTROL SYSTEM SHALL BE ABLE TO 5.
PROVIDE NEW CONTROL CONDUIT TO DDC PANEL.
VALVES, ACTUATORS, AND NEW CONTROL WIRING.
PROVIDE AND INSTALL NEW CONTROL VALVE, SHUT-OFF 4.
ACCORDANCE WITH SPECIFICATION SECTION 23 09 23.
EQUIPMENT SHOWN IN THE PLANS AND IN
NEW CONTROL EQUIPMENT AND POINTS FOR ALL
CONTRACTOR SHALL PROVIDE AND INSTALL ALL 3.
FOR SEQUENCE.
CONTROLS). IF NONE EXIST, SEE SPECIFICATIONS
EXISTING DDC CONTROLS CONTRACTOR (JOHNSON
FOR SEQUENCE OF OPERATION, CONTACT THE2.
FOR GENERAL NOTES, SEE DRAWING M002.1.
dfw-d-traco-m006
2022-04-11T12:57:52-0400
KEVIN MILES
2022-04-11T06:24:10-0500
ARTURO MEDINA
ACCESSIBLE LOCATIONS. PROVIDE ACCESS PANELS WHERE REQUIRED.
INSTALL VALVES AND COMPONENTS REQUIRING MAINENANCE, CLEANING OR ADJUSTMENT IN 7.
MINIMUM SLOPE OF 2% (1/4" PER FOOT).
(1/8" PER FOOT). SANITARY PIPING 2 1/2" AND SMALLER SHALL BE INSTALLED TO PROVIDE A
SANITARY PIPING 3" AND LARGER SHALL BY INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1% 6.
INSTRUCTIONS.
ACCORDANCE WITH SPECIFICATIONS, LOCAL CODES,AND ORDINANCES, AND MANUFACTUREER'S
A COMPLETE INSTALLATION. PIPING, EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN
THEY DO NO SHOW ALL REQUIRED BENDS, OFFEST, VALVES, AND MISCELLANEOUS FITTINGS FOR
FINAL CONNECTIONS TO EQUIPMENT. THESE PLANS ARE SCHEMATIC & DIAGRAMMATIC ONLY.
PROVIDE REQUIRED WATER, WASTE & VENT PIPING, FITTINGS, AND INSULATION, AND MAKE 5.
EQUIPMENTOR PANELS.
NO PIPING SHALL BE INSTALLED ABOVE ELECTRICAL, COMMUNICATIONS, OR DATA
COORDINATE LOCATION OF PIPING AND DRAINS WITH MECHANICAL & ELECTRICAL EQUIPMENT. 4.
LOCATION.
WALL CLEANOUTS SHALL BE PROVIDED WITH WALL COVERS, MOUNT IN UNOBTRUSIVE 3.
PIPING SHALL BE CONCEALED IN FINISHED AREAS UNLESS OTHERWISE NOTED.2.
PLUMBING WITH FAA RE.
DETAILED SEQUENCE OF WORK FOR ALL PLUMBING WORK. COORDINATE INSTALLAITON OF
PIPING ROUTE FOR SEWER AND DOMESTIC PIPING. THE CONTRACTOR SHALL SUBMIT A
CONTRACTOR SHALL SUBMIT A PIPING LAYOUT SHOWING ALL NECESSARY CONNECTIONS AND 1.
GENERAL NOTES
C CHANNEL OR CONDUIT
BP BOOSTER PUMP
BOP BOTTOM OF PIPE
BLDG BUILDING
BD BOARD OR BACKDRAFT
AVG AVERAGE
AUX AUXILIARY
ATC ACOUSTICAL TILE CEILING
ARCH ARCHITECTURAL
APPROX APPROXIMATELY
ANCH ANCHOR
AFF ABOVE FINISHED FLOOR
ADR ACCESS DOOR
ADJ ADJACENT OR ADJUSTABLE
AD AREA DRAIN
DEMAND
EMD ESTIMATED MAXIMUM
ELEV ELEVATOR
ELEC ELECTRIC (AL)
EL ELEVATION
E/G ENGINE GENERATOR
EF EACH FACE
DWV DRAIN, WASTE, VENT
DS DOWNSPOUT
DN DOWN
DIA DIAMETER
DF DRINKING FOUNTAIN
DET DETAIL
DEPR DEPRESSED
HR HOUR
HPT HIGH POINT
HP HORSE POWER
H/L HIGH LEVEL
HB HOSE BIBB
H HUMIDIFIER
GPM GALLONS PER MINUTE
FT FEET
FPRF FIREPROOFING
FP FIRE PUMP
FM FORCE MAIN
FL / FLR FLOOR
FIX FIXTURE
FHC FIRE HOSE CABINET
FH FIRE HYDRANT
BRACKET
FEB FIRE EXTINGUISHER
FE FIRE EXTINGUISHER
FD FIRE DAMPER
FCU FAN COIL UNIT
FA FIRE ALARM
F FILTER, FAHRENHEIT
EXIST EXISTING
EXH EXHAUST
EWH ELECTRIC WATER HEATER
EWC ELECTRIC WATER COOLER
EQUIP EQUIPMENT
EMT ELECRICAL METAL TUBING
EHC ELECTRIC HEATING COIL
MAX MAXIMUM
MAINT MAINTENANCE
M MOTOR
LTG LIGHTING
L/L LOW LEVEL
LF LINEAR FEET
LAV LAVATORY
L
KIT KITCHEN
K
JP JOCKEY PUMP
J JUNCTION
J
INSUL INSULATION
IN INCH
IE INVERT ELEVATION
I
HZ HERTZ
HW HOT WATER
AIR CONDITIONING
HVAC HEATING/VENTING/
PVC POLYVINYL CHLORIDE
CURVATURE
PTVC POINT OF VERTICAL
PT POINT OF TANGENCY
PSI POUNDS PER SQUARE INCH
PSF POUNDS PER SQUARE FOOT
PRV PRESSURE REDUCING VALVE
PR PAIR
PLF POUND PER LINEAR FOOT
PIV POST INDICATOR VALVE
PI POINT OF INTERSECTION
CONDITIONING
VENTILATING & AIR
PHVAC PLUMBING/ HEATING/
PEN PENETRATION
PCF POUND PER CUBIC FOOT
PART PARTITION
P PUMP
OPNG OPENING
OD OUTSIDE DIAMETER
NTS NOT TO SCALE
NO NORMALLY OPEN
NC NORMALLY CLOSED
MIN MINUTES
MH MANHOLE
MG MOTOR GENERATOR
MFR MANUFACTURER
MET METAL
MECH MECHANICAL
MC MISCELLANEOUS CHANNEL
STM STEAM
SP
SERVICE SINK
SPEC SPECIFICATIONS
SK
SUMP PUMP
SM SPRINKLER MAIN
SS
SINK
SIM SIMILAR
SAN SANITARY
ROW RIGHT OF WAY
RM ROOM
REQ'D REQUIRED
RD ROOF DRAIN
RCP REINFORCED CONC.PIPE
R RISER OR REGISTER
Q
PW POTABLE WATER
TANGENCY
PVT POINT OF VERTICAL
INTERSECTION
PVI POINT OF VERTICAL
YH YARD HYDRANT
YD YARD
WHA WATER HAMMER ARRESTOR
WW WATER WARMER
HYDRANT
WH WATER HEATER OR WALL
WG WATER GAUGE
WC WATER CLOSET
W WIDTH
VTR VENT THROUGH ROOF
VCP VITRIFIED CLAY PIPE
VC VERTICAL CURVE
V VENT
UR URINAL
UG UNDERGROUND
T-STAT THERMOSTAT
TP TOILET PARTITION
TOIL TOILET
TK TANK
CUBIC FOOTCF
CHANNEL CH
CAST IRONCI
CAST IRON PIPECIP
CEILING OR COOLINGCLG
CORRUGATED METAL PIPECMP
CLEAN OUTCO
CONDENSATECOND
CONSTRUCTIONCONST
CONTRACTORCONTR
COPPERCU
CONTROL VALVE ORCV
COLD WATERCW
CUBIC YARDCYD
FPHB FREEZE PROOF HOSE BIBB
HWR HOT WATER RETURN
CENTRAL VACUUM
OVERFLOW DRAINOFD
WALL CLEANOUTWCO
FLOOR CLEANOUTFCO
REQUIRED TO MAINTAIN ASSEMBLY INTEGRITY.
PENETRATIONS OF FIRE AND/OR SMOKE-RATED ASSEMBLIES SHALL BE FIRE-STOPPED AS 13.
TOP OF FLOOR DRAINS AND FLOOR CLEANOUTS SHALL BE SET FLUSH WITH FINISHED FLOOR.12.
(INSIDE) OF BUILDING INSULATION.
WATER PIPING ABOVE CEILING AND IN EXTERIOR WALLS SHALL BE ROUTED ON HEATED SIDE 11.
SHALL NOT REST ON CEILING TILES OR BE SUPPORTED FROM CEILING GRID SYSTEM
PIPING ABOVE GRADE SHALL BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE. PIPING 10.
FIXTURES.
REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS AND ELEVATIONS OF PLUMBING 9.
AND EQUIPMENT WITH FAST-ACTING VALVES.
WATER HAMMER ARRESTORS SHALL BE INSTALLED PER PDI WH-201 NEAR PLUMBING FIXTURES 8.
TX
1508267
DFW-D-TRACO-P001
PLUMBING GENERAL NOTES
DFW INTERNATIONAL AIRPORTDALLAS-FORT WORTH
05/26/2021 w d t r a c o p
-d
-p lo tt e
SANITARY DRAIN PIPE
STORM DRAIN PIPE
VENT PIPE
DOMESTIC COLD WATER PIPE
DOMESTIC HOT WATER PIPE
UNION
STRAINER
CLEAN OUT
GATE VALVE
GLOBE VALVE
CHECK VALVE
HOSE BIBB
FREEZE PROOF HOSE BIB
FLOOR DRAIN
SD
SYMBOL DESCRIPTION
PLUMBING LEGEND
FD
PIPE DOWN
PIPE UP
HOT WATER RETURN PIPE
BOOSTED DOMESTIC COLD WATER PIPE
PIPE UP AND DOWN
RD ROOF DRAIN
OFD OVERFLOW DRAIN PIPE
CO
CENTRAL VACUUM PIPECV
OFD OVERFLOW DRAIN
SOLENOID VALVE, 120 V
PRESSURE GAUGE W/GAUGE COCK
dfw-d-traco-p001
2022-04-11T12:57:58-0400
KEVIN MILES
2022-04-11T06:24:39-0500
ARTURO MEDINA
KEYED CONSTRUCTION NOTE:
THE FOLLOWING CLOUDED ITEMS ON THE DRAWING ARE PART OF THE
NEW PLUMBING AND RENOVATION FOR THE RESTROOMS AT D10 TRACON
FACILITY. THE CONTRACTOR IS RESPONIBLE TO PROVIDE ALL NEW MATERIALS
AND NEW FUNCTIONAL RESTROOMS FOR THE FACILITY. THIS DRAWING AND
SIMILAR DRAWINGS ARE NOT INTEDED TO BE A COMPLETE LIST OF REQUIRED
ITEMS AND WORK TASKS. COORDINATE CUT-OVERS AND SHUTDOWNS WITH
FAA PROJECT ENGINEER AND RE SO THAT THERE ARE NO UNSCHEDULED
OUTAGES. WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE
CONTRACTORS' APPROVED SEQUENCE OF WORK SUBMITTAL.
FIRST FLOOR RESTROOMS
GROUND LEVEL
4" W
WC-1 WC-2 LAV-1
2" V
4" V
FD 2"
FD 2"GROUND LEVEL
LAV-1
WC-1 WC-2
4"V
TO THE CITY SEWER
DOUBLE CO
6" W
6"W
3/4" HW
1-1/2" CW
2" CW
3/4" CW
INSTALL NEW SEWER PIPE FOR ALL THE BRANCH WASTE & VENT
LINES FOR THE MEN'S AND WOMEN'S RESTROOMS. THIS WORK
INCLUDES INSTALLING NEW CLEANOUTS, FLOOR DRAINS, AND
ALL NEW MATERIAL ASSOCIATED WITH REPLACING THE WASTE
& VENT PIPING FOR THE FIRST FLOOR RESTROOMS.
INSTALL ALL NEW DOMESTIC WATER PIPING AND ACCESSORIES
THAT SERVES THE MEN'S AND WOMEN'S RESTROOMS UP TO
AND INCLUDING THE SHUT-OFF VALVE THAT FEEDS THE RESTROOM.
THIS WORK INCLUDES ALL COLD WATER (CW) AND HOT WATER (HW)
DOMESTIC PIPING CLOUDED ON THE DRAWINGS.
INSTALL A NEW DOUBLE CLEANOUT OUTSIDE ON THE WEST SIDE
OF THE TRACON BUILDING. COORDINATE WITH FAA RE FOR
SCHEDULED WORK.
DFW-D-TRACO-P002
1ST FLOOR RESTROOMS
07/16/2021 w d t r a c o p
-d lo tt e
FIRST FLOOR PLUMBING PLAN
FLR.
IN ACCESS
FCO
6" W UP
FLOOR.
FD-2 ON SECOND
2" W UP IN WALL TO
HB-1
3/4"
CU-1
1/2" CW TO
1/2"1/2"
1/2"1/2"
AHU'S.
TO SERVE COMPUTER
3/4" CW IN ACCESS FLR
1/2"
FLR AREA.
TO ACCESS
3/4" CW DN
CU-4
CU-3
CU-2
CU-5 1/2" CW TO
CU-6
CU-7
CU-8
CU-12
CU-11
CU-10
CU-9
CU-13
CU-14
CU-17
CU-16 &
CU-15
CU-18
CU-19
CU-20 CU-21
2"V
SHT. F1
RISER, SEE
H-1
DN TO
1/2" CW
CEILING AREA.
WALL TO 1ST FLR
IN 1ST FLR
1 1/2 " V UP
COLUMN
TO H-2
1/2" CW DN
UP ALONG COLUMN
6" CV EXHAUST
10" FIRE
2 1/8 " CV UP
TO 1ST FLR
CLG. AREA
CV-1
P2 P7
RISER INSIDE BLDG
BLDG SHUT OFF VALVE IN
P3 P5
R1N
R2N
SEE SHT. P3
FLR. CLG. AREA
2 1/2 " CV UP TO 1ST
2" W UP
BELOW SLAB
VENT PIPING
IN CHASE
ALONG
IN WALL
4" W UP
1" HWR UP
2" CW UP
1" HW UP
1" HWR UP
1" CW, HW UP
AREA
PIPING IN CEILING
3/4" CW, RUN
6" OFD UP
10" SD UP
UR-2
WC-2
WC-1
BP-1&2
1 1/2 " PRESSURE CW
OUT THRU WALL
6"] OFD DN
FPHB-1
SITE MAIN.
BEAM, TO
UNDER GRADE
10" ] SD DN
4"] W
@ 1/8" PER FT.
@ 1/8" PER FT.
4"] W
3/4" CW UP
SS-1
EXIST. TRACON.
RENOVATION OF
FOR FUTURE
3" CW CAPPED
1" CW UP
3/4" HW UP
3" W UP
EXIST. TRACON.
RENOVATION OF
FOR FUTURE
1" HWR CAPPED
1 1/2 " HW CAPPED
4" V UP
,B
6" W UNDER GRADE
BEAM, TO SITE
MAIN, SEE CIVIL PLANS.
4" DOMESTIC CW SUPPLY
SEE CIVIL PLANS.
4" CW DN
3" CW UP
2 1/2 " HW, 1" HWR
TO ESU BLDG.
IN UNDERGROUND
TUNNEL. SEE SHT P9.
FCO BELOW
ACCESS FLR.
4" V UPSPLASH ON CONCRETE
SEE CIVIL PLANS.
G F E D C B A
G.5
FD-2
FD-4
FD-2 FD-2
2" 2"
2" V UP
2 1/2 " V UP
FD-1
3/4" DN TO
TCHNR PIPING TO
THE PUMPS. FOR
CONTINUATION,
SEE DWG. NO.
DFW-TRACO-117
1/4" = 1'-0"
PARTIAL PLUMBING PLAN - R2N
1/4" = 1'-0"
AFF.
MOUNT 24"
3/4"2 1/2 "
1" 1"
1/2" 3/4"
3"2"
1 1/2 " 1"
3/4" 2"
114111
EWC-1A,B
LAV-1 UR-2
2" 3"
ELETRICAL ROOM
NAV/COMMUNICATIONS EQUIP.
TELEPHONE
ELEVATOR MACHINE ROOM
TELEPHONE ROOM
ELEV. MECH. ROOM
RADAR/ARTS EQUIP.
R4N
PARTIAL PLUMBING PLAN - R4N
MEN'S RESTROOM SEWER LAYOUT - R3N
R3N
P2 P5
R5N
P2 P5
WOMEN'S RESTROOM SEWER LAYOUT - R5N
P002 P002
P002 P002 dfw-d-traco-p002
2022-04-11T12:58:05-0400
KEVIN MILES
2022-04-11T06:24:58-0500
ARTURO MEDINA
3" CW
3" CW
1" CW
1" HW
1" HW
1" CW
3/4" CW
3/4" HW1/2" HW
3/4" HW
3/4" CW 1/2" CW
1/2" HW
SECOND FLOOR RESTROOMS
INSTALL NEW PIPE FOR ALL THE BRANCH WASTE & VENT
& VENT PIPING FOR THE SECOND FLOOR RESTROOMS.
THIS WORK INCLUDES ALL COLD WATER (CW), HOT WATER (HW),
AND RETURN HOT WATER (HWR) DOMESTIC PIPING CLOUDED ON
THE DRAWINGS.
NEW WORK IS CLOUDED
1 2
DFW-D-TRACO-P003
2ND FLOOR RESTROOMS
07/16/2021 w d t r a c o p
-d lo tt e
SECOND FLOOR PLUMBING PLAN
HB-1,
WALL.
3/4" HW DN
FD-1FD-1
UP & DN
6" CV EXHAUST
WALL
IN 1ST FLR.
FROM 1ST FLR.
CEILING AREA
THRU SLAB.
MOUNT CV INLET
FLUSH W/ACCESS
FLOOR. (TYP)
FLOOR. (TYP)
FLUSH W/ACCESS
MOUNT CV INLET
THRU SLAB.
FROM 1ST FLR.
CV PIPING
(TYP)
MACHINE
WALL TO CV
2 1/8 " CV DN
IN 1ST FLR. WALL
IN 1ST FLR. WALL
ALONG 1ST FLR.
2 1/2 " CV DN
2" W DN
2 1/8 " CV UP 2 1/8 " CV UP
CV
CV CV
VCV
AREA.
1ST FLR. CEILING
2" V, IN
2" W, 6" OFD UP & DN
10" SD UP & DN
IN 2ND FLR.
1 1/2 " V DN
SK-1
UR-2 WC-2
WC-1WC-1
217218
2" W UP & DN
3/4" HW UP & DN
1" CW UP & DN
4" W UP & DN
3/4" CW UP & DN
4" V UP & DN
ABCDEFG
4" V UP & DN
1/2" CW UP
UR-1
2" V UP, 1 1/2 " V DN
2 1/2 " V
IN 1ST
FLR. CEILING
AREA.
ALONG COLUMN.
2 1/2 " V DN
1 1/2 "2" W DN
PLUG FOR
1 1/2 " RUN
CEILING
2" V UP, 1 1/2 " V DN
1 1/2 ", 1CO
CKT 42 ABOVE COUNTER
CKT 38 ABOVE COUNTER
2" W
CKT 2
CKT 4
CKT 6
CKT 11
FOR 4)
(4' AF TYP
2" 2" FD-1FD-1 6" OFD UP & DN
10" SD UP & DN
4"3 "
3/4" 3/4"
1" CW & HW UP
1" CW, 1" HW DN
1" HWR UP & DN
1" CW & HW UP
2" CW & 1" HW DN3" CW UP AND DN
4" W UP AND DN
4" V UP, 2" V DN
2" TO FD-2 IN RM. 203
4" 1 1/2 "
LAV-1LAV-1
WC-2 LAV-1
217218
PARTIAL PLUMBING PLAN - R1N
THIRD FLOOR SIM.
MECH. SHAFT
NOTUSED
MECH. SHAFT
DISPLAY ARTS SHOP
BREAK ROOM
CONFERENCE
SMOKING ROOM
INTERIM TRACON
END STATE FACILITY
225 CABLE CHASE
P003P003
R2N
R3N
R5NR4N
PARTIAL PLUMBING PLAN - R2N
PARTIAL PLUMBING PLAN - R3N
PARTIAL PLUMBING PLAN - R4NPARTIAL PLUMBING PLAN - R5N
dfw-d-traco-p003
2022-04-11T12:58:14-0400
KEVIN MILES
2022-04-11T06:25:32-0500
ARTURO MEDINA
THIRD FLOOR RESTROOMS
& VENT PIPING FOR THE THIRD FLOOR RESTROOMS.
REFER TO DRAWING DFW-D-TRACO-P003 & P006 FOR DETAIL OF THE
RESTROOMS AND PIPING LAYOUTS. CONTACTOR SHALL SUMBIT
A DETAILED PIPING LAYOUT FOR CONSTRUCTION.
1 2 3
DFW-D-TRACO-P004
3RD FLOOR RESTROOMS
07/20/2021 w d t r a c o p
-d lo tt e
24" AFF.
MOUNT
TO H-4
CEILING
TO H-3
FD-1 FD-1
PENETRATION
ROOF
PRIOR TO
OFFSET
THRU ROOF.
6" CV UP
EXHAUST DN
6" CV
P3 P6
R4N
4" VTR
OFFSET PRIOR
TO ROOF
2" V, CONNECT
TO 2" V
IN 3RD FLR
IN 2ND FLR.
2" V DN
ALONG COLUMN
1 1/2 " VTR
4" W DN
2" VTR
4"4"
FD-4FD-4
4" VTR
6" OFD DN
10" SD DN
1 1/2 " CW DN, 1" HW DN
3/4" CW, HW, UP
2" W UP, 4" W DN
2" VTR, 2" V DN
2 1/2 " CW UP & DN
4" VTR, 4" V DN
1" CW, HW DN
3/4" CW, HW UP
2" W UP, 3" W DN
2" VTR, 1 1/2 " V DN
4" V DN
WC-1WC-1
ABCDEFG
2" VTR, 2" V DN
1 1/2 " W UP, 3" W DN
3/4" HW DN
1" CW DN
4" W DN
3/4" CW DN 4" V DN
353 351
366367
365368
369371
378377
324 323
375374
309 311
316 313
THIRD FLOOR PLUMBING PLAN
P003 P003
TRAINING
LIBRARY/REF.
TRAINING RECORDS
ASST. MGR. TRAINING
SECRETARY
AREA MANAGERS OFFICES
OFFICE
OFFICE
MECHANICAL/ELECTRICAL
CBI LAB
AREA SUPV. OFFICE
INTERVIEW
INTERVIEW
STAFF WORKROOM
QUALITY ASSURANCE
TAPE STORAGE
ASST. MANAGER QUALITY ASSURANCE
Q.A. SPECIALISTS
TRANSCRIPT/PLAYBACK
AIRSPACE & PROCEDURES WORKROOM
SPECIALISTS
ASST. MGR. AIRSPACE & PROCEDURES
TRAFFIC WORKROOM
ASST. MGR. TRAFFIC MGMT.
T.M. SYSTEMS ANALYSIS ROOM
DRUG SCREENING
SPECIMEN COLLECTION
TOILET
MECHANICAL/ELECTRICAL
PLANS & PROGRAMS
ASST. MGR. PLANS & PROGRAMS
ETG LAB
ETG/DISPLAY SHOP
COPIER/STORAGE
TRAINING ROOM
OPT WORKROOM
TEAM BRIEFING ROOM
dfw-d-traco-p004
2022-04-11T12:58:27-0400
KEVIN MILES
2022-04-11T06:25:55-0500
ARTURO MEDINA
INDEX OF DRAWINGS
05/21/2021 1508267
DFW-D-TRACO-G005
w d t r a c o g
-d
-g lo tt e
DRAWING NO. DRAWING TITLE
INDEX OF DRAWINGS
DFW-D-ATCT-P004
DFW-D-ATCT-P003
DFW-D-ATCT-P002
DFW-D-ATCT-P001
DFW-D-TRACO-P007
DFW-D-TRACO-P006
DFW-D-TRACO-P005
DFW-D-TRACO-P004
DFW-D-TRACO-P003
DFW-D-TRACO-P002
DFW-D-TRACO-P001
DFW-D-TRACO-M006
DFW-D-TRACO-M005
DFW-D-TRACO-M004
DFW-D-TRACO-M003
DFW-D-TRACO-M002
DFW-D-ATCT-E082
DFW-D-TRACO-E010
DFW-D-TRACO-E009
DFW-D-TRACO-E008
DFW-D-TRACO-E007
DFW-D-ATCT-A021
DFW-D-TRACO-A009
DFW-D-TRACO-A008
DFW-D-TRACO-A007
DFW-D-TRACO-A006
DFW-D-TRACO-A005
DFW-D-ATCT-D028
DFW-D-ATCT-D027
DFW-D-TRACO-D006
DFW-D-TRACO-D005
DFW-D-TRACO-D004
DFW-D-TRACO-D003
DFW-D-TRACO-D002
DFW-D-TRACO-G005
DFW-D-TRACO-G004
DFW BASE BUILDING - RISER DIAGRAMS
DFW BASE BUILDING - RESTROOMS 3 OF 3
DFW BASE BUILDING - RESTROOMS 2 OF 3
DFW BASE BUILDING - RESTROOMS 1 0F 3
ESU BUILDING - RISER DIAGRAMS
TRACON - RISER DIAGRAMS
ESU BUILDING - RESTROOMS
TRACON - THIRD FLOOR RESTROOMS
TRACON - SECOND FLOOR RESTROOMS
TRACON - FIRST FLOOR RESTROOMS
TRACON - PLUMBING GENERAL NOTES
TRACON - CONTROL DIAGRAM
TRACON - MECHANICAL SCHEDULE
TRACON - MECHANICAL RISER DIAGRAM
TRACON - FIRST FLOOR COMPUTER ROOM UNITS
TRACON - GENERAL NOTES & SEQUENCE OF WORK
BASE BUILDING - FIRST FLOOR RESTROOM PLANS
TRACON - FIRST FLOOR PLAN COMPUTER UNITS
TRACON - THIRD FLOOR AND ESU BUILDING FLOOR PLANS
TRACON - FIRST & SECOND FLOOR RESTROOMS
TRACON - FIRST FLOOR PLAN
BASE BUILDING - RESTROOM ARCHITECTURE
ESU BUILDING - RESTRROM ARCITECTURE SCHEDULE
TRACON - RESTROOM ARCHITECTURE SCHEDULE
TRACON - ESU RESTROOM AND DETAIL
TRACON - RESTROOMS DETAIL & ELEVATION
TRACON - RESTROOMS
DEMO - BASE BUILDING PLUMBING
DEMO - BASE BUILDING ARCHITECTURE
DEMO - ESU RESTROOM PLUMBING
DEMO - TRACON RESTROOM PLUMBING
DEMO - TRACON MECHANICAL
DEMO - ESU RESTROOM ARCHITECTURE
DEMO - TRACON RESTROOM ARCHITECTURE
DRAWING INDEX
PLUMBING & COMPUTER ROOM UNIT REPLACEMENT PROJECT - COVER SHEET
dfw-d-traco-g005
2022-04-11T12:54:13-0400
KEVIN MILES
2022-04-11T06:26:42-0500
ARTURO MEDINA
ESU BUILDING RESTROOMS
& VENT PIPING FOR THE THIRD FLOOR RESTROOMS.
REFER TO DRAWING DFW-D-TRACO-P007 FOR DETAIL OF THE
RESTROOMS AND PIPING LAYOUTS. CONTACTOR SHALL SUMBIT
A DETAILED PIPING LAYOUT FOR CONSTRUCTION.
DFW-D-TRACO-P005
ESU RESTROOMS
07/21/2021 w d t r a c o p
-d
:2 lo tt e
BUILDING.
TO MATCH EXTERIOR OF
PAINT PIPES, CLAMPS, ETC.,
STEEL ABOVE GRADE.
FROM CAST IRON TO BLACK
WALL. CHANGE VENT PIPING
2" & 3" VENTS UP EXTERIOR
P9 P7
SEE DETAIL
EXPANSION LOOP
E101 CORRIDOR
E102 SHOP
E103 STAIR
E104 STAIR
E105 TOOL STORAGE
E106 STORAGE
E107 STAIR
E108 UPS ROOM
E109 EMERGENCY GENERATOR ROOM
E110 MECHANICAL
E111 SWITCH GEAR ROOM
E112 BATTERY ROOM
E201 STAIR
E202 HALL
E203 TECHNICIAN OFFICE
E204 NOT USED
E205 TECHNICIAN OFFICE
E206 CONTROL
E207 BREAK ROOM
E208 MEN'S TOILET
E209 LOCKER
E210 NOT USED
E211 VESTIBULE
E212 WOMEN'S TOILET
E213 JANITOR
E214 STORAGE
E215 STAIR
E216 STORAGE
RM.NO. RM. NAME
T-04 TUNNEL (REFER TO SHT. A1)
T-03 TUNNEL
T-02 MECHANICAL ROOM
T-01 STAIR
E111
4"4" 4"
TO H-5
P2 P7
3VALVE, SEE
BLDG. STOP
2" 4"
FD-4 FD-4
2" 1" 2"
P9 P7
T-01
T-03
T-02
P9 P9
P9 P6
R1E
FIRE RISER
IN WALLIN WALL
1 1/2 "1 1/2 "
IN CEILING AREA
1 1/2 ", RUN PIPING
W/SHOWER.
EMERGENCY
EYE WASH
2 1/2 " VTR
PLAN.
TUNNEL LEVEL
PENETRATION. SEE
BASEMENT WALL
2" 2"2"
2" 2 1/2 " V UP
2" V EXPOSED,
THRU ROOF
THRU ROOF
2" V EXPOSED,
FOR CONTINUATION.
SEE CIVIL PLANS
3" FORCE MAIN
UNDER FLR. SLAB.
FROM SP-1 & 2
UP FROM SUMP.
P7 P9
P7 P9
UP FROM SUMP.
4" 4"
2"2"
FD-2FD-2FD-2FD-2
MAIN FROM SP-2.
TO CEILING AREA.
UP ALONG WALL
FIRST FLOOR SLAB.
PIPE TO RUN UNDER
3" FORCE MAIN.
WCO
FOR CONTINUATION.
SEE SHT. P2
1" HWR UP.
2 1/2 " HW UP,
2 1/2 "2 1/2 " SP-2A,B
PLAN.
TUNNEL LEVEL
PENETRATION. SEE
BASEMENT WALL
TRENCH DRAIN
RISER WITHIN BLDG.
UNDER SLAB TO
4" FIRE PIPE
MAIN.
ORIGINATION.
CIVIL PLANS FOR
UP, EXPOSED. SEE
1 1/2 " CW UNDER SLAB
TUNNEL
EXISTING
SP-1A,B
1 1/2 "1/2"
FLOOR
TO FIRST
1" HW DN
2" CW DNE211
E202
E203
E205
E206
E214
E216
E207 E213
E209
2" WALL, 4" VTR
4" W DN IN
FLOOR PLAN.
SEE FIRST
@ 10'-0" AFF.
BASEMENT WALL.
SLAB, PENETRATING
SITE MAIN, UNDER
3" CW FROM
ALONG WALL
TO BASEMENT.
4" W UP AND DN
TO BASEMENT
3" CW UNDER SLAB
1" IN 1ST FLR. CEILING AREA
2" IN 1ST FLR. CEILING AREA
AREA TO BASEMENT.
FIRST FLOOR CEILING
2" CW, 1" HW FROM
LEVEL
TO MEZZANINE
2" CW, 1" HW UP
M8 M8
ARRANGEMENTS
FOR TUNNEL PIPING
NEW TRACON. 3" FORCE
2 1/2 " HW, 1" HWR TO
PLAN
LEVEL PLUMBING
SEE MEZZANINE
TO CEILING AREA.
FLOOR WALL
UP THRU FIRST
2" CW, 1" HW
FD-2FD-2
DETAIL
TO DHWC, SEE
FOR STEAM PIPING
O.7QR
.3
O.7V.3W U T S R Q O
EWC-1B
1 1/2
SK-1
SHR-1
DHWC-1
TUNNEL LEVEL PLUMBING PLAN
SCALE: 1/16" = 1'-0"
E208
MEZZANINE LEVEL PLUMBING PLAN
STORAGE TANK.
W/WASTE OIL
OIL SEPARATOR
SANITARY SEWER
SLAB TO SITE
4" W UNDER
FROM PARAPET WALL.
ROOF PENETRATION
TO ROOF. OFFSET
ALONG COLUMN
3" V UP
4"4"
4" 4" FD-4FD-4FD-4
FD-4 4"
OS-1
EYE WASH
EMERGENCY
FPHB-1 FPHB-1
W V U T S R Q P O
V.3 O.7
E107
E106 E105
E102
E104
E103
E101
E108
E110
E112
E109
FIRST FLOOR PLUMBING PLAN
dfw-d-traco-p005
2022-04-11T12:58:34-0400
KEVIN MILES
2022-04-11T06:26:08-0500
ARTURO MEDINA
LIGHT COVE
PORCELAIN TILEPORCELAIN TILE
ACCENT TILE
MIRROR
LAVS
SOAP DISPENSER
PORCELAIN TILE
CABINET
6" X 12" COVE BASE
TILE ACCENT
SS TOILET
PARTITION
VANITY
PORCELAIN
TILE
PULL
SANITARY
NAPKIN
DISPENSER
(@ 215 ONLY)
PULL
PAPER TOWEL
DISPENSER &
WASTE RECPT
WASTE RECPT SS TOILET
SANITARY
NAPKIN
DISPENSER
LIGHT COVE LIGHT COVE
OPEN
LIGHT COVE LIGHT COVE
SHOWER ROD
FOLD DOWN
SHOWER SEAT
GRAB BAR
CURB
CURB
SHOWER ROD
CONTROL AREA
GRAB BAR
SHOWER HEAD
AND HOSE
GRAB BARGRAB BAR
FOLD DOWN
SHOWER SEAT
OPEN
1'-0"
ATCT
BASE BUILDING RESTROOMS
10/14/2021 1508267
DFW-D-ATCT-A021
w d a t c t a
KEYED CONSTRUCTION NOTES:
INFORMATION.
REFER TO THE ARCHITECTURAL SPECIFICATIONS FOR MORE DETAILED 5.
CONTRACTOR SHALL SUBMIT A DETAILED LAYOUT TO BE APPROVED.
MATERIAL OR WORK TASKS. RESTROOM LAYOUT IS SUGGESTED AND THE
THIS DRAWING IS NOT INTENDED TO BE A COMPLETE LIST OF REQUIRED 4.
INSTALLATION OF THOSE DISCIPLINES' MATERIAL AND EQUIPMENT.
COORDINATE WITH MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR 3.
IT IS THE CONTRACTOR'S RESPONSIBILTY TO RESTORE TO NEW.
GROUNDS, AND CONTENTS. IF ANY ITEMS ARE DAMAGED BY THE CONTRACTOR,
CONTRACTOR TO PROTECT REMAINING PORTIONS OF THE EXISTING BUILDING,
WHILE WORKING UNDER THIS CONTRACT, IT IS THE RESPONSIBILITY OF THE 2.
WITH THE APPROVED SEQUENCE OF WORK SUBMITTAL.
MATERIAL/EQUIPMENT. THE WORK SHALL BE ACCOMPLISHED IN ACCORDANCE
MATERIAL/EQUIPMENT NOTED IS TO BE REPLACED WITH NEW
DRAWING IS PART OF THE RESTROOM REPLACEMENT PROJECT. ALL EXISTING
THE FOLLOWING ARCHITECTURAL MATERIALS/EQUIPMENT IDENTIFIED ON THE 1.
-d -a tc t-a lo tt e
SCALE: 3/16"=1'-0"
ELEVATION
A18 A18
6 WOMEN'S TOILET 129
7 WOMEN'S TOILET 129
8 WOMEN'S TOILET 129
9 WOMEN'S TOILET 129
10 WOMEN'S TOILET 129
11 WOMEN'S TOILET 129
12 WOMEN'S TOILET 129
13 WOMEN'S TOILET 129
14 WOMEN'S TOILET 129
15 WOMEN'S TOILET 129
16 WOMEN'S TOILET 129
17 WOMEN'S TOILET 129
18 WOMEN'S TOILET 129
19 WOMEN'S TOILET 129
20 WOMEN'S TOILET 129
WOMEN'S TOILET 129ELEVATION
21 WOMEN'S TOILET 129
22 WOMEN'S TOILET 129
SUGGESTED FLOOR PATTERN
dfw-d-atct-a021
2022-04-11T12:56:29-0400
KEVIN MILES
2022-04-11T06:22:49-0500
ARTURO MEDINA
TRACON RESTROOMS - RISER DIAGRAMS
09/03/2021 1508267
DFW-D-TRACO-P006
w d t r a c o p
-d lo tt e dfw-d-traco-p006
2022-04-11T12:58:40-0400
KEVIN MILES
2022-04-11T06:26:25-0500
ARTURO MEDINA
SK-2
EWC-1 A,B
ICEMAKER
HUB DRAIN
-1
-2
Q P O N M L K J H G F E D C B A
ROOM NAMEROOM NO
SECT/RECEPT
AF MANAGER
FILES
MAIL/COPY ROOM
CLOSET
DIRECTORY/LIBRARY
ADMINISTRATIVE STORAGE
LOGISTICS
RECEIVING
TELCO ROOM/NON-FAA EQUIP RM
PACKING STATION
PACKING MATERIAL STORAGE
SECURED DATA STORAGE
PANTRY
AF BREAKROOM
COFFEE
CLERICAL/NAPRS
UNIT SUPV
LUNCH ROOM
VENDING
ESU SHOP
EXERCISE ROOM
F & E/CONTRACTOR OFFICE
LOCKERS
WOMEN'S RESTROOM
SHOWER
MEN'S RESTROOM
EXIST STAIR
EXIST CABLE CHASE
EXIST ELEVATOR CHASE
SECURITY
TV AV STORAGE
CONFERENCE ROOM
WORKROOM
UNIT #5 STORAGE
MCC RMM WORKROOM
UNIT #2 SHOP
UNIT #2 TECH OFFICE
UNIT #2 STORAGE
UNIT #2 SPS
UNIT #1 SHOP
UNIT #1 STORAGE
UNIT #1 TECH OFFICE
UNIT #3 SPS
UNIT #3 SHOP
UNIT #3 STORAGE
UNIT #3 TECH OFFICE
SPRINKLER RISER ROOM
UNIT #6 SHOP
UNIT #6 STORAGE
UNIT #6 TECH OFFICE
READY/PERIODICALS
UNIT #5 SHOP
UNIT #5 TECH OFFICE
UNIT #4 TECH OFFICE
UNIT #4 TECH SHOP
UNIT #4 STORAGE
UNIT #4 SPS
ASU WORKROOM
ASST MGR AUTOMATION
RECEPT/SECT
AT MANAGER
PERSONNEL MGMT SPECIALISTS/
ADMINISTRATION OFFICE
COPIER/SUPPLY ROOM
AT LMR OFFICE
ASST MGR OFFICE
A20
204 203
201 198
163 161
112111
115114
143 133
129 128 127
172173
RESTROOMS - ARCHITECTURE DEMO
REPLACEMENT - BASE BUILDING
09/15/2021 1508267
DFW-D-ATCT-D027
w d a t c t d
KEYED DEMOLISTION NOTES
WORKING WITH ANY ELECTRICAL PANELS AND PANELBOARD BREAKERS.
CONTRACTOR MUST COORDINATE WITH FAA RE AND FACILITY BEFORE 4.
OF PROPERLY.
ALL DEMOLITION SHALL BE REMOVED DAILY FROM THE BUILDING AND DISPOSED 3.
DEMOLITION WORK CAN BEGIN.
PERFORMED. COORDINATE WITH FAA RE AND FACILITY BEFORE ANY
COVER FOR THE RESTROOM DOORWAY THAT DEMOLITION WORK IS BEING
CONTRACTOR TO PROVIDE AND INSTALL A MINIMUM 10 MIL POLY SHEET DUST 2.
SUBMITTAL.
ACCOMPLISHED IN ACCORDANCE WITH THE APPROVED SEQUENCE OF WORK
REPLACED. ALL DEMOLITION SHALL BE COORDINATED WITH FAA RE AND
RESPONSIBLE FOR LOCATING ALL EXISTING MATERIAL AND DEVICES TO BE
ARCHITECTURAL MATERIAL AND WORK TASKS. THE CONTRACTOR IS
SIMILAR DRAWINGS ARE NOT INTENDED TO BE A COMPLETE LIST OF REQUIRED
BASE BUILDING RESTROOMS AS SHOWN ON THE DRAWINGS. THIS DRAWING AND
THE FOLLOWING ARCHITECTURAL MATERIAL TO BE REPLACED IN ALL OF THE 1.
BASE BUILDING RESTROOM DEMOLITION
NECESSARY SCOPE OF WORK TO BE REMOVED AND REINSTALLED.
MECHANICAL, AND ELECTRICAL SUB-CONTRACTOR CAN ACCESS THE
CONTRACTOR SHALL REMOVE ALL GYSUM WALLBOARD WHERE THE PLUMBING,
ALL EXISTING RELATED ARCHITECTURAL ACCESSORIES IN EACH RESTROOM.
COUNTERTOPS, URNIALS, WATER CLOESTS, PARTITIONS, LIGHT FIXTURES, AND
CONTRACTOR SHALL REMOVE ALL EXISTING FLOOR & WALL TILE, SINKS,
ALL NEW MATERIAL AND DEVICES ON SITE.
PRIOR TO REMOVAL OF ARCHITECTURAL MATERIALS, THE CONTRACTOR SHALL HAVE
-d -a tc t-d lo tt e
PLUMBING PLAN
SCALE: 3/32" = 1' - 0"
dfw-d-atct-d027
2022-04-11T12:55:01-0400
KEVIN MILES
2022-04-11T06:20:33-0500
ARTURO MEDINA
ESU RESTROOMS - RISER DIAGRAMS
03/31/2021 1508267
DFW-D-TRACO-P007
-d
-d lo tt e
-d lo tt e dfw-d-traco-p007
2022-04-11T12:58:47-0400
KEVIN MILES
2022-04-11T06:26:38-0500
ARTURO MEDINA
2"FD-1
1 12" V
2" WASTE
RUN WITHIN
EXIST 3 DEEP ACCESS
FLOORING AT 1.4"
PER FT
1 12"
2" EWC-1 A,B2"
4" FPHB-1
4" WASTE PIPE UP
TO MECHANICAL
ROOM 217
1 12" HW, 1" HWR
FROM VALVED AND
CONNECTIONED TO
THE TRACON
2 1
1 1
SS-13"
4" VENT UP THRU
ROOF; EXPOSED IN
THE MECHANICAL ROOM
RM 217
" BOOSTED
CW FOR TOWER
EXISTING SUMP
PUMP
6" DRY STAND
PIPE UP IN
CHASE
3" VTR 2"
FCO HWR
BALANCING
"2"
BCW
FF
FFFF
BCW BCW BCW BCW
4" SANITARY
WASTE FROM
TOWER
3" VTR
4" SANITARY WASTE PIPE
FPHB-1FPHB-1
6" DRY STAND PIPE
UP IN CHASE TO ABOVE
2" VTR 2"
2" BOOSTED CW &
3" DOMESTIC CW 2
2" 2" 1"
DOUBLE
GCO
BASE BUILDING RESTROOMS - PLUMBING DEMO
09/18/2021 1508267
DFW-D-ATCT-D028
w d a t c t d
KEYED DEMOLITION NOTES:
WORK SUBMITTAL.
ACCOMPLISHED IN ACCORDANCE WITH THE CONTRACTOR'S APPROVED SEQUENCE OF
WEEK IN ADVANCE SO THAT THERE ARE NO UNSCHEDULED OUTAGES. WORK SHALL BE
NEXT FLOOR LEVEL OF RESTROOMS. COORDINATE ANY CUT-OVERS WITH THE FAA RE 2
INTERRUPTIONS OR SHUT-DOWNS BEFORE THE CONTRACTOR CAN BEGIN WORK ON THE
RESTROOMS SHALL BE IN OPERATION FOR 48 HOURS MINIMUM WITHOUT ANY
TWO (2) RESTROOMS (1 MEN/1 WOMEN), CAN BE REPLACED AT ONE TIME. THE NEW
PER PLANS AND SPECIFICATIONS. ONLY ONE SET OF RESTROOMS, WITH A MAXIMUM OF
NEW COMPLETE AND FULLY FUNCTIONAL RESTROOMS THORUGHOUT THE BASE BUILDING
PLUMBING REPLACEMENT PROJECT. THE CONTACTOR IS RESPONSIBLE FOR PROVIDING
THE FOLLOWING PLUMBING EQUIPMENT/MATERIAL ON THE DRAWING IS PART OF THE
BASE BUILDING RESTROOM PLUMBING REPLACEMENT
TO AND INCLUDING THE SHUT-OFF VALVE THAT FEEDS EACH RESTROOM.
WATER (CW), HOT WATER (HW), AND RETURN HOT WATER (HWR) DOMESTIC PIPING UP
SERVE THE TRACON RESTROOMS. THIS WORK INCLUDES REMOVAL OF THE COLD
CONTRACTOR SHALL REMOVE ALL DOMESTIC WATER PIPING AND ACCESSORIES THAT
REGARDING PIPING REPLACEMENT.
CONTRACTOR SHALL ALSO REFER TO THE RISER DIAGRAMS FOR MORE DETAILS
WITH THE REMOVAL OF THE WASTE AND VENT PIPING FOR THE RESTROOMS.
OF EXISTING CLEANOUTS, FLOOR DRAINS, AND ANY EXISITNG MATERIAL ASSOCIATED
WALL FOR ALL OF THE RESTROOMS IN THE TRACON. THIS WORK INCLUDES REMOVAL
CONTRACTOR SHALL REMOVE EXISTING SEWER WASTE & VENT LINES BEHIND THE
HYDROXYL GENERATORS WITH THE FAA RE.
APPROVED EQUAL) BEFORE ANY DEMOLITION CAN BEGIN. COORDINATE LOCATON OF THE
SITE. CONTRACTOR SHALL PROVIDE TWO (2) HYDROXYL GENERATORS (TITAN 4000 OR
THE CONTRACTOR SHALL HAVE ALL NEW PLUMBING AND PLUMBING RELATED MATERIAL ON
PRIOR TO ANY REMOVAL OF PLUMBING MATERIALS IN THE BASE BUILDING RESTROOMS,
-d -a tc t-d lo tt e
PLUMBING PLAN
dfw-d-atct-d028
2022-04-11T12:55:08-0400
KEVIN MILES
2022-04-11T06:20:52-0500
ARTURO MEDINA
DFW-D-ATCT-E082
w d a t c t e
UNIT REPLACEMENT
DFW/D10 PLUMBING & COMPUTER ROOM
AA
06/30/2021 1508267
IE
FIRST FLOOR NORTH MENS RESTROOMFIRST FLOOR NORTH WOMENS RESTROOM
GENERAL ELECTRICAL NOTES:
FIRST FLOOR LOCKER ROOM RESTROOMS
FIRST FLOOR ATCT RESTROOM PLANS
-d -a tc t-e lo tt e
WOMEN
MEN
MEN
WOMEN
152 149
21 21
EE D D
THE FLOOR PLANS.
REPLACE LIGHT FIXTURES IN ALL RESTROOMS AS SHOWN ON
NEC AND LOCAL CODES.
LATEST EDITIONS OF FAA STANDARD FAA 1217F, FAA 19E,
ALL ELECTRICAL WORK SHALL BE DONE ACCORDING TO
AND ABBREVIATIONS.
SEE DRAWING DFW-D-TRACO-E008 FOR GENERAL NOTES
3.
2.
1.
LITHONIA L24-MVOLT-DM-35K-80CRI-WH
120/277
120/277
TYPE DESCRIPTION PART NUMBER VOLTS
CDS LED STRIP LIGHT
LITHONIA 65SEBN-LED-30K-90CRI-LED CAN LIGHT FIXTURED
NOTE:
1. CONTRACTOR TO VERIFY ALL QUANTITIES, VOLTAGES AND PART NUMBERS.
LIGHTING FIXTURE SCHEDULE
120/277CDS LED STRIP LIGHT LITHONIA L48-MVOLT-DM-35K-80CRI-WH
-MVOLT-L7XRLEDT24
GENERAL NOTES:
1.
2.
CODES.
FAA 1217, FAA 19G AND LATEST EDITION OF NEC AND LOCAL
ALL ELECTRICAL WORK DONE ACCORDING TO LATEST FAA STANDARDS
CHANGED PANEL NAMES AND ABBREVIATIONS.
SEE DRAWING DFW-D-TRACO-E007 FOR GENERAL NOTES, SYMBOLS,
C 120/277CDS LED STRIP LIGHT LITHONIA L96-MVOLT-DM-35K-80CRI-WH
CONNECT TO EXISTING EMERGENCY CIRCUIT.
ACCORDING TO LIGHTING FIXTURE SCHEDULE.
REPLACE EXISTING LIGHT WITH NEW LED LIGHT
CONNECT TO EXISTING CIRCUIT.
ACCORDING TO LIGHTING FIXTURE SCHEDULE.
REPLACE EXISTING LIGHT WITH NEW LED LIGHT1
120/277LITHONIA 65SEBN-LED-30K-90CRI-LED SHOWER LIGHTE
-MVOLT-L7XRLEDT24FIXTURE
dfw-d-atct-e082
2022-04-11T12:57:08-0400
KEVIN MILES
2022-04-11T10:41:36-0500
SYED A ABBAS
2"FD-1
1 12" V
2" WASTE
RUN WITHIN
EXIST 3 DEEP ACCESS
FLOORING AT 1.4"
PER FT
2" EWC-1 A,B2"
4" FPHB-1
4" WASTE PIPE UP
TO MECHANICAL
ROOM 217
1 12" HW, 1" HWR
FROM VALVED AND
CONNECTIONED TO
THE TRACON
2 1
SS-13"
4" VENT UP THRU
ROOF; EXPOSED IN
THE MECHANICAL ROOM
RM 217
" BOOSTED
CW FOR TOWER
EXISTING SUMP
PUMP
6" DRY STAND
PIPE UP IN
CHASE
3" VTR 2"
FCO HWR
BALANCING
"2"
FF
FFFF
BCW BCW BCW BCW
4" SANITARY
WASTE FROM
TOWER
4" SANITARY WASTE PIPE
FPHB-1FPHB-1
6" DRY STAND PIPE
UP IN CHASE TO ABOVE
2" VTR 2"
2" BOOSTED CW &
3" DOMESTIC CW 2
2" 2" 1"
O N M
4"CO
KEYED CONSTRUCTION NOTES
NEW PLUMBING AND RENOVATION FOR THE RESTROOMS AT DFW BASE BUILDING
& VENT PIPING FOR THE FIRST FLOOR RESTROOMS.
THIS WORK INCLUDES ALL COLD WATER (CW) AND HOT WATER (HW)
DOMESTIC PIPING CLOUDED ON THE DRAWINGS.
INSTALL A NEW DOUBLE CLEANOUT OUTSIDE ON THE WEST SIDE
OF THE TRACON BUILDING. COORDINATE WITH FAA RE FOR
SCHEDULED WORK.
DOUBLE
GCO
BASE BUILDING
10/21/2021
DFW-D-ATCT-P001
w d a t c t p
-d -a tc t-p lo tt e
APLUMBING PLAN
MECHANICAL PENTHOUSE PLUMBING PLAN
P002 dfw-d-atct-p001
2022-04-11T12:58:56-0400
KEVIN MILES
2022-04-11T06:26:55-0500
ARTURO MEDINA
Domestic CW
Domestic HW
GRADE
WC-1 UR-1
WC-2FD-1
TO URINALS
BASE BUILDING RESTROOMS - SECTIONS
DFW-D-ATCT-P002
w d a t c t p
-d -a tc t-p lo tt e
ROOM 215 (WOMEN'S SINKS)
ROOM 215 (WOMEN'S WATER CLOSETS)
ROOM 108 (MEN'S SINKS)
ROOM 108 (MEN'S WATER CLOSETS)
ROOM 151 (MEN'S SINKS)
ROOM 151 (MEN'S SINKS)
dfw-d-atct-p002
2022-04-11T12:59:02-0400
KEVIN MILES
2022-04-11T06:27:06-0500
ARTURO MEDINA
SEWER VENT
FD-1 FD-1
4" "2
"2
"4
"2
SEWER VENT
DFW-D-ATCT-P003
w d a t c t p
-d -a tc t-p lo tt e
P003
ROOM 151 (MEN'S WATER CLOSETS)
ROOM 148 (WOMEN'S WATER CLOSETS)
ROOM 148 (WOMEN'S SINKS)
ROOM 151 (MEN'S URINALS)
dfw-d-atct-p003
2022-04-11T12:59:12-0400
KEVIN MILES
2022-04-11T06:27:17-0500
ARTURO MEDINA
2 ½"
½"
HA A
EW
C-1A,B
C-2
C-1
½", TYP
HA B
HA D
1 ½"
1 ¼"
1 ½", TYP
SHR-
¾"
TO ICEMAKER
SK-
HA
1 ½" HW & 1" HWR
½", TYP
HA-
C-1BEW
C-1A
1 ½", VTR
C-1A,B
1" HW WITH BALANCING VALVE
CONNECT TO END OF
1" HWR
FLOOD RIM OF WC-2
THAN 6" ABOVE
BE MADE NOT LESS
CONNECTION SHALL
1 ½" VTR
1 ½"1 ½"
2" TYP 2"
4" TYP
4" PENTHOUSE, RM 217
EXPOSED IN MECHANICAL
4" VENT UP THRU ROOF,
COFD-
C-1A
C-1B
FOR
IC
EMAKER
HUB
DRAI
ACCESS FLOORING
PIPING RUN IN EXIST
2 ½" SANITARY WASTE
FD-
FLOOD RIM OF SK-2 (TYP)
THAN 6" ABOVE
BE MADE NOT LESS
CONNECTION SHALL
C-
SHR-
IN
ASTE
UP
TO
C-1AEW
C-1B
DFW-D-ATCT-P004
w
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .