J-1a Drawings ILM HVAC Upgrade.pdf
PDF 4 MB Posted
- Attached to
- ILM HVAC Replacement Federal contract opportunity
- Solicitation number
- 697DCK-22-R-00467
About this file
This solicitation requests proposals for an HVAC system upgrade at the Air Traffic Control Tower and base building at Wilmington International Airport in Wilmington, NC. The Federal Aviation Administration requires replacing the existing HVAC system. Interested offerors must register in the System for Award Management and submit a proposal by the due date specified in the solicitation to be considered. A site visit is optional for additional information. The agency will award a contract following review of submitted proposals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 4_Questions and Answers 3_Coil Coating.pdf | ||
| 697DCK22R00467_Amendment 4.pdf | ||
| Amendment 3_Questions and Answers 2_Past Performance Submission.pdf | ||
| 697DCK22R00467_Amendment 3.pdf | ||
| Amendment 2_Site Visit Attendee List_8-30-22.pdf | ||
| 697DCK22R00467_Amendment 2.pdf | ||
| 697DCK22R00467_Amendment 1.pdf | ||
| Amendment 1_Spec 23 09 23 - DDC.pdf | ||
| Amendment 1 Clarifications.pdf | ||
| 697DCK-22-R-00467.pdf | ||
| L3 - Form 7460-1.pdf | ||
| J-5 COVID 19 Memo Contractor_8-17-21.pdf | ||
| J-7 FAA Certification Vaccination PRAv7_Blank.pdf | ||
| J-3 Construction Waste Management Form.xls | XLS spreadsheet | |
| J-2 Wage Determinations.pdf | ||
| J-1 Specifications ILM HVAC Upgrade.pdf | ||
| L2 - Price Proposal.xlsx | XLSX spreadsheet | |
| L1 - Past Performance Questionnaire.pdf | ||
| J-6 COVID-19 Contractual Requirement Rev 1 8-26-20.pdf | ||
| J-4 eInvoicing Vendor Notification Letter.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BELVILLE
NAVASSA
COUNTRY CLUB
PINE VALLEY
COUNTRY CLUB
CAPE FEAR
WILMINGTON
UNIVERSITY OF NORTH CAROLINA
MEMORIAL HOSPITAL
CAPE FEAR
REGIONAL MEDICAL CENTER
NEW HANOVER
COUNTY AIRPORT
NEW HANOVER
17 17
PROJECT LOCATION
UNIVERSITY OF NORTH CAROLINA
N KERR AVE
C A
S
TL
E H
A Y
N E
R D
N 23R
D
ST
SITE
AREA LOCATION
12345678
45678 23 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021P. GEE
P. GEE
E. BEHO
COVER SHEET
ILM-D-ATCT-G001
WILMINGTON INTERNATIONAL
AIRPORT
HVAC UPGRADE FOR
BASE BUILDING & AIR TRAFFIC
CONTROL TOWER
03/25/2022 ISSUE FOR CONSTRUCTION
03/25/2022
12345678
45678 23 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021P. GEE
P. GEE
E. BEHO
INDEX OF DRAWINGS
ILM-D-ATCT-G002
MECHANICAL:
ILM-D-ATCT- M001 MECHANICAL NOTES, LEGEND, SYMBOLS & ABBREVIATIONS
ILM-D-ATCT- MD101 BASE BUILDING - MECHANICAL DEMOLITION PLAN
ILM-D-ATCT- MD102 ATCT - MECHANICAL CONTROL DEMOLITION DIAGRAMS 1
ILM-D-ATCT- MD103 ATCT - MECHANICAL CONTROL DEMOLITION DIAGRAMS 2
ILM-D-ATCT- MD104 ATCT - MECHANICAL CONTROL DEMOLITION DIAGRAMS 3
ILM-D-ATCT- M101 BASE BUILDING - MECHANICAL PLAN
ILM-D-ATCT- M102 BASE BUILDING - REFLECTED CEILING PLAN
ILM-D-ATCT- M111 ATCT - FLOOR PLANS 1
ILM-D-ATCT- M112 ATCT -FLOOR PLANS 2
ILM-D-ATCT- M113 ATCT - FLOOR PLANS 3
ILM-D-ATCT- M301 BASE BUILDING - MECHANICAL SECTIONS
ILM-D-ATCT- M501 MECHANICAL SCHEDULES 1
ILM-D-ATCT- M601 MECHANICAL DETAILS 1
ILM-D-ATCT- M602 MECHANICAL DETAILS 2
ILM-D-ATCT- M603 MECHANICAL DETAILS 3
ILM-D-ATCT- M604 MECHANICAL DETAILS 4
ILM-D-ATCT- M605 CEILING DETAILS
ILM-D-ATCT- M801 MECHANICAL CONTROLS LEGEND
ILM-D-ATCT- M802 CONTROLS - ARCHITECTURE
ILM-D-ATCT- M803 CONTROLS - BASE BUILDING - VAV AHU CONTROLS
ILM-D-ATCT- M804 CONTROLS - BASE BUILDING - VAV AHU POINTS LIST
ILM-D-ATCT- M805 CONTROLS - BASE BUILDING - VAV TERMINAL UNIT CONTROLS
ILM-D-ATCT- M806 CONTROLS - BASE BUILDING - EF & UH CONTROLS
ILM-D-ATCT- M807 CONTROLS - ATCT - SINGLE-ZONE CV AHU CONTROLS
ILM-D-ATCT- M808 CONTROLS - ATCT - SINGLE-ZONE CV AHU POINTS LIST
ILM-D-ATCT- M809 CONTROLS - ATCT - MULTI-ZONE CV AHU CONTROLS
ILM-D-ATCT- M810 CONTROLS - ATCT - MULTI-ZONE CV AHU POINTS LIST
ILM-D-ATCT- M811 CONTROLS - ATCT - CHILLED WATER SYSTEM CONTROLS
ILM-D-ATCT- M812 CONTROLS - ATCT - HOT WATER SYSTEM CONTROLS
ILM-D-ATCT- M813 CONTROLS - MISCELLANEOUS
ELECTRICAL:
ILM-D-ATCT- E001 ELECTRICAL LEGEND
ILM-D-ATCT- ED101 BASE BUILDING - ELECTRICAL DEMOLITION PLAN
ILM-D-ATCT- EP101 BASE BUILDING - POWER PLAN
ILM-D-ATCT- EP102 ATCT - POWER PLANS 1
ILM-D-ATCT- EP103 ATCT - POWER PLANS 2
ILM-D-ATCT- EP104 ATCT - POWER PLANS 3
ILM-D-ATCT- EP501 POWER PANEL SCHEDULE
ILM-D-ATCT- EL601 LIGHTING DETAILS
ILM-D-ATCT- EP701 SINGLE LINE REFERENCE
GENERAL:
ILM-D-ATCT- G001 COVER SHEET
ILM-D-ATCT- G002 INDEX OF DRAWINGS
ILM-D-ATCT- G003 CONSTRUCTION PHASING
DRAWING INDEX
GENERAL:
1. THE CONTRACTOR SHALL PROVIDE A COMPLETE AND COMPREHENSIVE SCHEDULE TO THE RESIDENT ENGINEER FOR REVIEW AND APPROVAL BEFORE A NOTICE TO PROCEED IS ISSUED. SCHEDULE SHALL OUTLINE ALL PHASES OF THE WORK AND THEIR IMPACT ON
THE OPERATION OF THE FACILITY.
2. SIGNIFICANT AMOUNTS OF WORK MUST BE COMPLETED AFTER NORMAL OPERATING HOURS. COORDINATE TIMES WITH FAA RESIDENT
ENGINEER.
3. CONSTRUCTION NOISE, DUST AND DEBRIS MUST NOT INTERFERE WITH OPERATION OF BASE BUILDING ATCT FACILITY. MAINTAIN HEPA FlLTRATION OF TOWER CAB DURING ALL ABATEMENT (IF ANY) AND GENERAL CONSTRUCTION SEQUENCES.
4. CONTRACTOR TO PROVIDE ADEQUATE MEASURES FOR VENTILATION TO MlNIMIZE ODORS DURING PAINTING, CURING OF FRP RESINS AND OTHER CONSTRUCTION ACTIVITIES THAT HAVE THE POTENTIAL FOR STRONG ODORS. THE RESIDENT ENGINEER SHALL APPROVE
THE SYSTEM TO BE UTILIZED FOR VENTILATION.
5. CONTRACTOR SHALL PROVIDE TEMPORARY CONNECTIONS AND HVAC EQUIPMENT WITH AS LITTLE IMPACT TO BUILDING OPERATION AS POSSIBLE. COORDINATE EQUIPMENT DOWNTIME TO OCCUR SIMULTANEOUSLY WHERE POSSIBLE.
6. BUILDING CRITICAL HVAC EQUIPMENT SHALL BE PLACED IN MANUAL MODE WHILE ITS REDUNDANT COUNTERPART IS BEING
DEMOLISHED AND INSTALLED.
7. ALL LOCAL THERMOSTATS AND RELATIVE HUMIDITY SENSORS TO BE DEMOLISHED. REFER TO CONTROL DRAWINGS AND MD101 FOR
FULL SCOPE OF WORK.
8. CONTRACTOR SHALL PROVIDE LOCAL TEST AND BALANCE REPORT FOR THE AIRSIDE AND WATERSIDE EQUIPMENT SERVING THE CONTROL TOWER AND ADOPT THE NEW DDC CONTROLLER, SENSORS, AND ACCESSORIES TO THE EXISTING HVAC CONDITIONS.
NEW AHU-07:
1. TEMPORARY HEATING AND COOLING SHALL BE INSTALLED AND FULLY OPERATIONAL PRIOR TO DEMOLITION OF EXISTING AHU-7 AND AHU-8 AND ASSOCIATED SYSTEMS OR ACCESSORIES. SPACES AND CLIMATE REQUIREMENTS ARE NOTED IN SECTION A OF THE SPECIAL NOTES FOUND ON THIS SHEET. TEMPORARY HEATING AND COOLING SHALL NOT BE REMOVED UNTIL THE NEW AHU-07 AND ASSOCIATED SYSTEMS AND ACCESSORIES ARE INSTALLED AND FULLY OPERATIONAL. TEMPORARY MOBILE SPOT COOLERS COULD BE USED AS A MEANS OF TEMPORARY HEATING AND COOLING. FINAL NUMBER OF MOBILE SPOT COOLERS AND THEIR SIZES AND
LOCATIONS SHALL BE DETERMINED AND COORDINATED WITH OWNER AND USER.
EXISTING AHU-1, AHU-2, AHU-3, AHU-4, AHU-5, AHU-6:
1. NEW DDC CONTROLS WIRING FOR EXISTING AHU SHALL BE INSTALLED PRIOR TO DEMOLITION OF EXISTING DDC CONTROLS WIRING.
DURING SWITCH OVER PHASE FROM EXISTING TO NEW DDC CONTROLS, THE EXISTING AHU SHALL BE OPERATING IN MANUAL OVERRIDE OR BYPASS MODE. UPON SUCCESSFUL INSTALLATION AND PROVEN OPERATION OF NEW DDC CONTROLS FOR EXISTING AHU, EXISTING DDC CONTROLS WIRING AND ASSOCIATED ACCESSORIES SHALL BE DEMOLISHED, AND EXISTING AHU SHALL BE SWITCHED
OVER TO STANDARD AUTO MODE PER EXISTING SEQUENCE OF OPERATION.
EXISTING CH-1, CHWP-1 & CHWP-2:
1. NEW DDC CONTROLS WIRING FOR EXISTING CHILLER CH-1, EXISTING CHILLED WATER PUMPS CHWP-1 AND CHWP-2 SHALL BE INSTALLED PRIOR TO DEMOLITION OF EXISTING DDC CONTROLS WIRING. DURING SWITCH OVER PHASE FROM EXISTING TO NEW DDC CONTROLS, EXISTING CHILLER AND ASSOCIATED PUMP SHALL BE OPERATING IN MANUAL OVERRIDE OR BYPASS MODE. UPON SUCCESSFUL INSTALLATION AND PROVEN OPERATION OF NEW DDC CONTROLS FOR EXISTING CHILLER AND PUMPS, EXISTING DDC CONTROLS WIRING AND ASSOCIATED ACCESSORIES SHALL BE DEMOLISHED AND EXISTING CHILLER AND PUMPS SHALL BE SWITCHED
OVER TO STANDARD AUTO MODE PER EXISTING SEQUENCE OPERATION.
EXISTING B-1 & HWP-1:
1. NEW DDC CONTROLS WIRING FOR EXISTING BOILER B-1 AND EXISTING HOT WATER PUMP HWP-1 SHALL BE INSTALLED PRIOR TO DEMOLITION OF EXISTING DDC CONTROLS WIRING. DURING SWITCH OVER PHASE FROM EXISTING TO NEW DDC CONTROLS, EXISTING BOILER AND ASSOCIATED PUMP SHALL BE OPERATING IN MANUAL OVERRIDE OR BYPASS MODE. UPON SUCCESSFUL INSTALLATION AND PROVEN OPERATION OF NEW DDC CONTROLS FOR EXISTING BOILER AND PUMP, EXISTING DDC CONTROLS WIRING AND ASSOCIATED ACCESSORIES SHALL BE DEMOLISHED AND EXISTING BOILER AND PUMP SHALL BE SWITCHED OVER TO STANDARD AUTO MODE PER
EXISTING SEQUENCE OPERATION.
EXISTING H-1, H-2, H-3, H-4:
1. NEW DDC CONTROLS WIRING FOR EXISTING HUMIDIFIER H-1, H-2, H-3, H-4 SHALL BE INSTALLED PRIOR TO DEMOLITION OF EXISTING DDC CONTROLS WIRING. DURING SWITCH OVER PHASE FROM EXISTING TO NEW DDC CONTROLS, EXISTING HUMIDIFIERS SHALL BE OPERATING IN MANUAL OVERRIDE OR BYPASS MODE. UPON SUCCESSFUL INSTALLATION AND PROVEN OPERATION OF NEW DDC CONTROLS FOR EXISTING HUMIDIFIER, EXISTING DDC CONTROLS WIRING AND ASSOCIATED ACCESSORIES SHALL BE DEMOLISHED AND EXISTING HUMIDIFIERS SHALL BE SWITCHED OVER TO STANDARD AUTO MODE PER EXISTING SEQUENCE OPERATION. REFER TO CONTROLS DETAILS FOR SCOPE OF WORK REGARDING CONTROLS TO BE DEMOLISHED AND REPLACED AND CONTROLS TO REMAIN.
EXISTING UH-1, UH-2, UH-3:
1. NEW DDC CONTROLS WIRING FOR MONITORING THE STATUS OF THE EXISTING UNIT HEATER UH-1, UH-2, UH-3 SHALL BE INSTALLED AND PROVEN OPERATIONAL PRIOR TO THE DEMOLITION OF ANY EXISTING DDC CONTROLS WIRING. EXISTING UNIT HEATERS SHALL CONTINUE TO OPERATE AS DESCRIBED IN THE EXISTING SEQUENCE OF OPERATION. REFER TO CONTROLS DETAILS FOR SCOPE OF
WORK REGARDING THE NEW DDC CONTROLS WIRING TO BE INSTALLED.
EXISTING EF-1 & EF-3:
1. NEW DDC CONTROLS WIRING FOR EXISTING EXHAUST FAN EF-1 AND EF-3 SHALL BE INSTALLED PRIOR TO DEMOLITION OF EXISTING DDC CONTROLS WIRING. DURING SWITCH OVER PHASE FROM EXISTING TO NEW DDC CONTROLS, EXISTING EXHAUST FANS SHALL BE OPERATING IN MANUAL OVERRIDE OR BYPASS MODE. UPON SUCCESSFUL INSTALLATION AND PROVEN OPERATION OF NEW DDC CONTROLS FOR EXISTING EXHAUST FANS, EXISTING DDC CONTROLS WIRING AND ASSOCIATED ACCESSORIES SHALL BE DEMOLISHED AND EXISTING EXHAUST FANS SHALL BE SWITCHED OVER TO STANDARD AUTO MODE PER EXISTING SEQUENCE OPERATION.
EXISTING CAB DEFOGGER:
1. NEW DDC SYSTEM WIRING FOR MONITORING THE STATUS OF THE EXISTING CAB DEFOGGER SYSTEM SHALL BE INSTALLED AND PROVEN OPERATIONAL PRIOR TO DEMOLITION OF ANY EXISTING EXISTING DDC CONTROLS WIRING. EXISTING CAB DEFFOGER SYSTEM SHALL CONTINUE TO OPERATE AS DESCRIBED IN THE EXISTING SEQENCE OF OPERATION. REFER TO CONTROLS DETAILS FOR SCOPE OF WORK REGARDING THE NEW DDC CONTROLS WIRING TO BE INSTALLED. SHOULD A NEW WINDOW DEFOGGER SYSTEM (WHICH IS MORE AUTOMATIC) BE INSTALLED IN THE FUTURE; THE NEW DDC SYSTEM SHALL BE CAPABLE OF MONITORING AND CONTROLLING CAB
DEFOGGER SYSTEM OPERATION.
CONSTRUCTION SEQUENCE NOTES
1. THE CONSTRUCTION OF THIS PROJECT MUST NOT INTERFERE WITH OPERATION OF THE AlR TRAFFIC CONTROL FUNCTION DURING NORMAL OPERATING HOURS. NORMAL HOURS OF OPERATION ARE STATED IN DlVlSION 1
OF THE SPECIFICATIONS.
2. LOCKOUT AND TAG PROCEDURES MUST BE FOLLOWED AT ALL TIMES.
3. ALL ELECTRONIC EQUIPMENT CIRCUITS SHALL BE RELOCATED BY THE FAA. ALL OTHER BUILDING SYSTEMS
CIRCUITS SHALL BE RELOCATED BY THE CONTRACTOR. COORDINATE WITH RESIDENT ENGINEER.
4. DO NOT PAINT OVER ANY FIRE DOOR LABEL.
5. REINSTALL ALL SMOKE/FIRE DETECTORS AS REQUIRED.
CONSTRUCTION GENERAL NOTES
A. MINIMIZING EQUIPMENT DOWNTIME IS CRITICAL FOR THE PROPER OPERATION OF FAA EQUIPMENT COORDINATE WITH THE FAA RESIDENT ENGINEER PRIOR TO EQUIPMENT SHUT DOWN. THE CONTRACTOR SHALL PROVIDE HEATING AND/OR COOLING SYSTEM DURING CONSTRUCTION AS REQUIRED TO THE SPACES AS
FOLLOWS:
LIST OF NON-CRITICAL AND CRITICAL SPACES SHALL BE DETERMINED BY OWNER AND USER.
THE TEMPORARY EQUIPMENT SHALL BE CAPABLE OF MAINTAINING SPACE TEMPERATURE REGARDLESS OF THE TIME OF YEAR WORK IS ACCOMPLISHED. SPACES IDENTIFIED AS NON-CRITICAL SHALL BE MAINTAINED BETWEEN 68°F AND 70°F. CRITICAL AREAS SUCH AS ELECTRONIC EQUIPMENT ROOMS, UPS ROOM, AND TOWER CAB SHALL
BE MAINTAINED AT 73°F.
B. CONTRACTOR SHALL SUBMIT A TEMPORARY CONDITIONING PLAN TO THE RESIDENT ENGINEER PRIOR TO SHUTTING OFF SUCH SERVICE IN THE CRITICAL AREAS. THE FAA RESIDENT ENGINEER SHALL APPROVE THE TEMPORARY HEATING AND/OR COOLING SYSTEM TO BE UTILIZED TO MAINTAIN SPACE TEMPERATURE.
C. CONTRACTOR SHALL SUPPLY EMERGENCY SERVICE RESPONSE FOR TEMPORARY SYSTEMS. CONTRACTOR SHALL GUARANTEE 1 HOUR RESPONSE TIME FROM NOTIFICATION TO ARRIVAL OF SERVICE PERSONNEL.
D. ALL WORK IN THE TOWER CAB SHALL BE PREFORMED BETWEEN HOURS IDENTIFIED DURING THE PRE-BID CONFERENCE BY LOCAL FAA PERSONNEL AND RESIDENT ENGINEER DURING THE PRE-BID CONFERENCE.
E. DURING CONSTRUCTION, THE CONTRACTOR SHALL PROTECT ALL ELECTRIC EQUIPMENT. THE PROTECTION SHALL
BE REMOVED AND EQUIPMENT CLEANED AT THE END OF EACH WORK SHIFT.
F. ALTHOUGH THIS FACILITY IS CONSIDERED TO BE ASBESTOS FREE, IF ANY ASBESTOS CONTAINING MATERIALS
ARE SUSPECTED, DO NOT DISTURB MATERIALS. NOTIFY COTR FOR FURTHER EVALUATION.
SPECIAL NOTES
12345678
45678 23 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021P. GEE
P. GEE
E. BEHO
CONSTRUCTION PHASING
ILM-D-ATCT-G003
FIRE PROTECTION:
1. NOTIFY THE DESIGNATED FIRE MARSHAL AND FAA AUTHORITY HAVING JURISDICTION (AHJ) TWO WEEKS
PRIOR TO DISABLING THE EXISTING FIRE ALARM OR STAIR PRESSURIZATION SYSTEM.
2. AT A MINIMUM THE FOLLOWING CODES AND STANDARDS ARE APPLICABLE; IBC - CHAPTER ON SAFEGUARDS DURING CONSTRUCTION, IFC - CHAPTER ON FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION, NFPA 241 - STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS, NFPA 90A - STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, AND NFPA 72 -
NATIONAL FIRE ALARM AND SIGNALING CODE.
3. PROVIDE A FIRE SAFETY PLAN FOR APPROVAL BY THE LOCAL FIRE MARSHAL AND FAA AHJ PRIOR TO DISABLING ANY FIRE PROTECTION SYSTEMS OR PERFORMING ANY HOT WORK ACTIVITY WITHIN THE
BUILDING. AT A MINIMUM, THE FIRE SAFETY PLAN SHALL ADDRESS THE FOLLOWING ITEMS:
A. MEANS OF EGRESS - DISCUSS HOW A SAFE MEANS OF EGRESS WILL BE MAINTAINED THROUGH THE
BUILDING DURING CONSTRUCTION. HOW WILL SCAFFOLDING BE USED IN THE STAIRWELL IN SUCH A MANNER AS TO NOT BLOCK THE STAIRS? HOW WILL SIGNAGE BE PROVIDED TO WARN OCCUPANTS EGRESS PAST THE SCAFFOLDING OF HAZARDS? WILL SCAFFOLDING EVER BE UNATTENDED, AND IF SO
HOW WILL OCCUPANTS SAFELY NAVIGATE THE UNATTENDED CONSTRUCTION AREA?
B. PASSIVE FIRE PROTECTION - DISCUSS HOW THE INTEGRITY OF THE STAIRWELL WILL BE MAINTAINED DURING CONSTRUCTION. DISCUSS HOW AN OPENING IN THE STAIRWELL ENCLOSURE WILL NOT BE LEFT WITHOUT A RATED DOOR DURING NON-CONSTRUCTION HOURS. HOW WILL THE DOOR CLOSURE BE ADJUSTED DURING CONSTRUCTION TO ENSURE THE ALLOWABLE DOOR OPENING FORCE IS NOT
EXCEEDED?
C. FIRE ALARM SYSTEM - DISCUSS HOW OUTAGES TO THE FIRE ALARM SYSTEM WILL BE MINIMIZED.
WHAT METHODS WILL BE USED TO REDUCE THE TIME OF OUTAGE DURING CONSTRUCTION? DISCUSS
THE FIRE ALARM SYSTEM, NOT ASSOCIATED WITH THE STAIR PRESSURIZATION SYSTEM TO BE
DEMOLISHED, WILL NOT BE LEFT DISABLED DURING NON CONSTRUCTION HOURS. DISCUSS WHAT
METHODS WILL BE IMPLEMENTED AS DEVICES ARE REMOVED AND REMAINING CIRCUITS ARE
REPAIRED, TO MAINTAIN CIRCUIT CONTINUITY WITHIN THE SAME DAY.
D. FIRE WATCH - DISCUSS WHERE, HOW AND THE DURATION A FIRE WATCH WILL BE PROVIDED WHEN
HOT WORK (INCLUDING SPARK CREATING ACTIVITIES) ARE PERFORMED).
PIPE SYMBOLS
PIPE ELBOW
PIPE DOWN
PIPE UP
PIPE CONTINUATION
HVAC LEGEND
M
CONTROL DAMPER, MOTOR
OPERATED
MANUAL BALANCE DAMPER
AD
AD
ACCESS DOOR (AD)
ACCESS PANEL (AP)
S
AD
S
DAMPERS:
FIRE (F) -
SMOKE (S) -
FIRE SMOKE (F/S) -
FLEXIBLE DUCT CONNECTION
RECTANGLUAR ELBOW WITH
TURNING VANES
RECTANGULAR TEE WITH
TURNING VANES
RECTANGULAR RADIUS ELBOW
SQUARE OR RECTANGULAR TO
ROUND TRANSITION
SUPPLY AIR OR OUTSIDE AIR
RECTANGULAR DUCT SECTION
RETURN AIR RECTANGULAR
DUCT SECTION
EXHAUST AIR RECTANGULAR
DUCT SECTION
ROUND FLEXIBLE DUCT
(5'-0" MAX LENGTH)
SQUARE OR RECTANGULAR
SUPPLY DIFFUSER
RETURN AIR DIFFUSER
EXHAUST AIR DIFFUSER
T THERMOSTAT
H HUMIDISTAT
VAV- VARIABLE AIR VOLUME
TERMINAL BOX
M MOTOR
AIRFLOW ARROW
SUPPLY AIR OR OUTSIDE AIR
ROUND DUCT SECTION
RETURN AIR ROUND DUCT
SECTION
EXHAUST AIR ROUND DUCT
SECTION
ROUND & RECTANGULAR DUCT
TAKEOFF
UNDERCUT
UC
DSP DUCT STATIC PRESSURE SENSOR
OA
OUTDOOR WEATHER STATION
(TEMPERATURE, CO2, HUMIDITY)
DSD DUCT SMOKE DETECTOR
PIPE LINE ACCESSORIES
3-WAY VALVE
2-WAY VALVE
ANGLE VALVE
AV
AUTOMATIC AIR VENT
ASSEMBLY
BFP
BACKFLOW PREVENTION
ASSEMBLY
BALANCING VALVE / CIRCUIT
SETTER
BALL VALVE
BLIND FLANGE
BUTTERFLY VALVE
CHECK VALVE
FLEX CONNECTION
FLOW ARROW
FM FLOW METER
GATE VALVE
GLOBE VALVE
HOSE GATE DRAIN VALVE
IF
INSULATING FLANGE
MV
MANUAL AIR VENT ASSEMBLY
- SEE SPECIFICATIONS FOR
APPROPRIATE VALVE TYPE
M METER
M MOTORIZED CONTROL VALVE
OS&Y
OUTSIDE SCREW & YOKE VALVE
PIPE WITH HEAT TRACE
PLUG VALVE
PRESSURE GUAGE
SELF CONTAINED PRESSURE
REDUCING (REGULATING)
VALVE
PUMP
REDUCER (CONCENTRIC)
RELIEF, SAFETY OR THERMAL
RELIEF VALVE
REMOVABLE CAP
REMOVABLE PLUG
S STRAINER
SUCTION DIFFUSER
TEST CONNECTION
THERMOMETER
UNION
Y-TYPE STRAINER
SRC SPRING RETURN CLOSED BALL
VALVE
PIPELINE ABBREVIATIONS
MECHANICAL ABBREVIATIONS
GENERAL NOTES:
DETAIL / ENLARGED
CALLOUT SYMBOL
A1
M-001
INDICATES
LIMITS OF
DETAIL/SECTION
DETAIL/SECTION
DESIGNATOR
SHEET WHERE
DETAIL/SECTION IS
SHOWN
DETAIL/SECTION TITLE
TITLE
A1
LOCATION WHERE
DETAIL / SECTION IS
SHOWN ON SHEET
SCALE:
SECTION CUT SYMBOL
A1
M-001
INDICATES PERSPECTIVE
AND LIMITS OF SECTION
SECTION
DESIGNATOR
DRAWING WHERE
SECTION IS SHOWN
CONSTRUCTION INTERFACE
DEMOLITION
EXISTING
NEW
EXISTING
EXISTING
NEW
DEMOLITION
AIR DISTRIBUTION DEVICE
IDENTIFICATION
AIR FLOW NECK SIZE
QUANTITY
SYSTEM TYPE SPEC. TYPE
SA-A
(2)175-8Ø
1. LEGEND IS GENERAL IN NATURE AND MAY INDICATE MORE INFORMATION THAN IS APPLICABLE TO PROJECT. SEE PLANS FOR
SPECIFIC SYMBOLS AND ABBREVIATIONS.
2. PROVIDE ALL MATERIALS, VALVES, HANGERS, ETC. AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY
CODE.
3. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.
4. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ELECTRICAL WORK SHOWN ON OTHER CONTRACT
DOCUMENT DRAWINGS.
5. UNLESS OTHERWISE INDICATED MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, DUCTWORK
ETC., THROUGHOUT ACCESS ROUTES AND IN MECHANICAL ROOMS.
6. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING.
7. VERIFY DIMENSIONS AND CONNECTION SIZE WITH FURNISHED EQUIPMENT.
8. ALL ELEVATIONS ARE ABOVE FINISHED FLOOR TO BOTTOM OF DUCT, PIPE, OR PIPE INSULATION UNLESS NOTED
OTHERWISE.
9. ALL DUCTWORK DIMENSIONS REFER TO INSIDE CLEAR AREA.
10. DUCT STATIC PRESSURE CLASSIFICATION: SEE MECHANICAL DETAILS FOR TABLE.
11. INSTALL TEMPERATURE CONTROLS AT 48" ABOVE FINISHED FLOOR AND COORDINATE WITH OTHER DEVICES LOCATED ON
WALLS.
12. CONTRACTOR SHALL AIR BALANCE ALL GRILLES TO CFM'S SHOWN ON PLANS.
13. MOUNT ALL OVERHEAD MECHANICAL EQUIPMENT AND FIXTURES WEIGHING 31 POUNDS OR MORE TO SUPPORTS THAT SHALL RESIST FORCES OF 0.5 TIMES THE EQUIPMENT WEIGHT IN ANY HORIZONTAL DIRECTION AND 1.5 TIMES THE
EQUIPMENT WEIGHT IN THE DOWNWARD DIRECTION.
BLWDN BLOWDOWN
CD CONDENSATE DRAIN
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSATE RETURN
CT CHEMICAL TREATMENT
CTB COOLING TOWER BLOWDOWN
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D DRAIN
DI DEIONIZED WATER
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
HPS HIGH PRESSURE STEAM
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
LPS LOW PRESSURE STEAM
MPS MEDIUM PRESSURE STEAM
MW MAKEUP WATER (AFTER BACKFLOW PREVENTER)
N NITROGEN
NG NATURAL GAS
O OXYGEN
PCR PUMPED CONDENSATE RETURN
V VACUUM
LAT LEAVING AIR TEMPERATURE
LWT LEAVING WATER TEMPERATURE
MAT MIXED AIR TEMPERATURE
MAU MAKEUP AIR UNIT
MFR MANUFACTURER
MJ MECHANICAL JOINT
MW MAKE-UP WATER (AFTER BACKFLOW
PREVENTER)
NC NORMALLY CLOSED (FAIL POSITION)
NO NORMALLY OPEN (FAIL POSITION)
OA OUTSIDE AIR
OB OPPOSED BLADE
OD OVERFLOW DRAIN
PB PARALLEL BLADE
PCW PROCESS COLD WATER
PFX PLATE AND FRAME HEAT EXCHANGER
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
RA RETURN AIR
RED REDUCER-REDUCING
RG REFRIGERANT HOT GAS DISCHARGE
RL REFRIGERANT LIQUID
RMJ RESTRAINED MECHANICAL JOINT
RS REFRIGERANT SUCTION
SA SUPPLY AIR
SCH SCHEDULE
SCR SPRING RETURN CLOSED
SHR SHORT RADIUS
SP STATIC PRESSURE SENSOR
SR SUPPLY REGISTER
ST STEAM TRAP
STM STEAM
SW SOCKET WELD
TA TRANSFER AIR
TOA TREATED OUTSIDE AIR
TOC TOP OF CONCRETE
TOD TOP OF DUCT
TOS TOP OF STEEL
UH UNIT HEATER
V VENT
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
WB WET BULB
WE WELD END
WN WELD NECK
(E) EXISTING
12"Ø ROUND DUCT DIMENSION
24x12 RECTANGULAR DUCT DIMENSION (INCHES)
ACT ACOUSTIC CEILING TILE
ACU AIR CONDITIONING UNIT
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
ATCT AIR TRAFFICE CONTROL TOWER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
CFM CUBIC FEET PER MINUTE
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CHWP CHILLED WATER PUMP
CL CENTER LINE OF PIPE ELEVATION
CONC CONCENTRIC
COND COOLING COIL CONDENSATE DRAIN
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
DB DRY BULB
DH DEHUMIDIFIER
DN DOWN
DRG DIFFUSER, REGISTER, GRILLE
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
EL ELEVATION
EMCS ENERGY MANAGEMENT CONTROL SYSTEM
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
EXIST EXISTING
FCU FAN COIL UNIT
FD FEEDWATER
HWB HEATING HOT WATER BOILER
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
IN. W.C INCHES WATER COLUMN
L LOUVER
12345678
45678 23 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021P. GEE
P. GEE
E. BEHO
MECHANICAL NOTES, LEGEND, SYMBOLS &
ABBREVIATIONS
ILM-D-ATCT-M001
LIMITS OF DEMOLITION
GENERAL DEMOLITION NOTES:
1. ALL REMOVED EQUIPMENT AND MATERIALS SHALL BE DISPOSED OF IN ACCORDANCE WITH PREVAILING REGULATIONS AND
LAWS AT CONTRACTOR'S EXPENSE.
2. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS IS NOT TO BE CONSIDERED AS COMPLETE AND FULLY ACCURATE AS PERTAINS TO THE EXACT QUANTITY AND LOCATION OF ALL SYSTEM COMPONENTS. THE INFORMATION CONTAINED HEREIN WAS OBTRAINED FROM ORIGINAL DESIGN DOCUMENTS AND LIMITED SITE VISITS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE EXACT LOCATIONS, SERVICE, AND QUANTITY OF ALL EXISTING SYSTEM COMPONENTS PRIOR TO BEGINNIG DEMOLITION WORK. THE INFORMATION CONTAINED HERIN IS TO BE USED SOLELY AS AN AID TO THE CONTRACTOR IN COMPLETING THE CONTRACT. ADDITIONAL INFORMATION CONCERNING EXISTING ITEMS
TO BE REUSED CAN BE FOUND IN DOCUMENTS CONTAINING NEW WORK.
3. ALL EQUIPMENT, PIPING, AND ACCESSORIRES SERVING THIS FACILITY THAT ARE SHOWN ON THIS PLAN SHALL BE LOCATED
AND VERIFIED PRIOR TO DEMOLITION.
4. EXTERIOR WALL OPENING RESULTING FROM LOUVER, PIPING, OR OTHER MECHANICAL DEMOLITION ITEMS SHALL BE
PATCHED AND SEALED.
5. MAKE ALL NECESSARY MODIFICATIONS TO EXISTING EQUIPMENT, PIPING, DUCTWORK, AND ASSOCIATED SYSTEMS TO
ACCOMODATE INSTALLATION OF NEW EQUIPMENT.
6. ALL REMAINING PIPING AND DUCTWORK THAT WAS CONNECTED TO EQUIPMENT SHALL BE CAPPED AND SEALED WATER AND
AIR TIGHT DURING DEMOLITION PERIOD FOR PROTECTION PURPOSES.
7. CONTRACTOR TO PROTECT ALL EXISTING FINISHES AND FURNITURE. ANY DAMAGE CAUSED DURING CONSTRUCTION SHALL BE REAPAIRED AT NO ADDITIONAL COST OT THE GOVERNMENT. IF UNAVOIDABLE DAMAGE IS FORSEEN THEN THE CONTRACTOR SHALL COORDINATE WITH THE COR AHEAD OF TIME HOW TO ADRESS THIS POSSIBILITY.
WINTER DESIGN DRY BULB 70-72°F
SUMMER DESIGN HUMIDITY 40-60%RH
SUMMER DESIGN DRY BULB 75°F
STANDARD INDOOR DESIGN CONDTIONS:
SUMMER DESIGN WET BULB 77.9°F
SUMMER DESIGN DRY BULB 93.5°F DEHUMIDIFICATION DRY BULB (0.4%) 83.9°F
WINTER DESIGN DRY BULB
(99.6%) 24.7 °F
DEHUMIDIFICATION HUMIDITY RATIO
(0.4%) 144.6 gr/lb
STANDARD OUTDOOR DESIGN CONDITIONS:
ELEVATION 38'
LONGITUDE 77.9°W
LOCATION WILMINGTON INTERNATIONAL
AIRPORT
LATITUDE 34.3°N
HVAC DESIGN CRITERIA
A
B
11 11
12345678
45678 23 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021P. GEE
P. GEE
E. BEHO
BASE BUILDING - MECHANICAL DEMOLITION
PLAN
ILM-D-ATCT-MD101
NOT TO SCALEMD101
MECHANICAL DEMOLITION PLAN1
GENERAL NOTES:
1. PROVIDE TOTAL MECHANICAL SYSTEM TESTING,
ADJUSTING, AND BALANCING. PROCESS SHALL
INCLUDE ALL EXISTING, MODIFIED, AND NEW
MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED
TO EXHAUST FANS, AHU-7, AHU-8, ASSOCIATED ATU'S
AND DUCT IN THE BASE BUILDING. CONTRACTOR
SHALL COMPLY WITH PROCEDURES DESCRIBED IN THE
SPECIFICATION 230593 "TESTING, ADJUSTING, AND
BALANCING". CONTRACTOR TO SUBMIT FOR REVIEW.
2. DEMOLISH EXISTING GRILLES AND DIFFUSERS UNLESS
NOTED OTHERWISE.
3. DEMOLISH ALL TRANSFER DUCT UNLESS NOTED
OTHERWISE.
4. PATCH AND PAINT ALL WALLS WHERE DEMOLITION
HAS OCCURRED TO MATCH EXISTING CONDITIONS.
5. PROVIDE TOTAL DUCTWORK CLEANING FOR ALL
EXISTING TO REMAIN DUCTWORK PRIOR TO
INSTALLATION OF NEW EQUIPMENT AND DUCTWORK.
PROCESS SHALL COMPLY WITH PROCEDURES
DESCRIBED IN THE SPECIFICATION 233113 3.8 "DUCT
CLEANING"
DEMOLITION NOTES:
1. DEMOLISH EXISTING CONDENSING UNITS (TYP. 2),
EQUIPMENT PAD, ALL ASSOCIATED REFRIGERANT
PIPING AND ACCESSORIES. PATCH AND PAINT ALL
HOLES ASSOCIATED WITH CONDENSING UNIT
DEMOLITION.
2. DEMOLISH EXISTING AHU AND ALL ASSOCIATED
DUCTWORK, EQUIPMENT PAD, HANGARS, AND
ACCESSORIES.
3. DEMOLISH EXISTING ATU AND ALL ASSOCIATED
DUCTWORK, THERMOSTATS, HANGERS, AND
ACCESSORIES TO POINT SHOWN.
4. DEMOLISH EXISTING DDC PANEL.
5. EXISTING UNIT HEATER TO REMAIN.
6. EXISTING EXHAUST FAN TO REMAIN.
7. EXISTING DUCTWORK, GRILLES AND DIFFUSERS
SERVING 119 - MEN, 120 - JANITOR, 121 - WOMEN TO
REMAIN.
8. DEMOLISH EXISTING ABANDONED PLUMBING PIPE IN
AREA ABOVE COPIER AREA - 112.
9. EXISTING 36" X 36" OUTSIDE AIR INTAKE DUCT TO
REMAIN. PATCH OA DUCT WHERE DUCTS CONNECT TO
EXISTING AHU-7 AND AHU-8 TAP OFF. PREPARE OA
DUCT FOR CONNECTION TO NEW WORK.
10. EXISTING TRANSFER DUCT OPENINGS IN WALLS TO
REMAIN AND BE REUSED FOR NEW TRANSFER DUCTS.
SEE M101 FOR ADDITIONAL INFORMATION.
11. EXISTING WALL OPENING WHERE DUCTWORK
DEMOLITION OCCURRED SHALL BE PATCHED AND
PAINTED. WALL TO BE REPAIRED TO MATCH CURRENT
WALL CONDITION.
12. EXISTING CONDENSING UNITS (TYP.2) SHALL
ALREADY BE ELECTRICALLY AND MECHANICALLY
ISOLATED FROM THE BUILDING INFRASTRUCTURE
PRIOR TO THE START OF DEMOLITION. REFRIGERANT
FROM THE EXISTING CONDENSING UNITS MUST BE
PROPERLY RECOVERED BY M&O SITE. RECLAMATION
OF THE EXISTING CONDENSING UNITS REFRIGERANT
SHALL FOLLOW FEDERAL STANDARDS/EPA
REGULATIONS FOR THE REMOVAL, DISPOSAL, AND
RECYCLING OF REFRIGERANT. M&O SITE MUST KEEP
RECORDS OF THEIR RECOVERY ACTIVITIES AND
SUPPLY DOCUMENTATION THAT THE REFRIGERANTS
WERE PROPERLY REMOVED TO WHOMEVER RECEIVES
THE SCRAPPED EQUIPMENT. EXISTING CONDENSING
UNITS CONNECTION PIPING SHALL BE PROPERLY
CAPPED AIR AND WATER TIGHT. EXISTING
CONDENSING UNITS SHALL BE TRANSPORTED IN THAT
NATURE TO NOT JEOPARDIZE STRUCTURAL
INTEGRITY OF THE EQUIPMENT. DEMOLISH BOTH
REFRIGERANT LINE SETS IN THEIR ENTIRETY FROM
EXISTING CONDENSING UNITS TO EXISTING AIR
HANDLING UNIT CONNECTION POINTS.
13. COORDINATOR OFFICE - 107.
14. DEMOLISH EXISTING THERMOSTAT AND ASSOCIATED
WIRE.
15. RELIEF GRILLES SHALL BE CAPPED FROM WITHIN THE
BUILDING AND ABANDONED IN PLACE.
16. SUPPLY AND TRANSFER DUCTS WITH FIRE DAMPERS
TO LINK ARE EXISTING TO REMAIN.
EF-1
EF-3
03/25/2022 ISSUE FOR CONSTRUCTION
N
AI AI
AI AI
AI
AI
AI BI
AI AI
AI AI
AI AI
AI AI
AI
AI
AI
C
MVD
OUTSIDE
AIR
CWR
CWS
H
HWR
HWS
AO
AO
N.C.N.C.
COOLING COIL HEATING COIL
SUPPLY FAN
SMK
HUMIDIFIER
H-1,H-2, AND H-3
RHT
IN SPACE
TYP. 3
HUMIDIFIER
CONTROLLER
TO SPACE
T IN SPACE
TYP. 5
BI BO
AHU LOCAL
CONTROLLER
RETURN
AIR
BO
RHT
AIR HANDLING
UNIT (EXISTING)
HHL
T T
T I
TT TI
H L
DPI
DPS
TSL
FILTER
TIPT TT PI PT
TIPT TT PI PT
TIPT TT PI PT
TIPT TT PI PT
TI TT
BO 1
BI
12345678
45678 23 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021Designer
Author
Checker
ATCT - MECHANICAL CONTROL DEMOLITION
DIAGRAMS 1
ILM-D-ATCT-MD102
KEYED NOTES:
1. DEMOLISH EXISTING THERMOSTAT AND ASSOCIATED CONTROL WIRING. ONE
THERMOSTAT PER UNIT.
2. DEMOLISH EXISTING RELATIVE HUMIDITY SPACE SENSOR AND ASSOCIATED
CONTROL WIRING. ONE HUMIDITY SPACE SENSOR PER HUMIDIFIER.
3. DEMOLISH LOCAL AHU CONTROLLER AND ALL ASSOCIATED CONTROL WIRING.
ONE CONTROLLER PER AHU.
4. DUCT SMOKE DETECTOR APPLIES TO AHU-3 AND AHU-4 ONLY.
GENERAL NOTES
1. PATCH AND PAINT WALLS WHERE EXISTING FINISHES ARE DAMAGED DURING
THE DEMOLITION OF EXISTING THERMOSTATS AND INSTALLATION OF NEW
THERMOSTATS. ALL FINISHES SHALL MATCH EXISTING FINISHES.
2. REFER TO NEW CONTROLS DRAWING FOR FINAL SCOPE OF WORK.
3. ALL CONTROLS WIRING, ACCESSORIES, AND DDC HARDWARE SHOWN FOR
DEMOLITION TO BE FULLY REMOVED FROM DDC PANEL TO HARDWARE AND
BACK TO UNIT. ANY BUILDING FINISHES DAMAGED DURING DEMOLITION TO BE
PATCHED AND PAINTED BACK TO ORIGINAL FINISH.
4. AHU AND ALL COMPONENTS (DAMPERS, FILTERS, COOLING COIL, HEATING
COIL, FAN, AND HUMIDIFER, MANUAL PRESSURE/TEMPERATURE GUAGES, AND
P/T PORTS) TO REMAIN.
NOT TO SCALEMD102
SINGLE ZONE CONSTANT VOLUME AIR HANDLING UNIT (AHU-1, 2, 3, 4, AND 5) CONTROL DEMOLITION DIAGRAM1
BI BO
AI
AI AI
AIAI
AO
AO
AI
BI
AI
AI AI
AI AI
AI AI
AI AI
SUPPLY AIR TO
ZONE 1
OUTSIDE
AIR
H-4
SUPPLY AIR TO
ZONE 2 (CAB)
MVD
TI
TT TI
H L
DPI
DPS
TSL
TIPT TT PI PT
TIPT TT PI PT
HWR
HWS
AO
N.C.
H
TI PTTTPIPT
TI PTTTPIPT
CHWR
CHWS
AO
N.C.
C
SMK
SMK
FACP
HHL
HUMIDIFIER
H-4 (EXISTING)
T IN SPACE
RHT IN SPACE
HUMIDIFIER
CONTROLLER
AHU LOCAL
CONTROLLER
BO
SUPPLY FAN
HUMIDIFIER
CONTROLLER
AIR HANDLING
UNIT (EXISTING )
BO
FACP
TT
BI
12345678
45678 23 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021Designer
Author
Checker
ATCT - MECHANICAL CONTROL DEMOLITION
DIAGRAMS 2
ILM-D-ATCT-MD103
NOT TO SCALEMD103
MULTI-ZONE CONSTANT VOLUME AIR HANDLER (AHU-6) CONTROL DEMOLITION DIAGRAM1
KEYED NOTES:
1. DEMOLISH EXISTING THERMOSTAT AND ASSOCIATED
CONTROL WIRING. ONE THERMOSTAT PER UNIT.
2. DEMOLISH EXISTING RELATIVE HUMIDITY SPACE
SENSOR AND ASSOCIATED CONTROL WIRING. ONE
HUMIDITY SPACE SENSOR PER HUMIDIFIER.
3. DEMOLISH LOCAL AHU CONTROLLER AND ALL
ASSOCIATED CONTROL WIRING. ONE CONTROLLER
PER AHU.
GENERAL NOTES
1. PATCH AND PAINT WALLS WHERE EXISTING FINISHES
ARE DAMAGED DURING THE DEMOLITION OF
EXISTING THERMOSTATS AND INSTALLATION OF NEW
THERMOSTATS. ALL FINISHES SHALL MATCH EXISTING
FINISHES.
2. REFER TO NEW CONTROLS DRAWING FOR FINAL
SCOPE OF WORK.
3. ALL CONTROLS WIRING, ACCESSORIES, AND DDC
HARDWARE SHOWN FOR DEMOLITION TO BE FULLY
REMOVED FROM DDC PANEL TO HARDWARE AND BACK
TO UNIT. ANY BUILDING FINISHES DAMAGED DURING
DEMOLITION TO BE PATCHED AND PAINTED BACK TO
ORIGINAL FINISH.
4. AHU AND ALL COMPONENTS (DAMPERS, FILTERS,
COOLING COIL, HEATING COIL, FAN, AND HUMIDIFER,
MANUAL PRESSURE/TEMPERATURE GUAGES, AND P/T
PORTS) TO REMAIN.
BI BOBI BO AIBI AI
BI BOBI BO AIBI AI
BI BOBI BO AIBI AI
AI
AI
AI AI AI
AI
AI BI BO
BI BO BI BO
BI BO
AI
AIAI
AI
AI
CHWS
CHWR
PT PT
PT PT
PT PI
PT PI
PT PI PT PI TI TT
TI TT
TI TT
PUMP
PUMP
CHILLER
PT
HEATING HOT WATER
RETURN FROM SYSTEM
PT
PT
HEATING HOT WATER RETURN
FROM SYSTEM
BOILER
PUMP
FS
PRESSURE/TEMPERATURE
TEST PORT (TYP)
FLOW SWITCH
PT PI
PT PITT TI
TT TI
TT TI
12345678
45678 23 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021Designer
Author
Checker
ATCT - MECHANICAL CONTROL DEMOLITION
DIAGRAMS 3
ILM-D-ATCT-MD104
NOT TO SCALEMD104
CHILLED WATER CONTROL DEMOLITION DIAGRAM1
NOT TO SCALEMD104
HEATING HOT WATER SYSTEM BOILER (B-1) CONTROL DEMOLITION DIAGRAM2
KEYED NOTES:
1. DEMOLISH EXISTING THERMOSTAT AND ASSOCIATED
CONTROL WIRING. ONE THERMOSTAT PER UNIT.
2. DEMOLISH EXISTING RELATIVE HUMIDITY SPACE
SENSOR AND ASSOCIATED CONTROL WIRING. ONE
HUMIDITY SPACE SENSOR PER HUMIDIFIER.
3. DEMOLISH LOCAL AHU CONTROLLER AND ALL
ASSOCIATED CONTROL WIRING. ONE CONTROLLER
PER AHU.
GENERAL NOTES
1. REFER TO NEW CONTROLS DRAWING FOR FINAL
SCOPE OF WORK.
2. ALL CONTROLS WIRING, ACCESSORIES, AND DDC
HARDWARE SHOWN FOR DEMOLITION TO BE FULLY
REMOVED FROM DDC PANEL TO HARDWARE AND BACK
TO UNIT. ANY BUILDING FINISHES DAMAGED DURING
DEMOLITION TO BE PATCHED AND PAINTED BACK TO
ORIGINAL FINISH.
3. CHILLER, BOILER, PUMPS, AND ALL COMPONENTS
(MANUAL PRESSURE/TEMPERATURE GUAGES, AND P/T
PORTS, ETC.) TO REMAIN.
AT
MECHANICAL
CONFERENCE ROOM
CORRIDOR
AF SSC MGR
COPIER AREA
OFFICE / MOTHERS
ROOM
JANITOR
WOMEN
CLOSET
AIR TRAFFIC
MANAGER
AT
AT
ENGINE GENERATOR
ROOM
114 TELCO
AF SSC SECRETARY
101A
AT SECRETARY
101B
CORRIDOR
101D
MEN
TRAINING
BULK STORAGE
COORDINATOR
OFFICE
CORRIDOR
101C
VESTIBULE
B
M301
CU-01
VAV-03
VAV-04
VAV-02
VAV-05
VAV-07
VAV-10
VAV-01
VAV-08
VAV-09
VAV-06
4' - 6"
145-8x6
SA-C
145-8x6
SA-C
140-8x6
SA-C
140-8x6
SA-C
50-6x6
SA-C
AHU-07
12x10 SA
8x10 SA x S
A x S
A
22x18 SA
8x10 SA
10x10 SA
8x10 SA
8x10 SA
EXIST 36x36 OA x S
A
8x10 SA
12x10 SA
12x10 SA
T
T
T
T
T
T
T
T
T
12x10 OA
M301
75-6ø
SA-A
75-6ø
SA-A
250-10ø
SA-A
225-10ø
SA-A
145-8ø
SA-A
145-8ø
SA-A
100-8ø
SA-A
150-8ø
SA-A
150-8ø
SA-A
120-8ø
SA-A
120-8ø
SA-A
40-6ø
SA-F
50-6ø
SA-A
175-8ø
SA-E
175-8ø
SA-E
130-8ø
SA-A
130-8ø
SA-A
100-6ø
SA-A
10x10 SA
12x12 TA 12x12 TA 12x12 TA
12x12 TA
12x12 TA
12x12 TA
12x12 TA x T
A
18x12 TA x T
A
12x12 TA
UC
U C
(2) 200-10x6
SA-C
(E) UH-2
T T
EF-1 THERMOSTAT
(E) UH-3
T
T
(E) UH-1
125 CFM
RA-B
85 CFM
RA-B
170 CFM
RA-B
245 CFM
RA-B
85 CFM
RA-B 330 CFM
RA-B
105 CFM
RA-B
105 CFM
RA-B
125 CFM
RA-B
65 CFM
RA-B
460 CFM
RA-B
18x12 TA
175 CFM
RA-B
OA
D S P
M
(E) EF-3
(E) EF-1
LINK
EQUIPMENT
PAD
70 CFM
EA-(E)
60 CFM
EA-(E)
60 CFM
EA-(E)
EQUIPMENT SUPPORTS
AS REQUIRED (TYP.)
REFER TO DETAIL FOR
MORE INFORMATION
RL
RS
x R
A
D S D
1" COND
M
50 CFM
EA-(E)
ø S
A
EQUIPMENT
PAD
HOA
EF-1 HAND-OFF-AUTO SWITCH
RS
RL
12345678
45678 23 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021P. GEE
P. GEE
E. BEHO
BASE BUILDING - MECHANICAL PLAN
ILM-D-ATCT-M101
SCALE: 1/4" = 1'-0"M101
MECHANICAL PLAN1
0 2' 4' 8'
SCALE IN FEET
0 2' 4' 8'
SCALE IN FEET
0 2' 4' 8'
SCALE IN FEET
0 2' 4' 8'
SCALE IN FEET
GENERAL NOTES:
1. FOR GENERAL NOTES, ABBREVIATIONS, AND LEGEND, SEE SHEET M001.
2. VAV INLET DUCT SHALL MATCH THE VAV INLET DIAMETER.
3. FIRE DAMPERS SHALL BE PROVIDED IN ALL EXISTING 2-HOUR FIRE RATED WALLS.
4. ALL UNDERCUTS TO BE 1.5" HIGH UNLESS OTHERWISE NOTED ON THE PLANS.
5. ALL DUCT SHALL BE INSULATED WITH EXTERIOR INSULATION UNLESS NOTED OTHERWISE.
6. PATCH AND PAINT WALLS WHERE EXISTING FINISHES ARE DAMAGED DURING THE INSTALLATION OF NEW
THERMOSTATS. ALL FINISHES SHALL MATCH EXISTING FINISHES.
7. DUCTWORK/EQUIPMENT SHALL BE SUPPORTED FROM JOISTS WITH C-CLAMPS USED AS MEANS OF ATTACHMENT.
SUPPORT FROM DECKING IS PROHIBITED. DRILLING AND WELDING AS MEANS OF ATTACHMENT ARE PROHIBITED ON
SITE.
8. ALL EXPOSED AND VISIBLE SUPPLY, RETURN, OUTSIDE AIR, EXHAUST, AND VENTILATION DUCT SHALL BE DOUBLE
WALL INSULATED.
9. PROVIDE TOTAL DUCTWORK CLEANING FOR ALL EXISTING DUCTWORK PRIOR TO INSTALLATION OF NEW EQUIPMENT AND DUCTWORK. PROCESS SHALL COMPLY WITH PROCEDURES DESCRIBED IN THE SPECIFICATION
213113 3.9 "DUCT CLEANING."
KEYED NOTES:
1. CONNECT TO EXISTING 20x8 SUPPLY DUCT WITH EXISTING FIRE DAMPER TO LINK. EXISTING 18x10 TRANSFER DUCT
WITH EXISTING FIRE DAMPER INSTALLED BELOW SUPPLY DUCT.
2. PROVIDE NEW THERMOSTAT IN THE SAME LOCATION AS EXISTING THERMOSTAT IN THE LINK.
3. OUTSIDE AIR WEATHER STATION. SEE CONTROLS FOR ADDITIONAL INFO.
4. NEW CONDENSING UNIT (CU-01) AT LOCATION SHOWN. PROVIDE NEW 12" THICK (6" ABOVE GRADE) EQUIPMENT
PAD TO ACCOMMODATE MANUFACTURER'S INSTALLATION REQUIREMENTS. SEE MECHANICAL DETAIL FOR FURTHER INFORMATION ON CONCRETE PAD. CU-01 TO BE INSTALLED ON CONCRETE PAD. INSTALL UNIT PER
MANUFACTURER’S CLEARANCE REQUIREMENTS.
5. UP TO EXISTING EXHAUST FAN EF-1. EXHAUST FAN AND ALL ASSOCIATED EXHAUST AND TRANSFER DUCTWORK AND
ACCESSORIES TO REMAIN.
6. UP TO EXISTING EXHAUST FAN EF-3. EXHAUST FAN AND ALL ASSOCIATED DUCTWORK TO REMAIN. ASSOCIATED
THERMOSTAT AND CONTROL WIRING SHALL BE REPLACED WITH NEW IN SAME LOCATION.
7. PROVIDE OPEN END OF DUCT WITH WIRE MESH SCREEN.
8. CONDENSATE FOR AHU. ROUTE TO EXISTING MECHANICAL ROOM FLOOR DRAIN. MAKE ALL NECESSARY
MODIFICATIONS TO EXISTING FLOOR DRAIN TO ACCOMMODATE NEW CONDENSATE DRAIN.
9. EXISTING UH-1 AND ASSOCIATED BUILT-IN THERMOSTAT TO REMAIN.
10. EXISTING UH-2 AND ASSOCIATED BUILT-IN THERMOSTAT TO REMAIN.
11. EXISTING UH-3 AND ASSOCIATED BUILT-IN THERMOSTAT TO REMAIN.
12. NEW TRANSFER DUCTS TO RE-USE EXISTING OPENINGS FROM EXISTING TRANSFER DUCTS. CONTRACTOR TO
COORDINATE SIZE OF OPENING FOR NEW TRANSFER DUCT AND EXPAND OPENING OR PATCH AND PAINT TO
MAINTAIN WALL AS REQUIRED. SEE MD101 FOR ADDITIONAL INFORMATION.
13. NEW REFRIGERANT LINES TO BE ROUTED THROUGH EXTERIOR WALL AT HIGH ELEVATION. PROVIDE WEATHERTIGHT PATCHING FOR EXISTING EXTERIOR OPENING. PROVIDE PIPING SUPPORTS PER DETAIL. PROVIDE PROTECTIVE PLATING OVER ALL OUTDOOR PIPING & INSULATION PER MECHANICAL DETAIL. SEE SECTIONS ON
SHEET M301 FOR FURTHER INFORMATION.
14. NEW DUCT SMOKE DETECTOR SHALL HAVE AN AUXILARY ALARM STATUS POINT CONNECTION TO THE DDC SYSTEM.
15. PROVIDE HVAC MANUFACTURER'S DEDICATED SPLIT SYSTEM INTEGRATION CONTROL PANEL.
16. NEW DDC PANEL TO BE PROVIDED. SEE CONTROL DRAWINGS FOR ADDITIONAL INFORMATION.
N
B
CONFERENCE ROOM
AT
AIR TRAFFIC
MANAGER
AT
AT
102AT SECRETARY
101B
AF SSC SECRETARY
101A
AF SSC MGR
CORRIDOR
MECHANICAL
COPIER AREA
COORDINATOR
OFFICE
CORRIDOR
101D
MEN
JANITOR
OFFICE / MOTHERS
ROOM
CLOSET
WOMEN
VESTIBULE
CORRIDOR
101C
TRAINING
TELCO
ENGINE GENERATOR
ROOM
BULK STORAGE
LINK
12345678
45678 23 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021P. GEE
P. GEE
E. BEHO
BASE BUILDING - REFLECTED CEILING PLAN
ILM-D-ATCT-M102
SCALE: 1/4" = 1'-0"M102
REFLECTED CEILING PLAN1
0 2' 4' 8'
SCALE IN FEET
0 2' 4' 8'
SCALE IN FEET
0 2' 4' 8'
SCALE IN FEET
0 2' 4' 8'
SCALE IN FEET
NEW WORK NOTES:
1. NEW ACT SUSPENDED CEILING SHALL BE INSTALLED AT 8'-0" AFF WHERE GRID IS SHOWN.
2. NEW ACT CEILING SHALL BE 24" x 24" ACOUSTICAL CEILING TILES, 15/16" THICK, SQUARE TEGULAR OPTIMA BY
ARMSTRONG OR APPROVED EQUAL. USE WITH PRELUDE XL 15/16" EXPOSED TEE SUSPENSION GRID SYSTEM, INTERMEDIATE DUTY, OR APPROVED EQUAL. REFER TO M605 FOR CEILING DETAILS.
3. ALL REPAIR/NEW WORK SHALL MATCH OR REPLACE THE EXISTING FINISHES.
4. PROVIDE SUNSET BRONZE SB20 SOLAR CONTROL FILMS (OR APPROVED EQUAL) ON THE INTERIOR SIDE OF ALL
EXISTING WINDOWS IN ROOMS 104 - AIR TRAFFIC MANAGE, 105 - AT, AND 106- CONFERENCE ROOM. SOLAR SPECIFICATIONS REPRESENT FILM MOUNTED TO 1/8 INCH (3MM) CLEAR GLASS, UNLESS NOTED OTHERWISE.
SUNSET BRONZE SB20 SPECIFICATION CAPACITIES ARE IN ACCORDANCE WITH ASTM E903:
1. FILM COLOR: BRONZE
2. VISIBLE LIGHT TRANSMISSION: 20%
3. SOLAR ENERGY REJECTED/HEAT REDUCTION: 77%
4. VISIBLE LIGHT REFLECTANCE (EXTERIOR): 37%
5. VISIBLE LIGHT REFLECTANCE (INTERIOR): 34%
6. SHADING COEFFICIENT: 0.26
7. SOLAR HEAR GAIN COEFFICIENT: 0.23
8. U FACTOR: .97
9. SOLAR ENERGY ABSORPTION: 35%
10. SOLAR TRANSMISSION: 13%
11. SOLAR REFLECTANCE: 52%
12. UV REJECTION: 99%
13. GLARE REDUCTION: 78%.
14. NFRC CERTIFICATION NUMBERS: JLC-K-029
CONTRACTOR SHALL EXAMINE EXISTING WINDOW GLAZING SYSTEM FOR UPGRADE VIABILITY PRIOR TO INSTALLATION OF WINDOW FILM. CONTRACTOR SHALL VERIFY SATISFACTORY QUALITY OF THE EXISTING GLASS, SUFFICIENT EDGE BITE AND SPACING, AND ELASTICITY OF GASKET MATERIAL. CONTRACTOR SHALL VERIFY FRAME AND GASKET ARE OF SATISFACTORY CONDITION SO AS TO NOT INTERFERE WITH INSTALLATION OR TYPICAL THERMAL EXPANSION AND CONTRACTION OF GLAZING SYSTEM. ANY UNSATISFACTORY CONDITIONS MUST BE
CORRECTED PRIOR TO PROCEEDING WITH INSTALLATION.
FINAL AMOUNT OF SQFT GLASS AREA SHALL BE FIELD VERIFIED, COORDINATED AND DETERMINED BY CONTRACTOR
IN ACCORDANCE WITH FAA REGULATIONS AND REQUIREMENTS.
BUILD MOCKUPS TO VERIFY SELECTIONS MADE UNDER SAMPLE SUBMITTALS AND TO EVALUATE SURFACE PREPARATION TECHNIQUES AND APPLICATION WORKMANSHIP. INSTALL WINDOW FILM IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. IF INSTALLED FILM DOES NOT MEET VISUAL ACCEPTANCE STANDARD CRITERIA, REMOVE, AND REPLACE WITH NEW FILM.
DEMOLITION NOTES:
1. EXISTING CONDITIONS SHOWN ON DRAWINGS ARE FOR INFORMATIONAL PURPOSES ONLY AND DO NOT SHOW ALL CONDITIONS THAT MAY AFFECT THE WORK OF THIS CONTRACT. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. REFER TO ALL MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION
INFORMATION AND COORDINATION.
2. DEMOLISH ALL EXISTING ACT CEILING SYSTEMS IN THEIR ENTIRETY INCLUDING ASSOCIATED CEILING SUSPENSION GRID. CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO THE EXISTING FINISHES.
3. ELECTRICAL CONTRACTOR TO ENSURE THE REMOVAL, SAFE STORAGE, AND REINSTALLATION OF THE EXISTING LIGHTS INTO THE NEW ACT CEILING. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
03/25/2022 ISSUE FOR CONSTRUCTION
MEN'S
TOIL.
FOYER
AREA SUPV.
204201
ELEV.
CABLE
SHAFT
ETG LAB
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
1-1/4" CHWS/R
1" HWS/R
1" C
NOTE 4
(TYP)
VD
AD
OPENING TO 20X16
RETURN AIR DUCT.
AHU-2
RECORDER
PLAYBACK
x1
20x16
20x12
ET-1
ET-2
HVAC CONTROL PANEL
PANEL NLP1-14
20x16 RETURN AIR
A CB
T
AHU-2
CABLE
SHAFT
ELEV.
ENTRY
MECH. EQUIP.
ELEVATOR
MACH. ROOM
SUPPLY ROOM
FOYER
A.F.
BREAKROOM
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXISTING CHILLED
WATER PUMPSAS-1
1" CHWS/R
3/4" HWS/R
1" C
HWP-1 , 3/TM03
HWB-1 , BELOW
AHU-1, 2/TM03
VD
AD
RETURN AIR OPENING
TO 14X14 RETURN AIR
DUCT.
AHU-1
x1
18x12
14x14
TRANSITION FROM 20x8
HHWP
PANEL
MDPE-8
AHU-1
STARTER/
DISCONNECT
PANEL HDPE-26
HVAC
CONTROL
PANEL NLP-34
A B C
T
AHU-1
OA 2
12345678
45678 23 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021P. GEE
P. GEE
E. BEHO
ATCT - FLOOR PLANS 1
ILM-D-ATCT-M111
NOT TO SCALEM111
ATCT - LEVEL 2 HVAC PLAN2
KEYED NOTES:
1. NEW DDC CONTROL PANEL TO BE PROVIDED. SEE
CONTROLS DRAWINGS FOR ADDITIONAL
INFORMATION.
2. NEW OUTDOOR AIR WEATHER STATION. INTEGRATE
WITH ALL ATCT TOWER EQUIPMENT. SEE CONTROLS
DRAWINGS FOR ADDITIONAL INFORMATION AND
CONTROLS INFORMATION.
NOT TO SCALEM111
ATCT - LEVEL 1 HVAC PLAN1
1. ITEMS SHOWN IN GRAYSCALE ARE EXISTING TO
REMAIN.
2. PATCH AND PAINT WALLS WHERE EXISTING
FINISHES ARE DAMAGED DURING THE
DEMOLITION OF EXISTING THERMOSTATS AND
INSTALLATION OF NEW THERMOSTATS. ALL
FINISHES SHALL MATCH EXISTING FINISHES.
GENERAL NOTES:
CABLE
SHAFT
ELEV.
WOMEN'S
TOIL.
MECH. EQUIP.
AND STORAGE
COMMUNICATIONS
ELEC. EQUIP.
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
1-1/2" CHWS/R
1-1/4" HWS/R
1" C
VD
AD
H-1
AHU-3
x1
28x16
H-3
HVAC CONTROL PANEL
PANEL NLP1-23
H-3 DISCONNECT
PANEL NLP1-25,
AHU-3 STARTER
DISCONNECT
PANEL
ELP-15, 17, 19
A CB
T H
AHU-3
H-1
DSD 3
CABLE
SHAFT
ELEV.
JANITOR
H/C
LAV. 405
MECH. EQUIP.
RADAR
ELEC. EQUIP.
EXIST
8"
EXIST
8"
1-1/2" CHWS/R
1-1/4" HWS/R
1" C
VD
AD
H-2
AHU-4
x1
28x16 AHU-4
STARTER/DISCONNECT
PANEL ELP-3, 5, 7
H-4 DISCONNECT
PANEL NLP1-34,
HVAC CONTROL
PANEL-4
PANEL NLP-1-38
H-4
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
A CB
T H
AHU-4
H-2
DSD 3
12345678
45678 23 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021P. GEE
P. GEE
E. BEHO
ATCT -FLOOR PLANS 2
ILM-D-ATCT-M112
NOT TO SCALEM112
ATCT - LEVEL 3 HVAC PLAN1
NOT TO SCALEM112
ATCT - LEVEL 4 HVAC PLAN2
KEYED NOTES:
1. NEW DDC PANEL AND WORKSTATION SHALL BE
INSTALLED IN SAME LOCATION SHOWN ON THE
EXISTING LEVEL 3 AIR TRAFFIC CONTROL TOWER
HVAC PLANS. INTEGRATE ALL NEW AND EXISTING
CONTROL WIRING PER CONTROL DETAILS.
2. NEW DDC CONTROL PANEL TO BE PROVIDED. SEE
CONTROLS DRAWINGS FOR ADDITIONAL
INFORMATION.
3. NEW DUCT SMOKE DETECTOR SHALL HAVE AN
AUXILARY ALARM STATUS POINT CONNECTION TO
THE DDC SYSTEM. REFER TO CONTROL DRAWINGS
FOR ADDITIONAL INFORMATION.
1. ITEMS SHOWN IN GRAYSCALE ARE EXISTING
TO REMAIN.
2. PATCH AND PAINT WALLS WHERE EXISTING
FINISHES ARE DAMAGED DURING THE
DEMOLITION OF EXISTING THERMOSTATS
AND INSTALLATION OF NEW THERMOSTATS.
ALL FINISHES SHALL MATCH EXISTING
FINISHES.
GENERAL NOTES
A CB
MECH.
EQUIP.
LAV.
ELEV.
CABLE
SHAFT
TRACON
TRACON
MAINT.
1-1/4" CHWS/R
1" HWS/R
1" C
VD
AD
H-3
AHU-5
H-5 PANEL NLP1-37
36x24
24x16
16x18
10x8
24x16
ACCESS DOORS
ABOVE
TRACON CONSOLES
12"x12" INSULATED
HINGED DOORS
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
HVAC CONTROL
PANEL-5
PANEL NLP1-37
AHU-5
STARTER/DISCONNECT
PANEL ELP-8, 10, 12
T H
AHU-5 H-3
A CB
CABLE
SHAFT
ELEV.
LAV.
MECH. EQUIP.
AND STORAGE
READY
ROOM
STAIRWAY
TELCO
EXISTING 72X30
RETURN AIR DUCT
UP TO CAB
EXISTING 24X24
SUPPLY AIR DUCT UP
TO CAB
ADVD
24X24 DN TO AHU-6
24X12 DOWN TO AHU-6
2" CHWS/R
1-1/2 " HWS/R
1" C
EDH-6
H-4
NOTE 11
AHU-6
AHU-6
STARTER/DISCONNECT
PANEL ELP-14, 16, 18
H-6
DISCONNECT
PANEL ELP2-22,
HVAC CONTROL
PANEL-6
PANEL ELP2-5
H-6
12X24
24X24
12X24
24X24
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
EXIST
8"
T
AHU-6
ZONE 1
DSD 2
D S D
EXISTING 24X24 SUPPLY
AIR DUCT UP FROM
SIXTH FLOOR
EXISTING DUCTWORK
AND SUPPLY GRILLES
ARE UNDERFLOOR
CAB
ALUMINUM GATE
EXIST
6X34
EXIST
6X34
EXIST
6X34
EXIST
6X34
EXIST
6X34
T
H
AHU-6
ZONE 2
H-4
12345678
45678 23 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021P. GEE
P. GEE
E. BEHO
ATCT - FLOOR PLANS 3
ILM-D-ATCT-M113
NOT TO SCALEM113
ATCT - LEVEL 5 HVAC PLAN1
NOT TO SCALEM113
ATCT - LEVEL 6 HVAC PLAN2
NOT TO SCALEM113
ATCT- CAB SUPPLY DUCTWORK PLAN3
KEYED NOTES:
1. NEW DDC CONTROL PANEL TO BE PROVIDED. SEE
CONTROLS DRAWINGS FOR ADDITIONAL
INFORMATION.
2. NEW DUCT SMOKE DETECTOR SHALL HAVE AN
AUXILARY ALARM STATUS POINT CONNECTION TO
THE DDC SYSTEM. REFER TO CONTROL DRAWINGS
FOR ADDITIONAL INFORMATION.
GENERAL NOTES
1. ITEMS SHOWN IN GRAYSCALE ARE EXISTING TO
REMAIN.
2. PATCH AND PAINT WALLS WHERE EXISTING FINISHES
ARE DAMAGED DURING THE DEMOLITION OF
EXISTING THERMOSTATS AND INSTALLATION OF
NEW THERMOSTATS. ALL FINISHES SHALL MATCH
EXISTING FINISHES.
FIRST FLOOR
100' - 0"
M301
18x22 SA
M
DSD
1" COND
RL
14x32 RA
24x20 RA
RS
RL
RS
FIRST FLOOR
100' - 0"
M301
EXIST 36x36 OA 10x12 OA
M
32x14 RA
1" COND
REFRIGERANT LINE SETS
(E) UH-1 20x24 RA
22x18 SA
AHU-07
LEV CONTROL BOX
12345678
45678 23 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021P. GEE
P. GEE
E. BEHO
BASE BUILDING - MECHANICAL SECTIONS
ILM-D-ATCT-M301
SCALE: 3/4" = 1'-0"M301
NORTH-EAST VIEW 111 - MECHANICAL ROOM1
SCALE: 3/4" = 1'-0"M301
SOUTH-EAST VIEW 111 - MECHANICAL ROOM2 2'1' 4'0
SCALE IN FEET
2'1' 4'0
SCALE IN FEET
2'1' 4'0
SCALE IN FEET
2'1' 4'0
SCALE IN FEET
2'1' 4'0
SCALE IN FEET
2'1' 4'0
SCALE IN FEET
AHU-07
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
WILMINGTON NC
MANAGER
WILMINGTON INTL AIRPORT
PROJECT ENGINEER
FEDERAL AVIATION ADMINISTRATIONFEDERAL AVIATION ADMINISTRATION
REV DESCRIPTION JCN REDLINE
DATE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
APPROVED
DATE
DEPARTMENT OF TRANSPORTATION
WILMINGTON INTERNATIONAL
AIRPORT ATCT HVAC UPGRADE
ATLANTA, GEORGIASOUTHERN REGION
TERMINAL
ENGINEERING
CENTER
1506784 - -
10/22/2021P. GEE
P. GEE
E. BEHO
MECHANICAL SCHEDULES 1
ILM-D-ATCT-M501
NOTES:
1. AHU-07 SHALL HAVE SMOKE DETECTOR ON SUPPLY SIDE OF UNIT.
2. PROVIDE UNIT WITH A SINGLE POINT ELECTRICAL CONNECTION.
3. PROVIDE WITH FACTORY-INSTALLED NON-FUSED DISCONNECT.
4. PROVIDE UNIT WITH MODINE ELECTROFIN E-COAT COIL COATING.
5. PROVIDE WITH FACTORY STARTER AND VFD.
6. PROVIDE UNIT WITH HVAC MANUFACTURER'S DEDICATED SPLIT SYSTEM
INTEGRATION CONTROL PANEL.
7. UNIT SHALL BE PROVIDED WITH 8 HOURS OF FACTORY OVERSIGHT FOR ON
SITE DISASSEMBLY AND REASSEMBLY OF THE AIR HANDLER INSIDE THE
MECHANICAL ROOM.
NOTES ALL NOTES
FILTER DEPTH (IN) 2" / 4"
AIR PRESS. DROP (IN WC) 0.81
FINAL FILTER MERV RATING 13
PRE-FILTER MERV RATING 8
TYPE COMBO
FILTER
LVG. AIR TEMP. - DB (F) 55
ENT. AIR TEMP. - DB/WB (°F) 81.0/71.1
SENSIBLE CAPACITY (MBH) 105.5
TOTAL CAPACITY (MBH) 200.5
COOLING COOLING COIL
FREQUENCY 60
PHASE 3
VOLTS 208
ELECTRICAL
HP 5
BHP 3.87
RPM 1800
MOTOR
TOTAL STATIC PRESS. (IN WC) 2.5
INT. STATIC PRESS. (IN WC) 1.75
EXT. STATIC PRESS. (IN WC) 0.75
VOLUME CONTROL VFD
DRIVE TYPE DIRECT
TYPE VERTICALLY HOUSED, TOP FRONT DISCHARGE
SUPPLY FAN
MINIMUM OUTSIDE AIR (CFM) 535
TOTAL (CFM) 3700
AIRFLOW
MODEL UCCAD08A
MANUFACTURER TRANE
BASIS OF DESIGN
SERVICE BASE BUILDING
EQUIPMENT TAG AHU-07
AIR HANDLING UNIT SCHEDULE
3. PROVIDE…