J-1a Final_D10 Plumbing_Drawings.pdf

PDF 20 MB Posted

Attached to
D10 Terminal Plumbing Replacement Federal contract opportunity
Solicitation number
697DCK-22-R-00363
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This document provides details for a federal solicitation to replace plumbing at the D10 Terminal Radar Approach Control facility in Dallas-Fort Worth, Texas. The Federal Aviation Administration is seeking to procure plumbing replacement services through competitive proposals. Offerors must be registered in the System for Award Management and submit proposals in accordance with the instructions and deadlines provided in the solicitation. A non-mandatory site visit will be held on July 19, 2022 to review the project details. Proposals are due on the date specified in the solicitation. The selected offeror will be eligible for award of a contract to complete the plumbing replacement work at the FAA facility.

View the file

Other files for this federal contract opportunity

Other files attached to D10 Terminal Plumbing Replacement, newest first.
File Type Posted
697DCK-22-R-00363 Amd 3.pdf PDF
J-3 Questions and Answers D10 Terminal Plumbing 24 Aug 22.pdf PDF
697DCK-22-R-00363_Amendment 02.pdf PDF
697DCK-22-R-00363 Amd 1.pdf PDF
697DCK-22-R-00363 SIR.pdf PDF
L4 - Form 7460-1.pdf PDF
L1 - BidBond SF24.pdf PDF
J-1 Final_D10_Plumbing_Specifications.pdf PDF
L2 - Past Performance Questionnaire.pdf PDF
L3 - Price Proposal.xlsx XLSX spreadsheet
J-2 Wage Determiniation Dallas TX.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

ENGINEERING SERVICES

TERMINAL

TRACON

FIRST FLOOR TRACON

REPLACEMENT

DFW/D10 PLUMBING & COMPUTER ROOM UNIT

TXDFW INTERNATIONAL AIRPORTDALLAS-FORT WORTH

PROJECT ENGINEER MGR: ENGINEERING - FORT WORTH

04/07/2021 1508267

DFW-D-TRACO-M003

d f w d t r a c o m .d g n

THIS DRAWING PRODUCED ON ASW REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

C O

N S

T R

U

IO

TRACON EQUIPMENT ROOM CRAC AND CONTROLS REPLACEMENT

WITH THE CONTRACTOR'S APPROVED SEQUENCE OF WORK SUBMITTAL.

SO THAT THERE ARE NO UNSCHEDULED HVAC EQUIPMENT OUTAGES. WORK SHALL BE ACCOMPLISHED IN ACCORDANCE

AND WORK TASKS. COORDINATE CUT-OVER TO THE NEW HVAC EQUIPMENT WITH THE FAA RESIDENT ENGINEER (RE)

THIS DRAWING AND SIMILAR DRAWINGS ARE NOT INTENDED TO BE A COMPLETE LIST OF REQUIRED EQUIPMENT

PLANS AND SPECIFICATIONS. THE NEW HVAC EQUIPMENT SHALL BE CONNECTED TO THE EXISTING DDC SYSTEM.

THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A NEW COMPLETE AND FULLY FUNCTIONAL EQUIPMENT PER

THE FOLLOWING EQUIPMENT IDENTIFIED ON THE DRAWING IS PART OF THE NEW CRAC EQUIPMENT PROJECT.

KEYED CONSTRUCTION NOTES:

CONTRACTOR SHALL VALVE AND CAP CHILLED WATER PIPING AT THE LOCATIONS SHOWN ON THE DRAWINGS.

COORDINATE ALL ELECTRICAL WORK REQUIRED INSIDE AN FAA POWER PANEL WITH THE RE 2 WEEKS IN ADVANCE.

DISRUPTIONS TO AREAS SERVED BY THE CRAC UNITS AND OTHER ASSOCIATED HVAC EQUIPMENT DURING INSTALLATION WORK.

THE CONTRACTOR SHALL COORDINATE WORK OF THE MECHANICAL AND CONTROL SUB-CONTRACTORS SO THAT THERE ARE NO

WITH THE CONTROL SUBCONTRACTOR.

NEW SENSORS, NEW THERMOSTATS, AND NEW FLOW METERS IN ACCORDANCE WITH PLANS AND SPECIFICATIONS. COORDINATE THIS WORK

CONTRACTOR SHALL INSTALL EXISTING DIRECT DIGITAL CONTROL (DDC) SYSTEM TO THE NEW CRU CONTROL PANELS, NEW ACTUATORS, 3/4" DIAMETER OR PER MANUFACTURER'S RECOMMENDED SIZE.

INSTALL NEW COPPER CONDENSATE TUBING FROM EACH AIR HANDLING UNIT AND COMPUTER ROOM UNIT TO THE NEAREST FLOOR DRAIN, SPECIFICATIONS.

ALL NEW HVAC EQUIPMENT. NEW PIPE INSULATION SHALL BE COVERED WITH PVC JACKET AND LABELED IN ACCORDANCE WITH PLANS AND

CONTRACTOR SHALL FURNISH AND INSTALL CELLULAR GLASS INSULATION ON ALL NEW CHILLED WATER PIPING, FITTINGS, AND VALVES FOR

RESIDENT ENGINEER (RE) 2 WEEKS IN ADVANCE.

(MINIMUM) WITHOUT ANY PROBLEMS BEFORE THE NEXT CRUs CAN BE REPLACED. ALL WORK SHALL BE COORDINATED WITH THE FAA

BE REPLACED AT A TIME AS DETERMINED BY THE APPROVED SEQUENCE OF WORK SUBMITTAL. CRUs MUST OPERATE FOR 24 HOURS

RELATED ITEMS. FOR LIEBERT EQUIPMENT ASSISTANCE, CONTRACT PHIL BONDS AT 214-693-3044. ONLY ONE GROUP OF CRAC UNITS SHALL

PRESSURE/TEMPERATURE TEST PORTS (PETE'S PLUGS), ELECTRICAL WIRING AND CONDUIT, AND ALL OTHER TEMPERATURE GAUGES, WORK INCLUDES NEW CHILLED WATER SUPPLY AND RETURN PIPING, CONDENSATE PIPING, VALVES, LIQUID FILLED PRESSURE GAUGES, THRU 15), LIEBERT MODEL CW038DC1A1-DOWNFLOW (OR APPROVED EQUAL) IN ACCORDANCE WITH PLANS AND SPECIFICATIONS. THIS

CONTRACTOR SHALL FURNISH AND INSTALL FIFTEEN (15) NEW LIEBERT CHILLED WATER COMPUTER ROOM AIR CONDITIONING UNITS (CRU-1

COOLING DURING THE REPLACEMENT OF THE CRUs.

EQUIPMENT AND OTHER NECESSARY MATERIALS ON SITE. CONTRACTOR SHALL PROVIDE FOUR (4) 2- TON SPOT COOLERS FOR EMERGENCY

PRIOR TO REMOVAL OF CRU'S AND EQUIPMENT CONTROLS, THE CONTRACTOR SHALL HAVE ALL NEW MECHANICAL, ELECTRICAL, AND CONTROL

1 2 3 4 5 6 fw -d -t ra c

-m

/0

/2

:3

:4

P

M lo tt e b y

V

-C

A E

G -E

D

B

F

H

8 7 6 5 4 3 2 1

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

REDLINE

APVD

-d lo tt e

1 1/4 "1"

1"1 1/4 "1"

1 1/4 "

1"

2 1/2" CHWS & CHWR

6" ECHWS & ECHWR

M2 M2

D D

DDD

CUH-1

BBH-2

CUH-1

CUH-2

CUH-2

BBH-3

FIRST FLOOR MECHANICAL PLAN - BELOW CEILING

1/16" = 1'-0"

SHEET M10

FOR THIS AREA

SEE ENLARGED PLAN,

ECHWS

ECHWR

CRAC-1 CRAC-2

CRAC-3

W

CRAC-9CRAC-8CRAC-7

CU-5

(TYPICAL).

AREAS ROUTE BELOW RAISED FLOOR

HYDRONIC LINES IN COMPUTER

CRAC-15CRAC-14CRAC-13

SEE ENLARGED PLAN,

SHEET M10

FOR THIS AREA

128132

111 114

CRAC-6

2" HWS & HWR

CRAC-12CRAC-11CRAC-10

EXPANSION JOINT

CRAC-4 CRAC-5

ROOM NUMBER KEY

ROOM NAME

STAIR

MECHANICAL ROOM

ELECTRICAL ROOM

NAV/COMMUNICATIONS EQUIP.

CORRIDOR

WOMEN'S TOILET

VESTIBULE

TELEPHONE

JANITOR

CENTRAL VACUUM ROOM

CABLE CHASE

ELEVATOR SHAFT

LOBBY

MEN'S TOILET

STORAGE

NOT USED

TELEPHONE ROOM

RADAR/ARTS EQUIP.

ROOM NO.

IS

dfw-d-traco-m003

2022-04-11T12:57:25-0400

KEVIN MILES

2022-04-11T06:23:23-0500

ARTURO MEDINA

MANUFACTURE PROVIDED 3-WAY VALVE

RISER DIAGRAM

04/08/2021 1508267

DFW-D-TRACO-M004

w d t r a c

-d

:0 lo tt e

2 1/2 "

2 1/2"3"3"

INDICATED BY MANUFATURE.

SHALL BE 1 3/8" UNLESS OTHERWISE

NOTE: RUN-OUTS TO COMPUTER UNITS (CU)

1 1/2 "2"

2 1/2 "1 1/4 "

1 1/2 "

1 1/2 "2"

4" 2"

3" 6"

1 3/8 "

6"2 1/2 "6"

2-1/2"

2 1/2 "6"

3"3"

3"1"1 1/2 "3"

3"4"

8"

8"

4"3"

2 1/2 "1 1/2 "

1 1/2 "3"1 1/2 "

1"1 1/2 "1 1/2 "2"

"INTERIM TRACON" RM. 203

(WEST)

FROM ESU BLDG.

UTILITY TUNNEL

COMPUTER FLOOR, SEE PLAN.

ROUTE BELOW RAISED

PIPES DROP DOWN AND

(EAST)

"END STATE" RM. 202

MECH. RM. 133

HWR

HWS

CHWS

CHWR

TCHWS

TCHWR

THE-1

(STANDBY)

TCHWP-1

CU-CU-

CRU-

CRU-CRU-CRU-

12 11 10

"NAV/COMM." RM. 131

SECOND FLOOR

THIRD FLOOR

MECH. RM. 354

AHU-6AHU-8

AHU-2AHU-4

"RADAR/ARTS" RM. 103

CU-9

CU-1CU-2CU-3

CU-6 CU-8CU-5

MECH. RM. 108

FIRST FLOOR

AHU-3AHU-1

AHU-7AHU-5

THIRD FLOOR

MECH. RM. 319

TCHWP-2

TRACON BLDG. HYDRONIC PIPING SCHEMATIC

NOT TO SCALE

ROOFTOP

P/T PORT (TYP OF 2)

CWS

CWR

CONDENSATE LINE

TO NEAREST DRAIN

BALL VALVE FOR

COLD WATER SUPPLY

COMPRESSION FITTING

SOLAR DIGITAL THERMOMETER

(TYP OF 2)

CALIBRATED BALANCING

VALVE

BALL VALVE (TYP OF 2)

FLEX CONN (TYP OF 2)

STRAINER WITH

BLOW DOWN VALVE

FLOW METER

NOT TO SCALEM004

3/4" HOSE END DRAIN, TYP

COMPUTER AIR

CONDITIONER

PIPING CONNECTION TO COMPUTER ROOM AIR CONDITIONER (CRU-1 THRU 15)

dfw-d-traco-m004

2022-04-11T12:57:34-0400

KEVIN MILES

2022-04-11T06:23:34-0500

ARTURO MEDINA

MECHANICAL SCHEDULE

05/03/2021 1508267

DFW-D-TRACO-M005

w d t r a c

-d

:1 lo tt e

BERKO #CUH3-0427-1277/1CUH-2 ELECTRIC 4.0 1 2

ESU BLDG.

CAPACITY - GALLONS

RECEIVER MINIMUM

PSI

DISCHARGE HEAD

WEIL # 4206K12330 460 3 6022.5DUPLEXCP-1

HZ

GPM REMARKSMANUFACTURER AND MODEL NO.

ELECTRICAL

PHVOLTS

MARK TYPE

STEAM CONDENSATE RETURN PUMP SCHEDULE

MOTOR

HP

10.0

CAPACITY - KW

HEATING

BERKO # HUH-1048-M

CFM

ELECTRIC UNIT HEATER SCHEDULE

LOCATIONMARK

VOLTS PH

MANUFACTURER AND MODEL NO. REMARKSTYPE

HZ

FAN HP

UH-1E

UH-2E

UH-3E

UH-4E

HORIZ. SUSPENDED

6034801/10500 BERKO # HUH-1048-M

6034801/10500

5 PRESS. INDEPENDENT BOX, SET FOR CONSTANT VOLUME.

8"]

8"]

14"]

1 180\ EWT, 140\ LWT.

HIGH CAPACITY (250 CFM).

1 INTEGRAL (TAMPER PROOF) THERMOSTAT.

4.0ELECTRICCUH-1

MANUFACTURER

& MODEL NUMBER

CABINET UNIT HEATER SCHEDULE

MARK REMARKSKWTYPE VOLTS/PHASE

277/1 BERKO #CUH3-0427-1

BERKO #BKOC-2573

5'-0"

4'-0"

3'-0"

LENGTH

NOMINAL

277/1

VOLTS/PHASE

1.25ELECTRICBBH-3

1.0ELECTRICBBH-2

TYPE KW REMARKSMARK

BASEBOARD HEATER SCHEDULE

BBH-1 ELECTRIC .75

INTEGRAL (TAMPER PROOF) THERMOSTAT1

LOUVER FIN DIFFUSER

TRANE #100-S1535 60 31.2 1.61 1.0 1/8 1550 120 1 60

SET PRIM. VALVE MIN. FLOW @ 20%2

1 HTG. FAN CAPACITIES @ MIN .125" DOWNSTREAM S.P. 35DB MAX SOUND/OCCUPIED SPACE

SERVES SECOND FLOOR4

TRANE #VSDD-24

SIZE

INLET

650 325 1/15 2.0 277/1/60 TRANE #VFPE 1104 3

850 425 1/8 2.5 277/1/60 TRANE #VFPE 1104 3

2225 - - - - 3

2225 14"] - - - - TRANE #VSDD-24 3

550 8"] 275 1/15 2.0 277/1/60 TRANE #VFPE 1104 2 3

600 8"] 260 1/15 1.5 277/1/60 TRANE #VFPE 1104 2 3

1200 10"] 600 1/8 2.0 277/1/60 TRANE #VFPE 1707 2 3

1400 10"] 700 1/8 2.0 277/1/60 TRANE #VFPE 1707 2 3

900 8"] 450 1/8 2.0 277/1/60 TRANE #VFPE 1107 2 3

400 6"] 200 1/15 .5 277/1/60 TRANE #VFPE 0604 2 3

350 6"] 175 1/15 1.0 277/1/60 TRANE #VFPE 0604 2 3

700 8"] 350 1/15 1.0 277/1/60 TRANE #VFPE 1104 2 3

800 8"] 400 1/8 1.0 277/1/60 TRANE #VFPE 1107 2 3

700 8"] 350 1/15 1.0 277/1/60 TRANE #VFPE 1104 2 3

950 8"] 475 1/8 1.0 277/1/60 TRANE #VFPE 1107 2 3

600 8"] 300 1/15 .75 277/1/60 TRANE #VFPE 1104 2 3

450 6"] 225 1/15 .5 277/1/60 TRANE #VFPE 0604 2 3

550 8"] 275 1/15 .75 277/1/60 TRANE #VFPE 1104 2 3

1550 10"] 775 1/3 4.0 277/1/60 TRANE #VFPE 1711 2 3

1300 10"] 650 1/8 4.0 277/1/60 TRANE #VFPE 1707 2 3

800 8"] 400 1/8 1.5 277/1/60 TRANE #VFPE 1107 2 3

1200 10"] 600 1/8 3.0 277/1/60 TRANE #VFPE 1707 2 3

1200 10"] 600 1/8 4.0 277/1/60 TRANE #VFPE 1707 2 3

300 6"] 150 1/15 1.0 277/1/60 TRANE #VFPE 0604 2 3

800 8"] 400 1/8 2.0 277/1/60 TRANE #VFPE 1107 2 3

400 6"] 200 1/15 .5 277/1/60 TRANE #VFPE 0604 2 3

500 8"] 250 1/15 .75 277/1/60 TRANE #VFPE 1104 2 3

1900 12"] 950 1/3 2.5 277/1/60 TRANE #VFPE 2415 2 3

600 8"] 300 1/15 1.0 277/1/60 TRANE #VFPE 1104 2 3

600 8"] 300 1/15 1.0 277/1/60 TRANE #VFPE 1104 2 3

850 8"] 425 1/8 1.0 277/1/60 TRANE #VFPE 1107 2 3

1200 10"] 600 1/8 3.0 277/1/60 TRANE #VFPE 1707 2 3

600 8"] 300 1/15 3.0 277/1/60 TRANE #VFPE 1104 2 3

1200 10"] 600 1/8 4.0 277/1/60 TRANE #VFPE 1707 2 3

700 8"] 350 1/15 2.0 277/1/60 TRANE #VFPE 1104 2 3

32TRANE #VFPE 1107277/1/603.01/85008"]1000

HORIZ. SUSPENDEDESU BLDG.

UH-12E

UH-11E

UH-10E

UH-9E

UH-8E

UH-7E

UH-6E

UH-5E

FT WG

MAX PD

GPM

MIN CAP

MBH HZ

TYPE REMARKSMANUFACTURER AND MODEL NO.

MOTOR DATA

PHVOLTSRPMHP

MARK LOCATION

HOT WATER UNIT HEATER SCHEDULE

AIR \F

ENT

VAV TERMINAL UNIT SCHEDULE

MARK

CFM FAN HP VOLTS/PH HTR. KW

MANUFACTURER AND MODEL NO. REMARKS

HTR. VOLTS/PH

COOLING

46,000

FAN CFM AT .3" MIN. ESP

INCLUDE INSECT SCREEN.1

.0622 X 221,625INTAKEIH-4E "ACME" (SKYMASTER) MODEL I.V. 1.

.1016 X 161,200INTAKEIH-3E "ACME" (SKYMASTER) MODEL I.V. 1.

.1030 X 304,500INTAKEIH-2E "ACME" (SKYMASTER) MODEL I.V. 1.

1."ACME" (SKYMASTER) MODEL I.V..1042 X 429,500INTAKEIH-1E

PROVIDE 3-WAY CONTROL VALVES

2 150 PSIG DESIGN PRESSURE (ASME)

ESSENTIAL CHW SYSTEM

7SERVED BY EMERGENCY POWER SYSTEM, AND

SECURED BY EMERGENCY PANEL SYSTEM5

1 MAX PRESS. DROP (FT.H 0) = 5.0

2-PASS, VERTICAL3,815

SIZE

THROAT

@ NOM. CFM

3-STAGE, STAINLESS STEEL FIN-TUBE.INFRARED TYPE

4 ACTUAL CAPACITY @ 105\ AMBIENT = 193.75 TONS MINIMUM.

4 2

2 304 STAINLESS STEEL PLATES.

1 145 PSIG DESIGN PRESSURE.

PATTERSON-KELLEY #DS-8-581001751801403700VERT. STM-HW

SERVES ONLY EXIST. TOWERBELL & GOSSETT # GPX258B.0001107047641070624550PLATE & FRAME

HWC-1

THE-1

MERV 11 FILTERS REQ.

10 CHW 460 3 60 113.1 115.3 75 4.8 15 460/3 DOWNFLOW 32

2 3DOWNFLOWVERTIV MODEL CW038DC1A1460/3154.875115.3113.160346046,000CHW10

CRU-15

CRU-14

CRU-13

CRU-12

CRU-11

CRU-10

CRU-9

CRU-8

CRU-7

CRU-6

CRU-5

CRU-4

CRU-3

CRU-2

CRU-1

ALL RATINGS = EMERGENCY MODE.

PACKAGED, HELICAL SCREW.

CH-4 200 105 AIR COOLED 60.5 45.0 300 460 3 60 406 TRANE #RTAA-200

CH-3 200 105 AIR COOLED 60.5 45.0 300 460 3 60 406 TRANE #RTAA-200

CH-2 200 105 AIR COOLED 60.5 45.0 300 460 3 60 406 TRANE #RTAA-200

FUTURE

TRANE #RTAA-20040660346030045.060.5AIR COOLED105200CH-1

LWT

\F

AIR COOLED CHILLER SCHEDULE

VOLTS PHASE Hz MCA

UNIT ELECTRICAL

REMARKSTYPE

FAN

COMPUTER ROOM UNIT SCHEDULE

TYPE KW

KW

ELEC REHEAT

MANUFACTURER AND MODEL NO. REMARKSVOLTS/

NOM.

TONS

AMBIENT

TEMP. \F

EWT

1 MIN. EER. = 8.0

PHASE

HUMIDIFICATIONCOOLINGUNIT ELECTRICAL

EAT

MBH

TOTAL

MBH

SENS.

HzPHASEVOLTS

TYPE

FAN

HP

F, LWT=55

EWT=451

PD-ft.

MAX.

SOURCE (COLD) SIDE

REMARKS

HEAT EXCHANGER SCHEDULE

TOWER (HOT) SIDE

PD-ft.

FOULING

FACTOR

AIR INTAKE/RELIEF HOOD SCHEDULE

MARK REMARKSTYPE

MAX.-AIR

PRESS. DROP

LBS./HR.

PSIG.

PRESS.

STEAM

HOT WATER CONVERTER SCHEDULE

REMARKS

HEATING WATER

TOTAL

CAP'Y.-MBH

VERTIV MODEL CW038DC1A1

dfw-d-traco-m005

2022-04-11T12:57:41-0400

KEVIN MILES

2022-04-11T06:23:54-0500

ARTURO MEDINA

CONTROL DIAGRAM

05/17/2021 1508267

DFW-D-TRACO-M006

w d t r a c

-d

:5 lo tt e

C E

PART OF EXISTING DIRECT DIGITAL CONTROL PANEL (DDCP)

ID

DIDI

DO

AI DI

TROUBLE

UNIT MICROPROCESSOR CONTROL

AIAI

SA

RA

AI

TS

HS

PS

FM

PS

TS

AI

AO AO

DI

DI

DETECTION

LEAK

CRU

TYP

TO

FACP

COMPUTER ROOM AIR CONDITIONER CRAC-1 THRU CRAC-15 (TRACON)

TEMPERATURE/HUMIDITY CONTROL AND AIR FLOW DIAGRAM

3-WAY VAVLE

MANUFACTURER PROVIDED

NOTES:

SEQUENCE OF OPERATION.

ACCORDANCE WITH THE ON THE UNIT SCHEMATIC IN

MONITOR THE ANALOG AND DIGITAL POINTS IDENTIFIED

EXISTING DDC CONTROL SYSTEM SHALL BE ABLE TO 5.

PROVIDE NEW CONTROL CONDUIT TO DDC PANEL.

VALVES, ACTUATORS, AND NEW CONTROL WIRING.

PROVIDE AND INSTALL NEW CONTROL VALVE, SHUT-OFF 4.

ACCORDANCE WITH SPECIFICATION SECTION 23 09 23.

EQUIPMENT SHOWN IN THE PLANS AND IN

NEW CONTROL EQUIPMENT AND POINTS FOR ALL

CONTRACTOR SHALL PROVIDE AND INSTALL ALL 3.

FOR SEQUENCE.

CONTROLS). IF NONE EXIST, SEE SPECIFICATIONS

EXISTING DDC CONTROLS CONTRACTOR (JOHNSON

FOR SEQUENCE OF OPERATION, CONTACT THE2.

FOR GENERAL NOTES, SEE DRAWING M002.1.

dfw-d-traco-m006

2022-04-11T12:57:52-0400

KEVIN MILES

2022-04-11T06:24:10-0500

ARTURO MEDINA

ACCESSIBLE LOCATIONS. PROVIDE ACCESS PANELS WHERE REQUIRED.

INSTALL VALVES AND COMPONENTS REQUIRING MAINENANCE, CLEANING OR ADJUSTMENT IN 7.

MINIMUM SLOPE OF 2% (1/4" PER FOOT).

(1/8" PER FOOT). SANITARY PIPING 2 1/2" AND SMALLER SHALL BE INSTALLED TO PROVIDE A

SANITARY PIPING 3" AND LARGER SHALL BY INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1% 6.

INSTRUCTIONS.

ACCORDANCE WITH SPECIFICATIONS, LOCAL CODES,AND ORDINANCES, AND MANUFACTUREER'S

A COMPLETE INSTALLATION. PIPING, EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN

THEY DO NO SHOW ALL REQUIRED BENDS, OFFEST, VALVES, AND MISCELLANEOUS FITTINGS FOR

FINAL CONNECTIONS TO EQUIPMENT. THESE PLANS ARE SCHEMATIC & DIAGRAMMATIC ONLY.

PROVIDE REQUIRED WATER, WASTE & VENT PIPING, FITTINGS, AND INSULATION, AND MAKE 5.

EQUIPMENTOR PANELS.

NO PIPING SHALL BE INSTALLED ABOVE ELECTRICAL, COMMUNICATIONS, OR DATA

COORDINATE LOCATION OF PIPING AND DRAINS WITH MECHANICAL & ELECTRICAL EQUIPMENT. 4.

LOCATION.

WALL CLEANOUTS SHALL BE PROVIDED WITH WALL COVERS, MOUNT IN UNOBTRUSIVE 3.

PIPING SHALL BE CONCEALED IN FINISHED AREAS UNLESS OTHERWISE NOTED.2.

PLUMBING WITH FAA RE.

DETAILED SEQUENCE OF WORK FOR ALL PLUMBING WORK. COORDINATE INSTALLAITON OF

PIPING ROUTE FOR SEWER AND DOMESTIC PIPING. THE CONTRACTOR SHALL SUBMIT A

CONTRACTOR SHALL SUBMIT A PIPING LAYOUT SHOWING ALL NECESSARY CONNECTIONS AND 1.

GENERAL NOTES

C CHANNEL OR CONDUIT

BP BOOSTER PUMP

BOP BOTTOM OF PIPE

BLDG BUILDING

BD BOARD OR BACKDRAFT

AVG AVERAGE

AUX AUXILIARY

ATC ACOUSTICAL TILE CEILING

ARCH ARCHITECTURAL

APPROX APPROXIMATELY

ANCH ANCHOR

AFF ABOVE FINISHED FLOOR

ADR ACCESS DOOR

ADJ ADJACENT OR ADJUSTABLE

AD AREA DRAIN

DEMAND

EMD ESTIMATED MAXIMUM

ELEV ELEVATOR

ELEC ELECTRIC (AL)

EL ELEVATION

E/G ENGINE GENERATOR

EF EACH FACE

DWV DRAIN, WASTE, VENT

DS DOWNSPOUT

DN DOWN

DIA DIAMETER

DF DRINKING FOUNTAIN

DET DETAIL

DEPR DEPRESSED

HR HOUR

HPT HIGH POINT

HP HORSE POWER

H/L HIGH LEVEL

HB HOSE BIBB

H HUMIDIFIER

GPM GALLONS PER MINUTE

FT FEET

FPRF FIREPROOFING

FP FIRE PUMP

FM FORCE MAIN

FL / FLR FLOOR

FIX FIXTURE

FHC FIRE HOSE CABINET

FH FIRE HYDRANT

BRACKET

FEB FIRE EXTINGUISHER

FE FIRE EXTINGUISHER

FD FIRE DAMPER

FCU FAN COIL UNIT

FA FIRE ALARM

F FILTER, FAHRENHEIT

EXIST EXISTING

EXH EXHAUST

EWH ELECTRIC WATER HEATER

EWC ELECTRIC WATER COOLER

EQUIP EQUIPMENT

EMT ELECRICAL METAL TUBING

EHC ELECTRIC HEATING COIL

MAX MAXIMUM

MAINT MAINTENANCE

M MOTOR

LTG LIGHTING

L/L LOW LEVEL

LF LINEAR FEET

LAV LAVATORY

L

KIT KITCHEN

K

JP JOCKEY PUMP

J JUNCTION

J

INSUL INSULATION

IN INCH

IE INVERT ELEVATION

I

HZ HERTZ

HW HOT WATER

AIR CONDITIONING

HVAC HEATING/VENTING/

PVC POLYVINYL CHLORIDE

CURVATURE

PTVC POINT OF VERTICAL

PT POINT OF TANGENCY

PSI POUNDS PER SQUARE INCH

PSF POUNDS PER SQUARE FOOT

PRV PRESSURE REDUCING VALVE

PR PAIR

PLF POUND PER LINEAR FOOT

PIV POST INDICATOR VALVE

PI POINT OF INTERSECTION

CONDITIONING

VENTILATING & AIR

PHVAC PLUMBING/ HEATING/

PEN PENETRATION

PCF POUND PER CUBIC FOOT

PART PARTITION

P PUMP

OPNG OPENING

OD OUTSIDE DIAMETER

NTS NOT TO SCALE

NO NORMALLY OPEN

NC NORMALLY CLOSED

MIN MINUTES

MH MANHOLE

MG MOTOR GENERATOR

MFR MANUFACTURER

MET METAL

MECH MECHANICAL

MC MISCELLANEOUS CHANNEL

STM STEAM

SP

SERVICE SINK

SPEC SPECIFICATIONS

SK

SUMP PUMP

SM SPRINKLER MAIN

SS

SINK

SIM SIMILAR

SAN SANITARY

ROW RIGHT OF WAY

RM ROOM

REQ'D REQUIRED

RD ROOF DRAIN

RCP REINFORCED CONC.PIPE

R RISER OR REGISTER

Q

PW POTABLE WATER

TANGENCY

PVT POINT OF VERTICAL

INTERSECTION

PVI POINT OF VERTICAL

YH YARD HYDRANT

YD YARD

WHA WATER HAMMER ARRESTOR

WW WATER WARMER

HYDRANT

WH WATER HEATER OR WALL

WG WATER GAUGE

WC WATER CLOSET

W WIDTH

VTR VENT THROUGH ROOF

VCP VITRIFIED CLAY PIPE

VC VERTICAL CURVE

V VENT

UR URINAL

UG UNDERGROUND

T-STAT THERMOSTAT

TP TOILET PARTITION

TOIL TOILET

TK TANK

CUBIC FOOTCF

CHANNEL CH

CAST IRONCI

CAST IRON PIPECIP

CEILING OR COOLINGCLG

CORRUGATED METAL PIPECMP

CLEAN OUTCO

CONDENSATECOND

CONSTRUCTIONCONST

CONTRACTORCONTR

COPPERCU

CONTROL VALVE ORCV

COLD WATERCW

CUBIC YARDCYD

FPHB FREEZE PROOF HOSE BIBB

HWR HOT WATER RETURN

CENTRAL VACUUM

OVERFLOW DRAINOFD

WALL CLEANOUTWCO

FLOOR CLEANOUTFCO

REQUIRED TO MAINTAIN ASSEMBLY INTEGRITY.

PENETRATIONS OF FIRE AND/OR SMOKE-RATED ASSEMBLIES SHALL BE FIRE-STOPPED AS 13.

TOP OF FLOOR DRAINS AND FLOOR CLEANOUTS SHALL BE SET FLUSH WITH FINISHED FLOOR.12.

(INSIDE) OF BUILDING INSULATION.

WATER PIPING ABOVE CEILING AND IN EXTERIOR WALLS SHALL BE ROUTED ON HEATED SIDE 11.

SHALL NOT REST ON CEILING TILES OR BE SUPPORTED FROM CEILING GRID SYSTEM

PIPING ABOVE GRADE SHALL BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE. PIPING 10.

FIXTURES.

REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS AND ELEVATIONS OF PLUMBING 9.

AND EQUIPMENT WITH FAST-ACTING VALVES.

WATER HAMMER ARRESTORS SHALL BE INSTALLED PER PDI WH-201 NEAR PLUMBING FIXTURES 8.

TX

1508267

DFW-D-TRACO-P001

PLUMBING GENERAL NOTES

DFW INTERNATIONAL AIRPORTDALLAS-FORT WORTH

05/26/2021 w d t r a c o p

-d

-p lo tt e

SANITARY DRAIN PIPE

STORM DRAIN PIPE

VENT PIPE

DOMESTIC COLD WATER PIPE

DOMESTIC HOT WATER PIPE

UNION

STRAINER

CLEAN OUT

GATE VALVE

GLOBE VALVE

CHECK VALVE

HOSE BIBB

FREEZE PROOF HOSE BIB

FLOOR DRAIN

SD

SYMBOL DESCRIPTION

PLUMBING LEGEND

FD

PIPE DOWN

PIPE UP

HOT WATER RETURN PIPE

BOOSTED DOMESTIC COLD WATER PIPE

PIPE UP AND DOWN

RD ROOF DRAIN

OFD OVERFLOW DRAIN PIPE

CO

CENTRAL VACUUM PIPECV

OFD OVERFLOW DRAIN

SOLENOID VALVE, 120 V

PRESSURE GAUGE W/GAUGE COCK

dfw-d-traco-p001

2022-04-11T12:57:58-0400

KEVIN MILES

2022-04-11T06:24:39-0500

ARTURO MEDINA

KEYED CONSTRUCTION NOTE:

THE FOLLOWING CLOUDED ITEMS ON THE DRAWING ARE PART OF THE

NEW PLUMBING AND RENOVATION FOR THE RESTROOMS AT D10 TRACON

FACILITY. THE CONTRACTOR IS RESPONIBLE TO PROVIDE ALL NEW MATERIALS

AND NEW FUNCTIONAL RESTROOMS FOR THE FACILITY. THIS DRAWING AND

SIMILAR DRAWINGS ARE NOT INTEDED TO BE A COMPLETE LIST OF REQUIRED

ITEMS AND WORK TASKS. COORDINATE CUT-OVERS AND SHUTDOWNS WITH

FAA PROJECT ENGINEER AND RE SO THAT THERE ARE NO UNSCHEDULED

OUTAGES. WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE

CONTRACTORS' APPROVED SEQUENCE OF WORK SUBMITTAL.

FIRST FLOOR RESTROOMS

GROUND LEVEL

4" W

WC-1 WC-2 LAV-1

2" V

4" V

FD 2"

FD 2"GROUND LEVEL

LAV-1

WC-1 WC-2

4"V

TO THE CITY SEWER

DOUBLE CO

6" W

6"W

3/4" HW

1-1/2" CW

2" CW

3/4" CW

INSTALL NEW SEWER PIPE FOR ALL THE BRANCH WASTE & VENT

LINES FOR THE MEN'S AND WOMEN'S RESTROOMS. THIS WORK

INCLUDES INSTALLING NEW CLEANOUTS, FLOOR DRAINS, AND

ALL NEW MATERIAL ASSOCIATED WITH REPLACING THE WASTE

& VENT PIPING FOR THE FIRST FLOOR RESTROOMS.

INSTALL ALL NEW DOMESTIC WATER PIPING AND ACCESSORIES

THAT SERVES THE MEN'S AND WOMEN'S RESTROOMS UP TO

AND INCLUDING THE SHUT-OFF VALVE THAT FEEDS THE RESTROOM.

THIS WORK INCLUDES ALL COLD WATER (CW) AND HOT WATER (HW)

DOMESTIC PIPING CLOUDED ON THE DRAWINGS.

INSTALL A NEW DOUBLE CLEANOUT OUTSIDE ON THE WEST SIDE

OF THE TRACON BUILDING. COORDINATE WITH FAA RE FOR

SCHEDULED WORK.

DFW-D-TRACO-P002

1ST FLOOR RESTROOMS

07/16/2021 w d t r a c o p

-d lo tt e

FIRST FLOOR PLUMBING PLAN

FLR.

IN ACCESS

FCO

6" W UP

FLOOR.

FD-2 ON SECOND

2" W UP IN WALL TO

HB-1

3/4"

CU-1

1/2" CW TO

1/2"1/2"

1/2"1/2"

AHU'S.

TO SERVE COMPUTER

3/4" CW IN ACCESS FLR

1/2"

FLR AREA.

TO ACCESS

3/4" CW DN

CU-4

CU-3

CU-2

CU-5 1/2" CW TO

CU-6

CU-7

CU-8

CU-12

CU-11

CU-10

CU-9

CU-13

CU-14

CU-17

CU-16 &

CU-15

CU-18

CU-19

CU-20 CU-21

2"V

SHT. F1

RISER, SEE

H-1

DN TO

1/2" CW

CEILING AREA.

WALL TO 1ST FLR

IN 1ST FLR

1 1/2 " V UP

COLUMN

TO H-2

1/2" CW DN

UP ALONG COLUMN

6" CV EXHAUST

10" FIRE

2 1/8 " CV UP

TO 1ST FLR

CLG. AREA

CV-1

P2 P7

RISER INSIDE BLDG

BLDG SHUT OFF VALVE IN

P3 P5

R1N

R2N

SEE SHT. P3

FLR. CLG. AREA

2 1/2 " CV UP TO 1ST

2" W UP

BELOW SLAB

VENT PIPING

IN CHASE

ALONG

IN WALL

4" W UP

1" HWR UP

2" CW UP

1" HW UP

1" HWR UP

1" CW, HW UP

AREA

PIPING IN CEILING

3/4" CW, RUN

6" OFD UP

10" SD UP

UR-2

WC-2

WC-1

BP-1&2

1 1/2 " PRESSURE CW

OUT THRU WALL

6"] OFD DN

FPHB-1

SITE MAIN.

BEAM, TO

UNDER GRADE

10" ] SD DN

4"] W

@ 1/8" PER FT.

@ 1/8" PER FT.

4"] W

3/4" CW UP

SS-1

EXIST. TRACON.

RENOVATION OF

FOR FUTURE

3" CW CAPPED

1" CW UP

3/4" HW UP

3" W UP

EXIST. TRACON.

RENOVATION OF

FOR FUTURE

1" HWR CAPPED

1 1/2 " HW CAPPED

4" V UP

,B

6" W UNDER GRADE

BEAM, TO SITE

MAIN, SEE CIVIL PLANS.

4" DOMESTIC CW SUPPLY

SEE CIVIL PLANS.

4" CW DN

3" CW UP

2 1/2 " HW, 1" HWR

TO ESU BLDG.

IN UNDERGROUND

TUNNEL. SEE SHT P9.

FCO BELOW

ACCESS FLR.

4" V UPSPLASH ON CONCRETE

SEE CIVIL PLANS.

G F E D C B A

G.5

FD-2

FD-4

FD-2 FD-2

2" 2"

2" V UP

2 1/2 " V UP

FD-1

3/4" DN TO

TCHNR PIPING TO

THE PUMPS. FOR

CONTINUATION,

SEE DWG. NO.

DFW-TRACO-117

1/4" = 1'-0"

PARTIAL PLUMBING PLAN - R2N

1/4" = 1'-0"

AFF.

MOUNT 24"

3/4"2 1/2 "

1" 1"

1/2" 3/4"

3"2"

1 1/2 " 1"

3/4" 2"

114111

EWC-1A,B

LAV-1 UR-2

2" 3"

ELETRICAL ROOM

NAV/COMMUNICATIONS EQUIP.

TELEPHONE

ELEVATOR MACHINE ROOM

TELEPHONE ROOM

ELEV. MECH. ROOM

RADAR/ARTS EQUIP.

R4N

PARTIAL PLUMBING PLAN - R4N

MEN'S RESTROOM SEWER LAYOUT - R3N

R3N

P2 P5

R5N

P2 P5

WOMEN'S RESTROOM SEWER LAYOUT - R5N

P002 P002

P002 P002 dfw-d-traco-p002

2022-04-11T12:58:05-0400

KEVIN MILES

2022-04-11T06:24:58-0500

ARTURO MEDINA

3" CW

3" CW

1" CW

1" HW

1" HW

1" CW

3/4" CW

3/4" HW1/2" HW

3/4" HW

3/4" CW 1/2" CW

1/2" HW

SECOND FLOOR RESTROOMS

INSTALL NEW PIPE FOR ALL THE BRANCH WASTE & VENT

& VENT PIPING FOR THE SECOND FLOOR RESTROOMS.

THIS WORK INCLUDES ALL COLD WATER (CW), HOT WATER (HW),

AND RETURN HOT WATER (HWR) DOMESTIC PIPING CLOUDED ON

THE DRAWINGS.

NEW WORK IS CLOUDED

1 2

DFW-D-TRACO-P003

2ND FLOOR RESTROOMS

07/16/2021 w d t r a c o p

-d lo tt e

SECOND FLOOR PLUMBING PLAN

HB-1,

WALL.

3/4" HW DN

FD-1FD-1

UP & DN

6" CV EXHAUST

WALL

IN 1ST FLR.

FROM 1ST FLR.

CEILING AREA

THRU SLAB.

MOUNT CV INLET

FLUSH W/ACCESS

FLOOR. (TYP)

FLOOR. (TYP)

FLUSH W/ACCESS

MOUNT CV INLET

THRU SLAB.

FROM 1ST FLR.

CV PIPING

(TYP)

MACHINE

WALL TO CV

2 1/8 " CV DN

IN 1ST FLR. WALL

IN 1ST FLR. WALL

ALONG 1ST FLR.

2 1/2 " CV DN

2" W DN

2 1/8 " CV UP 2 1/8 " CV UP

CV

CV CV

VCV

AREA.

1ST FLR. CEILING

2" V, IN

2" W, 6" OFD UP & DN

10" SD UP & DN

IN 2ND FLR.

1 1/2 " V DN

SK-1

UR-2 WC-2

WC-1WC-1

217218

2" W UP & DN

3/4" HW UP & DN

1" CW UP & DN

4" W UP & DN

3/4" CW UP & DN

4" V UP & DN

ABCDEFG

4" V UP & DN

1/2" CW UP

UR-1

2" V UP, 1 1/2 " V DN

2 1/2 " V

IN 1ST

FLR. CEILING

AREA.

ALONG COLUMN.

2 1/2 " V DN

1 1/2 "2" W DN

PLUG FOR

1 1/2 " RUN

CEILING

2" V UP, 1 1/2 " V DN

1 1/2 ", 1CO

CKT 42 ABOVE COUNTER

CKT 38 ABOVE COUNTER

2" W

CKT 2

CKT 4

CKT 6

CKT 11

FOR 4)

(4' AF TYP

2" 2" FD-1FD-1 6" OFD UP & DN

10" SD UP & DN

4"3 "

3/4" 3/4"

1" CW & HW UP

1" CW, 1" HW DN

1" HWR UP & DN

1" CW & HW UP

2" CW & 1" HW DN3" CW UP AND DN

4" W UP AND DN

4" V UP, 2" V DN

2" TO FD-2 IN RM. 203

4" 1 1/2 "

LAV-1LAV-1

WC-2 LAV-1

217218

PARTIAL PLUMBING PLAN - R1N

THIRD FLOOR SIM.

MECH. SHAFT

NOTUSED

MECH. SHAFT

DISPLAY ARTS SHOP

BREAK ROOM

CONFERENCE

SMOKING ROOM

INTERIM TRACON

END STATE FACILITY

225 CABLE CHASE

P003P003

R2N

R3N

R5NR4N

PARTIAL PLUMBING PLAN - R2N

PARTIAL PLUMBING PLAN - R3N

PARTIAL PLUMBING PLAN - R4NPARTIAL PLUMBING PLAN - R5N

dfw-d-traco-p003

2022-04-11T12:58:14-0400

KEVIN MILES

2022-04-11T06:25:32-0500

ARTURO MEDINA

THIRD FLOOR RESTROOMS

& VENT PIPING FOR THE THIRD FLOOR RESTROOMS.

REFER TO DRAWING DFW-D-TRACO-P003 & P006 FOR DETAIL OF THE

RESTROOMS AND PIPING LAYOUTS. CONTACTOR SHALL SUMBIT

A DETAILED PIPING LAYOUT FOR CONSTRUCTION.

1 2 3

DFW-D-TRACO-P004

3RD FLOOR RESTROOMS

07/20/2021 w d t r a c o p

-d lo tt e

24" AFF.

MOUNT

TO H-4

CEILING

TO H-3

FD-1 FD-1

PENETRATION

ROOF

PRIOR TO

OFFSET

THRU ROOF.

6" CV UP

EXHAUST DN

6" CV

P3 P6

R4N

4" VTR

OFFSET PRIOR

TO ROOF

2" V, CONNECT

TO 2" V

IN 3RD FLR

IN 2ND FLR.

2" V DN

ALONG COLUMN

1 1/2 " VTR

4" W DN

2" VTR

4"4"

FD-4FD-4

4" VTR

6" OFD DN

10" SD DN

1 1/2 " CW DN, 1" HW DN

3/4" CW, HW, UP

2" W UP, 4" W DN

2" VTR, 2" V DN

2 1/2 " CW UP & DN

4" VTR, 4" V DN

1" CW, HW DN

3/4" CW, HW UP

2" W UP, 3" W DN

2" VTR, 1 1/2 " V DN

4" V DN

WC-1WC-1

ABCDEFG

2" VTR, 2" V DN

1 1/2 " W UP, 3" W DN

3/4" HW DN

1" CW DN

4" W DN

3/4" CW DN 4" V DN

353 351

366367

365368

369371

378377

324 323

375374

309 311

316 313

THIRD FLOOR PLUMBING PLAN

P003 P003

TRAINING

LIBRARY/REF.

TRAINING RECORDS

ASST. MGR. TRAINING

SECRETARY

AREA MANAGERS OFFICES

OFFICE

OFFICE

MECHANICAL/ELECTRICAL

CBI LAB

AREA SUPV. OFFICE

INTERVIEW

INTERVIEW

STAFF WORKROOM

QUALITY ASSURANCE

TAPE STORAGE

ASST. MANAGER QUALITY ASSURANCE

Q.A. SPECIALISTS

TRANSCRIPT/PLAYBACK

AIRSPACE & PROCEDURES WORKROOM

SPECIALISTS

ASST. MGR. AIRSPACE & PROCEDURES

TRAFFIC WORKROOM

ASST. MGR. TRAFFIC MGMT.

T.M. SYSTEMS ANALYSIS ROOM

DRUG SCREENING

SPECIMEN COLLECTION

TOILET

MECHANICAL/ELECTRICAL

PLANS & PROGRAMS

ASST. MGR. PLANS & PROGRAMS

ETG LAB

ETG/DISPLAY SHOP

COPIER/STORAGE

TRAINING ROOM

OPT WORKROOM

TEAM BRIEFING ROOM

dfw-d-traco-p004

2022-04-11T12:58:27-0400

KEVIN MILES

2022-04-11T06:25:55-0500

ARTURO MEDINA

INDEX OF DRAWINGS

05/21/2021 1508267

DFW-D-TRACO-G005

w d t r a c o g

-d

-g lo tt e

DRAWING NO. DRAWING TITLE

INDEX OF DRAWINGS

DFW-D-ATCT-P004

DFW-D-ATCT-P003

DFW-D-ATCT-P002

DFW-D-ATCT-P001

DFW-D-TRACO-P007

DFW-D-TRACO-P006

DFW-D-TRACO-P005

DFW-D-TRACO-P004

DFW-D-TRACO-P003

DFW-D-TRACO-P002

DFW-D-TRACO-P001

DFW-D-TRACO-M006

DFW-D-TRACO-M005

DFW-D-TRACO-M004

DFW-D-TRACO-M003

DFW-D-TRACO-M002

DFW-D-ATCT-E082

DFW-D-TRACO-E010

DFW-D-TRACO-E009

DFW-D-TRACO-E008

DFW-D-TRACO-E007

DFW-D-ATCT-A021

DFW-D-TRACO-A009

DFW-D-TRACO-A008

DFW-D-TRACO-A007

DFW-D-TRACO-A006

DFW-D-TRACO-A005

DFW-D-ATCT-D028

DFW-D-ATCT-D027

DFW-D-TRACO-D006

DFW-D-TRACO-D005

DFW-D-TRACO-D004

DFW-D-TRACO-D003

DFW-D-TRACO-D002

DFW-D-TRACO-G005

DFW-D-TRACO-G004

DFW BASE BUILDING - RISER DIAGRAMS

DFW BASE BUILDING - RESTROOMS 3 OF 3

DFW BASE BUILDING - RESTROOMS 2 OF 3

DFW BASE BUILDING - RESTROOMS 1 0F 3

ESU BUILDING - RISER DIAGRAMS

TRACON - RISER DIAGRAMS

ESU BUILDING - RESTROOMS

TRACON - THIRD FLOOR RESTROOMS

TRACON - SECOND FLOOR RESTROOMS

TRACON - FIRST FLOOR RESTROOMS

TRACON - PLUMBING GENERAL NOTES

TRACON - CONTROL DIAGRAM

TRACON - MECHANICAL SCHEDULE

TRACON - MECHANICAL RISER DIAGRAM

TRACON - FIRST FLOOR COMPUTER ROOM UNITS

TRACON - GENERAL NOTES & SEQUENCE OF WORK

BASE BUILDING - FIRST FLOOR RESTROOM PLANS

TRACON - FIRST FLOOR PLAN COMPUTER UNITS

TRACON - THIRD FLOOR AND ESU BUILDING FLOOR PLANS

TRACON - FIRST & SECOND FLOOR RESTROOMS

TRACON - FIRST FLOOR PLAN

BASE BUILDING - RESTROOM ARCHITECTURE

ESU BUILDING - RESTRROM ARCITECTURE SCHEDULE

TRACON - RESTROOM ARCHITECTURE SCHEDULE

TRACON - ESU RESTROOM AND DETAIL

TRACON - RESTROOMS DETAIL & ELEVATION

TRACON - RESTROOMS

DEMO - BASE BUILDING PLUMBING

DEMO - BASE BUILDING ARCHITECTURE

DEMO - ESU RESTROOM PLUMBING

DEMO - TRACON RESTROOM PLUMBING

DEMO - TRACON MECHANICAL

DEMO - ESU RESTROOM ARCHITECTURE

DEMO - TRACON RESTROOM ARCHITECTURE

DRAWING INDEX

PLUMBING & COMPUTER ROOM UNIT REPLACEMENT PROJECT - COVER SHEET

dfw-d-traco-g005

2022-04-11T12:54:13-0400

KEVIN MILES

2022-04-11T06:26:42-0500

ARTURO MEDINA

ESU BUILDING RESTROOMS

& VENT PIPING FOR THE THIRD FLOOR RESTROOMS.

REFER TO DRAWING DFW-D-TRACO-P007 FOR DETAIL OF THE

RESTROOMS AND PIPING LAYOUTS. CONTACTOR SHALL SUMBIT

A DETAILED PIPING LAYOUT FOR CONSTRUCTION.

DFW-D-TRACO-P005

ESU RESTROOMS

07/21/2021 w d t r a c o p

-d

:2 lo tt e

BUILDING.

TO MATCH EXTERIOR OF

PAINT PIPES, CLAMPS, ETC.,

STEEL ABOVE GRADE.

FROM CAST IRON TO BLACK

WALL. CHANGE VENT PIPING

2" & 3" VENTS UP EXTERIOR

P9 P7

SEE DETAIL

EXPANSION LOOP

E101 CORRIDOR

E102 SHOP

E103 STAIR

E104 STAIR

E105 TOOL STORAGE

E106 STORAGE

E107 STAIR

E108 UPS ROOM

E109 EMERGENCY GENERATOR ROOM

E110 MECHANICAL

E111 SWITCH GEAR ROOM

E112 BATTERY ROOM

E201 STAIR

E202 HALL

E203 TECHNICIAN OFFICE

E204 NOT USED

E205 TECHNICIAN OFFICE

E206 CONTROL

E207 BREAK ROOM

E208 MEN'S TOILET

E209 LOCKER

E210 NOT USED

E211 VESTIBULE

E212 WOMEN'S TOILET

E213 JANITOR

E214 STORAGE

E215 STAIR

E216 STORAGE

RM.NO. RM. NAME

T-04 TUNNEL (REFER TO SHT. A1)

T-03 TUNNEL

T-02 MECHANICAL ROOM

T-01 STAIR

E111

4"4" 4"

TO H-5

P2 P7

3VALVE, SEE

BLDG. STOP

2" 4"

FD-4 FD-4

2" 1" 2"

P9 P7

T-01

T-03

T-02

P9 P9

P9 P6

R1E

FIRE RISER

IN WALLIN WALL

1 1/2 "1 1/2 "

IN CEILING AREA

1 1/2 ", RUN PIPING

W/SHOWER.

EMERGENCY

EYE WASH

2 1/2 " VTR

PLAN.

TUNNEL LEVEL

PENETRATION. SEE

BASEMENT WALL

2" 2"2"

2" 2 1/2 " V UP

2" V EXPOSED,

THRU ROOF

THRU ROOF

2" V EXPOSED,

FOR CONTINUATION.

SEE CIVIL PLANS

3" FORCE MAIN

UNDER FLR. SLAB.

FROM SP-1 & 2

UP FROM SUMP.

P7 P9

P7 P9

UP FROM SUMP.

4" 4"

2"2"

FD-2FD-2FD-2FD-2

MAIN FROM SP-2.

TO CEILING AREA.

UP ALONG WALL

FIRST FLOOR SLAB.

PIPE TO RUN UNDER

3" FORCE MAIN.

WCO

FOR CONTINUATION.

SEE SHT. P2

1" HWR UP.

2 1/2 " HW UP,

2 1/2 "2 1/2 " SP-2A,B

PLAN.

TUNNEL LEVEL

PENETRATION. SEE

BASEMENT WALL

TRENCH DRAIN

RISER WITHIN BLDG.

UNDER SLAB TO

4" FIRE PIPE

MAIN.

ORIGINATION.

CIVIL PLANS FOR

UP, EXPOSED. SEE

1 1/2 " CW UNDER SLAB

TUNNEL

EXISTING

SP-1A,B

1 1/2 "1/2"

FLOOR

TO FIRST

1" HW DN

2" CW DNE211

E202

E203

E205

E206

E214

E216

E207 E213

E209

2" WALL, 4" VTR

4" W DN IN

FLOOR PLAN.

SEE FIRST

@ 10'-0" AFF.

BASEMENT WALL.

SLAB, PENETRATING

SITE MAIN, UNDER

3" CW FROM

ALONG WALL

TO BASEMENT.

4" W UP AND DN

TO BASEMENT

3" CW UNDER SLAB

1" IN 1ST FLR. CEILING AREA

2" IN 1ST FLR. CEILING AREA

AREA TO BASEMENT.

FIRST FLOOR CEILING

2" CW, 1" HW FROM

LEVEL

TO MEZZANINE

2" CW, 1" HW UP

M8 M8

ARRANGEMENTS

FOR TUNNEL PIPING

NEW TRACON. 3" FORCE

2 1/2 " HW, 1" HWR TO

PLAN

LEVEL PLUMBING

SEE MEZZANINE

TO CEILING AREA.

FLOOR WALL

UP THRU FIRST

2" CW, 1" HW

FD-2FD-2

DETAIL

TO DHWC, SEE

FOR STEAM PIPING

O.7QR

.3

O.7V.3W U T S R Q O

EWC-1B

1 1/2

SK-1

SHR-1

DHWC-1

TUNNEL LEVEL PLUMBING PLAN

SCALE: 1/16" = 1'-0"

E208

MEZZANINE LEVEL PLUMBING PLAN

STORAGE TANK.

W/WASTE OIL

OIL SEPARATOR

SANITARY SEWER

SLAB TO SITE

4" W UNDER

FROM PARAPET WALL.

ROOF PENETRATION

TO ROOF. OFFSET

ALONG COLUMN

3" V UP

4"4"

4" 4" FD-4FD-4FD-4

FD-4 4"

OS-1

EYE WASH

EMERGENCY

FPHB-1 FPHB-1

W V U T S R Q P O

V.3 O.7

E107

E106 E105

E102

E104

E103

E101

E108

E110

E112

E109

FIRST FLOOR PLUMBING PLAN

dfw-d-traco-p005

2022-04-11T12:58:34-0400

KEVIN MILES

2022-04-11T06:26:08-0500

ARTURO MEDINA

LIGHT COVE

PORCELAIN TILEPORCELAIN TILE

ACCENT TILE

MIRROR

LAVS

SOAP DISPENSER

PORCELAIN TILE

CABINET

6" X 12" COVE BASE

TILE ACCENT

SS TOILET

PARTITION

VANITY

PORCELAIN

TILE

PULL

SANITARY

NAPKIN

DISPENSER

(@ 215 ONLY)

PULL

PAPER TOWEL

DISPENSER &

WASTE RECPT

WASTE RECPT SS TOILET

SANITARY

NAPKIN

DISPENSER

LIGHT COVE LIGHT COVE

OPEN

LIGHT COVE LIGHT COVE

SHOWER ROD

FOLD DOWN

SHOWER SEAT

GRAB BAR

CURB

CURB

SHOWER ROD

CONTROL AREA

GRAB BAR

SHOWER HEAD

AND HOSE

GRAB BARGRAB BAR

FOLD DOWN

SHOWER SEAT

OPEN

1'-0"

ATCT

BASE BUILDING RESTROOMS

10/14/2021 1508267

DFW-D-ATCT-A021

w d a t c t a

KEYED CONSTRUCTION NOTES:

INFORMATION.

REFER TO THE ARCHITECTURAL SPECIFICATIONS FOR MORE DETAILED 5.

CONTRACTOR SHALL SUBMIT A DETAILED LAYOUT TO BE APPROVED.

MATERIAL OR WORK TASKS. RESTROOM LAYOUT IS SUGGESTED AND THE

THIS DRAWING IS NOT INTENDED TO BE A COMPLETE LIST OF REQUIRED 4.

INSTALLATION OF THOSE DISCIPLINES' MATERIAL AND EQUIPMENT.

COORDINATE WITH MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR 3.

IT IS THE CONTRACTOR'S RESPONSIBILTY TO RESTORE TO NEW.

GROUNDS, AND CONTENTS. IF ANY ITEMS ARE DAMAGED BY THE CONTRACTOR,

CONTRACTOR TO PROTECT REMAINING PORTIONS OF THE EXISTING BUILDING,

WHILE WORKING UNDER THIS CONTRACT, IT IS THE RESPONSIBILITY OF THE 2.

WITH THE APPROVED SEQUENCE OF WORK SUBMITTAL.

MATERIAL/EQUIPMENT. THE WORK SHALL BE ACCOMPLISHED IN ACCORDANCE

MATERIAL/EQUIPMENT NOTED IS TO BE REPLACED WITH NEW

DRAWING IS PART OF THE RESTROOM REPLACEMENT PROJECT. ALL EXISTING

THE FOLLOWING ARCHITECTURAL MATERIALS/EQUIPMENT IDENTIFIED ON THE 1.

-d -a tc t-a lo tt e

SCALE: 3/16"=1'-0"

ELEVATION

A18 A18

6 WOMEN'S TOILET 129

7 WOMEN'S TOILET 129

8 WOMEN'S TOILET 129

9 WOMEN'S TOILET 129

10 WOMEN'S TOILET 129

11 WOMEN'S TOILET 129

12 WOMEN'S TOILET 129

13 WOMEN'S TOILET 129

14 WOMEN'S TOILET 129

15 WOMEN'S TOILET 129

16 WOMEN'S TOILET 129

17 WOMEN'S TOILET 129

18 WOMEN'S TOILET 129

19 WOMEN'S TOILET 129

20 WOMEN'S TOILET 129

WOMEN'S TOILET 129ELEVATION

21 WOMEN'S TOILET 129

22 WOMEN'S TOILET 129

SUGGESTED FLOOR PATTERN

dfw-d-atct-a021

2022-04-11T12:56:29-0400

KEVIN MILES

2022-04-11T06:22:49-0500

ARTURO MEDINA

TRACON RESTROOMS - RISER DIAGRAMS

09/03/2021 1508267

DFW-D-TRACO-P006

w d t r a c o p

-d lo tt e dfw-d-traco-p006

2022-04-11T12:58:40-0400

KEVIN MILES

2022-04-11T06:26:25-0500

ARTURO MEDINA

SK-2

EWC-1 A,B

ICEMAKER

HUB DRAIN

-1

-2

Q P O N M L K J H G F E D C B A

ROOM NAMEROOM NO

SECT/RECEPT

AF MANAGER

FILES

MAIL/COPY ROOM

CLOSET

DIRECTORY/LIBRARY

ADMINISTRATIVE STORAGE

LOGISTICS

RECEIVING

TELCO ROOM/NON-FAA EQUIP RM

PACKING STATION

PACKING MATERIAL STORAGE

SECURED DATA STORAGE

PANTRY

AF BREAKROOM

COFFEE

CLERICAL/NAPRS

UNIT SUPV

LUNCH ROOM

VENDING

ESU SHOP

EXERCISE ROOM

F & E/CONTRACTOR OFFICE

LOCKERS

WOMEN'S RESTROOM

SHOWER

MEN'S RESTROOM

EXIST STAIR

EXIST CABLE CHASE

EXIST ELEVATOR CHASE

SECURITY

TV AV STORAGE

CONFERENCE ROOM

WORKROOM

UNIT #5 STORAGE

MCC RMM WORKROOM

UNIT #2 SHOP

UNIT #2 TECH OFFICE

UNIT #2 STORAGE

UNIT #2 SPS

UNIT #1 SHOP

UNIT #1 STORAGE

UNIT #1 TECH OFFICE

UNIT #3 SPS

UNIT #3 SHOP

UNIT #3 STORAGE

UNIT #3 TECH OFFICE

SPRINKLER RISER ROOM

UNIT #6 SHOP

UNIT #6 STORAGE

UNIT #6 TECH OFFICE

READY/PERIODICALS

UNIT #5 SHOP

UNIT #5 TECH OFFICE

UNIT #4 TECH OFFICE

UNIT #4 TECH SHOP

UNIT #4 STORAGE

UNIT #4 SPS

ASU WORKROOM

ASST MGR AUTOMATION

RECEPT/SECT

AT MANAGER

PERSONNEL MGMT SPECIALISTS/

ADMINISTRATION OFFICE

COPIER/SUPPLY ROOM

AT LMR OFFICE

ASST MGR OFFICE

A20

204 203

201 198

163 161

112111

115114

143 133

129 128 127

172173

RESTROOMS - ARCHITECTURE DEMO

REPLACEMENT - BASE BUILDING

09/15/2021 1508267

DFW-D-ATCT-D027

w d a t c t d

KEYED DEMOLISTION NOTES

WORKING WITH ANY ELECTRICAL PANELS AND PANELBOARD BREAKERS.

CONTRACTOR MUST COORDINATE WITH FAA RE AND FACILITY BEFORE 4.

OF PROPERLY.

ALL DEMOLITION SHALL BE REMOVED DAILY FROM THE BUILDING AND DISPOSED 3.

DEMOLITION WORK CAN BEGIN.

PERFORMED. COORDINATE WITH FAA RE AND FACILITY BEFORE ANY

COVER FOR THE RESTROOM DOORWAY THAT DEMOLITION WORK IS BEING

CONTRACTOR TO PROVIDE AND INSTALL A MINIMUM 10 MIL POLY SHEET DUST 2.

SUBMITTAL.

ACCOMPLISHED IN ACCORDANCE WITH THE APPROVED SEQUENCE OF WORK

REPLACED. ALL DEMOLITION SHALL BE COORDINATED WITH FAA RE AND

RESPONSIBLE FOR LOCATING ALL EXISTING MATERIAL AND DEVICES TO BE

ARCHITECTURAL MATERIAL AND WORK TASKS. THE CONTRACTOR IS

SIMILAR DRAWINGS ARE NOT INTENDED TO BE A COMPLETE LIST OF REQUIRED

BASE BUILDING RESTROOMS AS SHOWN ON THE DRAWINGS. THIS DRAWING AND

THE FOLLOWING ARCHITECTURAL MATERIAL TO BE REPLACED IN ALL OF THE 1.

BASE BUILDING RESTROOM DEMOLITION

NECESSARY SCOPE OF WORK TO BE REMOVED AND REINSTALLED.

MECHANICAL, AND ELECTRICAL SUB-CONTRACTOR CAN ACCESS THE

CONTRACTOR SHALL REMOVE ALL GYSUM WALLBOARD WHERE THE PLUMBING,

ALL EXISTING RELATED ARCHITECTURAL ACCESSORIES IN EACH RESTROOM.

COUNTERTOPS, URNIALS, WATER CLOESTS, PARTITIONS, LIGHT FIXTURES, AND

CONTRACTOR SHALL REMOVE ALL EXISTING FLOOR & WALL TILE, SINKS,

ALL NEW MATERIAL AND DEVICES ON SITE.

PRIOR TO REMOVAL OF ARCHITECTURAL MATERIALS, THE CONTRACTOR SHALL HAVE

-d -a tc t-d lo tt e

PLUMBING PLAN

SCALE: 3/32" = 1' - 0"

dfw-d-atct-d027

2022-04-11T12:55:01-0400

KEVIN MILES

2022-04-11T06:20:33-0500

ARTURO MEDINA

ESU RESTROOMS - RISER DIAGRAMS

03/31/2021 1508267

DFW-D-TRACO-P007

-d

-d lo tt e

-d lo tt e dfw-d-traco-p007

2022-04-11T12:58:47-0400

KEVIN MILES

2022-04-11T06:26:38-0500

ARTURO MEDINA

2"FD-1

1 12" V

2" WASTE

RUN WITHIN

EXIST 3 DEEP ACCESS

FLOORING AT 1.4"

PER FT

1 12"

2" EWC-1 A,B2"

4" FPHB-1

4" WASTE PIPE UP

TO MECHANICAL

ROOM 217

1 12" HW, 1" HWR

FROM VALVED AND

CONNECTIONED TO

THE TRACON

2 1

1 1

SS-13"

4" VENT UP THRU

ROOF; EXPOSED IN

THE MECHANICAL ROOM

RM 217

" BOOSTED

CW FOR TOWER

EXISTING SUMP

PUMP

6" DRY STAND

PIPE UP IN

CHASE

3" VTR 2"

FCO HWR

BALANCING

"2"

BCW

FF

FFFF

BCW BCW BCW BCW

4" SANITARY

WASTE FROM

TOWER

3" VTR

4" SANITARY WASTE PIPE

FPHB-1FPHB-1

6" DRY STAND PIPE

UP IN CHASE TO ABOVE

2" VTR 2"

2" BOOSTED CW &

3" DOMESTIC CW 2

2" 2" 1"

DOUBLE

GCO

BASE BUILDING RESTROOMS - PLUMBING DEMO

09/18/2021 1508267

DFW-D-ATCT-D028

w d a t c t d

KEYED DEMOLITION NOTES:

WORK SUBMITTAL.

ACCOMPLISHED IN ACCORDANCE WITH THE CONTRACTOR'S APPROVED SEQUENCE OF

WEEK IN ADVANCE SO THAT THERE ARE NO UNSCHEDULED OUTAGES. WORK SHALL BE

NEXT FLOOR LEVEL OF RESTROOMS. COORDINATE ANY CUT-OVERS WITH THE FAA RE 2

INTERRUPTIONS OR SHUT-DOWNS BEFORE THE CONTRACTOR CAN BEGIN WORK ON THE

RESTROOMS SHALL BE IN OPERATION FOR 48 HOURS MINIMUM WITHOUT ANY

TWO (2) RESTROOMS (1 MEN/1 WOMEN), CAN BE REPLACED AT ONE TIME. THE NEW

PER PLANS AND SPECIFICATIONS. ONLY ONE SET OF RESTROOMS, WITH A MAXIMUM OF

NEW COMPLETE AND FULLY FUNCTIONAL RESTROOMS THORUGHOUT THE BASE BUILDING

PLUMBING REPLACEMENT PROJECT. THE CONTACTOR IS RESPONSIBLE FOR PROVIDING

THE FOLLOWING PLUMBING EQUIPMENT/MATERIAL ON THE DRAWING IS PART OF THE

BASE BUILDING RESTROOM PLUMBING REPLACEMENT

TO AND INCLUDING THE SHUT-OFF VALVE THAT FEEDS EACH RESTROOM.

WATER (CW), HOT WATER (HW), AND RETURN HOT WATER (HWR) DOMESTIC PIPING UP

SERVE THE TRACON RESTROOMS. THIS WORK INCLUDES REMOVAL OF THE COLD

CONTRACTOR SHALL REMOVE ALL DOMESTIC WATER PIPING AND ACCESSORIES THAT

REGARDING PIPING REPLACEMENT.

CONTRACTOR SHALL ALSO REFER TO THE RISER DIAGRAMS FOR MORE DETAILS

WITH THE REMOVAL OF THE WASTE AND VENT PIPING FOR THE RESTROOMS.

OF EXISTING CLEANOUTS, FLOOR DRAINS, AND ANY EXISITNG MATERIAL ASSOCIATED

WALL FOR ALL OF THE RESTROOMS IN THE TRACON. THIS WORK INCLUDES REMOVAL

CONTRACTOR SHALL REMOVE EXISTING SEWER WASTE & VENT LINES BEHIND THE

HYDROXYL GENERATORS WITH THE FAA RE.

APPROVED EQUAL) BEFORE ANY DEMOLITION CAN BEGIN. COORDINATE LOCATON OF THE

SITE. CONTRACTOR SHALL PROVIDE TWO (2) HYDROXYL GENERATORS (TITAN 4000 OR

THE CONTRACTOR SHALL HAVE ALL NEW PLUMBING AND PLUMBING RELATED MATERIAL ON

PRIOR TO ANY REMOVAL OF PLUMBING MATERIALS IN THE BASE BUILDING RESTROOMS,

-d -a tc t-d lo tt e

PLUMBING PLAN

dfw-d-atct-d028

2022-04-11T12:55:08-0400

KEVIN MILES

2022-04-11T06:20:52-0500

ARTURO MEDINA

DFW-D-ATCT-E082

w d a t c t e

UNIT REPLACEMENT

DFW/D10 PLUMBING & COMPUTER ROOM

AA

06/30/2021 1508267

IE

FIRST FLOOR NORTH MENS RESTROOMFIRST FLOOR NORTH WOMENS RESTROOM

GENERAL ELECTRICAL NOTES:

FIRST FLOOR LOCKER ROOM RESTROOMS

FIRST FLOOR ATCT RESTROOM PLANS

-d -a tc t-e lo tt e

WOMEN

MEN

MEN

WOMEN

152 149

21 21

EE D D

THE FLOOR PLANS.

REPLACE LIGHT FIXTURES IN ALL RESTROOMS AS SHOWN ON

NEC AND LOCAL CODES.

LATEST EDITIONS OF FAA STANDARD FAA 1217F, FAA 19E,

ALL ELECTRICAL WORK SHALL BE DONE ACCORDING TO

AND ABBREVIATIONS.

SEE DRAWING DFW-D-TRACO-E008 FOR GENERAL NOTES

3.

2.

1.

LITHONIA L24-MVOLT-DM-35K-80CRI-WH

120/277

120/277

TYPE DESCRIPTION PART NUMBER VOLTS

CDS LED STRIP LIGHT

LITHONIA 65SEBN-LED-30K-90CRI-LED CAN LIGHT FIXTURED

NOTE:

1. CONTRACTOR TO VERIFY ALL QUANTITIES, VOLTAGES AND PART NUMBERS.

LIGHTING FIXTURE SCHEDULE

120/277CDS LED STRIP LIGHT LITHONIA L48-MVOLT-DM-35K-80CRI-WH

-MVOLT-L7XRLEDT24

GENERAL NOTES:

1.

2.

CODES.

FAA 1217, FAA 19G AND LATEST EDITION OF NEC AND LOCAL

ALL ELECTRICAL WORK DONE ACCORDING TO LATEST FAA STANDARDS

CHANGED PANEL NAMES AND ABBREVIATIONS.

SEE DRAWING DFW-D-TRACO-E007 FOR GENERAL NOTES, SYMBOLS,

C 120/277CDS LED STRIP LIGHT LITHONIA L96-MVOLT-DM-35K-80CRI-WH

CONNECT TO EXISTING EMERGENCY CIRCUIT.

ACCORDING TO LIGHTING FIXTURE SCHEDULE.

REPLACE EXISTING LIGHT WITH NEW LED LIGHT

CONNECT TO EXISTING CIRCUIT.

ACCORDING TO LIGHTING FIXTURE SCHEDULE.

REPLACE EXISTING LIGHT WITH NEW LED LIGHT1

120/277LITHONIA 65SEBN-LED-30K-90CRI-LED SHOWER LIGHTE

-MVOLT-L7XRLEDT24FIXTURE

dfw-d-atct-e082

2022-04-11T12:57:08-0400

KEVIN MILES

2022-04-11T10:41:36-0500

SYED A ABBAS

2"FD-1

1 12" V

2" WASTE

RUN WITHIN

EXIST 3 DEEP ACCESS

FLOORING AT 1.4"

PER FT

2" EWC-1 A,B2"

4" FPHB-1

4" WASTE PIPE UP

TO MECHANICAL

ROOM 217

1 12" HW, 1" HWR

FROM VALVED AND

CONNECTIONED TO

THE TRACON

2 1

SS-13"

4" VENT UP THRU

ROOF; EXPOSED IN

THE MECHANICAL ROOM

RM 217

" BOOSTED

CW FOR TOWER

EXISTING SUMP

PUMP

6" DRY STAND

PIPE UP IN

CHASE

3" VTR 2"

FCO HWR

BALANCING

"2"

FF

FFFF

BCW BCW BCW BCW

4" SANITARY

WASTE FROM

TOWER

4" SANITARY WASTE PIPE

FPHB-1FPHB-1

6" DRY STAND PIPE

UP IN CHASE TO ABOVE

2" VTR 2"

2" BOOSTED CW &

3" DOMESTIC CW 2

2" 2" 1"

O N M

4"CO

KEYED CONSTRUCTION NOTES

NEW PLUMBING AND RENOVATION FOR THE RESTROOMS AT DFW BASE BUILDING

& VENT PIPING FOR THE FIRST FLOOR RESTROOMS.

THIS WORK INCLUDES ALL COLD WATER (CW) AND HOT WATER (HW)

DOMESTIC PIPING CLOUDED ON THE DRAWINGS.

INSTALL A NEW DOUBLE CLEANOUT OUTSIDE ON THE WEST SIDE

OF THE TRACON BUILDING. COORDINATE WITH FAA RE FOR

SCHEDULED WORK.

DOUBLE

GCO

BASE BUILDING

10/21/2021

DFW-D-ATCT-P001

w d a t c t p

-d -a tc t-p lo tt e

APLUMBING PLAN

MECHANICAL PENTHOUSE PLUMBING PLAN

P002 dfw-d-atct-p001

2022-04-11T12:58:56-0400

KEVIN MILES

2022-04-11T06:26:55-0500

ARTURO MEDINA

Domestic CW

Domestic HW

GRADE

WC-1 UR-1

WC-2FD-1

TO URINALS

BASE BUILDING RESTROOMS - SECTIONS

DFW-D-ATCT-P002

w d a t c t p

-d -a tc t-p lo tt e

ROOM 215 (WOMEN'S SINKS)

ROOM 215 (WOMEN'S WATER CLOSETS)

ROOM 108 (MEN'S SINKS)

ROOM 108 (MEN'S WATER CLOSETS)

ROOM 151 (MEN'S SINKS)

ROOM 151 (MEN'S SINKS)

dfw-d-atct-p002

2022-04-11T12:59:02-0400

KEVIN MILES

2022-04-11T06:27:06-0500

ARTURO MEDINA

SEWER VENT

FD-1 FD-1

4" "2

"2

"4

"2

SEWER VENT

DFW-D-ATCT-P003

w d a t c t p

-d -a tc t-p lo tt e

P003

ROOM 151 (MEN'S WATER CLOSETS)

ROOM 148 (WOMEN'S WATER CLOSETS)

ROOM 148 (WOMEN'S SINKS)

ROOM 151 (MEN'S URINALS)

dfw-d-atct-p003

2022-04-11T12:59:12-0400

KEVIN MILES

2022-04-11T06:27:17-0500

ARTURO MEDINA

2 ½"

½"

HA A

EW

C-1A,B

C-2

C-1

½", TYP

HA B

HA D

1 ½"

1 ¼"

1 ½", TYP

SHR-

¾"

TO ICEMAKER

SK-

HA

1 ½" HW & 1" HWR

½", TYP

HA-

C-1BEW

C-1A

1 ½", VTR

C-1A,B

1" HW WITH BALANCING VALVE

CONNECT TO END OF

1" HWR

FLOOD RIM OF WC-2

THAN 6" ABOVE

BE MADE NOT LESS

CONNECTION SHALL

1 ½" VTR

1 ½"1 ½"

2" TYP 2"

4" TYP

4" PENTHOUSE, RM 217

EXPOSED IN MECHANICAL

4" VENT UP THRU ROOF,

COFD-

C-1A

C-1B

FOR

IC

EMAKER

HUB

DRAI

ACCESS FLOORING

PIPING RUN IN EXIST

2 ½" SANITARY WASTE

FD-

FLOOD RIM OF SK-2 (TYP)

THAN 6" ABOVE

BE MADE NOT LESS

CONNECTION SHALL

C-

SHR-

IN

ASTE

UP

TO

C-1AEW

C-1B

DFW-D-ATCT-P004

w

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .